17.1 Minimum Distance from Water Body and Water Course
Minimum clearance of 15 m shall be provided between the boundary of the bank of a river where there is no embankment and any development work or part thereof (Refer Figure No. 17.1).
Figure No. 17.1: Minimum Distance of Water Body and Water Course from Riverbank Boundary
2 Minimum clearance of 10 m to be provided between the embankment of a river and any building or part thereof or any other clearance as may be prescribed under any other general or specific orders of Government and Competent Authority whichever is more (Refer Figure No. 17.2).
Figure No. 17.2: Minimum Distance of Water Body and Water Course from River Embankment
Minimum clearances of 6 m shall be provided between the boundary of any other waterbody / water course such as lake, talav, pond, canal, nala, kotar (perineal / non perineal), and any building or part thereof (Refer Figure No. 17.3).
Figure No. 17.3: Minimum Distance of Water Body and Water Course from Watercourse / Water Boundary
4 Where a water course passes through a low-lying land without any well-defined bank, the applicant may be permitted by the Competent Authority to restrict or re‐direct the water course to an alignment and cross‐section determined by the Competent Authority.
17.4Grey Water Recycling
17.4.1 Applicability
Any owner / developer shall make provision for reuse of recycled water when applying for approval for -
1 new construction of development with 100 dwelling units or more.
2 new set of buildings for categories with total built up area mentioned in Table No.17.1 below:
Table No.17.1: Reuse of Recycled Water
No.
Building Use
Built up Area (sq m)
(1)
(2)
(3)
1
Health 1, 2, 3 and 4
More than 5,000
2
Hospitality 1, 2 and 3
3
Hostels for Schools, Colleges, Training Centres etc
More than 10,000
4
Community Centre, Banquet Halls, and similar uses
5
Mercantile 1, 2 and 3
6
All hazardous, water-polluting, chemical industries
17.4.2 Provisions of Recycling System
The applicant shall along with his application submit the designs, plans, calculations, and the references used for the calculations etc. to provide the system to recycle the grey water. Such system shall include the provisions to facilitate the following:
1 Separate plumbing/collection systems for collecting wastewater from toilets/WCs and wastewater from bathrooms & kitchens. Wastewater from WCs shall be let into the sewerage system / septic tanks. Wastewater / grey water from bathrooms and kitchens shall be treated within the premises and recycled – used for non-potable uses such as maintaining gardens, irrigation, vehicle washing, water closets, ground water recharge etc.
2 The grey water will be taken to a storage tank which may be provided in the marginal open space. Next to it a grey water treatment plant shall be provided / installed to enable treatment of the grey water. The treatment facility shall not constitute a nuisance of foul gases or cause public hazard or not comply with any other Rules.
3 Treated grey water shall be pumped and stored into a separate tank on the roof from where it may be supplied to WCs, garden taps, common taps for car washing, cleaning premises etc. The down take pipes for the recycled water shall be distinguished by purple-coloured pipes.
4 It shall be ensured that there is no connection between the potable water plumbing system and recycled water plumbing system to avoid contamination.
5 The treated water quality shall conform to standards of non-potable water. The recycled water shall be tested once in six months and results shall be made available to Competent Authority whenever demanded.
Page No 155
6 To enable use of treated grey water in WCs, it shall be mandatory to provide double button cistern (dual flush tank.).
7 Arrangements for diverting excess grey water to the sewerage system of the local authority / septic tanks shall also be provided.
8 Arrangements for diverting the excess treated grey water into the storm water system of the local authority shall be made and treated grey water may be diverted into this, provided it is on accepted quality as mentioned in Rules of Competent Authority.
17.4.3 Quality of Water and Treatment
1 The water generated after treatment should be safe for its use for flushing toilets, gardening etc.
2 The company or the agency engaged for installation of system for recycling of wastewater shall preferably confirm ISO:14000.
3 Water quality from the Grey Water Recycling plants shall be as approved by the Pollution Control Board.
4 Provision may be made for checking the quality of recycled water with water testing laboratory with Municipal Council / Pollution Control Board / Competent Authority.
5 The testing of wastes and the submission of the results shall be done in a manner in accordance with the terms and conditions prescribed by Pollution Control Board / Competent authority.
17.4.4 General Provisions
1 Mandatory disclosure regarding changes:
An occupier of premises shall inform the Competent Authority of any change in the quality, nature or quality of the wastes discharged from his / her plant or premises and / or the manner of their discharge of water, immediately, if the change is likely to cause discharge of water in variation or violation of license under these Rules.
2 Corrective action:
In the event it is found if any person is violating the provisions of these Rules, the Competent Authority or Pollution Control Board shall issue notice, and after inquiry and personal hearing, take necessary corrective action.
