21.1 Applicability
The quality control and inspection shall apply to all high-rise residential building and all non-residential buildings.
The owner / developer / occupants and registered appointed Person on Record shall have to certify the inspection and safety report as per Schedule No. 3.
Page No 164
Schedules & Forms
Page No 165
Page No 166
| No. | Schedules |
|---|---|
| 1 | Minimum Qualification, Experience and Document Requirements for being considered for Registering with the Competent Authority as Persons on Record |
| 2 | Procedures for Ascertaining Whether a Person on Record has failed in Discharging his Responsibilities and Penalties |
| 3 | Technical Audit Report |
| 4 | Buildings requiring Fire Protection Consultant on Record and Inspection by Fire Officer |
| 5A | Fees and Charges for Grant of a Development Permission / Revised Development Permission / Revalidation of Development Permission |
| 5B | Fees and Charges for Grant of Occupancy Certificate / Change of Occupancy Certificate |
| 5C | Fees for Temporary Construction |
| 5D | Penalties |
| 6A | Drawings, Specifications and Documents to be Submitted with Application for Obtaining / Revising Development Permission for Building and for Sub- division & Amalgamation of Building Unit / Plot |
| 6B | Drawings, Specifications and Documents to be Submitted with Application for Obtaining / Revising / Revalidating Development Permission for Brick Kiln, Mining and Quarrying |
| 6C | Format for submission of Documents, Drawings and Specifications |
| 6D | Drawing, Specification and Documents to be Submitted with Application for Obtaining Permission for Temporary Construction |
| 7A | Information to be Displayed on Site |
| 7B | Documents and Drawings to be Maintained on Site During Period of Construction |
| 7C | Stages of Construction Work for which Notice for Progress of Construction to be Submitted to the Competent Authority |
| 8 | Inspection Requirements |
| 9 | Documents and Drawings to be Submitted along with the Application for Occupancy Certificate |
| 10 | Schedule for Maintenance and Inspection for Structural Stability and Fire Safety |
| 11 | Documents and Fees Required with Application for Advertising Display & Communication Infrastructures |
| 12 | List of Recommended Trees |
| 13 | Standalone Multi-Level Public Parking |
Page No 167
Page No 168
Forms:
| No. | Forms |
|---|---|
| 1 | Application for Registering as Person on Record |
| 2 | Certificate of Undertaking for Persons on Record |
| 3 | Notice to the Competent Authority of Non-Compliance of Building to Sanctioned Design and Specifications |
| 4 | Notice to the Competent Authority of Discontinuation as Person on Record |
| 5 | Notice of Cancellation of Development Permission |
| 6 | Notice to Stop Unauthorized Development |
| 7 | Direct Development Permission |
| 8 | Application for Registering Issue of Direct Development Permission |
| 9 | Registration or Cancellation of Direct Development Permission / Revised Direct Development Permission / Revalidated Direct Development Permission |
| 10A | Application for Development Permission for Building / Layout / Subdivision / Amalgamation |
| 10B | Application for Development Permission for Brick Kiln, Mining and Quarrying |
| 10C | Application for Development Permission for Temporary Construction |
| 11A | Area Statement for Buildings |
| 11B | Area Statement for Subdivision / Amalgamation / Layout of Land |
| 11C | Area Statement for Temporary Construction |
| 12 | Grant / Refusal of Development Permission / Revised Development Permission / Revalidated Development Permission |
| 13 | Application for Revised Direct Development Permission |
| 14 | Application for Registering Issue of Revised Direct Development Permission |
| 15 | Application for Revising Development Permission for Building / Layout / Sub - division / Amalgamation |
| 16 | Application for Revalidating Direct Development Permission / Revised Direct Development Permission |
| 17 | Application for Registering Revalidated Direct Development Permission / Revised Direct Development Permission |
| 18 | Application for Revalidating a Lapsed / Suspended Development Permission / Revised Development Permission |
| 19 | Notice for Commencement of Construction |
| 20 | Notice for Progress of Construction |
| 21 | Notice for Completion and Compliance Certification |
| 22A | Application for Occupancy Certificate |
Page No 169
Page No 170
Tables
| Table No. S1-1 | SEOR Qualification and Experience |
|---|---|
| Table No. S1-2 | COWOR Qualification and Experience |
| Table No. S1-3 | SOR Qualification and Experience |
| Table No. S2-1 | Penalties for Person on Record |
| Table No. S3-1 | Details of Technical Audit Report |
