($)10.2.1 Development along Ram Maruti Road and Gokhale Road.
Front set-backs for development on above roads shall be as below :-
In the case of plots fronting on Ram Maruti Road, only ground floor of the structure shall be set back by 3.05 m. from the road line and rest of the floors shall be set back at a distance of 4.5 m. (1) The front terrace so formed shall be allowed to be accessible.
ii) In case of any plot fronting on Gokhale Road, from the portion between Ashok Talkies and its junction with M.G. Road, the ground floor of the building shall be set back by 2.3 m. from the road line and the upper floors shall be set back at a distance of 4.5 m. subject to condition that the owner of the plot shall pave the front open space. (1) The front terrace so formed shall be allowed to be accessible.
10.2.2 Setbacks from Eastern Express Highway and Roads more than 52.5 m. in width.
No construction of building shall be undertaken within 7.5 m. from the boundary of the Eastern Express Highway and other roads having prescribed width more than 52.5 m.
186