For requirements regarding Lighting and ventilations for different uses and occupancies reference shall be made to part 8 “Building Services”, Section 1 “Lighting and Natural Ventilation” of the National Building Code, 2016 or its latest version.
14.4.2 Electrical and Allied Installations (Including Lighting Protection of Buildings and Solar Energy Utilization) :
For requirements regarding Electrical Installations in Buildings Including Lighting Protection of Buildings reference shall be made to part 8 “Building Services” Section 2 Electrical and Allied Installations of the National Building Code, 2016 or its latest version.
14.4.3 Air Conditioning, Heating and Mechanical ventilation :
For requirements regarding design, construction and installation of Air Conditioning, Heating and Mechanical ventilation systems, reference shall be made to part 8 “Building Services” Section 3 Air Conditioning, Heating and Mechanical ventilation of the National Building Code, 2016 or its latest version.
14.4.4 Acoustics, Sound Insulation and Noise Control :
For requirements regarding the desired Noise levels and sound Insulation in different occupancies reference shall be made to part 8 “Building Services” Section 4 Acoustics, Sound Insulation and Noise Control of the National Building Code, 2016 or its latest version.
14.4.5 Installation of Lifts Escalators and Moving Walks :
Provision for Lifts shall be made for buildings 15 m. or more in height For requirements regarding planning, designing and installation etc. of Lifts Escalators, reference shall be made to part 8 “Building Services” Section 5 Installation of Lifts Escalators and Moving Walks of the National Building Code, 2016 or its latest version.
14.4.6 Information and Communication Enabled Installations :
For requirements regarding Information and Communication Enabled Installations in Buildings reference shall be made to Part 8 “Building Services” Section 6 Information and Communication Enabled Installations of the National Building Code, 2016 or its latest version.
For requirements regarding water supply, drainage and Sanitation, Solid Waste Management and gas supply reference shall be made to part 9 “Plumbing Services (Including Solid Waste Management)” of the National Building Code, 2016 or its latest version.
14.6 Landscape Development :
For requirements regarding Landscape development, reference shall be made to part 10 ‘Landscape Development and Sign and outdoor display structures’ Section 1 Landscape Planning and Development of the National Building Code, 2016 or its latest version.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 195
14.7 Sign and outdoor display structures :
No advertising signs (including hoarding) on buildings or on land shall be displayed without the prior approval of the Authority. The standards specified in Section-2 of part 10 Signs and outdoor display structures of National Building Code, 2016 or its latest version.
14.8 Sustainability :
For requirements regarding sustainable buildings and built environment, reference shall be made to part 11 ‘Approach to Sustainability’ of the National Building Code, 2016 or its latest version.
14.9 Asset and Facility Management :
For requirements regarding Asset and Facility Management in respect of Existing Buildings and services thereof, reference shall be made to part 12 Asset and Facility Management of the National Building Code, 2016 or its latest version.
14.10 Energy Conservation Building :
For requirements regarding Energy Conservation Building guidelines reference shall be made to Energy Conservation Building Code, 2017 or its latest version & the J&K UT ECBC whenever framed.
Note:—Whenever an Indian Standard including those referred in the National Building Code or the National Building Code is referred; the latest revision of the same shall be followed except specific criteria, if any, mentioned above against that code.
14.11 Health Guidelines :
Refer guidelines issued by Department of Health, Family Welfare and Medical Education, Government of Jammu and Kashmir.
14.12 Education Guidelines :
Refer SRO-123 or latest guidelines issued by Department of Education, Government of Jammu and Kashmir.
Chapter 14General References
14.1 Facilities for physically handicapped persons :
For requirements regarding Facilities for Physically Handicapped Persons, reference shall be made to part 3 Development Control Rules and General Building Requirements of the National Building Code, 2016 or its latest version which shall apply.
14.2 Fire and Life Safety :
For requirements regarding Fire and Life Safety for different Occupancies, reference shall be made to part 4 Fire and Life Safety of the National Building Code, 2016 or its latest version.
14.3 Design and Construction :
For requirements regarding structural design, reference shall be made to part 6 Structural design of the National Building Code. For requirements regarding construction (including management and safety), reference shall be made to part 7 Construction Management, Practices and safety ‘of the National Building Code, 2016 or its latest version.
14.13Sports Guidelines :
Refer latest guidelines issued by Sports Department, Government of Jammu and Kashmir.