| Table No. S4-1 | (Deleted) |
| Table No. S5A-1 | Scrutiny Fees for Buildings |
| Table No. S5A-2 | Fees for Subdivision/ Amalgamation / Layout of Building Unit / Plot |
| Table No. S5A-3 | Charges for Change of Land Use |
| Table No. S5A-4 | Development Charges for Buildings |
| Table No. S5A-5 | Charges for Stacking Building Material on Public Roads |
| Table No. S5B-1 | Fees for Occupancy Certificate |
| Table No. S5B-2 | Fees for Change of Occupancy |
| Table No. S5C-1 | Fees for Applying for Temporary Construction |
| Table No. S5D-1 | Penalties for Unauthorized Construction and Occupancy |
| Table No. S5D-2 | Penalties Applicable for Regularizing Unauthorised Construction for Residential Use |
| Table No. S6C-1 | Drawing Sizes |
| Table No. S6C-2 | Colours and Notations for Drawings and Documents |
| Table No. S8A-1 | Principles of Risk Categorization (Definition of Consequence Class) and Inspection Requirements |
| Table No. S12-1 | List of Trees |
| Table No. F10A-1 | Information Sheet with Application for Development Permission for Building / Layout / Amalgamation/ Subdivision |
| Table No. F10B-1 | Application for Development Permission for Brick Kiln, Mining and Quarrying |
| Table No. F10C-1 | Information Sheet with Application for Development Permission for Temporary Construction |
| Table No. F11A-1 | Area Statement for Buildings |
| Table No. F11B-1 | Area Statement for Subdivision / Amalgamation / Layout of Land |
| Table No. F11C-1 | Area Statement for Temporary Construction |
| Table No. F26-1 | Details of Structural Inspection Report (Part 1) |
| Table No. F26-2 | Details of Structural Inspection Report (Part 2) |
| Table No. F26-3 |
Page No 171
Page No 172
Schedule
Page No 173
Minimum Qualification, Experience and Document Requirements for being considered for Registering with the Competent Authority as Persons on Record
(Refer Rule No. 3.2.1, 3.2.2, 3.2.3)
The procedure for registering persons with the Competent Authority is given in Rule No. 3.2.1. The registration shall be renewed annually. The following are the minimum qualifications and experience requirements for all persons to be considered for registering with the Competent Authority as Persons on Record, in order to determine their competence to fulfil their responsibilities as specified in Rule No. 3.2.2.
Minimum qualifications and experience requirements for architects, for being considered for registration with the Competent Authority, as Architects on Record shall be as follows:
(a) Architect must hold a valid registration with the Council of Architecture, India, issued as per the provisions of the Architects Act, 1972 or Bachelor’s Degree in Architecture / Diploma in Architecture Equivalent to B. Arch; and
(b) Architect must have a minimum of two years of experience in practice of architecture.
B Scope Work and Competence:
(a) Preparation & planning of all types of layouts; submission of drawings; submission of certificate of supervision, progress reports and submission of certificate of completion for all types of buildings in accordance with the provisions of these building Rules.
(b) Supervision & execution of construction work as per specifications & drawings prepared by authorised registered structural designer & engineer.
Minimum qualifications and experience requirements for engineers, for being considered for registration with the Competent Authority, as Engineers on Record shall be as follows:
(a) Master’s Degree in Civil Engineering, a bachelor’s degree in Civil Engineering or Building construction or its equivalent qualification recognized by the All-India Board of Technical Education, or, a Diploma in Civil Engineering or Diploma in Building Construction recognized by State Board of Technical Examination of any State of India or Associate Membership (Civil Engineering) of the Institute of Engineers, India (AMIE), and
(b) Engineer having bachelor’s degree, or its equivalent qualification must have minimum of two years of experience and Diploma holder/or AMIE must have minimum of five years of experience in professional work.
(a) Preparation & planning of all types of layouts except special structures / special buildings as per these Rules; submission of drawings and submission of certificate of supervision & completion for all types of buildings. A person having qualification of a Diploma in Civil Engineering shall be permitted to undertake low rise buildings only.
Page No 174
(b) Supervision & execution of construction work as per specifications & drawings prepared by authorized registered structural designer.
(c) He / she can prepare & submit structural details & calculations for buildings of load bearing structures.
