The following plans shall accompany the application for grant of building permission:—
(a) Site Plan.—The site plan drawn to a minimum scale of 1:200/1'=16'-0″ or Graphic Scale and shall show the following:—
(i) The boundaries of the site belonging to the owner with dimensions and of any contiguous land and other features including buildings up to 50-0 surrounding ;
(ii) The position of the site in relation to neighbouring streets with name of the street on which the building is situated ;
(iii) The position of the site and all other buildings (if any) which the applicant intends to erect upon his land in relation to—
The boundaries of the site and in case where the site has been partitioned, the boundaries of the portion owned by the applicant and also of the portions owned by other owners of that entire plot ;
The means of access from an existing street to the building ;
(iv) Graphic Scale with north direction ;
(v) Plot area, plinth area, floor space index/floor area ratio ;
21
(vi) Location, name and width of each adjacent road or lane ;
(vii) Such other particulars as may be prescribed by the Authority ;
(viii) The applicant shall also submit landscape plan indicating all landscaping elements viz-a-viz structure wherever applicable ;
(ix) Location with precise latitude and longitude/key plan of the site not to scale but giving distance from known landmark ;
(x) All utilities lines have to be marked in site plan wherever necessary ;
(xi) The position of all the existing features like high tension line, telegraph and electrical poles/lines, underground pipe lines, trees, grave yards, religious buildings, railway lines, etc. within a distance of 30m from the nearest edge of the site, all major physical features of land proposed to be developed which include the approximate location and size of any water body, flood affected areas and contours at an interval of 0.3m in case of the site which has a slope more than 1:20.
(b) Building Plan.—The details of the building which inter alia shall include plans, elevations and sections enclosed with the application shall be accurately drawn to scale of 1:100/1//=8-0// or Graphic scale. Adequate arrangement for proper drainage shall also be shown. The plan shall include—
(i) Complete layout plan of the area or areas showing location and width of all street’s dimensions, sizes and uses of all the plots.
(ii) Plans of all floors, accessory buildings and basement plan. Such drawings shall fairly indicate the size of rooms, size of windows and ventilators, size of door opening and stair runs.
(iii) Location of drains, sewers, public utility, electric lines, services, transformers.
(iv) Exact location of essential services such as W. C. sink, bath etc.
(v) Proposed and existing works should be clearly indicated in different colour (other than red) or in marking.
(vi) Sectional drawings showing clearly the sizes of footings, thickness of basement walls, if any, all roof slabs and floor slabs, ceiling heights and parapet height with their materials. The section shall indicate the drainage and slope off the roof. At least one section shall be taken through the staircase.
(vii) Details of served privies (if any).
(viii) Street elevation and one more side elevation.
(ix) Dimensions of the projected portions beyond the permissible building line i. e. Chajja line.
(x) The existing ground level of the plot and proposed ground level in relation to abutting road level to be clearly mentioned in drawing.
(xi) Detailed parking plan.
(xii) Space used for storing construction materials during the time of construction.
(xiii) The owner shall file an undertaking stating that he shall leave and surrender land for road widening if required under rules, and he will not violate any rules, building Bye-laws, and that in case of violations the Authority shall be at liberty to summarily remove such deviations without prior notice and at the owner’s cost. The form of undertaking shall be as at prescribed format (Appendix B Handing Over Land Required for Road Widening).
23
(c) Building Plans for Multi-Storeyed/Special Buildings.— For multi-storeyed buildings, which are above 15 M. in height the following additional information shall be furnished/indicated in the building plans in addition to the item listed in section 2.6.5.
For all high-rise buildings which are 15 m or more in height and for special buildings like educational, assembly, institutional, business, mercantile, industrial, storage and hazardous and mixed occupancies with any of the aforesaid occupancies having covered area more than 500 Sq.m. (see also Part 4. Fire and Lift Safety of the National Building Code, 2016), the building sanction shall be done in two stages. In case of important projects and projects having high complexity and sensitivity, the Authority may get the design, drawings and details of such buildings peer reviewed/proof checked before approving the same.
Stage 1: Planning clearance.—The following additional information shall be furnished/indicated in the building plan in addition to the items given in (b) as applicable :—
(i) Access to fire appliances/vehicles with details of vehicular turning circle and clear motorable access way around the building ;
(ii) Size (width) of main and alternative staircases along with balcony approach, corridor, ventilated lobby approach ;
(iii) Location and details of lift enclosures ;
(iv) Location and size of fire lift ;
(v) Smoke stop lobby/door, where provided ;
(vi) Refuse chutes, refuse chamber, service duct, etc. ;
(vii) Vehicular parking spaces ;
(viii) Refuge area, if any ;
(ix) Details of building services. Air conditioning system with position of fire dampers, mechanical ventilation system, electrical services, boilers, gas pipes, etc. ;
(x) Details of exits including provision of ramps, etc., for hospitals and special risks ;
(xi) Location of generator, transformer and switchgear room ;
(xii) Smoke exhauster system, if any ;
(xiii) Details of fire alarm system network ;
(xiv) Location of centralized control, connecting all fire alarm systems, built-in-fire protection arrangements and public address system, etc. ;
(xv) Location and dimensions of static water storage tank and pump room along with fire service inlets for mobile pump and water storage tank ;
(xvi) Location and details of fixed fire protection installations such as sprinklers, wet risers, hose-reels, drenchers, etc. ;
(xvii) Location and details of first-aid fire-fighting equipment/installations ;
(xviii) Features relating to accessibility for the elderly and persons with disabilities, shall be in accordance with Chapter 13 of Part 3 ‘Development Control Rules and General Building Requirements’ of the National Building Code, 2016 for the designated buildings and areas ; and
(xix) An undertaking stating that debris or construction materials will not be stacked in public places leading to public nuisance. If the Authority finds that the applicant caused nuisance to public while executing construction necessary fine be levied as per notifications issued by the authority.
