The cell shall be responsible for assessing and appraising the environmental concerns of the area under their jurisdiction where building activities are proposed. The Cell can evolve and propose additional environmental conditions as per requirements. These conditions may be area specific and shall be notified in advance from time to time. These additional conditions shall be approved following a due consultation
process. These environmental conditions will be integrated in building permissions by the sanctioning authority.
Develop and maintain an online system for application and payment of fees. The Cell shall maintain an online database of all applications received, projects approved, the compliance audit report, random inspections made. The Cell shall maintain a portal for public disclosure of project details including self-certification and compliance audit reports filed by the Qualified Building Environment Auditors for public scrutiny of compliance of environmental conditions by the project.
Monitoring the work of Environmental Audit process carried by the Qualified Building Auditors.
The Cell shall review the applications; finalize the additional environmental conditions if required within 30 days of the submission of the application to the local authority. The Cell shall adopt risk based random selection of projects for verifying on site for certification of Qualified Building Auditors, compliance of environmental conditions and five yearly audit report.
The Cell shall recommend to the local authority for financial penalty for non-compliance of environmental conditions by the project proponent.
The Cell shall recommend to the accrediting body and the local authority against any Qualified Building Environment Auditor, if any lapse is found in their work.
Annexure 14
Environmental Conditions for Buildings and Constructions (CATEGORY '1': 5,000 to less than 20,000 Square meters)
Medium
Serial Number
Environmental conditions
Topography and drainage
1
The natural drain system should be maintained for natural ensuring unrestricted flow of water. No construction shall be allowed to obstruct the natural drainage through the site. No construction is allowed on wetland and water bodies. Check dams, bio- swales, landscape, and other sustainable urban drainage systems (SUDS) are allowed for maintaining the drainage pattern and to harvest rain water.
Water Conservation, 2 Rain Water Harvesting and Ground Water Recharge
Use of water efficient appliances should be promoted with low flow fixtures or sensors.A rain water harvesting plan needs to be designed where the recharge bores (minimum one recharge bore per 5,000 square meters of built up area) is recommended. Other provisions of rain water harvesting as per rule no. 40 of these rules shall be followed.Storage and reuse of rainwater harvested should be promoted.In areas where ground water recharge is not feasible, the rain water should be harvested and stored for reuse.The ground water shall not be withdrawn without approval from the Competent Authority and as per notification issued vide Memo No. PUDA/CA/2013/ 1713-16 dated 27.02.2013; the underground water for construction of development works in the notified areas shall not be used.All recharge should be limited to shallow aquifer.
Water Conservation, 2 Rain Water Harvesting and Ground Water Recharge
2 (a)
At least 20 percent of the open spaces as required by the local building bye-laws shall be pervious. Use of Grass pavers, paver blocks with at least 50 percent opening, landscape etc. would be considered as pervious surface.
Medium
Serial Number
Environmental conditions
Waste Management
3
Solid waste: Separate wet and dry bins must be provided in each unit and at the ground level for facilitating segregation of waste.Sewage: Onsite sewage treatment of capacity of treating 100 percent waste water to be installed. Treated waste water shall be reused on site for landscape, flushing, cooling tower, and other end-uses. Excess treated water shall be discharged as per CPCB norms. Natural treatment systems shall be promoted.Sludge from the onsite sewage treatment, including septic tanks, shall be collected, conveyed and disposed as per the Ministry of Urban Development, Central Public Health and Environmental Engineering Organization (CPHEEO) Manual on Sewerage and Sewage Treatment Systems, 2013.The provisions of The Solid Waste (Management) Rules 2016 and The E-waste (Management) Rules 2016, and The Plastics Waste (Management) Rules 2016 shall be followed.
Energy
4
The provisions of Punjab Energy Conservation Building Code shall be applicable to the buildings/areas in accordance with the notification issued vide notification no. 18/04/16 HG 1/1856 dated: 24-06-2016 or as amended from time to time.Rooftop Solar Photovoltaic installation shall be as per the provisions laid down in rule no. 37 & 38 of these rules.Solar water heating shall be provided to meet 20 percent of the hot water demand of the commercial and institutional building or as per the requirement of these rules, whichever is higher. Residential buildings are also recommended to meet its hot water demand from solar water heaters, as far as possible.
(Category'2': 20,000 to less than 50,000 Square meters)
Provisions of “Action Plan for Monitoring of and Noise Construction/ Demolition Activity of Buildings within the State of Punjab” dated 01.03.2017 shall be applicable.All demolition and construction waste shall be managed as per the provisions of the Construction and Demolition Waste Rules 2016.For indoor air quality the ventilation provisions as per the National Building Code of India of India, 2016.
5(a)
The location of the Diesel Generator (DG) set and exhaust pipe height shall be as per the provisions of the CPCB norms.