Minimum qualifications and experience requirements for structural engineers, for being considered for registration with the Competent Authority as Structural Engineer on Record shall be as follows:
Table No. S1 – 1: SEOR Qualifications and Experience
| Grade | Scope of Work | Qualification | Minimum Years of Experience* |
| SEOR 1 | 1 Building with height above 25 m 2 Total proposed built-up area for a building unit is more than10000 sqm 3 Mercantile - 2, 3; Educational -1, 2, 3; Assembly - 1, 2, 3; Health - 2, 3, 4; Hospitality - 2, 3, Utility; Public Office; Special Buildings | Category 1 | 10 |
| Category 2 | 3 | ||
| SEOR 2 | 1 Building with height above 15 m /17.5 m (with Stilt) and up to 25 m 2 Total proposed built-up area for a building unit is more than 2000 sqm and up to 10000 sqm | Category 1 | 5 |
| Category 2 | 2 | ||
| SEOR 3 | 1 Building with height up to 15 m /17.5 m (with Stilt). 2 Total proposed built-up area for building unit up to 2000 sqm | Category 1 | 2 |
| Category 2 | ----- | ||
| Notes: 1 *Minimum years of experience of preparing structural design, detailed drawings, and specifications after attaining the degree/ Diploma. 2 Category 1: B.E/ B. Tech Civil or equivalent degree recognized by the AICTE. 3 Category 2: M.E/ M. Tech Civil, or a Ph. D in Structural Engineering. 4 Person holding Higher grade license can also work for Lower Grade Work | |||
Minimum qualifications and experience requirements for construction engineers, for being considered for registration with the Competent Authority as Clerk of Works on Record qualified for certifying the construction of buildings shall be as follows:
Table No. S1 – 2: COWOR Qualifications and Experience
| Grade | Scope of Work | Qualification | Minimum Years of Experience* |
| COWOR 1 | 1 Building with height above 25 m 2 Total proposed built-up area for a building unit is | Category 1 | 3 |
| Category 2 | 5 |
Page No 175
| Grade | Scope of Work | Qualification | Minimum Years of Experience* |
| more than 10000 sqm. 3 Mercantile - 2, 3; Educational -1, 2, 3; Assembly - 1, 2, 3; Health - 2, 3, 4; Hospitality - 2, 3; Utility; Public Office; Special Buildings | Category 3 | 3 | |
| COWOR 2 | 1 Building with height above 15 m /17.5 m (with Stilt) and up to 25 m. 2 Total proposed built-up area for a building unit is more than 2000 sqm and up to 10000 sqm. | Category 1 | 2 |
| Category 2 | 4 | ||
| Category 3 | 2 | ||
| COWOR 3 | 1 Building with height up to 15 m /17.5 m (with Stilt). 2 Total proposed built-up area for building-unit up to 2000 sqm | Category 1 | 1 |
| Category 2 | 2 | ||
| Category 3 | 1 | ||
| Notes: 1 *Minimum years of experience (after attaining the degree/ Diploma) in Construction work at a responsible position in any organization 2 Category 1: A Degree in Civil Engineering / Architecture or Diploma in Architecture equivalent to degree Architecture, or its equivalent qualification recognized by All India Board of Technical Education 3 Category 2: Diploma in Civil Engineering recognized by State Board of Technical Examinations of any State in India 4 Category 3: Bachelor's Degree with specialized training in building in construction technology or Diploma in Building Construction Technology from a recognized institute. 5 Person holding Higher grade license can also work for Lower Grade Work | |||
Minimum qualifications and experience requirements for construction engineers, for being considered for registration with the Competent Authority as Supervisor of Works on Record qualified for certifying the construction of buildings shall be as follows:
Table No. S1 – 3: SOR Qualifications and Experience
| Grade | Scope of Work | Qualification | Minimum Years of Experience* |
| SOR 1 | 1 Building with height above 25 m 2 Total proposed built-up area for a building unit is more than 10000 sqm 3 Mercantile - 2, 3; Educational -1, 2, 3; Assembly - 1, 2, 3; Health - 2, 3, 4; Hospitality - 2, 3; Utility; Public Office; Special Buildings | Category 1 | 3 |
| Category 2 | 5 | ||
| Category 3 | 3 | ||
| SOR 2 | 1 Building with height above 15 m /17.5 (with Stilt) m and up to 25 m 2 Total proposed built-up area for a building unit is more than 2000 sqm and up to 10000 sqm | Category 1 | 2 |
| Category 2 | 4 | ||
| Category 3 | 2 | ||
| SOR 3 | 1 Building with height up to 15 m /17.5 (with Stilt) m 2 Total proposed built-up area for building-unit up to 2000 | Category 1 | 1 |
| Category 2 | 2 |
Page No 176
| Grade | Scope of Work | Qualification | Minimum Years of Experience* |
| sqm | Category 3 | 1 | |
| SOR 4 | 1 Building with height up to 10 m 2 Total proposed built-up area for building-unit up to 200 sq m | Category 1 | 0 |
| Category 2 | 1 | ||
| Note: 1 *Minimum years of experience (after attaining the degree/ Diploma) in Construction work at a responsible position in any organization 2 Category 1: A Degree in Civil Engineering / Architecture or Diploma in Architecture equivalent to degree Architecture, or its equivalent qualification recognized by All India Board of Technical Education 3 Category 2: Diploma in Civil Engineering recognized by State Board of Technical Examinations of any State in India 4 Category 3: Bachelor's Degree with specialized training in building in construction technology or Diploma in Building Construction Technology from a recognized institute. 5 Person holding Higher grade license can also work for Lower Grade Work | |||
(Refer Rule No. 3.2.5)
1 Procedure for Ascertaining whether a Person on Record has failed to Discharge his Responsibility.
A four-member Professional Oversight Committee shall be established by the Union Territory / PDA to ascertain whether a Person on Record has failed to discharge his responsibilities.
The Professional Oversight Committee shall comprise of the following four members:
1 Chairman PDA
2 MS, PDA (respective)
3 Associate Town Planner of the PDA
4 Expert Architect / Engineer from the Private Sector
The Professional Oversight Committee shall undertake scrutiny of each case on an individual basis and shall provide at least one opportunity to the Person on Record under scrutiny to be heard. Its proceedings shall be recorded in writing.
The cost(s) incurred for conducting the scrutiny shall be borne by the PDA.
The Professional Oversight Committee shall ascertain whether the Professional on Record has failed in discharging his responsibilities and shall determine and administer penalties for the same.
