14.1 Facilities for physically handicapped persons :
For requirements regarding Facilities for Physically Handicapped Persons, reference shall be made to part 3 Development Control Rules and General Building Requirements of the National Building Code, 2016 or its latest version which shall apply.
14.2 Fire and Life Safety :
For requirements regarding Fire and Life Safety for different Occupancies, reference shall be made to part 4 Fire and Life Safety of the National Building Code, 2016 or its latest version.
14.3 Design and Construction :
For requirements regarding structural design, reference shall be made to part 6 Structural design of the National Building Code. For requirements regarding construction (including management and safety), reference shall be made to part 7 Construction Management, Practices and safety ‘of the National Building Code, 2016 or its latest version.
14.4Building services
14.4.1 Lighting and Ventilation :
For requirements regarding Lighting and ventilations for different uses and occupancies reference shall be made to part 8 “Building Services”, Section 1 “Lighting and Natural Ventilation” of the National Building Code, 2016 or its latest version.
14.4.2 Electrical and Allied Installations (Including Lighting Protection of Buildings and Solar Energy Utilization) :
For requirements regarding Electrical Installations in Buildings Including Lighting Protection of Buildings reference shall be made to part 8 “Building Services” Section 2 Electrical and Allied Installations of the National Building Code, 2016 or its latest version.
14.4.3 Air Conditioning, Heating and Mechanical ventilation :
For requirements regarding design, construction and installation of Air Conditioning, Heating and Mechanical ventilation systems, reference shall be made to part 8 “Building Services” Section 3 Air Conditioning, Heating and Mechanical ventilation of the National Building Code, 2016 or its latest version.
14.4.4 Acoustics, Sound Insulation and Noise Control :
For requirements regarding the desired Noise levels and sound Insulation in different occupancies reference shall be made to part 8 “Building Services” Section 4 Acoustics, Sound Insulation and Noise Control of the National Building Code, 2016 or its latest version.
14.4.5 Installation of Lifts Escalators and Moving Walks :
Provision for Lifts shall be made for buildings 15 m. or more in height For requirements regarding planning, designing and installation etc. of Lifts Escalators, reference shall be made to part 8 “Building Services” Section 5 Installation of Lifts Escalators and Moving Walks of the National Building Code, 2016 or its latest version.
14.4.6 Information and Communication Enabled Installations :
For requirements regarding Information and Communication Enabled Installations in Buildings reference shall be made to Part 8 “Building Services” Section 6 Information and Communication Enabled Installations of the National Building Code, 2016 or its latest version.
For requirements regarding water supply, drainage and Sanitation, Solid Waste Management and gas supply reference shall be made to part 9 “Plumbing Services (Including Solid Waste Management)” of the National Building Code, 2016 or its latest version.
14.6 Landscape Development :
For requirements regarding Landscape development, reference shall be made to part 10 ‘Landscape Development and Sign and outdoor display structures’ Section 1 Landscape Planning and Development of the National Building Code, 2016 or its latest version.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 195
14.7 Sign and outdoor display structures :
No advertising signs (including hoarding) on buildings or on land shall be displayed without the prior approval of the Authority. The standards specified in Section-2 of part 10 Signs and outdoor display structures of National Building Code, 2016 or its latest version.
14.8 Sustainability :
For requirements regarding sustainable buildings and built environment, reference shall be made to part 11 ‘Approach to Sustainability’ of the National Building Code, 2016 or its latest version.
14.9 Asset and Facility Management :
For requirements regarding Asset and Facility Management in respect of Existing Buildings and services thereof, reference shall be made to part 12 Asset and Facility Management of the National Building Code, 2016 or its latest version.
14.10 Energy Conservation Building :
For requirements regarding Energy Conservation Building guidelines reference shall be made to Energy Conservation Building Code, 2017 or its latest version & the J&K UT ECBC whenever framed.
Note:—Whenever an Indian Standard including those referred in the National Building Code or the National Building Code is referred; the latest revision of the same shall be followed except specific criteria, if any, mentioned above against that code.