Green Cover
6
Every plot having area more than 60 sq.mt. but upto 100 sq.mt. shall plant at least one tree in the setbacks of plot. However, for bigger plots, one tree for every additional 100 sq.mt. of plot area shall be mandatory.The existing trees will be counted for this purpose. Preference should be given to planting native species.Compensatory Plantation for felled/transplanted trees in the ratio 1:3 within the premises under consideration.Choice of species for plantation in site shall be as per Section 8 of the Urban Green Guidelines, 2014.
Medium
S. no.
Environmental conditions
Topography and natural drainage
1
The natural drain system should be maintained for ensuring unrestricted flow of water. No construction shall be allowed to obstruct the natural drainage through the site. No construction is allowed on wetland and water bodies. Check dams, bio- swales, landscape, and other sustainable urban drainage systems (SUDS) are allowed for maintaining the drainage pattern and to harvest rain water.Buildings shall be designed to follow the natural topography as much as possible. Minimum cutting and filling should be done.
Medium
Serial Number
Environmental conditions
Water Conservation, Rain Water Harvesting and Ground Water Recharge
2
A complete plan for rain water harvesting, water efficiency and conservation should be prepared.Use of water efficient appliances should be promoted with low flow fixtures or sensors.A rain water harvesting plan needs to be designed where the recharge bores of minimum one recharge bore per 5,000 square meters of built up area and storage capacity of minimum one day of total fresh water requirement shall be provided. Other provisions of rain water harvesting as per rule no. 40 of these rules shall be followed.In areas where ground water recharge is not feasible, the rain water should be harvested and stored for reuse.The ground water shall not be withdrawn without approval from the Competent Authority and as per notification issued vide Memo No. PUDA/CA/2013/1713-16 dated 27.02.2013; the underground water for construction of development works in the notified areas shall not be used.All recharge should be limited to shallow aquifer.
2 (a)
At least 20 percent of the open spaces as required by the local building bye-laws shall be pervious. Use of Grass pavers, paver blocks with at least 50 percent opening, landscape etc. would be considered as pervious surface.
Waste Management 3
Waste Management 3
Solid waste: Separate wet and dry bins must be provided in each unit and at the ground level for facilitating segregation of waste.Sewage: Onsite sewage treatment of capacity of treating 100 percent waste water to be installed. Treated waste water shall be reused on site for landscape, flushing, cooling tower, and other end-uses. Excess treated water shall be discharged as per CPCB norms. Natural treatment systems shall be promoted.Sludge from the onsite sewage treatment, including septic tanks, shall be collected, conveyed and disposed as per the Ministry of Urban Development, Central Public Health and Environmental Engineering Organization (CPHEEO) Manual on Sewerage and Sewage Treatment Systems, 2013.
The provisions of The Solid Waste (Management) Rules 2016 and The E-waste (Management) Rules 2016, and The Plastics Waste (Management) Rules 2016 shall be followed.
3 (a)
All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie up must be done with the authorized recyclers.
3 (b)
Organic waste compost/ Vermiculture pit with a minimum capacity of 0.3 kg/person/day must be installed.
Energy
4
The provisions of Punjab Energy Conservation Building Code shall be applicable to the buildings/areas in accordance with the notification issued vide notification no. 18/4/16 HG 1/1856 dated: 24-6-2016 or as amended from time to time.Rooftop Solar Photovoltaic installation shall be as per the provisions laid down in these rules.Solar water heating shall be provided to meet 20 percent of the hot water demand of the commercial and institutional building or as per the requirement of these rules, whichever is higher. Residential buildings are also recommended to meet its hot water demand from solar water heaters, as far as possible.
4 (a)
Use of environment friendly materials in bricks, blocks and other construction materials, shall be required for at least 20 percent of the construction material quantity. These include flyash bricks, hollow bricks, AACs, Fly Ash Lime Gypsum blocks, compressed earth blocks, and other environment friendly materials.Fly ash should be used as building material in the construction as per the provisions of the Fly Ash Notification of September, 1999 as amended from time to time.
Air Quality and Noise
5
Provisions of “Action Plan for Monitoring of Construction /Demolition Activity of Buildings within the State of Punjab” dated 01.03.2017 shall be applicable.All demolition and construction waste shall be managed as per the provisions of the Construction and Demolition Waste Rules 2016.
For indoor air quality the ventilation provisions as per the National Building Code of India, 2016 as amended from time to time.
5 (a)
The location of the Diesel Generator (DG) set and exhaust pipe height shall be as per the provisions of the CPCB norms.