Page No 178
Table No. S2 – 1: Penalties for Person on Record
| Violation of Reg. No.: | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financial penalty<sup>1</sup> and delisting for 6 months | Delisting for 12 months and registration of complaint with professional body | Permanent delisting and prosecution<sup>1</sup> |
|---|---|---|---|---|---|---|
| Rule Nos. 4.4: Person on Record undertake construction on plot without revalidating a Lapsed Development Permission or when a Development Permission has been cancelled | 1<sup>st</sup> offence (Rs. 10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) | |
| Rule No. 5.4: Negligence of Person on Record leading to structural failure of a building | 1<sup>st</sup> offence (Rs.50,000) | |||||
| Rule Nos. 4.10.1, 4.12.1 and 4.14.1: Architect on Record fails to register the Issue of Direct Development Permission / Revision of Direct Development Permission / Revalidation of Direct Development Permission with the Commissioner within the stipulated period | 1<sup>st</sup> offence (Rs. 10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) | |
| Rule Nos. 4.10, 4.11, 4.12, 4.13, 4.14, 4.15, 4.16: Person on Record submits incomplete or inadequate drawings, document, and specifications along with application to register Issue of Direct Development Permission / Revision of Direct Development Permission / Revalidation of Direct Development Permission to the Commissioner | 1<sup>st</sup> offence (Rs. 10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) | |
| Rule Nos. 4.10, 4.11, 4.12, 4.13, 4.14, 4.15, 4.16: Person on Record intentionally and fraudulently misrepresents or hides material facts from the Commissioner in the application to register issue of or grant of Development Permission / Revised Development Permission / Revalidation of Development Permission | 1<sup>st</sup> offence (Rs. 15,000) | 2<sup>nd</sup> offence (Rs.25,000) | 3<sup>rd</sup> offence (Rs.35,000) | |||
| Rule No. 5.2: Construction Engineer on Record fail to display necessary information on the Notice Board at site | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) |
1 Prosecution under section 140 (y) and 141 of the Dadra and Nagar Haveli and Daman and Diu Town & Country Planning Act, 1974
Page No 179
| Violation of Reg. No.: | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financial penalty<sup>1</sup> and delisting for 6 months | Delisting for 12 months and registration of complaint with professional body | Permanent delisting and prosecution<sup>1</sup> |
|---|---|---|---|---|---|---|
| Rule No. 5.3: Construction Engineer on Record fails to maintain necessary drawings and documents at site during Period of Construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) | |
| Rule No. 5.4.1: Construction Engineer on Record stack, store or dispose building material on public space or street without obtaining Permit to Use Abutting Street for Construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) | |
| Rule No. 5.4.2: Construction Engineer on Record does not provide barricading or provides inadequate barricading of the plot during period of construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) | |
| Rule No. 5.4.3: Construction Engineer on Record causes or fails to prevent damage or inconvenience during construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) | |
| Rule Nos. 5.5.1: Architect on Record or Construction Engineer on Record fail to notify the Commissioner before commencing construction on the plot within the stipulated period | 1<sup>st</sup> offence (Rs. 15,000) | 2<sup>nd</sup> offence (Rs.20,000) | 3<sup>rd</sup> offence (Rs.25,000) | 4<sup>th</sup> offence (Rs.30,000) | 5<sup>th</sup> offence (Rs.40,000) | |
| Rule Nos. 5.5.3: Architect on Record and Construction Engineer on Record fail to notify the PDA of Progress of Construction, Compliance Certification and obtaining Permission to Proceed with Further Construction within the stipulated period | 1<sup>st</sup> offence (Rs. 15,000) | 2<sup>nd</sup> offence (Rs.20,000) | 3<sup>rd</sup> offence (Rs.25,000) | 4<sup>th</sup> offence (Rs.30,000) |
Page No 180
| Violation of Reg. No.: | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financial penalty<sup>1</sup> and delisting for 6 months | Delisting for 12 months and registration of complaint with professional body | Permanent delisting and prosecution<sup>1</sup> |
|---|---|---|---|---|---|---|
| Development Use Permission or Permission to Change Sanctioned Use of Development | ||||||
| Rule Nos. 3.3.2: If there is any deviation from building sanction plan the AOR blacklisted for 10 years | 1<sup>st</sup> offence (Rs.50,000) | |||||
| Rule Nos. 5.1.4: Fire Protection Consultant on Record (FPCOR) shall inspect the building at intervals not more than 12 months to ascertain and certify to competent authority that the building's fire safety has not been compromised due to lack of adequate maintenance. For not doing so penalties will be taken | 1<sup>st</sup> offence (Rs.1,00,000) |
All financial penalties are to be decided by the Professional Oversight Committee of the PDA to ascertain whether a Person on Record has failed to discharge his responsibilities and to determine penalties for the same.
2 If the penalties imposed in the 1st offence are not complied with by the Person on Record within 1 month of the date of imposing the penalty, the penalty for 2nd offence shall apply and so forth.