Appendices
Appendix “A”: Form for Application to Erect, Re-Erect or to make Material Alteration in any place in a building
(To be submitted in duplicate)
To
Commissioner/Vice-Chairman/Secretary, Development Authority/Municipal Corporation/Council/Committee.
Table A-2: 1 Details of coverage on respective floor are given below:
S.No.
Floor
Existing (sq.m.)
Proposed (sq.m.)
Total (sq.m.)
1.
Basement Floor
2.
Ground Floor
3.
Mezzanine Floor
4.
First Floor
5.
Second Floor
6.
Third floor
7.
......
(a) Approximate number of in habitants proposed to be accommodated....
(b) The number of latrines, Urinals, Kitchens, Baths to be provided....
(c) The source of water to be used in the construction............
(d) Distance from public sewer....
(e) The materials to be used in construction Walls/Columns/Foundations/Roof/Floors....
Signature of Registered Architect/Engineer/Supervisor
Name................
Registration No................
Address....................
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 201
Sir,
I hereby give notice on behalf of Shri....(owner) that the owner intends to erect/demolish or make alteration in the building number or to on/in Plot No.... Block No....House No....situated at ....Scheme....and in accordance with the building Bye-Law No....and I forward herewith, the following plans and specification duly signed by me and by the owner :—
Site plan
Building Plan
Service Plan
Parking and circulation plan
Landscape Plan
General Specifications (in attached form)
Ownership Title (Lease/Conveyance/Sale Deed, etc.)
Other document, as required.
(ii) The building plan has been prepared strictly as per the approved Building Bye-Laws and relevant IS Codes/provisions of NBC. The construction shall be carried out in accordance with the building plan and I shall be completely accountable for any lapse on my part up to within 6 months after obtaining completion certificate of the building.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 197
(iii) The Building permit fee as required under bye-laws has been deposited vide receipt No....dated....(Photocopy enclosed).
(iv) I am aware that in the event of building being constructed in violation of the sanctioned building plan approval, the Authority shall have the right to take action against me as it may deem fit including referring the matter to concerned professional and statutory councils for taking disciplinary action against me.
Signature of the Owners
Signature of Registered
Name of the owner(s)
Architect/Engineer/Supervisor
Registration No. of the
Address of the owner(s)
Architect/Engineer/Supervisor
Address of the Architect/Engineer/ Supervisor
Encl.: As stated above.
Dated: ....
Appendix “A-1”
Statement of the Proposal and Certificate
By the Owner and Registered Architect—
Classification of the Proposal............
(To erect/re-erect/demolition)
Scheme/Colony...........Plot No...........
Plot Area ............ sq.m. size (in m)
Area Statement :
Parking Details :
Description
Permissible
Proposed sq.m.
Remarks sq.m.
Max. Ground coverage
Basement
Ground Floor
First Floor
Second Floor
Third Floor
Total Floor area
Floor Area Ratio
No. of Dwelling Units
Maximum height (in m) :
Setbacks
As per approved Layout plan (m.)
Proposed (m.)
Front
Rear
Left
Right
Building Use
Parking Required as per Building Bye law
Proposed (m.)
Residential
Commercial
PSP
Other...
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 199
(ii) Fees and Charges :
(a) Building Permission Fess ......
(b) Infrastructure Development Fees..........
(c) Additional Floor Space Fees ..........
(d) Any other (as applicable)...........
Total Amount as per details above...........
Receipt No.......... Dated..........
We hereby certify that—
The plot in question forms part of the approved layout plan and its location size and area conform to the approved layout plan and lease/sale deed/NOC of the lease Administration Branch of concerned Development Authority.
Plot is lying vacant and no construction shall be started before sanction.
The plot is free from all encumbrances (owner responsibility).
The period of construction valid up to .... As per the lease condition/further extension of time for construction granted by the lessor is valid up to .... Time construction obtained from the lease Administration Branch, Concerned Development Authority.
5. Size of each dwelling unit is not more than 300 sq.m.
Signature of Owner Name
Signature of Registered Architect Name
......
Registration No.
Address
Address
......
......
Dated
......
Authority Letter
I hereby authorize Mr./Mrs.... to collect the sanction whose signature is verified below: —
Specimen signature of the owner(s)/Registered Architect/Mr./Mrs.
Dated received.... Date ....
(Signature of authorized person/owner/Registered Architect)
Dated.... Remark, if any....
Appendix “A-2”
Form for Specifications of Proposed Building
The purpose (Residence, Office, Restaurant, Hotel, Dharmshala, School, Hostel Cinema, Shop, Factory Others) for which it is intended to be used....