14.11 Health Guidelines :
Refer guidelines issued by Department of Health, Family Welfare and Medical Education, Government of Jammu and Kashmir.
14.12 Education Guidelines :
Refer SRO-123 or latest guidelines issued by Department of Education, Government of Jammu and Kashmir.
14.13Sports Guidelines :
Refer latest guidelines issued by Sports Department, Government of Jammu and Kashmir.
Appendices
Appendix “A”: Form for Application to Erect, Re-Erect or to make Material Alteration in any place in a building
(To be submitted in duplicate)
To
Commissioner/Vice-Chairman/Secretary, Development Authority/Municipal Corporation/Council/Committee.
Sir,
I hereby give notice on behalf of Shri....(owner) that the owner intends to erect/demolish or make alteration in the building number or to on/in Plot No.... Block No....House No....situated at ....Scheme....and in accordance with the building Bye-Law No....and I forward herewith, the following plans and specification duly signed by me and by the owner :—
Site plan
Building Plan
Service Plan
Parking and circulation plan
Landscape Plan
General Specifications (in attached form)
Ownership Title (Lease/Conveyance/Sale Deed, etc.)
Other document, as required.
(ii) The building plan has been prepared strictly as per the approved Building Bye-Laws and relevant IS Codes/provisions of NBC. The construction shall be carried out in accordance with the building plan and I shall be completely accountable for any lapse on my part up to within 6 months after obtaining completion certificate of the building.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 197
(iii) The Building permit fee as required under bye-laws has been deposited vide receipt No....dated....(Photocopy enclosed).
(iv) I am aware that in the event of building being constructed in violation of the sanctioned building plan approval, the Authority shall have the right to take action against me as it may deem fit including referring the matter to concerned professional and statutory councils for taking disciplinary action against me.
Signature of the Owners
Signature of Registered
Name of the owner(s)
Architect/Engineer/Supervisor
Registration No. of the
Address of the owner(s)
Architect/Engineer/Supervisor
Address of the Architect/Engineer/ Supervisor
Encl.: As stated above.
Dated: ....
Appendix “A-1”
Statement of the Proposal and Certificate
By the Owner and Registered Architect—
Classification of the Proposal............
(To erect/re-erect/demolition)
Scheme/Colony...........Plot No...........
Plot Area ............ sq.m. size (in m)
Area Statement :
Parking Details :
Description
Permissible
Proposed sq.m.
Remarks sq.m.
Max. Ground coverage
Basement
Ground Floor
First Floor
Second Floor
Third Floor
Total Floor area
Floor Area Ratio
No. of Dwelling Units
Maximum height (in m) :
Setbacks
As per approved Layout plan (m.)
Proposed (m.)
Front
Rear
Left
Right
Building Use
Parking Required as per Building Bye law
Proposed (m.)
Residential
Commercial
PSP
Other...
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 199
(ii) Fees and Charges :
(a) Building Permission Fess ......
(b) Infrastructure Development Fees..........
(c) Additional Floor Space Fees ..........
(d) Any other (as applicable)...........
Total Amount as per details above...........
Receipt No.......... Dated..........
We hereby certify that—
The plot in question forms part of the approved layout plan and its location size and area conform to the approved layout plan and lease/sale deed/NOC of the lease Administration Branch of concerned Development Authority.
Plot is lying vacant and no construction shall be started before sanction.
The plot is free from all encumbrances (owner responsibility).
The period of construction valid up to .... As per the lease condition/further extension of time for construction granted by the lessor is valid up to .... Time construction obtained from the lease Administration Branch, Concerned Development Authority.
5. Size of each dwelling unit is not more than 300 sq.m.
Signature of Owner Name
Signature of Registered Architect Name
......
Registration No.
Address
Address
......
......
Dated
......
Authority Letter
I hereby authorize Mr./Mrs.... to collect the sanction whose signature is verified below: —
Specimen signature of the owner(s)/Registered Architect/Mr./Mrs.
