In a Building-unit, the Basement shall be permitted on the following conditions:
A. Setbacks :
-
Basement shall be permitted on plot abutting Minimum Road width 12 m or above and coverage up to Building Envelop only.
-
Basement shall be permitted on plot having minimum plot width 18 m or more.
-
Basement shall be permitted in the building envelop only.
B. Height of Basement:
-
Maximum Height of the Basement below soffit of beam shall be 3.0m.
-
Height of first basement above ground level will be maximum 1.5 m below the roof slab. Where stilt or podium parking is
permitted, the first basement roof will be levelled with the ground.
C. Permissible Uses in Basement :
-
Permitted uses in Basement are parking, safe deposit vault, A.C. Plant, storage other than inflammable material, Sewage Treatment Plant.
-
No habitable use shall be permitted in the basement.
-
Permitted uses in Basement of a Hospital Building: Radiation-producing device, Radiation Therapy Room, MRI or X-Ray room. This shall be permissible only if the basement layout is not shown as parking for approval.
-
For basements exclusively for parking, any other permissible use is permitted only in basement level-1 up to a maximum area of 10% of the total built-up area of the basement floor. This non-parking area shall be calculated towards the computation of FAR.