3 If the penalties imposed in the 1st offence are not complied with by the Person on Record within 6 months of the date of imposing the penalty, the Person on Record shall be unregistered from the records of the PDA for 1 year and complaint filed with his professional body.
Page No 181
(Refer Rule No. 3.3)
Table No. S3 – 1: Details of Technical Audit Report
| 1 | Design | Comments | |
| 1.1 | Design / Drawings available? | Y/N | |
| 1.2 | Design Category | ||
| 1.2.1 | Type Design? | Y/N | |
| 1.2.2 | Specific Design | Design to be collected to refer to Design Consultant /H.O. | |
| 1.3 | Drawings prepared / checked by competent Authority? | Y/ N | |
| 1.3 | Design Drawing/ Details | Y/ N | |
| 1.5 | Structural details included | Y/ N | |
| 1.6 | Earthquake/cyclone resistant features Included? | Y/ N | |
| 1.7 | Design verified/vetted by Dept./Govt. approved agency/competent authority? | Y/N | |
| 1.8 | Design changes approved by Dept./Govt. approved agency/competent authority | Y/N | |
| 2 | Foundation | ||
| 2.0 | Foundation used | Existing/ New | |
| 2.1 | If existing foundation used | ||
| 2.1.1 | Depth of foundation below ground | <50 cm @ 50-70/> 70cm | |
| 2.1.2 | Type of masonry | Stone / Bricks / PCC Blocks | |
| 2.1.3 | Thickness of masonry (above ground) | 23cin /35 />35 | |
| 2.1.4 | Mortar used | Cement - Sand | |
| 2.1.5 | Mix of cement mortar | As per NBC Indicate | |
| 2.1.6 | Height up to Plinth | _____m, as per GDCR Y/N | |
| 2.1.7 | If stone masonry | ||
(Refer Rule No. 3.3.7, 5.1.4)
Fire Officer (FO) shall be required in all cases in which the provisions of Fire Chapter (Part 2) of these GDR related to fire safety are applicable within the meaning of clause 14.1.1 of the GDR. Fire Protection Consultant on Record (FPCOR) shall be required in all cases where either the building is High Rise or for the non-residential uses, the total built up area is more than 4000 sq m.
Page No 185
Fees and Charges for Grant of a Development Permission / Revised Development Permission / Revalidation of Development Permission
(Refer Rule No. 4.10.2, 4.11.2, 4.12.2, 4.13.2, 4.14.2, 4.15.2, 5.3, 5.4.1, 6.6.2)
A person applying for a Development Permission / Revised Development Permission / Revalidation of Permission shall have to pay the following Fees and Charges along with the application to the Competent Authority at the following rates:
The fees shall be paid for both – Direct Development Permission and Development Permission. The scrutiny fees shall be levied at the time of making an application for Development Permission.
Table No. S5A – 1: Scrutiny Fees for Building
| No | Type of Use | Rate per sq m of Built-Up Area (Subject to minimum fees of Rs. 1000/-) | |
| Building upto 15m height | Building more than 15m height | ||
| 1 | Residential | Rs. 5.00 | Rs. 10.00 |
| 2 | Commercial | Rs. 8.00 | Rs. 13.00 |
| 3 | Residential Cum Commercial | Rs. 6.00 | Rs. 11.00 |
| 4 | Industrial | Rs. 7.00 | Rs. 12.00 |
| 5 | Public Offices, Utilities | Rs. 4.00 | Rs. 9.00 |
| 6 | Others | Rs. 5.00 | Rs. 10.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
• In case of a revised development permission, these shall be paid again.
In case of revalidation of lapsed / suspended development permission, these shall not be paid again, only a revalidation fee will be paid which will be 25% of the Scrutiny Fee already paid.
In case of cancellation of development permission, these shall be forfeited.
A One-time payment shall be made for approval of subdivision / amalgamation / layout of land. It shall be valid for a period of 5 years.
Table No. S5A – 2: Fees for Subdivision /Amalgamation / Layout of Building Unit / Plot
| No | Type of land Use | Rate per sq m of land (Subject to minimum fees of Rs. 1000/-) | |
| Amalgamation | Subdivision / Layout of Building Unit / Plot | ||
| 1 | Residential | Rs. 3.00 | Rs. 6.00 |
| 2 | Commercial | Rs. 4.00 | Rs. 8.00 |
| 3 | Residential Cum Commercial | Rs. 3.50 | Rs. 7.00 |
| 4 | Industrial | Rs. 5.00 | Rs. 10.00 |
| 5 | Public Offices, Utilities | Rs. 3.00 | Rs. 6.00 |
| 6 | Others | Rs. 4.00 | Rs. 8.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
Page No 186
In case of a revised development permission, these shall be paid again.
In case of revalidation of lapsed / suspended development permission, these shall not be paid again, only a revalidation fee will be paid which will be 25% of the Scrutiny Fee already paid.
In case of cancellation of development permission, it shall be forfeited.
Mining, quarrying and brick kiln with or without chimney and processing of lime, sagol etc. without construction‐ Rs.1,00,000 per 0.1 hectare or part thereof.
