Land, Air, Noise, Water, Energy, biological/socioeconomic/solid/other waste management are the main facts considered in relation to Pre, during and Post. Building Construction for Sustainable Environment Management. Therefore, it is necessary for the building process to ensure compliance to various conditions laid down by the Ministry of Environment, Forest and Climate Change (MoEF and CC).
The building construction sector is a major contributor towards carbon footprints which affects climate change. India is committed towards mitigating the effects of climate change and moving towards internationally accepted norms for environmentally friendly building construction. Currently this objective of environmental safeguard is achieved through obtaining a specific environmental clearance (EC) for any construction project having a size of more than 20,000 sq. m. This is administered under notification of Ministry of Environment, Forest and Climate Change.
With rapid urbanisation and growth of Indian economy, it is anticipated that the construction activity will experience a proportionate growth. Government is also committed towards streamlining of clearances for buildings and real estate sector and empowering the urban local bodies with an objective of ease of doing business.
13.1 Environmental conditions for compliance during Building approvals :
The Ministry of Environment, Forest and Climate Change has now decided to integrate the environmental concerns into
183
building plan approval process and empowering the concerned local body/development authority to approve and certify compliance of stipulated requirements. The new building construction proposals are classified in the following 3 categories :—
(i) Conditions for Category ‘A’ Buildings: Built-up Area 5000 sq. m.-20000 sq. m.
(ii) Conditions for Category ‘B’ Buildings: Built-up Area 20000 sq. m.-50000 sq. m.
(iii) Conditions for Category ‘C’ Buildings: Built-up Area 50000 sq. m.-150000 sq. m.
States are, therefore, advised to amend their building by-laws by incorporating the set of conditions for each category A, B and C as mentioned above either for the entire State/UT or clearly identified part thereof, where they would like to integrate the environmental clearance conditions with building permissions and empower the local authority to examine, stipulate and ensure compliance of conditions required to address environmental concerns the State/UT should submit such proposal/notification at draft stage as well as a copy of the final notification to the MoEF and CC.
(a) For building plans with a total built-up area between 5,000 sqm. and 1,50,000 sqm. and environment clearance will be required to be synchronized with the building regulations.
(b) The concerned Urban local body, authorized to sanction building plans, shall ensure at the time of sanctioning a building plan that the environmental requirements stipulated in Table 16.1 (for above 5,000 sqm. and up to 20,000 sqm.), Table 12.2 (for above 20,000 sqm. and up to 50,000 sqm.) and Table 12.3 (for above 50,000 sqm. and up to 1,50,000 sqm.), as the case may be, are complied with.
[No. 39-4
| S. No. | Medium | Environmental conditions | MBBL Ref. Clause |
|---|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water. | _ |
| 2 | Water conservations-Rainwater Harvesting and Ground Water Recharge | A rainwater harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rainwater harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rainwater harvested be linked to the tube well bore in the premises through a pipeline after filtration in the installed filters. | Table 9.1 |
| 2 (a) | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | 10.2.1(iv) | |
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | 10.2.5 (b) |
| 4 | Energy | In common areas, LED/solar lights must be provided. | 10.2 (3) |
| 5 | Air Quality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during | _ |
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 185
| S. No. | Medium | Environmental conditions | MBBL Ref. Clause |
|---|---|---|---|
| construction. Plastic/tarpaulin sheet covers must be used for trucks brining in sand and material at the site. | |||
| 5(a) | The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3m above the building. | __ | |
| 6 | Green Cover | A minimum of 1 tree for every 80 sqm of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. | 10.2.1 (i) |
| 6(a) | Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. | 10.2.1 (ii) |
| S. No. | Medium | Environmental conditions | MBBL Ref. Clause |
|---|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water. | _ |
| 2 | Water conservations-Rainwater Harvesting and Ground Water Recharge | A rainwater harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rainwater harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rainwater harvested be linked to the tube well bore in the premises through a pipeline after filtration in the installed filters. | Table 9.1 |
| 2 (a) | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | 10.2.1 (iv) | |
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | 10.2.5 (b) |
| 4 | Energy | In common areas, LED/solar lights must be provided. | 10.2 (3) |
| 4(a) | At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or windmills or hybrid should be provided. | 10.2 | |
| 4(b) | As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed. | 1-2.4-IV |