Appendix “A-3” Form for Supervision
To
The Commissioner/Vice-Chairman/Secretary,
Development Authority/Municipal Corporation/Council/Committee.
Sir,
I hereby certify that erection/re-erection demolition or material alteration in/of Building No....on/in .... Plot No....in Block No.... situated at .... scheme.... shall be carried out under my supervision and I certify that all the materials (type & Grade) and workman ship of the work shall be generally in accordance with the general specification submitted along with and the work shall be carried out according to the sanctioned plans which also included the services like drainage, sanitary, water supply, and electrical.
Signature of Registered Architect/Engineer/Supervisor
Name of Registered Architect/Engineer/Supervisor
(In block letters) .....
Registration No. of Architect/Engineer/Supervisor
.....
Address of Registered Architect/Engineer/Supervisor
....
Dated:................
Appendix "A-4"
Undertaking for Payment of Other and Peripheral Charges
Note:—It should be on non-judicial stamp paper of specified amount attested by Notary Public/First Class Magistrate.
Undertaking
Executed by me as................on day of....2004.
Executant
Witness :
1....................
2....
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 203
Appendix "A-5"
Affidavit-cum-Undertaking
(Affidavit of Competent Professional on Rs. 2/- Non-Judicial Stamp paper of specified amount to be attested by Notary Public/Metropolitan Magistrate)
I, ....son of.... Architect by profession having office at....do hereby solemnly affirm and declare as under:—
That I am a Licensed Architect/Engineer/Supervisor/Plumber duly registered with the Authority vide registration No....
That I have been engaged as a Competent Professional as per Table 2—2: Procedure for Building Permission of Non-Residential Use Building of the bye-laws for preparing the building plans and to supervise construction in respect of Plot No....Block No.... situated at....
That I have prepared the building plans in respect of the aforesaid plot.
That I have studied the layout plan of the colony and gone through the instructions, policy decisions and other relevant documents in respect of the plot and colony.
That I have personally inspected the site. The plot under proposal forms part of the approved layout plan with respect to its location, size shape and area of the plot and proposed land use is also in conformity with the approved layout plan. The plot has been demarcated at site and the size, shape and area of plot available at site tallies with the approved layout plan.
That the ownership documents are in the shape of registered sale deed/lease deed in favour of the applicants and have been thoroughly examined and the ownership in favour of the applicant is in order.
That there is no construction inexistence at the plot and no construction shall be started before sanction of the building plans.
That there is no encroachment on the Municipal land/road/other property and road widths as shown in the layout plan are available at site.
That the proposal is in conformity with the terms and condition of lease deed which is still valid and period of construction as per lease deed and the extension granted by the lessor is valid up to....
That the proposal has been prepared strictly in accordance with the Master Plan/Zonal Plan/Building Bye-Laws rules regulation and practice of the department and no misinterpretation on inference of provision of Building Bye-Law has been done while preparing the plans. The construction shall be carried out strictly in accordance with the sanctioned building plans and in case any deviation is carried out, I shall inform the concerned Authority within 48 hours.
That in case the owner dispenses with my services at any stage whatsoever, I shall inform the concerned Authority within 48 hours.
That the size of each dwelling unit is not more than 300 sq. m.
That mandatory setbacks have been proposed and shall be maintained in accordance with the setbacks marked in the layout plan/Master Plan/Zonal Plan/Building Bye-Laws.
That before submission of the proposal, necessary information/clarification have been obtained from the concerned department of the concerned Authority. The plot is safe and is not affected in any scheme or the road widening. Building activities for residential use are allowed with number of storeys as per approved layout plan.
That no development/additional development/deficiency charges are payable, against this plot (in case development/additional development/deficiency charges are payable then its details be given in the separate para).
That no non-compoundable deviations shall be carried out during the course of construction.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 205
That nothing has been concealed and no misrepresentation has been made while preparing and submitting the building plans.
That in case anything contrary to the above is found or established at any stage, the concerned Authority shall be at liberty to take any action as it may deem fit including revocation of sanction of building plans and debarring me for submission of building plans with the Authority under the scheme and also lodge a complaint with the Council of Architecture for appropriate action.
Deponent.
Verification :
I the above-named deponent do hereby verify at .... on this....of....20....that contents of the above affidavit are true and correct to my knowledge. No part of it is false and nothing has been concealed therefrom.
Deponent.
Appendix \"A-6\
Building Permit/Sanction
File No................... Dated................
To
Subject :—Sanction under section.... Dear Sir or Madam.