• In case of a revised development permission, these shall be paid again.
In case of revalidation of lapsed / suspended development permission, these shall not be paid again, only a revalidation fee will be paid which will be 25% of the Scrutiny Fee already paid.
In case of cancellation of development permission, it shall be forfeited.
Charges for change in land use shall be paid every time there is a change of use of land.
Page No 187
Table No. S5A – 3: Charges for Change of Land Use
| No | Type of land Use | Rate per sq m of land (Subject to minimum fees of Rs. 1000/-) |
|---|---|---|
| 1 | Residential | Rs. 25.00 |
| 2 | Commercial | Rs. 40.00 |
| 3 | Residential Cum Commercial | Rs. 40.00 |
| 4 | Industrial | Rs. 50.00 |
| 5 | Public Offices, Utilities | Rs. 10.00 |
| 6 | Others | Rs. 40.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
The Development Charges for infrastructure shall be paid for both – Direct Development Permission and Development Permission.
The development charges for infrastructure shall be levied at the time of making an application for Development Permission.
Table No. S5A – 4: Development Charges for Buildings
| No | Type of land Use | Rate per sq m of Built up (Subject to minimum fees of Rs. 1000/-) |
|---|---|---|
| 1 | Residential | Rs. 50.00 |
| 2 | Commercial | Rs. 80.00 |
| 3 | Residential Cum Commercial | Rs. 80.00 |
| 4 | Industrial | Rs. 100.00 |
| 5 | Public Offices, Utilities | Rs. 20.00 |
| 6 | Others | Rs. 80.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
• In case of a revision of development permission, the differential shall be paid.
• In case of revalidation of lapsed / suspended development permission, these shall not be paid again.
In case of cancellation of development permission, it shall be forfeited.
Stacking Charges shall be levied during grant of commencement certificate and charges will be taken per week.
Table No. S5A – 5: Charges for Stacking Building Material on Public Roads
Other Charges / Fees shall be levied under the provisions of other Act and or instructed by Government.
Note: All Charges and Fees may be revised by MS PDA from time to time.
Page No 188
Fees and Charges for Grant of Occupancy Certificate / Change of Occupancy Certificate
(Refer Rule No. 6.5.2)
A person applying for an Occupancy Certificate shall have to pay Fees along with the application to the Competent Authority at the following rates:
Table No. S5B – 1: Fees for Occupancy Certificate
| No. | Description | Fees equal to |
|---|---|---|
| (1) | (2) | (3) |
| 1 | If the Occupancy is in conformity with these Rules and no change from the permission granted. | 10% of the Development Permission Scrutiny Fees that is leviable on the building unit, as the case may be |
If the development use is in conformity with the General Development Rules but there is change of use, then a fee equal to two times of the Scrutiny Fees paid shall be paid. The Development Charges as per the new proposed use shall be paid – the earlier shall be forfeited.
Table No. S5B – 2: Fees for Change of Occupancy
| No. | Description | Fees equal to |
|---|---|---|
| (1) | (2) | (3) |
| 1 | In conformity with these Rules but with internal modification without any change in overall location and/or overall dimension or margins of the building. | Two times of the Development Permission Scrutiny Fees that is leviable on the building unit, as the case may be. |
Page No 189
(Refer Rule No. 4.16.2)
Table No. S5C – 1: Fees for Applying for Temporary Construction
| No. | Type of Temporary Construction | Rate per sq m of land (Subject to minimum fees of Rs. 1000/-) | |
| 1 | Pandals for fair, ceremonies, religious functions or for vendors | Rs 100 | |
| 2 | Temporary Monsoon Shed of bamboo (May to September) | Rs 75 | |
| 3 | Temporary construction like tent city, camping ground or base camp. | Rs 500 | |
| 4 | a) | Structures of exhibitions/ circuses etc | Rs 100 |
| b) | Structures for ancillary works for quarrying operations in conforming zones. | ||
| c) | Government booths and temporary shelters. | ||
| d) | Transit accommodation for persons to be rehabilitated in a new construction. | ||
| e) | Structures for educational and medical facilities within the site of the proposed building during the phase of planning and constructing the said permanent buildings. | ||
| f) | Ready mix concrete plant. | ||
Equal amounts of fees shall be payable as deposit, which will be refundable provided by end of the stipulated period, such temporary structures are removed without fail by the owner / applicant.
Failure to remove such temporary sheds will be liable for forfeiture of the deposit and any such failure continuing beyond the said period shall be liable for imposition of penalty which will, be three times the rate of 100/ per sq m per week.
