37 Provisions and applicability. - The approval of building plans shall be subject to the fulfilment of provisions of water conservation and management, energy efficiency, waste management and solar energy utilization as are given in the table below: -
(a) Provisions for various plot sizes (Residential uses)
| Green Building Provisions | Residential plotted | Group housing | |||||
| Plot Area in Sq.mt. | |||||||
| Upto 250 | Above 250 upto 500 | Above 500 upto 1,000 | Above 1,000 upto 3,000 | Above 3,000 | As per Government policy | ||
| Water Conservation and Management | Rain | √ | √ | √ | √ | √ | √ |
| Water Harvesting (by Recharge) | |||||||
| Low Water Consumption Plumbing Fixtures | √ | ||||||
| Energy Efficiency and Solar Energy Utilization | Provisions of notification no. 18/4/16 HG 1/1856 dated: 24-06-2016 of Department of New and Renewable Energy shall be applicable or as amended from time to time. | ||||||
| (b) Provisions for various plot sizes (Non-Residential uses) | |||||||
| Green Building Provisions | Plot Area in Sq.mt. | ||||||
| Upto 250 | Above 250 upto 500 | Above 500 upto 1,000 | Above 1,000 upto 3,000 | Above 3,000 | |||
| Water Conservation and Management | Rain | √ | √ | √ | √ | ||
| Water Harvesting (by Recharge) | |||||||
Note:-
2430 PUNJAB GOVT. GAZ., SEPTEMBER 10, 2021 (BHDR 19, 1943 SAKA)
| Residential plotted | Group housing | ||||||
| Green Building Provisions | Plot Area in Sq.mt. | ||||||
| Upto 250 | Above 250 | Above 500 upto 500 | Above 1,000 upto 1,000 | Above 3,000 upto 3,000 | As per Govern-ment policy | ||
| Low Water | √ | ||||||
| Consump-tion | |||||||
| Plumbing | |||||||
| Fixtures | |||||||
| Energy Efficiency and Solar Energy Utilization | Provisions of notification no. 18/4/16 HG 1/1856 dated: 24-06-2016 of Department of New & Renewable Energy shall be applicable or as amended from time to time. | ||||||
The √ indicate that the provision is applicable for a plot.
38Section Energy efficiency.- The provisions of the Punjab Energy Conservation Building 108 (2) Code shall be applicable to the buildings or areas in accordance with the notification issued by the Government vide No. 18/4/16 HG 1/1856, dated the 24th June 2016, as amended from time to time.
(ii) The applicant or owner shall submit a certificate from an architect or Civil Engineer confirming that the building plans conform to the Punjab Energy Conservation Building Code and is duly verified by Punjab Energy Development Agency (PEDA) along with the application approval of building plan.
(iii) The completion and occupation certificate of buildings shall be issued by the competent authority only after the applicant or owner shall submit a certificate from an architect or Civil Engineer (who has supervised the construction of building), that building has been constructed in accordance with the provisions of the Punjab Energy Conservation Building Code and is duly verified by Punjab Energy Development Agency.
(iv) An incentive of additional Floor Area Ratio of five percent for Three Star or Bronze or Sliver rated building, seven and half percent for Four Star or Gold rated building and ten percent for Five Star or Platinum rated building free of cost with hundred percent exemption of building scrutiny fee shall be permissible
Section 108 (2)
Section 108 (2)
2431
39
40
on submission of Green Building Certificate from the following agencies with rating duly verified by rating agencies, namely: -
(a) Buildings granted Three Star or Four Star or Five Star rating by Green Rating for Integrated Habitat (GRIHA); or
(b) Buildings granted Bronze or Silver or Gold or Platinum rating by Leadership in Energy and Environmental Design (LEED); or
(c) Buildings granted Bronze or Silver or Gold or Platinum rating by Indian Green Building Council (IGBC).
However, in case the owner or applicant fails to submit maintenance certificate after a period of every three years from the rating agencies (GRIHA/LEED/ IGBC), the defaulter can be penalized equivalent to five times the collector rate of land proportional to the five percent additional Floor Area Ratio availed and Building scrutiny fee shall be recovered along with interest at the rate of twelve percent from the date of the approval of building plans.
Provisions for tree plantation in new building sites.- The building plan shall only be approved, if the provision for planting trees of indigenous species is shown on the building plans as given below:-
(i) One tree for every 225 sq.m covered area of building(s) shall be planted. While calculating the number of trees, if there is a fraction less than 0.5, it shall be rounded down to the nearest whole digit and if there is a fraction equal to or greater than 0.5, it shall be rounded up to the nearest whole digit.
(ii) The occupancy certificate shall only be granted, if the owner has planted the requisite number of trees as per the sanctioned plans.