Green Cover
6
Every plot having area more than 60 sq.mt. but upto 100 sq.mt. shall plant at least one tree in the setbacks of plot. However, for bigger plots, one tree for every additional 100 sq.mt. of plot area shall be mandatory.The existing trees will be counted for this purpose. Preference should be given to planting native species.Compensatory Plantation for felled/transplanted trees in the ratio 1:3 within the premises under consideration.Choice of species for plantation in site shall be as per Section 8 of the Urban Green Guidelines, 2014.
The natural drain system should be maintained for natural ensuring unrestricted flow of water.No construction shall be allowed to obstruct the natural drainage through the site. No construction is allowed on wetland and water bodies. Check dams, bio-swales, landscape, and other sustainable urban drainage systems (SUDS) are allowed for maintaining the drainage pattern and to harvest rain water.Buildings shall be designed to follow the natural topography as much as possible.Minimum cutting and filling should be done.
Water Conservation,Rain WaterHarvesting and Ground Water Recharge
2
A complete plan for rain water harvesting, water efficiency and conservation should be prepared.Use of water efficient appliances should be promoted.Low flow fixtures or sensors are used to promote water conservation.A rain water harvesting plan needs to be designed where the recharge bores of minimum one recharge bore per 5,000 square meters of built up area and storage capacity of minimum one day of total fresh water requirement shall be provided. Other provisions of rain water harvesting as per rule no. 40 of these rules shall be followed.In areas where ground water recharge is not feasible, the rain water should be harvested and stored for reuse.The ground water shall not be withdrawn without approval from the Competent Authority and as per notification issued vide Memo No. PUDA/CA/2013/1713-16 dated 27.02.2013, the underground water for construction of development works in the notified areas shall not be used.All recharge should be limited to shallow aquifer.
2 (a)
At least 20 percent of the open spaces as required by the local building bye-laws shall be pervious. Use of Grass pavers, paver blocks with at least 50 percent opening, landscape etc. would be considered as pervious surface.
Solid waste: Separate wet and dry bins must be provided in each unit and at the ground level for facilitating segregation of waste.The provisions of The Solid Waste (Management) Rules 2016 and The E-waste (Management) Rules 2016, and The Plastics Waste (Management) Rules 2016 shall be followed.
3 (a)
All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie up must be done with the authorized recyclers.
3 (b)
Organic waste composter/Vermiculture pit with a minimum capacity of 0.3 kg/person/day must be installed.
Sewage Treatment Plant
4
Onsite sewage treatment of capacity of treating 100 percent waste water to be installed. Treated waste water shall be reused on site for landscape, flushing, cooling tower, and other end-uses. Excess treated water shall be discharged as per CPCB norms.Natural treatment systems shall be promoted.Sludge from the onsite sewage treatment, including septic tanks, shall be collected, conveyed and disposed as per the Ministry of Urban Development, Central Public Health and Environmental Engineering Organization (CPHEEO) Manual on Sewerage and Sewage Treatment Systems, 2013.
Energy
5
The provisions of Punjab Energy Conservation Building Code shall be applicable to the buildings/areas in accordance with the notification issued vide notification no. 18/04/16 HG 1/1856 dated: 24-06-2016 or as amended from time to time.Rooftop Solar Photovoltaic installation shall be as per the provisions laid down in these rules.
Solar water heating shall be provided to meet 20 percent of the hot water demand of the commercial and institutional building or as per the requirement of these rules, whichever is higher. Residential buildings are also recommended to meet its hot water demand from solar water heaters, as far as possible.
5 (a)
Use of environment friendly materials in bricks, blocks and other construction materials, shall be required for at least 20 percent of the construction material quantity. These include flyash bricks, hollow bricks, AACs, Fly Ash Lime Gypsum blocks, compressed earth blocks, and other environment friendly materials.Fly ash should be used as building material in the construction as per the provisions of the Fly Ash Notification of September, 1999 as amended from time to time.
Air Quality and Noise
6
Provisions of “Action Plan for Monitoring of and Noise Construction /Demolition Activity of Buildings within the State of Punjab” dated 01.03.2017 shall be applicable.All demolition and construction waste shall be managed as per the provisions of the Construction and Demolition Waste Rules 2016.For indoor air quality the ventilation provisions as per the National Building Code of India, 2016 as amended from time to time.
6 (a)
The location of the Diesel Generator (DG) set and exhaust pipe height shall be as per the provisions of the CPCB norms.
Green Cover
7
Every plot having area more than 60 sq.mt. but upto 100 sq.mt. shall plant at least one tree in the setbacks of plot. However, for bigger plots, one tree for every additional 100 sq.mt. of plot area shall be mandatory.The existing trees will be counted for this purpose. Preference should be given to planting native species.Compensatory Plantation for felled/transplanted trees in the ratio 1:3 within the premises under consideration.
Choice of species for plantation in site shall be as per Section 8 of the Urban Green Guidelines, 2014.