Stage 2: Building permit clearance.—After obtaining the sanction for planning (Stage 1) from the Authority, a complete set of structural plans, sections, details, design calculations duly signed by engineer/structural engineer (see Annexure A) along with the complete set of details duly
25
approved in Stage 1 and certificate of completed structural design work (see Annexure J) shall be submitted. A copy of the subsurface investigation report prepared and duly signed by the geotechnical engineer shall also be submitted. The building plans/details shall be deemed sanctioned for the commencement of construction only after obtaining the permit for Stage 2 from the Authority.
(d) Service Plan.—Details of private water supply, sewerage disposal system, rain water harvesting system and details of building services, where required by Authority, shall be made available on a scale not less than 1:200/1′ ′=16′-0′ ′ or Graphical scale rain water harvesting system need to be indicated.
(e) Specification.—General specification of the proposed constructions including a detail calculation sheet of FAR/FSI in the proposals.
(f) Signing the plans.—All the plans and drawings shall be duly signed by the owner and the Registered Technical Person preparing the plan, who shall be registered with the BPIA (please refer section CHAPTER 2:2.19 for details).
(g) Any other statement as may be required by the Authority.
(h) Ownership Document.—The applicant shall submit proof of ownership of the land, on which construction is proposed duly authenticated and verified by Revenue Authority (Assistant Commissioner, Revenue/Tehsildar as prescribed hereinafter).
(i) Fees for permission.—Every applicant intending to construct or reconstruct or alter any building or part of building shall pay to the Authority, the various fees prescribed by the Authority. The applicant shall keep the proof of submission of fees in his/her records.
(j) Withdrawal of application.—The applicant may withdraw the application and plans any time prior to its sanction and such action shall terminate all proceedings with respect to such application but the fees paid shall in no case be refunded.
(k) An undertaking shall be submitted along with the documents that the applicant shall be liable for action as per law for furnishing wrong information, fake/fraud documents or withheld any information having bearing for grant of building permission (Appendix “A-4”: Undertaking for Payment of Other and Peripheral Charges).
Note:—It should be on non-judicial stamp paper of specified amount attested by Notary Public/First Class Magistrate.
(l) Appendix “A-5”: Affidavit-cum-Undertaking.
(m) The applicant shall also attach the documents of seismic resilience duly signed by the Structural Engineer where the land is situated in highly vulnerable zone and certificates shall also be submitted in case the building having built up area more than 500 Sq.m. or in case more than G+2 building.
(n) Standard Plan Permission.—Each authority shall keep a set of approved standard building plans for plot sizes up to 150 Sq. m. In case the owner’s/applicants plot is situated in approval layout, and he wishes to construct as per plans available with the authority, he may apply to the authority in the prescribed format indicating his choice of standard approved plan along with requisite fees and his ownership documents. The receipt of payment of fees to the authority in such case shall be considered as authorized building permission.
(o) In the case the applicant has fulfilled all the requisite formalities and the Authority has not decided on the notice of intent of the applicant within a maximum period of 60 days from the date of application, the permission shall be deemed to have been accorded, provided the proposed construction does not—
Violate the planned development of J&K UT as envisaged by various departments and departmental agencies such as Municipal Corporation/Council/ Committee, Development Authorities, Jal Shakti Department, UEED etc. as applicable.
27
(ii) Violate zoning regulation under the Master Plan.
(iii) Violate the land use of the area.
(iv) Violate the FAR and set back norms.
(v) Come in alignment of green belt.
(vi) Effect the easement right of the adjacent plot holder and the title of the land is not subject matter of dispute before any forum.
(p) Notice for alteration.—When the notice is only for an alteration of the building, only such plans and statement as may be necessary, shall accompany the notice.
No notice and building permit, is necessary for the following alterations, which do not otherwise violate any provisions regarding general building requirements, structural stability and fire safety requirements of these Bye-Laws:—
(i) Plastering and patch repairs ;
(ii) Re-roofing or renewals of roof including roof of intermediate floors at the same height ;
(iii) Flooring and re-flooring ;
(iv) Opening and closing of windows, ventilators and doors not opening towards other’s properties and/or public road/property ;
(v) Replacing fallen bricks, stones, pillars, beams etc. ;
(vi) Construction or re-construction of sunshade not more than 75cms. in width within one’s land and not overhanging over a public street ;
(vii) Construction or re-construction of parapet not more than 1.5 m. in height and also construction or reconstruction of boundary wall as permissible under these Bye-laws ;
(viii) White washing, painting, etc. including erection of false ceiling in any floor at the permissible clear height provided the false ceiling in no way can be put to use as a loft etc. ;
(ix) Reconstruction of portions of buildings damaged by storm, rains, fire, earthquake or any other natural calamity to the same extent and specification as existed prior to the damage provided the use conforms to provisions of Master Plan/Zonal Plan ;
(x) Erection or re-erection of internal partitions provided the same are within the purview of the Bye-laws.