This chapter gives the mandatory requirements of water conservation. The methods and techniques shall be adopted from NBC, 2016.
10.1 The Rainwater Harvesting (RWH) system:
The harvesting of rainwater simply involves the collection of water from surfaces on which rain falls, and subsequently storing this water for use. The rainwater collected can be stored for direct use or can be recharged into the underground aquifers. In scientific terms water harvesting (broadly) refers to collection and storage of rainwater from the rooftops. This also restricts evaporation and seepage into building foundations. All buildings having a plot size of 100 sq.m. Or more, while submitting the building plans for sanction, shall mandatorily include the complete proposal of rainwater harvesting.
A rainwater harvesting system consists of—
(a) Roof catchment ;
(b) Gutters ;
(c) Down pipes ;
(d) Rainwater/Storm water drains ;
The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 165
(e) Filter Chamber ;
(f) Storage Tanks/Pits/Sumps ;
(g) Ground Water recharge structures like pit, trench, tube well or combination of above structure.
Rainwater Harvesting is a way to capture the rain runoff, store that water above ground or charge the underground aquifers and use it later. This happens naturally in open rural areas. But in congested, over-paved metropolitan cities, there is a need to devise methods to capture the rainwater. The rainwater that is incident on the surface/rooftop is guided to bore wells or pits or new/old/abandoned wells through small diameter pipes to recharge the underground water which can be used later whenever required.
Rainwater can be harvested to the extent of 55,000 litres per 100 sq. m. area per Year from rooftops.
10.2 Rainwater harvesting techniques:
There are two main techniques of rainwater harvestings—
(a) Storage of rainwater on surface for future use.
(b) Recharge to ground water.
The technical aspects and options of Rainwater harvesting from which the city authorities can assess and choose to adopt (Refer Appendix for the technical aspects and options as suggested by Model Building Bye-Laws, 2016).
10.3 Harvesting provisions in various Building categories:
All buildings in a city contribute to the rainwater runoff during the monsoon and hence such runoff can be harvested for water reuse/recharge. The indicative provisions of rainwater harvesting in various buildings types are:
| Category Use | Area of Plot (sq.m.) | Provision to be made | Other conditions |
| Residential Plotted Houses | |||
| New Proposals | 100 and above | ConstructionofRainwater Harvesting Structure | Shall have emphasis on both storage and reuse. |
166 The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. [No. 39-4
| Category Use | Area of Plot (sq.m.) | Provision to be made | Other conditions |
| Group Housing | |||
| New Proposals | All plot sizes | (i) Construction of Rainwater Harvesting Structure. (ii) Concrete paving to be avoided and permeable materials are to be used for all open parking spaces. | (i) Should indicate the system of Strom Water Drainage, Rainwater Harvesting Structure and Recharging Well. |
| Public and Semi-public Buildings | |||
| All Proposals | All Plot Sizes | (i) ShallhaveRainwater Harvesting Structure and storage (ii) Shall have Recharge pits. | Shall have emphasis on both storage and reuse. |
| Commercial Mixed Use | |||
| All Proposals | All Plot Sizes | Construction of Rainwater Harvesting Structure. Soft landscape provision and open spaces with percolation pits. Common treatment plant to be made part of the integrated development, funded by sale of commercial space. | Should indicate the system of Strom Water Drainage, Rainwater. Harvesting Structure and Recharging Well. Shall have emphasis on both storage and reuse. |
| Industrial | |||
| All Proposals | All Plot Sizes | Construction of Rainwater Harvesting Structure. Soft landscape provision and open spaces with percolation pits. Use of abandoned bore wells for recharging of ground water. iii Common treatment plant to be made part of the integrated development, funded by sale of commercial space. | Should indicate the system of Strom Water Drainage, Rainwater. Harvesting Structure and Recharging Well. Provision should be made not to inject contaminate water into recharge structures in industrial areas and care is to be taken to |
No. 39-4] The J&K Official Gazette, 24th Dec., 2021/3rd Agra., 1943. 167
| Category Use | Area of Plot (sq.m.) | Provision to be made | Other conditions |
| keep such structures away from sewer lines, septic tanks, soak pits, landfill and other sources of contamination. | |||
| Other Uses | |||
| Other Proposals | All Plot Sizes | Similar as above | Similar as above |
10.4 Rainwater Harvesting Provisions for Open spaces in cities:
The open spaces/recreational land use generally constitute regional parks, district parks, playground and stadium, sports complex, monument zones, public parking, Plaza and other public open space. This may be as high as 30% to 50% of the city’s geographic area. All such public open spaces above the size of 500 sq.m. shall have arrangements for complete utilization and capture of storm water with scientific rainwater harvesting arrangements.
Following ideas may also be included :—
(a) Well cum Channel cum Percolation pits.
(b) Use of abandoned bore wells for recharging of ground water.
(c) Artificial or natural Storage of storm water runoff from larger sites.
10.5 Ground Water Recharge:
Recharging of ground water should be made mandatory not only for residential buildings but for all types of buildings, including Group Housing Societies having a plot area more than 500 sq. m. and above.
The Ground Water Recharge should also be mandatory for open spaces like parks, parking, plazas and playgrounds. The harvesting and recharge structures could be constructed by the Authority with the involvement of community-based organizations like Resident Welfare Associations.
10.6 Enforcement and Monitoring:
(a) The Authority shall constitute a Rainwater Harvesting Cell which will be responsible for enforcement and monitoring of the provisions of Rainwater Harvesting. The cell shall employ qualified persons who are well versed with the interpretation of Building Bye-laws and responsible for enforcement as well as monitoring the functioning of the Rainwater Harvesting System.
(b) The Authority shall include inspection of Rainwater Harvesting Structures before issuing Completion Certificates or NOCs for service connections to the property.
(c) Set an example in the city by ensuring that Rainwater is harvested in the properties/assets owned by them including public buildings, markets, community enters, parking spaces, roads, and parks etc.
(d) The Authority shall also establish a mechanism to monitor 100% of RWH provisions in all the buildings above 1000 sq.m. with annual physical verification, while buildings less than 1000 sq.m. can be monitored on the basis of 10% random survey by BPIA.
(e) With regard to open public spaces viz., Parks, playgrounds etc. the implementation of provision rainwater harvesting may be done with the help of Residents Welfare Associations, Community Building Organization and Non-Governmental Organizations.
(f) The Authority shall ensure earmarking budgetary provision for the creation and maintenance of rainwater harvesting structures in public spaces owned and maintained by them, like parking spaces, parks, plazas etc.
(g) The practice of incentives and penalties to promote rainwater harvesting shall be formulated by the local authority based on best practices. Authority shall design its own incentive and penalty systems, considering the water level and scarcity.
Note:—For Methods of Rainwater Harvesting etc. refer the NBC, 2016 or its latest version.