With reference to your application dated.... for the grant of sanction to erect/re-erect/add to/alteration in the building to carry out the development specified in the said application relating to Plot No.... Block No.... situated in/at.... I have to state that the Authority subject to the following conditions and corrections done in the plans has sanctioned the same on....:—
The plans are valid up to ____ day.
months....year....
The construction will be undertaken as per sanctioned plan only and no deviation from the bye-laws will be permitted without prior sanction. Any deviation done against the bye-laws is liable to be demolished and the supervising Architect engaged on the job will run the risk of being blacklisted.
Violation of Building Bye-Laws will not be compounded.
It will be the duty of the owner of the plot and the Architect preparing the plans to ensure that the sanctioned plans are as per prevalent Master Plan/Zonal Plan/Building Bye-Laws. If any infringement of bye-laws remain unnoticed, the concerned Authority reserves the right to amend the plans as and when infringement come to the notice and concerned Authority will stand indemnified against any claim on this account.
A notice in writing shall be sent to Authority before commencement of the constructions of the building as per byelaws. Similar notice will be sent to Authority when the building has reached up to plinth level.
The owner shall not occupy or permit to occupy the building or use or permit to use the building or any part thereof affected by any such work until Completion Certificate is issued by the concerned Authority.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 207
Concerned Authority will stand indemnified and kept harmless from all proceedings in court and before other authorities of all expenses/claims which the concerned Authority may incur or become liable to pay as a result or in consequences of the sanction accorded by it to these building plans.
The doors and window leaves shall be fixed in such away that they shall not, when open project on any street.
The owner will not convert the house into more dwelling units on each floor then the sanctioned.
The building shall not be constructed within minimum distance as specified in Indian Electricity Rules from voltage lines running onside of the site.
The land left open as a consequence of the enforcement of the setback rule shall form part of the public street.
12 The owner shall ensure that the public areas like road, parks and other public opens spaces are not used for stacking the building materials or machineries to avoid public inconvenience and nuisance.
The sanction will be void if auxiliary conditions mentioned above and other conditions whatsoever imposed are not complied.
The owner will use the premises for the use, which has been sanctioned.
The owner will not proceed with the construction without having the supervision of an Architect/Engineer as the case may be. If he/she changes his Architect/Engineer, he/she shall inform the Authority about the appointment of new Architect/Engineer within 48 hours, with a proper certificate from him.
Yours Faithfully.
For ....
Encl.: A set of sanctioned plan.
Appendix “A-7” Form for Refusal of Building Permit
To
File No.................... Dated
Sir.
With reference to your application No.........
dated........... for the grant of sanction for the erection
of building/execution of work in House No. ........... Plot No.
........Block No...........Scheme...........
situated at........I have to inform you that
building permit under relevant provisions of the Act
of............ has been refused on...........
on the following grounds :—
Yours faithfully
For................
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 209
File No. ....
Dated................
Shri/Madam ....
Subject :—Revalidation of Building Plans relating to plot No........Block No........ Scheme........
Dear Sir/Madam, Block No.
With reference to your application dated....on the subject cited above, I am directed to inform you that your building plan which were sanctioned on....vide file No ....have been revalidated up to ....
Original sanctioned plan submitted by you is also returned herewith.
Please acknowledge receipt.
Yours Faithfully
For ............
Authority.
Encl.: As above.
Appendix “A-9”
Information for Intimation of Completion of Work up to Plinth Level To
The ............
....Authority.
The construction up to plinth/column up to plinth level has been completed in Building No.... on/in Plot No.... Scheme No.... Road/Street .... Ward.... in accordance with your permission No.... dated.... under my supervision and in accordance with the sanctioned plan.
Yours faithfully
Signature of Licensed Architect/Engineer/Supervisor
Name............ (In Block letters)
Address:................
Date :................
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 211
Appendix "A-10"
Inspection Report
I,....working as a....with....have carried out the inspection of Building No.......on/in Plot No....... Scheme No.......Road/Street........Ward........in accordance with permission No..........dated.......The following deviation from the sanctioned plans have been noticed which are against the provision of Master Plan/Bye-Laws are of non-compoundable nature :—Description of deviations noticed:................
You may not proceed with further work till such time the deviations made are rectified and construction brought in conformity to sanction plans.
Yours Faithfully
For................
BPIA
Office No....
Office Stamp................
Date................