Page No 190
(Refer Rule No. 4.4.4, 4.6, 4.7.2, 4.10.4, 4.11.4, 4.12.4, 4.13.4, 4.14.4, 4.15.4, 4.16.4, 6.5.4, 6.6.4)
Table No. S5D – 1: Penalties for Unauthorised Construction and Occupancy
| No. | Type | Penalty (Rs/ Sq m) | Remarks | |
| 1 | Construction / Occupancy started / completed before applying for permission. | Applicable to total proposed built up area or total occupied or constructed area, whichever is higher. | ||
| 1.1 | For Residential | 300 | ||
| 1.2 | For Commercial | 500 | ||
| 1.3 | For Industrial | 800 | ||
| 1.4 | For Others use | 600 | ||
| 2 | Construction / Occupancy started / completed before granting permission but had applied for permission. | Applicable to total proposed built up area or total occupied or constructed area, whichever is higher | ||
| 1.1 | For Residential | 200 | ||
| 1.2 | For Commercial | 300 | ||
| 1.3 | For Industrial | 500 | ||
| 1.4 | For Others use | 400 | ||
| 3 | Minor Deviation from the approved construction plan, but within these Rules. | Twice the scrutiny fees | Deviation in this respect would be only for minor alteration within the approved building plan without deviation in approved built up area | |
B Other Penalites
Lift auditor shall provide certificate at interval not more than 2 years that the lifts and escalator in the building are kept in good working condition. For not doing so penalties will be levied as decided by Competent Authority.
In cases where misuse of parking space is noticed, the use of the entire building shall be discontinued by the Competent Authority. Building use shall be permitted only after the required parking spaces are provided. High penalty shall be levied considering the period of misuse of the parking space and the benefit derived out of misuse as decided by the Competent Authority from time to time.
Page No 191
| 22B | Application for Occupancy of Temporary Construction |
| 23 | Grant / Refusal of Occupancy Certificate |
| 24 | Cancellation of Occupancy Certificate |
| 25 | Change in the Sanctioned Occupancy of Building / Development |
| 26 | Structural Inspection Report |
| 27 | Fire Safety Certificate |
| Details of Structural Inspection Report (Part 3) |
Page No 177
| 5<sup>th</sup> offence (Rs.40,000) |
| Rule No. 6.5.1 and 6.6.1: Person on Record submits incomplete or inadequate drawings, document, and specifications to the PDA along with application to register Issue or grant of Development Use Permission or Permission to Change Sanctioned Use of Development | 1<sup>st</sup> offence (Rs. 10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) |
| Rule Nos. 6.5 and 6.6: Person on Record intentionally and fraudulently misrepresents or hides material facts from the PDA in the application to register issue or grant of | 1<sup>st</sup> offence (Rs. 15,000) | 2<sup>nd</sup> offence (Rs.25,000) | 3<sup>rd</sup> offence (Rs.35,000) |
| 2.1.7.1 | Through Stones | Yes / No. If Yes Adequate/Inadequate |
| 2.1.7.2 | Corner Stones | Yes / No. If Yes Adequate/Inadequate |
| 2.2 | If a new foundation used |
| 2.2.1 | Depth of foundation below ground | <50/50-70/>70 cm |
| 2.2.2 | Type of masonry blocks | Stone / bricks / PCC |
| 2.2.3 | Thickness of Masonry above plinth - | 23cm/35/>35cm |
| 2.2.4 | Mortar used | Cement-sand / lime / mud |
| 2.2.5 | Mix of cement mortar (1:4)/As Per NBC | Yes/No |
| 2.2.6 | Height up to plinth | _____m, as per GDCR Y/N |
| 2.2.7 | If stone masonry |
| 2.2.7.1 | Through Stones | Yes / No. If Yes Adequate/Inadequate |
| 2.2.7.2 | Comer Stones | Yes / No. If Yes Adequate/Inadequate |
| 2.3 | Vertical reinforcement in foundation | Yes / No |
| 3 | Walls | ||
| 3.1 | Type of masonry | Stone/ Brick / PCC Blocks |
| 3.2 | Mortar used | Cement- Sand / Lime /Mud |
| 3.3 | Mix of cement mortar | 1:4 /1:1.6/Leaner |
| 3.4 | Thickness of wall | >23cm/23cm/23cm |
| 3.5 | Mixing of mortar | OK /Not OK |
| 3.6 | Join property filled | OK /Not OK |
Page No 182
| 3.7 | Wetting of bricks | Good / Medium / Poor | |
| 3.8 | Stone masonry | ||
| 3.8.1 | Through Stones | Yes/No | |
| 3.8.2 | Corner Stones | Yes / No | |
| 3.9 | Overall workmanship | Good / Medium / Poor | |
| 4 | Roofing | ||
| 4.1 | Type of roof | Flat / Sloping | |
| 4.2 | If sloped | Morbid tiles / AC sheet / G.I. sheet | |
| 4.3 | Purlins | Angle - | |
