8.1 Electric Vehicle Charging Infrastructure (EVCI) :
Based on the occupancy pattern and the total parking provisions in the premises of the various building types, charging infrastructures shall be provided only for EVs, which is currently assumed to be 20% of all ‘vehicle holding capacity’/ ‘parking capacity’ at the premise. Additionally, the building premise will have to have an additional power load, equivalent to the power required for all charging points in a Public Charging Station (PCS) to be operated simultaneously, with a safety factor of 1.25.
8.3EV Charging Technology
8.3.1 Electric Vehicle Supply Equipment (EVSE) :
An EVSE is a wall mounted box that supplies electric energy for recharging of electric vehicle batteries. Also, EVSEs have a safety lock-out feature that does not allow current to flow from the device until the plug is physically inserted into the car.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 135
EVSEs can be customized with added features like—
Authentication.
· Integrated payment gateways.
· Software for remote monitoring.
As electric vehicle charging technology continues to advance, several standards and guidelines have become widely accepted across the industry. Chapter 8 gives a brief overview of charging infrastructure technology, standards, and terminology.
8.3.2 Different types of EVSE :
(a) Charging speeds : Charging power, which determines the time required to charge a vehicle, can vary by orders of magnitude across charge points, as shown in Table 8.3. A small household outlet may charge as slowly as 1.2 KW, while the most advanced rapid charging stations can charge at up to 350 KW. Charging infrastructure is broadly broken into three categories based on speed: Level 1, Level 2, and direct current (DC) fast charging (sometimes referred to as Level 3).
(Source: “Emerging Best Practices for Electric Vehicle Charging Infrastructure”, Oct., 2017)
(b) Private Charging : Charging batteries of privately-owned cars through domestic charging points. Billing is mostly part of home domestic metering.
(c) AC “Slow” Charging : The home private chargers are generally used with 230Vl15A single phase plug which can deliver a maximum of up to about 2.5KW of power. The EVSE supplies AC current to the vehicle's on-board charger which in turn converts the AC power to DC allowing the battery to be charged.
(d) Public Charging : For charging outside the home premises, electric power needs to be billed and payment needs to be collected. The power drawn by these chargers may need to be managed from time to time.
(e) DC “Fast” Charging : DC current is sent to the electric car’s battery directly via the charge port. FC chargers (usually 50 KW or more) can supply 100 or more kilometres of range per hour of charging. The fast chargers would generally be used as a top-up, rather than fully
charging vehicles. These are important for cab companies and corporate users who have a fleet of electric cars.
8.2Residential Buildings (plotted house)
Table 8.1—Charging Infrastructure requirements for individual house/self-use
Building Type
Plotted House
Ownership of Station
Private (Owner)
Connection and Ming
Domestic m
Type of Charger
Slow chargers as per owner's specific requirements
Modes of Charging
AC (Single charging gun)
Norms of Provisions
Min. 1 SC and additional provisions as per the owner individual.
Note:—The charging infrastructure installed by a home owner shall be construed as a Private Cl meant for self-use (non-commercial basis).
8.2.1 All other buildings (including Group Housing) :
Any PCS installed at Public, Private areas or building premises of any category that caters to commercial mode of charging of EVs shall be deemed as a Public Charging Station and shall have to install the minimum requirements of chargers as specified in the Guidelines dated 14.12.2018 of Ministry of Power. However, in order to provide sufficient charging points for the EV share in all vehicles, ratio of types of chargers is recommended in the table below:—
Table 8.2—Charging Infrastructure requirements for PCS (Commercial use)
Building Type
Any Building Type
1
2
Ownership of
Service Provider
Station
Connectionand
Commercial Ming and Payment
Ming
Type of
As per min. requirements specified in MoP
Charger
Guidelines
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 133
1
2
Additional Chargers
PCS service providers shall install additional number of kiosk/chargers beyond the minimum specified requirements to meet the ratio of charging points as prescribed below (by the type of vehicles).
Norms of Provisions for charging points
4Ws 1 SC-each 3 EVs 1 FC-each 10 EVs
3Ws 1 SC-each 2 EVs
2Ws 1 SC-each 2 EVs
PV (Buses) 1 FC-each 10 EVs
Notes:—
· Charging bays shall be planned currently at 20% capacity of all vehicles including 2Ws and PVs (cars)
· Opening and on-spot payment options to be available for all users.
· Provision of FCB CS and BS shall not be mandatory and will be at the discretion of the service provider.
8.2.2 Rationale for EVCI establishment :
(a) Rapid urbanization coupled with adoption of mechanized transportation modes has resulted in high emissions of Green House Gases that goes on to impact Global warming. Unless, the global surface temperature rise is restricted to no more than 2oC compared with pre-industrial levels, the IPCC has warned that the world will see irreversible catastrophic climate change.
(b) India being a signatory to the UNFCCC, has pledged for efforts to assess the Greenhouse Gas Emissions (GHG) of anthropogenic origin and removal by sinks. India’s per capita emissions are still considered low at 1.9 tonnes (2013), but its total emissions are next only to China and the US and is likely to overtake those of the EU by 2019.
(c) While comparing the Indian cities for their emission scores, Delhi is on top as the biggest emitter at over 38.38 million tonnes of carbon dioxide equivalent overall emissions, followed by Greater Mumbai at 22.7 million tonnes and
134 The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. [No. 39-4
Chennai at 22.1 million tonnes, Kolkata at 14.8 million tonnes, Bangalore at 19.8 million tonnes, Hyderabad at 13.7 million tonnes and Ahmedabad at 9 million tonnes were the other cities whose emissions for the year were calculated sector-wise.
(d) As per the statistics of Transport Department (GNCTD), total number of vehicles in Delhi is more than the combined total vehicles in Mumbai, Chennai and Kolkata. Delhi has 85 private cars per 1000 population against the national average of 8 cars per 1000 population. In terms of Co2 emissions due to motor vehicles, Delhi emits about 12.4 million tonnes while the city of Bengaluru emits about 8.6 million tonnes.
(e) Therefore, addressing the quantum of emissions from the “Transport” and “Domestic” sector emerges to be the high priority subjects under the overarching umbrella of “Climate change mitigation” as committed to the UNFCC.
(f) Encouraging “Electric Vehicles” as a viable option for phased transportation in terms of short and long-distance trips with appropriate “Charging Infrastructure” is therefore, the pre-condition for this paradigm shift I phased migration to sustainable transportation.
(g) For these changes are required in infrastructure provisions (at Regional and City levels) and in Development Control Regulations (in terms of provisions therein) to include the formulations of norms and standards for “Charging Infrastructure” in the said Master Plan Regulations and UT/State Building Regulations for adoption across the country suiting local conditions.