Dear Sir,
We hereby certify that the erection, re-erection or material alteration in/at building No....on in Plot No....Block No....Scheme....situated at....has been supervised by me and has been completed on ....according to the plans sanctioned, vide office communication No....dated....The work has been completed to our best satisfaction, the workmanship and all the materials (type and grade) have been used strictly in accordance with general and detailed specifications. All the drainage/Sanitary/Water Supply work has been executed under our supervision and as per Building Bye-Laws. No provisions of the Building Bye-Laws and condition prescribed or order issued there under have been transgressed in the course of the work. The building is fit for use for which it has been erected/re-erected or altered/constructed and enlarged.
2. Certificate:
(i) Certified that the building(s) has been constructed according to the sanctioned plan and structural design (one set of structural drawings as executed is enclosed) which in corporate the provisions of structural safety as specified in relevant prevailing NBC Part 6 and IS codes standards/Guidelines.
(ii) Further certified that water harvesting as well as waste water re-cycling systems have been provided as per the sanctioned building plan.
(iii) It is also certified that construction has been done under our supervision and guidelines and adheres to the drawings submitted and the records of supervision have been maintained by us.
Permission to occupy of use the building may be granted.
Any subsequent change from completion drawings will be the responsibility of the owner(s)
(a) Signature of the owner with date Name in Block Letters Address
(c) Signature of the Structural Engineer with date (for certificate 1)
(as defined in NBC of India)
Name in Block Letters
Dated :....
(b) Signature of the Architect/ Engineer with date
Name in Block letter, Licence No.
Address
(d) Signature of Supervisor/Engineer/
Group/Engineer with date
Name in Block letters, Licence No.
Address
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 215
Appendix "A-13"
Building Use Certificate
File No....
Plan No.... Dated :....
Shri/Miss/Smt....
Appendix \"A-11\
Form of Notice of Completion
(To be submitted along with prescribed fee for notice of completion and other relevant documents)
To
The ............
....Authority.
Dear Sir,
I/we hereby give notice that I/we have completed the erection of building/execution of the works in Plot No .... Block No...... Scheme.... situated at.... in pursuance of the sanction granted by the Authority vide File No.... dated....I/we are enclosing all reports of the Authority inspection carried out during construction period.
Permission to occupy or use the building may be granted.
Yours Faithfully
Signature of owner....
Name of owner ....
(In Block Letters)
Address of the owner ....
......
Dated :................
Encl.: As above.
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 213
Appendix “A-12”
Form for Certificate of Architect/Engineer/Supervisor
(To be submitted along with notice of completion)
The ............
....Authority.
Building Use Certificate
With reference to your notice of completion dated.... I hereby certify that building as per description below certified plan at Plot No......Block No......Scheme...... situated at ....whose plans were sanctioned vide No......has been inspected with reference to Building Bye-Laws in respect to the structural safety, fire safety, hygienic and sanitary conditions and proposed rainwater harvesting systems inside and, in the surroundings, and is declared fit for occupation and release of regular water and electricity connections. The description of the construction work completed is given as under :—
Description of Construction Work Block-wise/Building-wise.
Block Building No.
Details of Completed Work floor-wise.
Commissioner of Authority.
Appendix “A-14”
Form of Rejection or Compliance in Respect of Completion Certificate
File No…
Dated:
Sh./Smt…
……………………………………………..
Subject :— Completion certificate in respect of Plot No
Dear Sir/Madam,
(1) With reference to your letter dated..
(2) With reference to your notice of completion dated..
(3) In continuation of this office letter of even No…… …..dated................on the subject noted above, I am directed to inform you that your case has been examined and Completion Certificate is rejected for the reasons as given below :—
Yours faithfully
For…
Authority.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 217
Appendix “B”
Handing Over Land Required for Road Widening
Affidavit/Undertaking (For Handing Over Land Required For Road Widening)
That I/we have submitted building plans for construction of building on plot No.. Block No. ..located at.. ...to the . ...under Sanction.. ..... of the ..Act for favour of sanction.
I/we undertake to hand over the land required for road widening as shown on site plan to concerned Authority free of cost as and when asked by.... .......to do so.
I/we have already understood that the........................is granting sanction on the basis of my undertaking.
If I/we fail to do so, the sanction so accorded shall be revoked and construction done as consequence thereof shall be deemed to have done unauthorizedly and shall be actionable u/s ..........of the...Act.
Deponent.
Verification
I/we verify that the contents of the above undertaking are correct to the best of my knowledge and belief and nothing material has been concealed therefrom.
Deponent.
Appendix “C”
Proforma to be submitted by the Owner
Name, Status and Address of the applicant .