| Material - Iron/ Timber/ NA | |||
| 4.4 | Truss type | ||
| 4.5 | Anchorage with wall | Adequate / Inadequate /NA | |
| 5 | Materials | Specifications must be conforming to NBC/Relevant IS Codes | |
| 5.1 | Cement | ||
| 5.1.1 | Source | Authorized Dealer / Market OPC/PPC/ PSC | |
| 5.1.2 | Type of cement | Grade (33 / 43 / 53) | |
| 5.1.3 | If OPC | OPC / PPC/ PSC | |
| 5.2 | Sand | ||
| 5.2.1 | Type of sand | Fine / Coarse | |
| 5.2.2 | Presence of deleterious materials | Mild / Moderate / High | |
| 5.3 | Coarse Aggregates | ||
| 5.3.1 | Type coarse Aggregates | Gravel / Crushed Stone | |
| 5.3.2 | Presence of deleterious material | Mild / Moderate / High | |
| 5.4 | P.C.C. Blocks (Applicable for onsite production) | ||
| 5.4.1 | Type of P.C.C. Blocks | Solid blocks / Hollow blocks | |
| 5.4.2 | Ratio of concrete in block | ||
| 5.4.3 | Interlocking feature | Yes / No | |
| 5.4.4 | Coarse aggregates used | Natural / Crushed stone | |
| 5.5 | Bricks Blocks, Stone etc. | ||
| 5.5.1 | Strength (field assessment) | Low / Medium / High | |
| 5.5.2 | Dimensional accuracy | Yes / No | |
| 5.6 | Concrete | ||
| 5.6.1 | Mix of concrete | (1:1 1/2:3)/ (1:2:4)/ Design Mix | |
| 5.6.2 | Batching | Weight batching/ Volume batching | |
| 5.6.3 | Compaction | Vibrators / Thappies and rods | |
| 5.6.4 | Workability | Low / Medium / High | |
| 5.6.5 | Availability of water | Sufficient / Insufficient | |
| 5.6.6 | Curing | Satisfactory/ unsatisfactory | |
| 5.7 | Reinforcing Steel | ||
| 5.7.1 | Type of Steel | Plain mild steel HYSD bars | |
| 5.7.2 | Source | Authorized Dealer /Market | |
| 5.7.3 | Whether IS Marked | Yes/No | |
| 5.7.4 | Conditions of bars | Clean / Corrugated | |
| 5.7.5 | Fixing of reinforcement as per drawing | Yes / No | |
| 5.7.6 | Suitable cover | Yes/No | |
| 5.7.7 | Spacing of bars | Regular / Irregular | |
| 5.7.8 | Overlaps as per specifications | Yes / No | |
| 5.8 | Form Work | Timber/ Play board /Steet | |
| 5.8.1 | Type of form work | Yes/No | |
| 5.8.2 | Use of mould oil | ||
| 5.8.3 | Leakage of cement slurry | Observed / Not | |
| 5.9 | Source | ||
| 5.9.1 | Cement | ||
| 5.9.2 | Sand | ||
| 5.9.3 | Coarse Agg. | ||
Page No 183
| 5.9.4 | Bricks | ||
| 5.9.5 | PCC Blocks | ||
| 6 | Seismic Resistance Features for Masonry Structures | ||
| 6.1 | Provision of seismic band provided Adequate | Yes/No | |
| 6.1.1 | Plinth level | Yes/No | |
| 6.1.2 | Stilt level | Yes/No | |
| 6.1.3 | Lintel level | Yes/No | |
| 6.1.4 | Roof level (if applicable) | Yes/No | |
| 6.2 | If sloped roof, whether seismic bands are provided at | Yes/No | |
| 6.2.1 | Gable wall top | Yes/No | |
| 6.2.2 | Eaves level | Yes/No | |
| 6.3 | Provision of vertical street in masonry at | Yes/No | |
| 6.3.1 | Each corner | Yes/No | |
| 6.3.2 | Each T-junction | Yes/No | |
| 6.3.3 | Each door joint | Yes/No | |
| 6.3.4 | Around each window | Yes/No | |
| 6.4 | Openings | Yes/No | |
| 6.4.1 | Total width of openings (*-42% for double storey) | <50%/50*-60%/>60% | |
| 6.4.2 | Clearance from corner | Ok/ Not Ok | |
| 6.4.3 | Pier width between two opening | Ok/ Not Ok | |
| 7 | Workmanship | Specifications must be conforming to | |
| NBC/Relevant IS Codes | |||
Name of AOR Registration No.: Address: Tel. No.: Signature: Date:
Name of SEOR Registration No.: Address: Tel. No.: Signature: Date:
Name of SOR: Registration No.: Address: Tel. No.: Signature: Date:
Name of EOR:
Registration No.:
Address:
Tel No.:
Signature:
Date:
Name of COWOR:
Registration No.:
Address:
Tel No.:
Signature:
Date:
Page No 184
| No | Type of land Use | Rate per sq m of Building Unit (Subject to minimum fees of Rs. 1000/-) |
|---|---|---|
| 1 | Residential | Rs. 4.00 |
| 2 | Commercial | Rs. 8.00 |
| 3 | Residential Cum Commercial | Rs. 6.00 |
| 4 | Industrial | Rs. 10.00 |
| 5 | Public Offices, Utilities | Exempted |
| 6 | Others | Rs. 4.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
A person applying for permission to carry out any development shall have to pay tree plantation deposit (Rs. 500 / tree required to be planted) along with his application to the Competent Authority. This deposit shall be refundable after the period of five years with the condition that trees planted on the site shall be grown up and maintained properly, otherwise the deposit shall be forfeited.