4.3.1 Grant of a Development Permission
Grant of a development permission does not constitute acceptance of correctness, confirmation, approval, or endorsement of:
1 Title, ownership, and easement rights of the building unit for which the development is proposed.
2 Variation in area from recorded areas of a building unit.
3 Location and boundary of building unit.
4 Workmanship, soundness of material and structural safety of the proposed development.
5 Structural reports and structural drawings.
And shall not bind or render the Competent Authority liable in any way in regard to (1), (2), (3), (4) and (5) above.
4.3.2 Liability
Notwithstanding any Development Permission granted under the Act and these Rules, any person undertaking any development work shall continue to be wholly and solely liable for any injury or damage or loss whatsoever that may be caused to anyone in or around the area during and after such construction and no liability whatsoever in this regard shall be cast on the Competent Authority or any officer / employee to whom power has been delegated.