Name of the Architect and address with Registration Number with Council of Architecture.
Details of the property/plot —
(a) Location.
(b) Boundaries.
(c) Area in sq.m. with dimensions (net plot area).
(d) Width of the roads.
Land use —
(a) Master Plan.
(b) Zonal Development Plan.
(c) Approved Layout Plan.
Title —
(a) Free Hold.
(b) Leasehold under notification for acquisition if lease hold permission of less or for construction under the leasehold condition obtained.
(c) Whether under acquisition, if so give details.
Whether the plot/land is affected under the Urban Land (Ceiling and Regulation) Act, 1976. If so, copy of the NCO from the concerned Authority be furnished.
Proposals—
(a) Land use .
(b) Coverage on each floor with proposed use of the floor space including basement.
(c) FAR.
(d) Height.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 219
(e) No. of floors.
(f) Envelope controls/setbacks.
(g) Parking norms.
Encl. :
Ownership title .
Permission to construct under the lease.
Permission under the Land Ceiling Act, 1976.
Site/Location Plan.
Tentative proposals to explain the scheme.
Signature of Architect
Name...............
Reg. No............... ... Address....
Signature of the owner
Name............ . Address..........
Appendix “D”
Penal Action for violation of provisions of Master Plan, Zonal Plans and Building Bye-Laws.
(A) Non-Compoundable Items :
Any deviations except those set-in para “AA” hereunder, from the maximum, minimum prescribed limits regarding—
Coverage,
F.A.R.,
Setbacks,
Open spaces,
Total height of the building,
No. of floors,
No. of DUs and density,
Parking norms,
Light and Ventilation provisions,
Land Use,
Access road requirement,
All other provisions of these Bye-laws except item given in para ‘B’ below shall not be compounded/regularized and shall have to rectified by altering/demolition at the risk and cost of owner. Besides this any other action as per terms and conditions of lease and provisions of Act shall proceed.
(A. A.) Compounding Excess Coverage/FAR :
Deviations in the coverage/FAR to the extent of 5% of the permissible coverage/FAR or 13.5 sq.m. whichever is less in building(s) use premises, other than building(s) use premises where 100% ground coverage and fixed height is allowed as per Architectural control forming part of comprehensive schemes like District Centre, Community Centres, Cluster Court Housing
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 221
etc. may be compounded after levying penalty at the following Rates:—
Rates of excess coverage/floor area:
Up to 5% of excess coverage/FAR a one-time compounding fee equivalent to the land rated in the concerned locality applicable at the time of the application for compounding.
For excess coverage/FAR for above 5%. Any excess coverage above 5% or 13.5 sq.m whichever is applicable would be liable to demolish to that extent.
Compounding at set back Infringements :
The infringements of the setbacks maximum to the extent of 30 cm (1 ft.) may be compounded by way of levying compounding fee at the following rates :—
Infringements
Residential Buildings
Non-Residential Buildings
Up to 15 cm (6 inch)
Rs. 1000 per sq.m. of area infringing the set back
Rs. 2500 per sq.m. of area infringing the set back
Above 15 cm (6 inch)
Rs. 2000 per sq.m of area infringing the set back
Rs. 5000 of area of the infringing the set back
(B. B.) Compoundable Items :
If a building or part thereof has been constructed unauthorized, i.e. without obtaining the requisite building permit from the concerned Authority as required under the Building Bye-Laws, the same shall be compounded at the following rates provided the building or part thereof so constructed otherwise conforms to the provisions contained in the Building Bye-Laws and Master/Zonal Plan regulations. For this party shall have to submit the request for building permit in the prescribed procedure.
Rates:
(a) Rs. 50 per sq.m. of the covered area constructed unauthorized in residential building up to 500 sq.m. Plot size.
(b) Rs. 100 per sq.m of the covered area constructed unauthorized in the building categorized below:—
• All Govt. Public and Semi-Public and Utility Buildings.
• Religious, Institutional and Educational Buildings.
(c) Rs. 250 per sq.m. of the covered area constructed unauthorizedly—
• Residential building above 500 sq.m. plot size, Group Housing and Guest Houses.
• Industrial Buildings.
• Storage buildings (underground or above ground)
(d) Rs. 1000 per sq.m. of covered area constructed unauthorizedly—
• Cinema and Theatre Building.
• Petrol Pumps (Filling/Service Station).
• Hazardous Buildings.
• Commercial/Business Buildings.