Dated received.... Date ....
(Signature of authorized person/owner/Registered Architect)
Dated.... Remark, if any....
Appendix “A-2”
Form for Specifications of Proposed Building
The purpose (Residence, Office, Restaurant, Hotel, Dharmshala, School, Hostel Cinema, Shop, Factory Others) for which it is intended to be used....
Appendix “A-3” Form for Supervision
To
The Commissioner/Vice-Chairman/Secretary,
Development Authority/Municipal Corporation/Council/Committee.
Sir,
I hereby certify that erection/re-erection demolition or material alteration in/of Building No....on/in .... Plot No....in Block No.... situated at .... scheme.... shall be carried out under my supervision and I certify that all the materials (type & Grade) and workman ship of the work shall be generally in accordance with the general specification submitted along with and the work shall be carried out according to the sanctioned plans which also included the services like drainage, sanitary, water supply, and electrical.
Signature of Registered Architect/Engineer/Supervisor
Name of Registered Architect/Engineer/Supervisor
(In block letters) .....
Registration No. of Architect/Engineer/Supervisor
.....
Address of Registered Architect/Engineer/Supervisor
....
Dated:................
Appendix "A-4"
Undertaking for Payment of Other and Peripheral Charges
Note:—It should be on non-judicial stamp paper of specified amount attested by Notary Public/First Class Magistrate.
Undertaking
Executed by me as................on day of....2004.
Executant
Witness :
1....................
2....
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 203
Appendix "A-5"
Table A-2: 1 Details of coverage on respective floor are given below:
S.No.
Floor
Existing (sq.m.)
Proposed (sq.m.)
Total (sq.m.)
1.
Basement Floor
2.
Ground Floor
3.
Mezzanine Floor
4.
First Floor
5.
Second Floor
6.
Third floor
7.
......
(a) Approximate number of in habitants proposed to be accommodated....
(b) The number of latrines, Urinals, Kitchens, Baths to be provided....
(c) The source of water to be used in the construction............
(d) Distance from public sewer....
(e) The materials to be used in construction Walls/Columns/Foundations/Roof/Floors....
Signature of Registered Architect/Engineer/Supervisor
Name................
Registration No................
Address....................
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 201
Appendix \"A-6\
Building Permit/Sanction
File No................... Dated................
To
Subject :—Sanction under section.... Dear Sir or Madam.
With reference to your application dated.... for the grant of sanction to erect/re-erect/add to/alteration in the building to carry out the development specified in the said application relating to Plot No.... Block No.... situated in/at.... I have to state that the Authority subject to the following conditions and corrections done in the plans has sanctioned the same on....:—
The plans are valid up to ____ day.
months....year....
The construction will be undertaken as per sanctioned plan only and no deviation from the bye-laws will be permitted without prior sanction. Any deviation done against the bye-laws is liable to be demolished and the supervising Architect engaged on the job will run the risk of being blacklisted.
Violation of Building Bye-Laws will not be compounded.
It will be the duty of the owner of the plot and the Architect preparing the plans to ensure that the sanctioned plans are as per prevalent Master Plan/Zonal Plan/Building Bye-Laws. If any infringement of bye-laws remain unnoticed, the concerned Authority reserves the right to amend the plans as and when infringement come to the notice and concerned Authority will stand indemnified against any claim on this account.
A notice in writing shall be sent to Authority before commencement of the constructions of the building as per byelaws. Similar notice will be sent to Authority when the building has reached up to plinth level.
The owner shall not occupy or permit to occupy the building or use or permit to use the building or any part thereof affected by any such work until Completion Certificate is issued by the concerned Authority.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 207
Concerned Authority will stand indemnified and kept harmless from all proceedings in court and before other authorities of all expenses/claims which the concerned Authority may incur or become liable to pay as a result or in consequences of the sanction accorded by it to these building plans.
The doors and window leaves shall be fixed in such away that they shall not, when open project on any street.
The owner will not convert the house into more dwelling units on each floor then the sanctioned.