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 187
| S. No. | Medium | Environmental conditions | MBBL Ref. Clause |
|---|---|---|---|
| 4(c) | Use of fly ash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time to time. | 10.2.6 (b) | |
| 5 | AirQuality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/tarpaulin sheet covers must be used for trucks brining in sand and material at the site. | _ |
| 5(a) | The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3 m above the building. | _ | |
| 6 | Green Cover | A minimum of 1 tree for every 80 sq.m. of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. | 10.2.1 (i) |
| 6(a) | Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. | 10.2.1 (ii) |
| S. No. | Medium | Environmental conditions | MBBL Ref. Clause |
|---|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water. | _ |
| 2 | Water conservations-Rainwater Harvesting and Ground Water Recharge | A rainwater harvesting plan needs to be designed where the recharge bores separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rainwater harvested is to be linked to the tube well bore in the premises through a pipeline after filtration in the installed filters (minimum one per 5000 sqm of built-up area) shall be provided. The rainwater harvested should be stored in a tank for reuse in household through a provision of | Table 9.1 |
| 2 (a) | The unpaved area shall be more than or equal to 20% of the recreational open spaces. | 10.2.1 (iv) | |
| 2(b) | The ground water shall not be withdrawn without approval from the BPIA. | ||
| 2(c) | Use of potable water in construction should be minimized. |
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 189
| S. No. | Medium | Environmental conditions | MBBL Ref. Clause |
|---|---|---|---|
| 2(d) | Low flow fixtures and sensors must be used to promote water conservation. | ||
| 2(e) | Separation of grey and black water should be done by the use of dual plumbing system. | ||
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level forfacilitating segregation of waste. | 10.2.5 (b) |
| 3(a) | All non-biodegradable waste shall be handed over to authorized recyclers which a written tie-up must be done with the authorized recyclers. | ||
| 3(b) | Organic waste composter/ vermin culture pit with a minimum capacity of 0.3 kg/tenement/day must be installed wherein the STP sludge may be use3d to be converted to manure which could be used at the site or handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers. | ||
| 4 | Energy | In common areas, LED/solar lights must be provided. | 10.2 (c) |
| 4(a) | At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or | 10.2 |
190 The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. [No. 39-4
| S. No. | Medium | Environmental conditions | MBBL Ref. Clause |
|---|---|---|---|
| windmills or hybrid should be provided. | |||
| 4(b) | As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed. | 1-2.4-IV | |
| 4(c) | Use of fly ash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time to time. | 10.2.6 (b) | |
| 4(d) | Use of concept of passive solar design of buildings using architectural design approaches that minimize energy consumption in buildings by integrating conventional energy-efficient devices, such as mechanical and electric pumps, fans, lighting fixtures and other equipment, with the passive design elements, such as building orientation, landscaping, efficient building envelope, appropriate fenestration, increased day lighting design and thermal mass. | 10.2(3) | |
| 4(e) | Optimize use of energy systems in buildings that | 10.2 (3) |
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 191
| S. No. | Medium | Environmental conditions | MBBL Ref. Clause |
|---|---|---|---|
| should maintain a specific indoor environment conducive to the functional requirements of the building by following mandatory compliance measures (for all applicable buildings) as recommended in the Energy Conservation Building Code (ECBC) 2007 of the Bureau of Energy Efficiency, Government of India. | |||
| 5 | Air Quality and Noise | Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks brining in sand and material at the site. | _ |
| 5(a) | The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3 m above the building. | _ | |
| 6 | Green Cover | A minimum of 1 tree for every 80 sq. m. of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. | 10.2.1 (i) |
192 The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. [No. 39-4
| S. No. | Medium | Environmental conditions | MBBL Ref. Clause |
|---|---|---|---|
| 6(a) | Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. | 10.2.1 (ii) | |
| 7 | Sewage Treatment Plant | Sewage treatment plant with capacity of treating 100% wastewater shall be installed. Treated water must be recycled for gardening and flushing. | 4.32.4 |
| 8 | Environment Management Plan | The environment infra-structure like Sewage Treatment Plant, Lands-caping, Rainwater Harvest-ing, Power backup for environment, infra-structure, Environment Monitoring, Solid Waste Management and Solar and Energy conservation, should be kept operational through Environment Monitoring Committee with defined functions and responsibility. | - |
(Source: Model Building Bye-laws 2016, Town and Country Planning Organisation, Ministry of Urban Development (now Ministry of Housing and Urban Affairs-MOHUA)
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 193