The buildings not covered specifically under the above categories shall be compounded as decided by the Authority, considering merits of each individual case.
Items which are exempted from the calculations of the coverage and FAR e.g. canopy, basement if used for parking and services, loft, etc. but constructed unauthorizedly without obtaining prior permission from the Authority, but within the permissible limits shall also be compounded/regularized at the rate prescribed above.
Deviations of the building Bye-laws other than specified in (A) (Non-compoundable)
Deviation up to the maximum extent of 10% from the maximum/minimum prescribed limit (as prescribed by the building Bye-laws) shall be compounded at the following rates :—
(a) In case of deviations of areas of various components of the building, the rate of penalty will be @ Rs. 50/- per 1% deviation.
(b) For deviations in terms of height the penalty shall be @ Rs. 50/- per 1% of deviation for every 10 sq.m. or part thereof of the affected area.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 223
(c) Deviations from the prescribed limit of width, length, penalty shall be @ Rs. 50/.—per 1% of the deviation for every 10 sq.m. or part thereof of the affected area.
The Authority if satisfied that there are other deviations of general nature, which are not described above, may fix rates for compounding such deviations. However, there shall be no further relaxation in FAR and coverage over that permitted above.
Revision of all fees and charges under consideration for compounding and regularization shall be revisited by the Authority from time-to-time based on the Schedule of rates.
Appendix “E”
Technical Aspects and Options of Rainwater Harvesting in Built forms and open spaces
Introduction
The storage of rainwater on surface is a traditional technique and the structures used were underground tanks, ponds, check dams, weirs etc. Recharge to ground water is a new concept of rainwater harvesting and the structures generally used are :—
(a) Pits.—Recharge pits are constructed for recharging the shallow aquifer. These are constructed 1 to 2m, wide and to 3m. deep which are back filled with boulders, gravels, coarse sand.
(b) Trenches.—These are constructed when the permeable stream is available at shallow depth. Trench may be 0.5 to 1m. wide, 1 to 1.5m deep and 10 to 20m long depending up availability of water. These are back filled with filler materials.
(c) Dug wells.—Existing dug wells may be utilized as recharge structure and water should pass through filter media before putting into dug well.
(d) Hand pumps.—The existing hand pumps may be used for recharging the shallow/deep aquifers, if the availability of water is limited. Water should pass through filter media before diverting it into hand pumps.
(e) Recharge wells.—Recharge wells of 100 to 300 mm. diameter are generally constructed for recharging the deeper aquifers and water is passed through filter media to avoid choking of recharge wells.
(f) Recharge Shafts.—For recharging the shallow aquifer which are located below clayey surface, recharge shafts of 0.5 to 3 m. diameter and 10 to 15 m. deep are constructed and back filled with boulders, gravels and coarse sand.
(g) Lateral shafts with bore-wells.—For recharging the upper as well as deeper aquifers lateral shafts of 1.5 to 2 m. wide & 10 to 30 m. long depending upon availability of water with one or two bore wells are constructed. The lateral shafts are back filled with boulders, gravels and coarse sand.
(h) Spreading techniques.—When permeable strata start from top then this technique is used. Spread the water in Streams/Nalas by making check dams, nala bunds, cement plugs, gabion structures or a percolation pond may be constructed.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 225
Appendix “F”
Number and Type of Lifts Required for Different Occupancies and Space for Electrical Installations
The number and type of lifts required depending on the capacity of lift, desired speed nature of operation are as given in table below:—
TableF-1: Number and types of lifts for non-residential Multi-storeyed Building
Sl. No.
No. of floors
Capacity of lifts in person
Speedm/s
No. of persons that can be carried by a lift
In 6 min
In 30 min.
In 50 min.
In 60 min.
Man-ually Oper-ated
Auto-matic
Man-ually Oper-ated
Auto-matic
Manu-ally Oper-ated
Auto-matic
Manu-ally Oper-ated
Auto-matic
1
2
3
4
5
6
7
8
9
10
11
12
1
7
6
0.6-0.75
17
-
102
-
170
-
204
-
2
7
8
0.6-0.75
22
-
132
-
220
-
-
-
3
7
10
0.6-0.75
26
-
156
-
260
-
312
-
4
7
10
1.0
30
-
180
-
300
-
360
-
5
7
13
1.0
37
-
122
--
370
-
444
-
6
11
6
0.6-0.75
11
-
70
-
115
-
140
-
7
11
8
0.6-0.75
15
-
90
-
150
-
180
-
8
11
10
0.6-0.75
18
-
108
-
180
-
216
-
Appendix “F-1”
The dimensions and relevant information for lift installations like lift well, pit depth, machine room, clearance from top floor landing to machine room flooring is given in table below :—
TableF-3: Dimensions and required information for Lift Installation in Building
Carry-ing Capa-city of lift (per-sons) Num-ber
Load (kg)
Lift Speed
Dimension of Lift well front depth (In cm.)