3 Dispute Resolution:
All the disputes arising in the enforcement of these Rules shall be referred to Competent Authority who in turn will resolve the disputes in advice with his authorized technical officer or any experts and intimate to the occupier / owner/ developer. The decision of the Competent Authority will be final and binding on the occupier.
4 Authorized Laboratories:
List of these shall be authorized by Pollution Control board or the Municipal Council.
17.4.5 Enforcement of Rules
1 In case of proposed / intending / under redevelopment properties, the occupier / developer / owner will submit an application to the Competent Authority with details of proposed grey water reuse system along with the application for demand of water permission to connect the grey water / sewage to local government sewerage system. Before the grant of final Occupancy Certificate, the developer shall have to produce permission to connect his sewerage system to sewerage network of the city
2 Conditional Waste Discharge Permission – waste discharges of the conditional type of plant will be allowed, on the issue of a conditional permission, provided the conditional type of plant has recycling and reuse of water facility and not exceeding limits as per Pollution Control Board norms.
17.2Rainwater Management
17.2.1 Rainwater Disposal
The roof (terrace) of a building and the remaining area of the building unit shall be provided with an effective rainwater drainage system so as to ensure that the rainwater is not discharged into adjacent building units and no dampness is caused in any walls or foundation of adjacent buildings.
2 Rainwater pipes shall be affixed to the outside of the walls of the building or in recesses or formed in such walls or in such other manner as may be approved by the Competent Authority.
3 No roof or terrace abutting on a public street shall be constructed without providing sufficient number of down take pipes and such pipes shall be so fixed as to discharge the rainwater at a level not higher than 0.6 m above the street level.
4 The manner of channelling rainwater discharge from a building unit to a public storm water drain, if available, shall be determined by the Competent Authority.
17.2.2 Rainwater Harvesting
Rainwater harvesting refers to collecting / capturing the runoff from the roofs / terraces and open areas of the building unit for 1) storing it for future use, and 2) using it to recharge the underground water aquifers.
1 Rainwater Storage
Rainwater storage is mandatory for all building units having an area of 100 sq m and above. Rainwater storage tank of adequate capacity shall be constructed in marginal open space such that rainwater from the roof and plot drains into it. The water may be used for household uses such as washing, cleaning, and gardening.
Page No 152
2 Ground Water Recharge
Ground water recharge is mandatory for all building units having an area above 100 sq m. It shall be provided for as follows:
a) For building units / plots having area 100 sq m and above and up to 500 sq m Percolation pit or bore recharge shall be provided in the marginal space around the building. Such pits shall be filled with small pebbles, brick jelly or river sand and covered with perforated concrete slabs (Refer Figure No. 17.4).
Figure No. 17.4: Percolation Pit or Bore Recharge
b) For building units having area above 500 sq m and up to 1500 sq m: Percolating well with rainwater harvesting system shall be provided (Refer Figure No. 17.5- Left Image) (up to first ground aquifer).
c) For building units having area above 1500 sq m and up to 4000 sq m Percolating well with rainwater harvesting system shall be provided (Refer Figure No. 17.5- Right Image) (up to second ground aquifer).
Page No 153
Figure No. 17.5: Percolation Well with Rainwater Harvesting System upto Ground First River (Left) and upto Ground Second River (Right)
d) For buildings with building unit area above 4000 sq m
One percolating well shall be provided as per Rule No. 17.2.2(c) for every 4000 sq m land area. As an alternative to providing multiple percolating wells, a water retention pond with minimum capacity of 300,000 litres with a percolating well for every five percolating wells or part thereof shall be permitted.
17.2.3 Open Spaces within Layouts
All open spaces / common plots that is provided must be provided with ground water recharge wells. The gradients must be such that the runoff from the layout leads towards these.
17.2.4 Public Open Spaces
All public parks, gardens, water bodies must be provided with ground water recharge wells.
17.3Solid Waste Management
All buildings shall provide facilities for solid waste management with segregation of dry and wet waste at source. Standards and specifications of facilities shall conform to the following requirements:
17.3.1 Solid Waste Bin for Residential Use
1 Separate collection bins for dry and wet waste shall be provided in the premises of every residential building which shall be placed at a location where they can be easily picked by waste collection vehicle of the local authorities.
The size of the bin container shall be calculated at the rate of 10 liters capacity per dwelling unit with a maximum size of bin of 80 liters. The numbers of bins shall be calculated on the basis of total number of dwelling units / tenements.
Page No 154
17.3.2 Solid Waste Bin for Non-Residential Use
1 Separate collection bins for dry and wet waste shall be provided in the premises of every non-residential building which shall be placed at a location where they can be easily picked by waste collection vehicle of the local authorities.
2 The size of the bin container shall be calculated at the rate of 20 liters capacity per 100 sq m of floor area with a maximum size of bin of 80 liters.