The building shall not be constructed within minimum distance as specified in Indian Electricity Rules from voltage lines running onside of the site.
The land left open as a consequence of the enforcement of the setback rule shall form part of the public street.
12 The owner shall ensure that the public areas like road, parks and other public opens spaces are not used for stacking the building materials or machineries to avoid public inconvenience and nuisance.
The sanction will be void if auxiliary conditions mentioned above and other conditions whatsoever imposed are not complied.
The owner will use the premises for the use, which has been sanctioned.
The owner will not proceed with the construction without having the supervision of an Architect/Engineer as the case may be. If he/she changes his Architect/Engineer, he/she shall inform the Authority about the appointment of new Architect/Engineer within 48 hours, with a proper certificate from him.
Yours Faithfully.
For ....
Encl.: A set of sanctioned plan.
Affidavit-cum-Undertaking
(Affidavit of Competent Professional on Rs. 2/- Non-Judicial Stamp paper of specified amount to be attested by Notary Public/Metropolitan Magistrate)
I, ....son of.... Architect by profession having office at....do hereby solemnly affirm and declare as under:—
That I am a Licensed Architect/Engineer/Supervisor/Plumber duly registered with the Authority vide registration No....
That I have been engaged as a Competent Professional as per Table 2—2: Procedure for Building Permission of Non-Residential Use Building of the bye-laws for preparing the building plans and to supervise construction in respect of Plot No....Block No.... situated at....
That I have prepared the building plans in respect of the aforesaid plot.
That I have studied the layout plan of the colony and gone through the instructions, policy decisions and other relevant documents in respect of the plot and colony.
That I have personally inspected the site. The plot under proposal forms part of the approved layout plan with respect to its location, size shape and area of the plot and proposed land use is also in conformity with the approved layout plan. The plot has been demarcated at site and the size, shape and area of plot available at site tallies with the approved layout plan.
That the ownership documents are in the shape of registered sale deed/lease deed in favour of the applicants and have been thoroughly examined and the ownership in favour of the applicant is in order.
That there is no construction inexistence at the plot and no construction shall be started before sanction of the building plans.
That there is no encroachment on the Municipal land/road/other property and road widths as shown in the layout plan are available at site.
That the proposal is in conformity with the terms and condition of lease deed which is still valid and period of construction as per lease deed and the extension granted by the lessor is valid up to....
That the proposal has been prepared strictly in accordance with the Master Plan/Zonal Plan/Building Bye-Laws rules regulation and practice of the department and no misinterpretation on inference of provision of Building Bye-Law has been done while preparing the plans. The construction shall be carried out strictly in accordance with the sanctioned building plans and in case any deviation is carried out, I shall inform the concerned Authority within 48 hours.
That in case the owner dispenses with my services at any stage whatsoever, I shall inform the concerned Authority within 48 hours.
That the size of each dwelling unit is not more than 300 sq. m.
That mandatory setbacks have been proposed and shall be maintained in accordance with the setbacks marked in the layout plan/Master Plan/Zonal Plan/Building Bye-Laws.
That before submission of the proposal, necessary information/clarification have been obtained from the concerned department of the concerned Authority. The plot is safe and is not affected in any scheme or the road widening. Building activities for residential use are allowed with number of storeys as per approved layout plan.
That no development/additional development/deficiency charges are payable, against this plot (in case development/additional development/deficiency charges are payable then its details be given in the separate para).
That no non-compoundable deviations shall be carried out during the course of construction.
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 205
That nothing has been concealed and no misrepresentation has been made while preparing and submitting the building plans.
That in case anything contrary to the above is found or established at any stage, the concerned Authority shall be at liberty to take any action as it may deem fit including revocation of sanction of building plans and debarring me for submission of building plans with the Authority under the scheme and also lodge a complaint with the Council of Architecture for appropriate action.
Deponent.
Verification :
I the above-named deponent do hereby verify at .... on this....of....20....that contents of the above affidavit are true and correct to my knowledge. No part of it is false and nothing has been concealed therefrom.