Top Soil preservation and reuse
8
Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved areas, and external services.It should be stockpiled appropriately in designated areas and reapplied during plantation of the proposed vegetation on site.
Transport
9
A comprehensive mobility plan, as per MoUD best practices guidelines (URDPFI), shall be prepared to include motorized, non-motorized, public, and private networks.Road should be designed with due consideration for environment, and safety of users. The road system can be designed with these basic criteria.Hierarchy of roads with proper segregation of vehicular and pedestrian traffic.Traffic calming measures.Proper design of entry and exit points.Parking norms as per local regulation.
The project proponent shall get it certified from the approved consultant of the PPCB/Qualified Building Environment Auditor regarding installation of sewage treatment plant (STP) and adequacy of disposal system and shall ensure that the treated sewage shall conform to the norms and standards prescribed by Punjab Pollution Control Board or any other statutory authority for such discharges.
Category 1, 2 and 3
2
The project proponent shall adopt only the authorized mode of disposal and shall not use any illegal mode of disposal for treated wastewater.
Category 1, 2 and 3
3
The project proponent shall form Environment Monitoring Committee for supervising and monitoring the environment related conditions of the building permission.
Category 3
4
The project proponent shall make provisions for the housing of construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, Safe drinking water and medical health care etc. The housing may be in the form to temporary structure and it shall be removed after the completion of the project.
Category 1, 2 and 3
5
The project proponent shall comply with the Construction and Demolition Rules, 2016.
Category 1, 2 and 3
6
The project proponent shall provide dual plumbing line for use of the treated wastewater for flushing purpose and shall provide other measures like providing fixtures for showers, toilet flushing and drinking of low flow either by use of aerators or pressure reducing devices or sensor based control, for conservation of groundwater.
Category 2 and 3
7
The project proponent shall use only treated wastewater for construction purpose and to reduce the water demand during construction, the project proponent shall make use of premixed concrete, curing agents and other best practices referred
Category 1, 2 and 3
8
The project proponent shall hire vehicles of good condition for bringing construction material to the site of the project and ensure that all these vehicles shall conform to applicable air, noise and emission standards and shall only be operated during non-peak hours.
Category 1, 2 and 3
9
The project proponent shall ensure that ambient noise levels shall conform to prescribed standards both during day and night times. The ambient air and noise quality should be closely monitored during construction and operation phase.
(1) Environmental Cell at the level of Development Authority:
An Environmental Cell shall be setup at the development authority level to support compliance and monitoring of environmental conditions in buildings. The Cell shall also provide assistance in environmental planning and capacity building within their jurisdiction. The responsibility of this cell would be monitoring the implementation of this notification and providing an oversight to the Third-Party Auditing process. The cell will operate under the development authority.
(2) Constitution of the cell:
The cell will comprise of at least 3 dedicated experts in following fields:
Waste management (solid and liquid)
Water conservation and management
Resource efficiency including Building materials
Energy Efficiency and renewable energy
Environmental planning including air quality management.
Transport planning and management.
The Cell shall induct at least two outside experts as per the requirements and background of dedicated experts. Existing environmental cells at the level of local authority can be co-opted and trained for this Cell.
(3) Financial Support:
An additional fee may be charged along with processing fee for building permission for integrating environmental conditions and it’s monitoring. The local authority can fix and revise this additional fee from time to time. The amount of this fee shall be deposited in a separate bank account, and used for meeting the requirement of salary / emoluments of experts and running the system of online application, verifications and the Environmental Cell.
Top Soil preservation reuse
7
Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings, roads, paved areas, and and external services.It should be stockpiled appropriately in designated areas and reapplied during plantation of the proposed vegetation on site.
Transport
8
A comprehensive mobility plan, as per MoUD best practices guidelines (URDPFI), shall be prepared to include motorized, non-motorized, public, and private networks.Road should be designed with due consideration for environment, and safety of users. The road system can be designed with these basic criteria.Hierarchy of roads with proper segregation of vehicular and pedestrian traffic.Traffic calming measures.Proper design of entry and exit points.Parking norms as per local regulation.
Environment Management Plan
10
An environmental management plan (EMP) shall be prepared and implemented to ensure compliance with the environmental conditions specified in item number 1 to 9 above. A dedicated Environment Monitoring Cell with defined functions and responsibility shall be put in place to implement the EMP. The environmental cell shall ensure that the environment infrastructure like Sewage Treatment Plant, Landscaping, Rain Water Harvesting, Energy efficiency and conservation, water efficiency and conservation, solid waste management, renewable energy etc. are kept operational and meet the required standards. The environmental cell shall also keep the record of environment monitoring and those related to the environment infrastructure.
Category 1, 2 and 3
10
The project proponent shall make provision of the budget for carrying out long lasting and public utility activities under the corporate social responsibility with the advice of District Administration.