3 For hospitals, hotels and restaurant, disposal of solid waste shall be carried out as per the applicable rules and byelaws made by any authority.
4 For clubs, community halls and party plots, garbage containers for dry and wet waste shall be provided as per the rules and bye laws of the local authority. In absence of any such direction, the bins shall be of such size and placed as such location as may be decided by the competent authority from time to time.
17.5Tree Plantation
Tree plantation to be provided as per following:
1 Building unit / plot having area of more than 100 sq m shall be provided with minimum four trees and further for every 200 sq m area or part thereof, upto 500 sq m of area, minimum four
Page No 156
Page No 157
trees, and beyond that for every 200 sq m area or part thereof minimum five trees shall be provided.
2 The trees shall preferably be shade giving and from the species listed in Schedule No. 12.
3 The requirement of trees shall be reduced on the basis of the number of grown existing trees that are conserved and not affected by the proposed development.
4 Trees shall be planted on site and guarded by the tree guards and shall be maintained properly.
5 Trees shall be planted without causing obstruction to the easy movement of fire fighting vehicles in case of fire emergency.
6 A fees for tree plantation are listed in Schedule No. 5A while applying for any development permission.
7 Competent Authority may consult Forest Department for tree typology, plantation, and maintenance, etc. if required.
17.6Solar Energy Systems
Solar energy system provisions shall be made for meeting the requirements of hot water and electricity generation.
17.6.1 Solar Water Heating System
All buildings in the following categories of uses shall provide solar assisted water heating systems:
Table No.17.2: Building Use Categories and Built-up Area for Provision of Solar Water Heating
No.
Building Use
Built-up Area
(1)
(2)
(3)
1
Bedded Hospitals and Nursing Homes
Irrespective to built up area.
2
Hospitality: Hotels, Lodges, Guest houses
More than 1000 sq m
3
Hostels for Schools, Colleges, Training Centres
4
Community Centre, Banquet Halls, and similar uses
5
Residential - detached and semi-detached dwelling units
More than 200 sq m of individual dwelling unit area
17.6.2 Roof Top Solar Energy Installations and Generation
All buildings in the following categories of uses shall provide roof top solar energy installations and generation:
Table No 17.3: Norms for Roof Top Solar PV Installation and Generation
No.
Category of building/ area
Area Standards
Generation Requirement*
Solar Panel Coverage
1
Dwelling 1 & 2
Plot Size of 500 sq m and above
Minimum 3 KWp
Maximum 70% of the roof area**
2
Dwelling 3
All proposals
Lighting and Ventilation of Staircase, Driveways, Parking, Common Corridors, Lift lobby, Setback areas and roof should be covered through Solar energy
Minimum 30% of the roof area should be utilized for solar energy
3
Education 1, 2 & 3 Public Office Health 1, 2, 3 & 4 Industrial 1, 2, & 3 Mercantile 1, 2 & 3 Recreational 1 & 2
Plot Size of 1000 sq m and above And Rooftop shadow free area greater than 50 sq m
All the common areas Lighting and Ventilation of Staircase, Driveways, Parking, Common Corridors, Lift lobby, Setback areas and roof should be covered through
Minimum 30% of the roof area should be utilized for solar energy
No.
Category of building/ area
Area Standards
Generation Requirement*
Solar Panel Coverage
Solar energy
*Area provisions on roof top shall be @12 sq m per 1KWp, as suggested by Ministry of New and Renewable Energy (Solar Rooftop System).
**“available roof area” = 70 % of the total roof size, considering 30 % area reserved for residents’ amenities.
17.7Energy Efficient Buildings
Any owner or developer, who constructs energy efficient buildings and gets a certificate indicating the rating, from GRIHA (Green Rating for Integrated Habitat Assessment) / IGBC (Indian Green Building Council) or any other Government recognised Institute, shall be eligible for an incentive. Based on the rating certificate, the Competent Authority may offer 5% discount in the rate of chargeable FSI for the energy efficient buildings / Green Buildings on the total payable amount.
The owner shall have to apply prior to commencement of the project to GRIHA / IGBC for the rating certificate and registration. This shall be indicated in the development permission application.
17.8 Energy Conservation Code Compliant Buildings
Building and Building complexes which are required to follow Dadra and Nagar Haveli and Daman and Diu Energy Conservation Building Code Rules shall have to follow the same as and when the same is finally notified. They shall also be required to produce the certificate of Empanelled Energy Auditor—as and when the same are empanelled and available—in such form and manner as may be stated in the finalized Energy Conservation Building Code Rules at the time of grant of Occupancy Certificate.
17.9 Environment Impact Assessment
No development permission shall be given to the building and construction projects, townships and area development project until getting Environment Clearance from SEIAA (State Level Environment Impact Assessment Authority) as required under the Environmental Impact Assessment Notification, 2006 as amended from time to time.