Rainwater harvesting.- The harvesting of rainwater simply involves the collection of water from surfaces on which rain falls, and subsequently storing this water for use. The rainwater collected can be stored for direct use or can be recharged into the underground aquifers. In scientific terms, water harvesting (broadly) refers to collection and storage of rainwater from the rooftops. This also restricts evaporation and seepage into building foundations.
A rainwater harvesting system consists of the following: -
(a) Roof catchment;
(b) Gutters;
(c) Down pipes;
(d) Rain water/ Storm water drains;
(e) Filter Chamber;
(f) Storage Tanks/ Pits/ Sumps; and
(g) Ground Water recharge structures like pit, trench, tube well or combination of above structure.
(1) Rainwater harvesting techniques. – There are two main techniques of rain water harvestings, namely: -
(a) Storage of rainwater under surface; and
(b) Recharge to ground water.
(2) Harvesting provisions in various building categories.- The provision for rain water harvesting is as under:
Rainwater harvesting by building types:-
| Category/Use | Area of Plot | Provisions to be made | Other conditions |
| Residential Plotted Houses | Residential Plotted Houses | Residential Plotted Houses | Residential Plotted Houses |
| New Proposals | Above 250 sq.mt. | Construction of Rain Water Harvesting Structure. | Shall have emphasis on both storage and reuse. |
| Group Housing | Group Housing | Group Housing | Group Housing |
| New Proposals | All plot sizes | Construction of Rain Water Harvesting Structure.Concrete paving to be avoided and permeable materials are to be used or all open parking spaces. | Should indicate the system of Storm Water Drainage, Rain Water Harvesting Structure and Recharging Well |
| Government and Semi Government Public Buildings and Private Institutions | Government and Semi Government Public Buildings and Private Institutions | Government and Semi Government Public Buildings and Private Institutions | Government and Semi Government Public Buildings and Private Institutions |
| All Proposals | Above 250 sq.mt. | Shall have Rain Water Harvesting Structure and storage Shall have Recharge pits | Shall have emphasis on both storage and reuse. |
| Commercial / Mixed use Buildings | Commercial / Mixed use Buildings | Commercial / Mixed use Buildings | Commercial / Mixed use Buildings |
| All Proposals | Above 100 Sq.mt. | Construction of Rain Water Harvesting Structure.Soft landscape provisions and open spaces with Percolation pits.Common treatment plant to be | Should indicate the system of Storm Water Drainage, Rain Water Harvesting Structure and |
| Category/Use | Area of Plot | Provisions to be made | Other conditions |
| made part of the integrated development, funded by sale of commercial space. | Recharging Well Shall have emphasis on both storage and reuse. | ||
| Industrial | Industrial | Industrial | Industrial |
| All proposals | Above 100 Sq.mt. | Construction of Rain Water Harvesting Structure. Soft landscape provisions and open spaces with Percolation pits. Use of abandoned bore wells for recharging of ground water. Common treatment plant to be made part of the integrated development funded by sale of commercial space. | Should indicate the system of Storm Water Drainage, Rain Water Harvesting Structure and Recharging Well. Provision should be made not to inject contaminated water into recharge structures in industrial areas and care is to be taken to keep such structures away from sewer lines, septic tanks, soak pits, landfill and other sources of contamination. |
Provided that design and structural specification of rain water harvesting system shall be prepared and certified by an Engineer dealing with civil work.
Section 108 (2)
41 Sustainable waste management.- (1) Zero waste is a concept of waste management and planning approach that emphasize waste prevention as opposed to end waste management. This means restructuring production and distribution systems, designing and managing products and processes to systematically follow the rule of 3R’s i.e., Reduce, Re-use and Re-cycle, the volume of waste, to conserve and recover all used resources, and therefore, eliminating all discharges to landfills, and prevent air, water and land pollution.
(2) Zero waste/ land-fill can be achieved by adopting systematic approach of segregation at source by planning, by collection facilitation and most importantly by creating public awareness.
(3) The green waste can be converted into fuel cakes, kitchen waste into manure, construction and demolition waste into bricks, plastic waste into oil, paper, glass and steel back into the same and all residual inert materials can also be converted into bricks. Achieving zero land-fill is more conveniently possible, if :-
(a) the collection is made from house to house and some segregation is done at household level;
(b) separate wet and dry bins must be provided at the ground level; and
(c) the recycling is done at decentralized.
(4) For Plot area 500 sq.m and above, the composting of biodegradable waste such as kitchen waste, garden waste etc. is mandatory. They should not be allowed to send their biodegradable waste to landfill. Final product after composting i.e Humus or Black Gold should be used as manure for green area within their complexes or sites.