| Serial Number | Type of occupancy | Occupant load factor (sq.m per person) |
| I. | Residential | 12.50 |
| II. | Educational | 4.00 |
| III. | Institutional | |
| Indoor patient area | 15.00 | |
| Outpatient area | 10.00 | |
| IV. | Assembly: | |
| Concentrated use without fixed seating | 0.65 | |
| Less concentrated use without fixed seating | 1.40 | |
| Fixed seating | Multiplying the number of seats by 1.2 | |
| Dining areas and restaurants with seating and table | 1.80 | |
| V. | Mercantile: | |
| Street floor and sales basement | 3.00 | |
| Upper sales floor | 6.00 | |
| Storage/warehouse, receiving and the like | 20.00 | |
| VI. | Business | 10.00 |
| VII. | Industrial | Calculated on the basis of Detailed Project Report (DPR) approved by labour Department plus 10 percent addition of it. However, if DPR is not approved by the labour Department then applicant shall submit the undertaking in this regard as per annexure 22. |
| VIII. | Storage | |
| IX. | Hazardous |
Section 108 (2)
Notes:-
(a) Gross area shall be the floor area as defined in clause (lxxviii) of sub-rule (1) of rule 2 of these rules. All factors expressed are in gross area unless marked net.
(b) Occupant load in dormitory portions of homes for the aged, orphanages, insane asylums, etc, where sleeping accommodation is provided, shall not be calculated at less than 7.5 m2 gross floor area/ person.
(c) For the purpose of public health facilities like W.C., urinal, washbasin, drinking water fountain, ablution tabs etc., occupant load shall be calculated on floor area ratio.
29 Clearance zone for buildings near High Tension Electrical Line.- The building shall not be constructed within the clearance zone. The clearance zone shall be in accordance with the guidelines of Punjab State Power Corporation Limited (PSPCL) and in accordance with the table given below, as amended from time to time:
Clearance Zone for buildings near High Tension Electrical Line
| Type of supply line | Type of supply line Horizontal clearance (in meters) (including both sides and from the centre line of the tower) |
|---|---|
| High voltage lines up to 11 KV | 11.5 |
| High voltage lines above 11 KV | 15.0 |
| and up to 33KV | |
| High voltage lines above 33 KV and | 18.0 |
| up to 66KV | |
| High voltage lines above 66 KV | 27.0 |
| and up to 132KV | |
| High voltage lines above 132 KV | 35.0 |
| and up to 220KV | |
| High voltage lines above 220 KV | 52.0 |
| and up to 440KV |
30 Part Building requirement.-This part sets out the standard space requirements of various parts of a building (for all types of buildings-low/high rise), namely:-
(1) Plinth.- The plinth level for building (s) shall be computed from the crown of the adjoining road in front or as specified by the Competent Authority from time to time. Interior court yard shall be raised at least 150 mm above the determining ground level and shall be satisfactorily drained.