(Cm)
Leading Pit Entrance (Cm)
Dimension of Machine Room
Clearance from top floor landing to machine room flooring cm
Imposed load in tones on top of lift well due to installat-ion. It may be noted that figures do not include weight of the machine from floors and well, etc.
1
2
3
4
5
6
7
8
9
10
11
12
4
272
Up to & including 1 m/s
175
115
70
140
230
275
245
450
6.5
6
408
--do--
195
135
80
140
230
335
275
450
7.0
8
544
Up to & including 1 m/s
200
170
80
150
245
395
275
450
8.5
10
680
Up to & including 1.5 m/s
225
170
90
150
245
395
305
470
10.5
13
884
--do--
235
188
90
150
245
425
335
470
13.0
16
1088
--do--
255
205
105
150
245
520
335
480
15.0
20
1360
--do--
255
220
105
150
245
520
335
480
15.0
Note:—
(i) All lift well dimensions are minimum clear finished plumb requirements.
(ii) Where more than one lift is located in the lift well, extra width of 10 cm. Separator beam should be provided.
9
11
13
0.6-0.75
22
-
132
-
220
-
264
-
10
11
10
0.6-0.75
21
-
126
-
210
-
252
-
11
11
10
1.5
24
-
144
-
240
-
288
-
12
11
13
1.5
28
-
156
-
260
-
312
-
13
11
13
1.5
32
-
180
-
300
-
-
-
14
16
10
1.0
17
-
100
126
170
210
-
252
15
16
13
1.5
20
24
120
145
200
240
248
290
16
16
13
1.5
23
30
138
180
230
300
-
360
17
16
16
1.5
25
33
150
198
250
330
300
356
18
21
10
1.5
18
32
108
132
180
220
214
264
19
21
13
1.5
21
26
126
156
210
250
250
312
20
21
14
1.5
23
28
138
168
230
280
-
-
Note-1:
(a) For all non-residential buildings, the traffic cleared in 50 minutes is considered adequate and is approved by Authority. As such for calculation the number of lifts required, the rate of the clearance of traffic in column 9 and 10 and the population may be taken into consideration.
(b) In addition to total number of lifts required as above, provision of one lift of the same capacity may be considered to serve as stand-by.
Note-2: The population may be worked out on the basis of useful carpet area which the person occupy (excluding area of Verandah, Lobbies, Halls, Passages, Lavatory blocks, etc.)
Note-3: The population on ground and first floor may not be taken into consideration since these floors are not generally served by lifts.
Note-4: 0.75 m per sec. Equivalent to 150 ft. per Min 1.00 m per sec. Equivalent to 200 ft. per Min. 1.5 m per sec. Equivalent to 300 ft. per Min.
Note-5: The height of buildings for lift installation i.e. the travel on the lift presumed in the above statements is as below:— 7 floors 21.0 m. 11 floors 33.0 m. 16 floors 48.0 m. 21 floors 64.0 m.
Table F-2Number and types of lifts for Residential Building
Sl. No.
No. of Floors
No.
Passen-ger unit capacity Persons
Speed in m/s
Land-ing Gate Type
Central System
Service Lift No.
Capa-city Persons
Type of Gate
Cent-ral Sys-tem
1
2
3
4
5
6
7
8
9
10
11
1
5 to 8
2
6
0.0 to 0.5
*
Automatic push button operation both from car and landing
-
-
-
Push button car handle switch control
2
9 to 12
2
8
0.6 to 1
*
--do--
1
8
-
Push button car handle switch control
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 227
1
2
3
4
5
6
7
8
9
10
11
3
11 to 13
21
86
0.6 to0.74
*Power operat ed doors
--Do--and without collection system --do--
1
8
-
Push button car handle switch control
4
13 to 19
22
88
11
-Power operat ed doors
--do--
1
8
-
Push button car handle switch control
* For buildings more than 15 m. in height collapsible gates shall not be permitted. [see bye-law No. 7.9.1(f)].
(iii) 1 m/s = 200 ft./min.
(iv) The height. of landing entrance should be 210 cm. (about 7 ft.) for all lifts.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 229