All POR have to jointly certify Technical Audit Report as per Schedule No. 3 for all high-rise residential buildings and for all type of non-residential buildings.
3.3.1 Responsibilities of all POR
The overall responsibilities of all POR shall be as follows:
1 They shall prepare the plan of the buildings/ layout in accordance with the provisions of General Development Rules in such a manner that they are compatible and accessible to the persons who will reside therein.
2 They shall inform the Competent Authority of their resignation from any work within 7 days of the date of such resignation.
Page No 34
3 They shall prepare and submit all plans, new or revised as applicable, documents and other details as required, in a neat, clean, and legible manner and on a durable paper properly arranged and folded in accordance with the prevailing Rules along with the soft copy of the same.
4 They shall submit plans, documents and details without any scratches or corrections. Only small corrections will be permitted with proper initials. They shall correctly represent all the site conditions including mature trees.
5 They shall personally comply with all requisitions / queries received from the Competent Authority in connection with the work under their charge, promptly expeditiously and at one time. Where they do not agree with requisitions/queries, they shall state objections in writing, otherwise for non‐compliance of any requisition / query within stipulated time, the plans and applications shall be filed forthwith, and shall not be re‐opened. In case the owner or developer is not cooperating in compliance of the points raised by the authority, an intimation to PDA within 15 days of this non-cooperation by PORs to this effect shall be considered a sufficient reason and accordingly the application shall be rejected.
6 They shall immediately intimate to the owners the corrections and other changes they make on the plans, documents, and details as per requisitions / queries from the Competent Authority.
They shall clearly indicate on every plan, document & submission, the details of their designation such as registered AOR, CEOR, SEOR, COWOR, SOR & FPCOR with registration number, date, full name, and their address below the signature for identification.
8 They or their authorised agent or employee, shall not accept the employment for preparation and submission of plans ‐ documents and supervision of any work if the same is intended or proposed to be or being executed or already executed in contravention of any Rules or Rules under the Act.
9 Approval of drawings and acceptance of any statements, documents, structural reports, structural drawings, progress certificates, or building completion certificates shall not absolve the owner, engineer, architect, clerk of work, supervisor, structural designer, developer, or owner from the responsibilities imposed under the Act, the Development Rules, and the laws of tort and local acts.
Specific responsibilities shall be follows: