In these chapter details of proposals identified in each sector has been provided. The preferable locations of sectoral projects have been marked in the proposed land use map as a point feature. The project may be undertaken by corporation or any agency subject to be availability of land and fund at the time of project implementation. The projects and project locations are suggestions developed through detailed study and analysis of each sector.
32.1 Industries
There is diversified industrial sector surrounding the Municipal limits (Including SEZs & Info Park) with 6 large scale industries within the Kochi corporation limits. There is a non-availability of suitable land for large scale industrial purposes due to tremendous hike in land value. Due to the increasing vulnerability of the coastal area, the West coast is unsuitable for polluting industries. However there is a High potential for green category micro enterprises, traditional industries, IT based industries etc. The following strategies could be adopted for the industrial sector. The industries coming under white, green and orange is to be promoted in the Kochi city.
• Mitigation measures for pollution abatement at industries to be adopted.
• Monitoring of water quality at the backwaters at regular intervals by PCB
Non-polluting industries are only allowed in west coast
Revival of traditional handicrafts and produce to be prioritised.
IT & Business tourism to be promoted in Kochi by providing facilities for staycations, conferences etc.
PPP models in all sectors to deliver public goods and services.
95
IT based Industries at Pipeline Junction
A set of land parcels have been identified in Padivattom ward in Edapally south village for promoting and placing IT industries with an area of 25 acres. The IT industry covers IT services, IT-enabled services (ITES), e-commerce (online business), and Software and Hardware products. The project can be implemented by utilizing KSIDC funds.
Figure 32:1 Proposed Location for IT based industries
Industrial Training Center SIDCO land at Pachalam
The identified location is at Pachalam of Ernakulam village. To improve the quality of vocational training and make it demand-driven so as to ensure better employability of the graduates. Industrial training centres with the major objectives of providing vocational and apprenticeship training to the youths. The project can be implemented using SIDCO funds.
Figure 32:2 Proposed location for Industrial Training center
32.5Fisheries
The fisheries sector faces several issues like lack of modern technology, lack of adequate cold storage facilities, lack of insurance schemes in shrimp/fish culture, over exploitation of marine resources, water pollution, climate change effects, declining traditional practices, lack of skilled man power & training institutes and shift to other job opportunities. Following are the proposals to be undertaken in the fisheries sector.
Upgradation of Cochin Fisheries Harbour
The following proposals are to be provided in the Cochin Fisheries Harbour under the ownership of the Cochin port
Mechanical retrieval system
• Temperature controlled auction hall & electronic display board for auction .
Conveyance system
• Sewage treatment plant
Provisions for safe landing & berthing of vessels
Pontoons for easy parking maintenance works of boats
• Facilities for fishing vessels to operate throughout the fishing season
Establishing hygienic conditions as per standards & international standard fish packing facility.
Net mending shed
Chill rooms for keeping fish 0 to 4 degree temperature
Cleaning machines
Ice crusher with conveyors
Weigh bridges Retail market & food court
Internal roads & canteen
• Office space amenities for fish workers
The project can be implemented by utilizing MPEDA funds.
Aquaculture Zones
The aquaculture area, pokkali farming, chemmeen kettu and related activities come under this. All activities allowed as per valid CRZ notification are allowed here.
SECTORAL PROPOSALS
Major aquaculture areas are found in:
Thanthoni thuruthu
Mundamveli
Edakochi
Ponnurunni
• Champakara
Tourism possibilities can be explored in these areas by including the “You catch, We cook concept”. The fish caught by the tourists could be cooked in the premises and served.
Upgradation of Fish Landing Centres
Fish landing centres have been identified within the corporation area which requires the following facilities:
Net mending yards,
Organised fish market (cold store & stalls),
Comfort station and proper waste management
Upgradation of existing facilities
Pontoons for easy parking maintenance works of boats
Cleaning machines
The following fish land centres are identified for up gradation and rejuvenation work
Sl no:
Fish Landing centres
1
Upgradation of Fish landing centre at Manasserry
2
Upgradation of Fish landing centre at Mylanthara
3
Upgradation of Fish landing centre at Konam
4
Upgradation of Fish landing centre at Perumbadappu & market
5
Upgradation of Fish landing centre at Karunakaran road
6
Upgradation of Fish landing centre at Pambaimoola
7
Upgradation of Fish landing centre at Palluruthy
8
Upgradation of Fish landing centre at Thevara ferry (west)
9
Upgradation of Fish landing centre at Thevara ferry (east)
10
Upgradation of Fish landing centre at Pachalam
11
Upgradation of Fish landing centre at Vaduthala
12
Upgradation of Fish landing centre at Chilavannoor lake
13
Upgradation of Fish landing centre at Oorulakkasserry
Figure 32:18 Fish landing centres in Kochi Corporation Source: Generated by LSGD (Planning), Fisheries Department
Fish landing centres which require detailed intervention are provided below:
Kochi Municipal Corporation
• Fish landing centre at Manasserry:
The fish landing centre is owned by around 14 families of fishermen community. The landing had an opening at the sea wall towards sea to launch boats which was closed with sea wall as a result of sea surge into the coastal area. However, this started affecting the livelihood of the families and the sea wall was opened again partially. Now the fish landing centre is no longer as active as before, the livelihood of the people are affected and the fish is brought from Thoppumpady to sell here.
Figure 32:19 Proposed Fish Landing Center at Manasserry- conceptual sketch Source: LSGD (Planning)
The new proposal requires redesigning of the coastal area with the beach to be located outside the sea wall enclosure. This will provide sufficient space to park the boats and launch it without much hindrance and also create enough space for net mending. The stalls can be provided along the road or the fish can be sold directly. A groyne can also be designed to stabilise the beach. The project requires good harbour engineering interventions and the sketch provided below is only conceptual.
Kochi Municipal Corporation
SECTORAL PROPOSALS
• Fish landing centre near Karunakaran road:
The approach road is inaccessible due to flooding by tidal waters. The storm water drains to be deepened and redesigned to accommodate the flood waters. Also the wetland pond nearby could be deepened to accommodate the excess water.
• Deepening of wetland pond nearby to collect part of tidal water.
• Fish landing centre at Perumbadappu:
The fish landing centre is associated with the market. The fish brought here in small boats are directly sold from the market. The bus bay is also located close by. More eateries selling fried fish etc. could be provided here also utilising the beautiful landscape of the area for tourism.
Other Strategies to be Adopted:
32.5.4.1 Inland fishing activities
The major threat for aquaculture activities in inland waters is ekkel (sediments) which reduce the depth of the water bodies and block the nets. This needs to be removed scientifically. The backwaters are infested with aquatic weeds which need to be removed periodically by engaging the locals. The weeds only live in fresh water and are therefore prominent in the post monsoon time when it germinates profusely. The Chinese fishing nets are often affected by this and the wooden beams are often stuck in the weeds or uprooted. Thevara to Kumbalangi ferry, GIDA Chathiyathu area etc. are majorly affected. The weeds can be used for developing value added products like the following
The removed aquatic weeds have high calorific value and can therefore be deposited in biogas plants for longer hours of burning.
High nitrogenous content of the weeds can be a potential ingredient in developing fertilisers for coconut farming. Branding under Kochi Corporation can be done.
Can be dried and used as fibre for landscaping and pot planting which would last very long.
Small scale fish feed mills can be developed as there is a shortage for quality feeds. The feeds can be branded under the corporation label and training can be provided under CMFRI and Thevara VHSC fisheries school.
• The pond within the Thevara VHSC school can be developed for bioflock/aquaculture.
The fishes cultivated under the subsidies of fisheries department and corporation could be branded under the corporation to obtain better reach for the products and obtain quality assurance.
• Vendors who sell fish along the roads needs to be provided with subsidies for proper selling carts.
32.5.4.2 Marine Fishing Activities:
Fort Kochi, Manaserry, Saudi areas have communities which are engaged in marine fishing. The have insurance for boat and engine but not for the net which is a major issue. Due to the presence of sea wall the communities find it hard to launch their boats directly into the sea. Often they travel to Thoppumpady to launch the boats.
The major threat for marine fishing activities are climate change and excessive septic waste dumping in the sea. Sea cages are not feasible due to sea jurisdiction under NAVY and Port trust. Several studies have noticed variations in PH values and expect future growth of antibiotic resistant pathogens.
Similarly illegal flushing out of waste from the factories in Eloor (especially when the rain fall is high or when the dam is opened up) leads to destruction of aquaculture facilities provided in the backwaters.
Insurance policies needs to be provided for fishing net
128
Multi-storeyed residential flats are proposed under “Punargeham” scheme to house fishermen from the CRZ areas. The proposed location is under the ownership of corporation in ward 26
32.6Heritage
Fort Kochi- Mattancherry Walkable Heritage Circuit
Fort Kochi and Mattancherry area comprises several significant heritage destinations which could be accessible through walking in a single day. Two separate walkable circuits, Fort Kochi circuit and Mattancherry circuit can be developed which could be connected through NMT corridor.
Fort Kochi beach, Indo Portuguese Museum, St Francis church, Santa Cruz Basilica, Aspin wall house, eateries and handicraft shopping experience, walkway and open spaces, heritage roads etc. can provide an exclusive experience for the visitors as whole.
32.6.1.2 Mattancherry circuit
The Mattancherry circuit consists of importance centres like Jain temple, Pardesi synagogue, Mattancherry palace, Jewish cemetery, Spice market, Jew street etc. all at walkable distance. Both the circuits which are 2.7 km apart can be connected via NMT proposals (bicycle, buggy rides or half an hour long walk)
Heritage Circuit at Central Area Kochi
Several locations along the backwaters of Kochi at the central area form part of the heritage of a bygone era of interventions from both royal kings of Kochi as well as colonial invasions. A heritage circuit connecting these destinations from the old railway station near to Mangalvanam, Ram Mohan Palace, High court, St Mary’s Cathedral Basilica, St Albert’s college, Bishop’s house, Ernakulam market, Broadway and other connecting streets, Synagogues, TD Temple, Old Jew cemetery, Govt. Law college, Kochi corporation building, Tahasildar’s office, Maharajas college, District court, Ernakulathappan ground, Durbar hall connecting Rajendra Maidan, Subash park, Children’s park etc.
Heritage Zone at Edapally
Several locations like Museum of Kerala History, Madhavan Nayar Foundation, St George church Edapally, Shi Mahaganapathy temple and Changampuzha park can be connected together as heritage circuit and can be a single day package for day travellers connecting the Fort Kochi and Mattancherry circuit.
Heritage Point at Rajendra Maidan
It was a venue which witnessed some glorious agitations during the pre-independence era. Great leaders delivered speeches at this venue, inspiring people to be a part of the freedom struggle. The existing Rajendra Maidan may be developed into a heritage point with facilities like to set up a permanent podium at the venue for the public to deliver lectures on any topic and an open gallery of memorabilia associated with historic events held at Rajendra Maidan and also steps to be taken to ensure the conservation of historic importance of the ground.
Figure 32:21 Rajendra Maidan and conceptual images of outdoor memorabilia
Railway Museum at Cochin Harbour Terminus
It is located in Willingdon Island. The Cochin Harbour Terminus was the principal station providing rail connectivity to the southern segment of the Port of Kochi located on the Willingdon Island. Cochin Harbour terminus can house a railway museum exhibiting the by gone days of railways and the significance of the station.
Rejuvenation of Thekkumbhagom and Kadavumbhagom Synagogues
Rejuvenation of existing Synagogues: The Thekkumbhagom and Kadavumbhagom synagogues located in the central area are under private parties and trusts. The historic monuments can be maintained with the help of corporation. Synagogue can be subtly exhibited with a museum character which is accessible to the public without hindering the prayer timings and exclusive nature.
Kochi Municipal Corporation
Cultural Center at Kochi Municipal Corporation Office
Once the corporation activities are shifted to the new building near high court the existing building can be used for adaptive reuse undertaking activities like performing arts, museum, art gallery, yoga and recreational space etc. within its premises.
Museum of Freedom Struggle at Fort Kochi Jail Premises
The project envisaged considers conceptualisation, design and development of a Museum of Freedom Struggle in the old Fort Kochi Jail premises. The proposal is to revamp the existing unused Fort Kochi Jail by improving the physical infrastructure of the complex and converting it into a museum with its cells as exhibition spaces along with landscaping, hardscaping, electrification, water supply, sanitation, provision of new toilet block and renovating the security cabin and also development of adjacent plot for landscaping and seating.
Venduruthy Bridge to be developed as Heritage Bridge with Food Street
It is an 83 year old bridge made by Sir Robert Bristo in 1930 to connect Wellington Island with the mainland. It is proposed to renovate the old bridge and make it a beautiful food street. With this, it will become a place where one can enjoy the beauty of the backwater, including the unique cuisine of Kochi and elsewhere. Heritage themed beautification can be
Kochi Municipal Corporation
done with Corporation, PWD and tourism department tie-up. It can be converted to pedestrian bridge for further safety. An MLCP has been proposed near to Venduruthi Bridge in order to accommodate the parking need that may arise due to the project. The visitors may park their vehicles and avail feeder buses/buggy services that may be provided to commute to the bridge.
Figure 32:22 Proposed food street at Venduruthy bridge and proposed MLCP at Ravipuram
32.6.10 Earthen Walkway at Old Railway Station, Mangalavanam
Earthen Walkway is proposed at the Old railway track area: It is close to Mangalvanam. The alignment is proposed uptill Pachalam and diverted to Queen’s walkway. The earthen walkway is envisaged above the railway track with softscaping provided along the path. Minimum interventions in sustainable manner to be adopted to avoid disturbing the birds of Mangalvanam nearby
Figure 32:23 Conceptual image of earthen walkway Source: LSGD (Planning)
Kochi Municipal Corporation
Figure 32:24 Proposed earthen walkway
32.7Water Supply
To maintain enough water supplies in the city, it is imperative that water supply infrastructure facilities need to be upgraded. It is also important to ensure an equitable distribution of water in those areas having scarcity of water. It is also important to ensure that the existing network works efficiently and unaccounted losses and thefts are minimised. Information technology and GIS is to be integrated with the water supply system and its maintenance. Measures to combat the water scarcity in West Kochi area are also proposed.
Proposals for overhead service reserves
The following overhead service reserves are proposed in the Kochi Municipal Corporation area. They are proposed in those areas where an equitable distribution of water is not achieved and are affected by head loss. They can reduce the head loss and thereby improve the pressure in their respective zones.
The Overhead service reserves proposals are:
40 Lakh Litres (LL) OHSR at Kaloor
13 LL OHSR at Edakochi
17 LL OHSR at Pachalam
25 LL OHSR at Karuvelippadi
10 LL OHSR at Elamakkara
10 LL OHSR at Vennala
10 LL OHSR at Vyttila
10 LL OHSR at CE Central Zone (Jalabhavan) Office
Kochi Municipal Corporation
OHSR of 10 LL proposed at Elamakkara, Vennala and Vyttila cater to the water scarcity and ensures sufficient water supply in these areas. Also an OHSR of 10 LL is proposed in the existing Jalabhavan office in the Hospital Road where the basic provisions for water tank have already been made. It is also proposed to recharge the existing OHSR at Cemetry Junction near Ayyappankavu and at Ravipuram to get the required head in their zoning areas.
Figure 32:25 Location of the proposed Overhead Service Reservoirs in Kochi Corporation Area Source: Generated by LSGD (Planning)
Kochi Municipal Corporation
Augmentation of existing water supply
As part of the KWA project (State Plan), KWA has formulated “Augmentation of Water Supply Scheme to Kochi City and Adjoining areas (Phase 1) – Construction of 190 MLD Ultimate Capacity Water Treatment Plant at Aluva and Allied Works” that would cater Kochi City & adjoining areas. This could bridge the demand – supply gap by the horizon year for Kochi Corporation area. The proposed WTP is to be constructed in the 1.57 Hectares of land owned by KWA at Aluva which is very close to the present WTP Complex. The proposed WTP could cater to the nearby so that the existing 900 mm, 1050 mm and 1200 mm lines to the Ernakulam area from the existing Aluva WTPs will be released in load and can be effectively used for distribution to Ernakulam City, Vypin, Mulavukad and Cheranelloor areas.
Figure 32:26 Service Area of the proposed WTP at Aluva Source: LSGD (Planning), KWA
Kochi Municipal Corporation
The project area for the water supply distribution master plan consists of Corporation of Kochi, Aluva, Thrikkakara, Kalamassery, Eloor, Maradu Municipalities and Kumbalam, Kumbalangi, Chellanam, Varappuzha, Cheranelloor, Kadamakkudi, Mulavukad, Elamkunnappuzha, Njarakkal, Nayarambalam, Keezhmad, Edathala & Choornikkara Grama Panchayaths which are very close to Kochi city and surrounding it. Most of the tapping from these existing lines can also be delinked. As per the projection, a supply demand gap of 21 MLD is estimated in the horizon year which could be made available from the 190 MLD WTP at Aluva. The 100 MLD WTP at Maradu which at present is not functioning to its full capacity, is also to be made fully functional so that, Western Kochi and nearby panchayaths will get its benefit substantially apart from Maradu areas.
Natural Ground water Sources & Rainwater Harvesting
Every natural water body should be identified, documented and protected to ensure water quality. Installation of Rainwater harvesting facility is to be made mandatory in all institutions in the corporation to ensure water conservation and to ensure ground water replenishment.
Strict monitoring of KMBR provisions related to rainwater harvesting measures has to be ensured and its functioning to be ensured in every permitted building to reduce the increasing demand for water. Government schools and buildings should be provided with a model rainwater harvesting systems. The rain water harvesting system is to be provided for Middle Income Households at subsidized rate
Water Quality Monitoring Protocol
With consultations to State Pollution Control Board (KSPCB), water quality of the water sources and the water supply systems to be monitored in compliance with the IS:10500 standards for drinking water
Replacement of Old and Worn-out Pipe System
The percentage of waste and losses in the present water supply system is about 35%. This has to be brought down to below 15%. Pipes that are worn out or broken, as well as the allied infrastructural facilities, should be identified and replaced by Kerala Water Authority. If the losses due to old and worn-out pipes are minimised, that will result in more water entering the pipe system.
Incorporation of Smart systems and SCADA (Supervisory Control and Data Acquisition)
Incorporation of smart systems includes the use of technology in monitoring, maintenance and detecting thefts and losses in water supply system. Sensors have to be placed at appropriate places so as to detect the leakages and at the same time, report the Water
Kochi Municipal Corporation
authority online. This method could SCADA (Supervisory Control and Data Acquisition) could be used in the remote maintenance of water supply lines.
Figure 32:27 Schematic diagram showing the working of SCADA in water supply system Source: SCADA Applications in Water Treatment Plant, https://www.electrical4u.com/scada-system/
Managed Aquifer Recharge
Managed Aquifer Recharge includes the recharge of the surplus surface run off water into the ground through injection wells directly into the aquifers after proper filtration thereby increasing ground water levels in quantity as well as quality. For this, specially designed injection wells are used. This can be an effective method to combat salt water intrusion in Coastal areas mainly in West Kochi. Pilot studies should be done and based on the success; corporation could incentivise such methods of ground water recharge.
Figure 32:28 Usage of injection wells in managed aquifer recharge Source: United States Geological Survey
Kochi Municipal Corporation
32.8Solid Waste Management
The Municipal Solid Waste Management requires a methodical treatment right from the collection till the disposal or recovery. It is one of the primary functions of the Urban Local Body. On the basis of 2040 population projection, 444 T of solid waste will be generated by the horizon year and 65% of the total solid waste i.e. 288 T comes out to be bio-waste. The solid waste management plan strategizes the treatment of about 50 T of this Bio-waste in a de-centralised way at 4 identified sites within the corporation area along with the treatment of waste at source like houses, communities, markets and other bulk generators of organic waste. The remaning can be sent to centralised treatment unit at Brahmanpuram. The decentralised treatment of solid waste is to be gradually strengthened. The use of non-recyclable faction of the non-bio waste is to be discouraged. The use of non-recyclable plastics needs to be discouraged while the recyclable plastics are to be segregated at designated Material Collection Facilities, bailed and given for recycling. Using the extended producer responsibility approach, the producers of the non-bio waste are to be given a significant responsibility – financial and/ or physical for the treatment or disposal of post-consumer products.
The frame work for this De-centralised waste treatment plan for Kochi is given in the Figure below:
Figure 32:29 Frame work of the De-centralised waste treatment plan for Kochi Corporation Source: LSGD (Planning)
Decentralized waste management systems or community level waste management systems reduce the burden of handling large volumes of MSW at a centralized location like Brahmapuram, with corresponding reduction in costs of transportation and intermediate
Kochi Municipal Corporation
storage. This strategy is based on the fact that the local communities are not the part of the problem, but they are the solution. The local communities are empowered with necessary tools and techniques for the treatment of their waste,
Some of the advantages of decentralized waste management plant for Kochi Municipal Corporation include the following:
• De-centralized systems allow for lower level of mechanization than the centralized solutions, and provide job opportunities for informal workers and small entrepreneurs.
These options can be tailor made for the local waste stream, climate, social, and economic conditions.
• They reduce the cost incurred for the collection, transportation, and disposal of waste by the ULBs.
The proposals also include facilities for the treatment of non-bio waste along with the policy level measures.
Rejuvenation of existing MCF at Edappally
The proposed project aims to rejuvenate the existing Material Collection Facility near Edappally Zonal Office for better efficiency in the collection and segregation of waste thereby making the process of solid waste collection and segregation easier. The site is near
to Edapally Zonal Office. The existing facility is to be renewed with designated place for collection, segregation, storage, de-dusting and bailing of the non – bio waste. The segregated Non – bio waste are sold to end buyers or sent for recycling. Green buffers should separate the sight from nearby habitations. Minimum intervention is needed to make this MCF workable.
Figure 32:30 Location of MCF at Edappally
140
Rejuvenation of existing RRF at Mattancherry
The existing Resource Recovery Facility at Mattancherry is proposed to be rejuvenated with necessary infrastructure for efficient collection and segregation of Non – Bio waste along with their bailing. The shredded plastic can be used in a variety of ways including road construction. This will mainly help in the efficient collection of non-bio waste from West Kochi and Island areas.
Figure 32:31 Location of RRF at Mattancherry
Rejuvenation of existing RRF & Solid waste management at Ravipuram
141
The existing Resource recovery Facility at Ravipuram is rejuvenated to have facilities for collection so as to handle the Non – bio waste of the main land. It should be provided with necessary infrastructure, machinery, tools and human power to sort, clean and store non-biodegradable discards from primarily sorted municipal waste and made available for production or consumption purposes. The existing bailing and shredding units are to be made workable and the facility should have segregated spaces for collection, segregation, storage and recycling of recyclable materials. Suitable collaborations need to be formed with Haritha Kerala Mission, Clean Kerala Company and KEIL (Kerala Enviro Infrastructure Ltd) for the handling of recyclable, recycled and hazardous waste. The bio waste treatment canter proposed at Ravipuram may be merged with this.
Figure 32:32 Location of RRF at Ravipuram
Rejuvenation of existing MCF at Manappattiparambu near Kaloor (along with proposed solid waste management plant) and Padiyath near Mullassery canal
The corporation land with material collection facility at Manappattipparambu - Kaloor and Padiyath is to be rejuvenated with facilities for collection, segregation and bailing of recyclable waste. A small scale solid waste treatment plant is also proposed at Manappattiparambu. A glass shredding unit can also be integrated with this plant for the shredding of glass collected from different parts of the corporation area. Proper sound monitoring mechanism needs to be installed here. Thumboormozhi type waste bins for the treatment of bio-waste may be installed here as part of decentralised waste management plant.
Kochi Municipal Corporation
Figure 32:33 Rejuvenation of existing MCF at Manapattiparambu and Padiyath
Installation of Community Vermin Compost Pit
Community composting is a largely unexploited solution that is gradually getting its fair share of attention in India’s sustainability and waste management landscape. The power to harness the potential of waste lies with housing societies and gated communities today that can reap the benefits of large-scale composting, produce rich organic fertiliser, create organic community gardens, or even generate revenue from the sale of good quality compost.
The wastes from households are collected and converted to the fertilizers. A green buffer cum park surrounds the waste management unit so as to minimise the disturbance to the surroundings. Organic farming activities and classes and training programs on scientific solid waste management could be encouraged here. This can be encouraged in the residential areas of Kochi corporation.
Installation of Bio-Bins at Broadway market
The project is done as a pilot project for Solid Waste Management within markets. The project is envisaged in the broad way market area of Division 67, Ernakulam North.
Kochi Municipal Corporation
Presently solid waste dumping is observed in this area. Bio bins are installed after clearing the site with necessary amenities. The high quality fertilizer obtained can be sold to the end buyers. A special committee is to be formed in the market which is responsible for the maintenance and running of the plant.
Figure 32:34 Location of Bio-Bins at Broadway market
Incorporation of technology in solid waste management & collection
Incorporation of technology helps to have a centralized mobile application based system for
monitoring the waste collection and management activities. It also helps to track the users the real time movement of waste collection network. This helps to have a better co-ordination and efficiency in waste collection activities. The mobile application also lets the citizens mark the unauthorized dumping sites (black spots) and helps in the timely clearance. This would also let the citizens know the locations of community/ street bins. These works can be coordinated by Integrated Command and Control Centre (IC4), which has already been operational in Kochi.
Decentralised Solid Waste Management Plan
The decentralised solid waste management plants are proposed in 5 sites in Kochi Corporation area for treating bio-waste generated in the Corporation area after sending the suitable quantity of bio-waste to Brahmapuram. A combination of OWC and Windrow composting is used, so as
Figure showing aerated windrow composting
144
to maximize the efficiency of the process and minimize the disturbances to the surroundings. The community level waste management systems reduce the burden of handling large volumes of Municipal Solid Waste at the centralized location, with corresponding reduction in costs of transportation and intermediate storage. The local communities are made part of the process thereby imbibing a participatory solid waste management culture in the community level which helps the process of Solid Waste Management easier and efficient. Aerated Windrow Composting can be used that involves forming organic waste into rows of long piles of windrows and aerating them periodically by either manually or mechanically turning the piles. The introduction of air blower in a forced aeration system is observed to be successful in supplying oxygen to the microorganism for successful and faster metabolic activity thereby making the whole process faster in minimum land area. The land area also includes loading and unloading space for waste collection vehicles and the office space. Landscaping and vertical gardens helps to create a positive space inside the Solid Waste Treatment site.
Green buffers are to be provided along the periphery site, so as to prevent the odours and noise from getting outside. The compost obtained as the end product can be shredded and sold as fertilizers. The project can be done with the assistance of the corporation while the profit can be shared between those who run the waste treatment plant. The Solid Waste Treatment plants are proposed at Mundamveli, Manapattiparambu, Vennala and Elamakkara. For lower capacities, Thumboormozhi type plants are also viable options. The waste treatment plants are to be provided with green buffers to provide separation from nearby habitations. Vertical gardens are to be provided with landscaping to provide aesthetic appearance and positive atmosphere in the sites.The locations of the treatment planrts are shown in the figure below and details are given in Table below:
Table 322 Details of Decentralized Treatment Plants
Sl. No
Location
Capacity(T/day)
Decentralised Solid Waste Management in vacant lands.
In addition to above 5 sites vacant spaces found for treatment plants, spaces like under the bridges, vacant plots, puramboku land etc which is poorly feasible for economic activities can be used temporarily / permanently for solid waste management activities like installing thumboormuzhi plants, material collection facilities, resource recovery facilities,backyard gardens utilising the manure generated etc.
Kochi Municipal Corporation
32.8.10 Policy level measures
Subsidizing sustainable solid waste management practises and giving support to new technologies in the Solid Waste Management scenario need to be taken up. To promote the source level treatment of bio-degradable waste, pot composting, kitchen bin/ ring compost, bucket composting, bio composting and indoor 147reas -composting need to be popularised and adequate awareness and training need to be given to people. The generation of non – biodegradable materials can be regulated to a great extent by incorporating the age old mantra, “Reduce, Reuse and Recycle” which should be given proper thrust in Solid Waste Management activities. Plastic art installations can raise awareness on the amount of plastics being generated by the community.
The “Rag pickers” who have been silently working in our communities as waste collectors need to be properly assigned a role in solid waste collection and are to be paid for their work. Their Employment, Education and Empowerment serves the dual role low cost door step collection as well as raising their standard of living.
Refining of the existing technologies for the household level waste treatment by minimizing the odour need to come up. The use of Bio bins may be promoted in high rise buildings and large housing complexes. The treatment facility up to 5 TPD can be setup in community level which needs to be encouraged. Markets, Restaurants, and all institutions and gated communities having an area greater than 5000m² are made mandatory to treat biodegradable waste within their premises. Markets are to be made self-sufficient in waste disposal and each market should have a dedicated waste management committee. The Corporation needs to have proper collaboration with Haritha Keralam Mission, Suchitwa Mission, Clean Kerala Company, Kerala Enviro Infrastructure Ltd (KEIL) for the disposal of hazardous waste, bio-medical waste and Construction & Demolition waste generated in the municipal corporation. The process of Bio-mining helps to process the existing waste into energy. Conditions for the proper disposal of construction and demolition waste are to be added while issuing building permit. Active Community participation should be the main component of Integrated Waste Management in populated city like Kochi. Future studies should be carried out for checking the efficiency of the proposed methods. Through the
147
combined efforts of individuals from household and a proper Municipal Solid Waste Management system, Kochi city will be able to dispose waste generated and in future, piling up of legacy waste can be avoided.
32.9Drainage
For a city that depended mostly on canal based drainage system, the recent urbanisation and associated development has caused a massive impact on the natural drainage system in Kochi. These are to be identified and preserved. Also, the various activities regarding drainage requires an inter sectoral – inter departmental linkage. Such an integrative approach is to be formulated. Major proposals are discussed below:
Drainage Master Plan
In order to facilitate an integrated approach to deal with storm water flows and to ensure an inter – departmental co-ordination in various activities, Corporation of Kochi in consultation with concerned departments should prepare a drainage master plan which among other things should cover:
a) Preparation of detailed inventory of the canals and drains and mapping the same in finding the area which are not served by the existing system.
b) Review of the status and efficacy of primary and secondary drainage in Kochi to identify interventions to rehabilitate / develop them given city topography and water flows by preparing a detailed inventory of the canals and drains.
Run-off management strategy at a regional / zonal level giving thrust to low lying areas where gravity based flow is limited and pumping maybe required addressing water logging.
Network Zoning and phasing for implementation of comprehensive area level drains across the city to achieve the service level norms for storm water drains within Corporation area.
Kochi Corporation in consultation with Government should clarify accountability for operations and maintenance of drain systems. Preparation of detailed inventory of the canals and drains and mapping the same over lay with natural drainage helps in in finding the area which are not served by the existing system.
Given that the drain network is being executed and maintained by multiple agencies including concerned local bodies, Irrigation Department and Public Works Department, it is advisable to constitute special purpose vehicle (SPV) exhaustively for the preparation of the drainage plan and monitoring all issues relating to the same.
Following the preparation of the Drainage Master Plan, the Corporation and other agencies should in consultation with the Government prepare Detailed Engineering studies and Project
Rejuvenation of canals through Local Area Plans/ DTP Schemes
Rejuvenation of major canals and their banks are to be done through Local Area Plans (LAP) and DTP Schemes that facilitates greater detail in the development of canals. As the local
Kochi Municipal Corporation
conditions around each of the canals are different, their management also requires localised planning efforts that suit the local physical and social conditions which are made use with the help of Local Area Plans and DTP Schemes in Canal Bank Management.
Renovation of ponds, water bodies & Canals
The existing drainage network including the Canal system and water bodies need to be restored and renewed. These ponds should be protected to retain their drainage properties.The width of the canals are to be measured as per records and need to be widened to the earlier width wherever possible. The following canals need to be rejuvenated:
a. Renovation of Polakkandam Market Canal: The Polakkandam market canal which is a part of Rameswaram Canal needs to be cleaned and side protected. Screens are to be placed at different parts of the canal for bigger wastes to accumulate which are to be removed regularly. The canal also needs desilting and restoration to original width.
b. Renovation of Mullassery Canal: Mullassery Canal forms the core of water logging in the city area including KSRTC Stand. The Mullassery canal is to be rejuvenated through integrated blue green infrastructure for flood mitigation and street scape improvements. This project is to be integrated with water management & flood mitigation, Bio diversity planning, mobility planning, canal edge development, sustainable livelihood plan, open public space planning, coastal edge development along with engineering measures mainly for slope correction.
149
Effecting natural drainage to the nearest outlet is the most viable solution for preventing flooding up of water in KSRTC/ South Railway Station area. Excess water from the GHS School for Girls is directed to the Perandoor canal. The bed level of Mullassery Canal has to be lowered to the bed level of nearby Perandoor canal about 1.25 m to facilitate the un-obstructed flow of water. The Mullassery canal is proposed to be opened up. The opened up section of the canal is widened and connected to parks on both sides. The park alternates low lying wetlands to encourage bio-diversity and allows for permeability with higher sections that can be re-wilded and programmed for social activity. To manage water in the KSRTC stand area, large water holding areas are to be created. Here the local catchment options are used to slow down the speed of flow, store and route excess run-off to reduce floods. Large sections of the KSRTC plots are excavated to hold water during flooding. These are designed as tanks or landscaped as floodable parks and the excess water is then pumped back into the Mullassery Canal and to the Perandoor canal through multiple pipes across the railway lines once the rain subsides. All developments on the KSRTC plots are to be raise above the 100 year flood line. The rail culvert connecting Mullassery Canal and Perandoor canal is to be kept free of obstruction as this is a juncture point of many water bodies and drains.
Figure 32:36 Mullassery Canal area
Hospital road and MG Road which are the collector streets are provided with rain gardens and tree pits to collect water from the streets and surrounding run – off. These blue – green infrastructure helps the existing storm water drain from getting overwhelmed by delaying the water. This helps to slow down the run-off before the water is released into the canal in case of cloud burst event. The project should also include community initiatives for effective waste management of communities on the banks of Mullassery Canal.
Figure 32:37 Integrated water management and flood mitigation strategies for sub-site as per Concept Plan for Mullassery Canal Area Source: GIZ, India for Kochi Municipal Corporation
Kochi Municipal Corporation
c. Renovation of Thevara Market Canal: Thevara Canal that runs along the Thevara market requires desilting and side protection. Effective community spaces are proposed along the banks of this canal including canal beautification and promenade development.
d. Renovation of Thevara Perandoor Canal (TP): ThevaraPerandoor canal requires silt removal especially between the Perandoor ROB and backwaters. The blockage of pipe culverts needs to be removed near the CBI quarters. Cables, ducts and pipes across the TP canal causing obstruction to the free flow of water needs to be shifted. TP canal is also linked through the backwaters through a system of link canals. These link canals need from Vaduthala to Atlantis hotel needs to be opened and cleaned. The boundaries of the canal have to be surveyed as per the revenue records and have to be brought back to its original shape. The Edges of the canal is to be beautified and preserved. The span and height of culverts especially in the Panampilly Nagar area, Pulleppadi – Kaloor area has to be increased. The storm water from MG Road has to be diverted directly into Kayal near shipyard area so that the water load of the TP Canal can be minimized. The mouth of the branch canal should be widened at Mullassery Canal Junction to avoid flooding in Kammattippadam area.
a. Connection of Changadampokku Thodu and Karanakodan Thodu at Kaloor: The Chilavannur canal needs to be fully opened and the connection of parts of the Chilavannur canal i.e. Changadampokku Thodu and Karanakodan Thodu is to be restored at Kaloor Metro Station to ensure the uninterrupted flow of water. This connectivity should be restored atleast by constructing a drain having minimum width of 4m from the sub-station compound by crossing Banerjee road adjacent to the JLN Stadium metro station so as to facilitate the flow of water in either direction. The width of the thodu is to be restored to original width. The canal banks are to be protected from encroachment. Existing culvers having no head room and vent way has to be reconstructed. Interlinking of parallel canals wherever possible to facilitate the natural flow of water for easy drainage. Providing high capacity pumps with shutter arrangements helps to drain out flood water to the lake so as to combat tidal variations.
Figure 32:38 Connection of Changadampokku Thodu and Karnakodan thodu
Kochi Municipal Corporation
The rivers & lakes encompassing the main lands have to be desilted regularly in order to accommodate the flood water. Water storage capacity of Perendoor canal and Chittor puzha shall be increased by desilting so as to reduce the travelling time of runoff water to kayal and to reduce the tidal inflow of water towards the thodu.
b. Restoration of Konthuruthy river and rehabilitation: The Konthuruthi river whose width has drastically reduced needs restoration to the original width. Desilting has to performed and delta formed at the end needs to be removed. The obstructions in the course of the channel also need to be removed. The pipe culverts provided under the thodu causing hindrances to the smooth flow of water needs to be removed and a culvert having necessary width and clearances need to be constructed. This area can be developed as a community space. The families along the river needs to be resettled and the encroached area is to be regained for the canal.
c. Renovation of Edappally, Chilavannoor and Market Canals: The Edappally, Chilavannoor and Market Canals are to developed through canal bank infrastructure development, Canal cleaning, canal widening and canal shore protection. Parks and other public places are to be set up along the banks of the canal to prevent the encroachment.
Figure 32:39 Canal bank infrastructure development of Edappally Canal-conceptual sketch Source: IURWTS Detailed Project Report, KMRL
The desiltation and rejuvenation of Canals in West Kochi area like Rameswaram Canal, Mantra Canal, Pallichal, Pashni thodu and Pandarachal that forms the life lines of canal network in West Kochi area also need to be carried out.
Considering the future generation of waste water and the high water table of Kochi Municipal Corporation, it is imperative that it should have a waste water treatment mechanism. With the unique to topography as well as interaction between various parts of the city a decentralised water treatment mechanism is proposed. In –situ liquid waste
Kochi Municipal Corporation
management systems like septic tanks and soak pits are not suitable to Kochi Corporation area mainly due to high water table, high population density and due to the risk of contamination of other bodies. So it is imperative that we need to move gradually to piped sewer system and decentralised collection of sewer.
Presently various schemes are being carried out in the corporation for carrying out the sewage treatment. These schemes are also integrated with the proposals.With better utilization of solar energy sources and IT based sensors for the operation of the plant, the operational cost can be reduced and the projects can be made eco- friendly. Absence of neat and clean toilets with proper signage and markings are proposed. Major proposals are detailed below:
Figure 32:40 Location of Proposed Sewage Treatment Plants Source:Generated by LSGD (Planning)
Kochi Municipal Corporation
32.10.1 Sewage Treatment Plant of 14 MLD at Vennala
A Sewage Treatment Plant of 14 MLD is proposed in Edapally South Village in the eastern end of Chakkarapparambu division covering the eastern parts of the corporation area in Zone 6. This includes parts of Vennala, Chalikkavattom, Ponnurunni, Thammanam, Palarivattom and Southern areas of Kaloor.
Figure 32:41 Proposed location for Vennala STP
32.10.2 Sewage Treatment Plant of 18 MLD at Muttar
A Sewage treatment plant in Edapally North Village of 18 MLD is proposed near Muttar at Kunnumpuram division partially serving the requirements of Zone 5, the other STP of 15 MLD being at Perandoor. The Muttar STP mainly serves the North Eastern parts of corporation mainly covering Kunnumpuram, Edappally, Devankulangara, Mamangalam, Padivattom and Karukappilly areas. A Sequencing Batch Reactor Technology is used.
Figure 32:42 Proposed location for Muttar STP
32.10.3Sewage Treatment Plant of 15 MLD at Perandoor
A 15 MLD plant in Cheranallur Village is proposed at Vaduthala East Division partially serving the requirements of Zone 5. This STP covers the North and North Western parts of the main land mainly covering Vaduthala, Pachalam, Elamakkara, Thrikkanaravattom,
Kochi Municipal Corporation
Thattazham and Ayyappankavu areas. The Sequencing Batch Reactor technology is proposed.
Figure 32:43 Proposed location for Perandoor STP
32.10.4 Sewage Treatment Plant of 23 MLD at Elamkulam
The existing KWA land of KWA STP in Elamkulam Village at Elamkulam can be utilized to serve the need of 23 MLD waste water by the horizon year. For that, the existing KWA land at Elamkulam is proposed to have a 23 MLD STP serving the Ernakulam city, Gandhi Nagar, Panampilly Nagar, Girinagar, Vyttila, Perumanoor, Konthuruthy and Thevara. This STP will serve the Kochi city and main residential areas of Kochi Corporation. The Poonithura and Chambakkara areas can also be added in the future. The capacity and efficiency of existing 4.5 MLD Sewage Treatment Plant can be enhanced with SBR technology.
Figure 32:44 Proposed location for Elamkulam STP
Kochi Municipal Corporation
32.10.5 Sewage Treatment Plant of 0.25 MLD at Kaloor Market
A 0.25 MLD STP is proposed in Rameswaram village near the GCDA Kaloor Market. This will mainly treat the sewage effluents in and around the GCDA Kaloor market area; in the future, this STP service with capacity augmentation can be expanded to the neighbouring residential areas as well.
Figure 32:45 Proposed location for Kaloor STP
32.10.6 Sewage Treatment Plant of 1.1 MLD at Edakochi
The Sewage treatment plant of 1.1 MLD capacity is proposed in Division 16 near Ambedkar Colony which using Sequential batch reactor technology. The coverage area of sewage plant area includes Edakochi and Perumpadappu areas.
Figure 32:46 Proposed location for Edakochi STP
156
32.10.7 Upgradation of existing FSTP at Willington Island to STP of 1.1 MLD
The existing FSTP at Willingdon Island is to be upgraded to 1.1 MLD STP for the whole of Willingdon Island.
Figure 32:47 Proposed location of Willingdon island STP
32.10.8 De-centralized nature-based Sewage Systems and improved septic tanks in West Kochi
The West Kochi area is to be provided with improved septic tanks which offer a higher degree of efficiency (usually up to 85% in place of conventional septic tanks that offer 30 – 35% efficiency). Similarly, small Decentralised Nature Based Waste Water Systems are proposed in the West Kochi area covering the housing pockets and low-income household areas. The waste water and sludge can be used in cultivation or urban agriculture thereby strengthening the local communities nearby.
32.10.9 Improved septic tanks and sewage systems in Padiyath
Improved septic tanks which offer a higher degree of efficiency has been proposed near Mullassery canal to serve the Padiyath East and Padiyath West in Padikathukulam colony. Nature based sewage systems can also be explored based on the availability of land area. The waste water generated can be used for gardening purposes in the colony. This system can help to tackle water pollution in Mullassery canal.
32.10.10Public Comfort Stations at Major Destinations
The absences of clean, neat and women friendly toilets have created a lot of health risks as well as discomfort for the people of Kochi as well as the commuters. Major gaps in the locations of the existing comfort station in the city are identified and proposals for the Public Comfort Stations are given based on the gaps as well as the need.
Kochi Municipal Corporation
SECTORAL PROPOSALS
Public Toilets with refreshment facilities at the GCDA Parking facility near Marine Drive
Public Toilet at Abraham Madamakkal Road near Goshree bridge
Public Toilets at Jawaharlal Nehru Stadium, Kaloor
Public Toilet at Shihab Thangal road near Panampilly Nagar
Public Toilet near Vaduthala Junction
Public Toilet near Edappally Junction
Public Toilet at Palarivattom Junction
These comfort stations should have proper signage and markings and other ancillary infrastructure for refreshments, cloak room, wash room and breast-feeding rooms. Such toilets should have separate provisions for trans genders. All the existing and proposed public comfort stations need to be integrated with GIS applications so that they could be easily found out using GIS platforms.
Figure 32:48 Proposed prototype of Public Toilet Complex
An app based public toilet finder is also proposed, that lets the commuter to spot the public toilet facilities in the vicinity and to spot their real time availability. Such an app can also report the unclean toilets to the authorities. This could also integrate the public toilets as well as the private toilets especially in the shopping complexes etc. that are willing to co-operate with the local authority in providing better sanitation network for the people. Such building owners could be given additional benefits including a reduced rate of taxes. The users can give ratings based on their experience.
32.10.11Policy level initiatives
Creating a positive atmosphere around the Sewerage Treatment Plants helps in the implementation of such projects easier by minimizing public protests. Green belts inspired landscaping and vertical gardens around the STP create a clean, green and odourless environment and mask the outside view. Growing plants at the exterior of STP components and various units provides a natural filtration and final treatment by removing harmful bacteria, viruses and nutrients. Using the solar energy sources and IoT (Internet of Things) based sensors for operation of the plant, operation cost and time for inspection of quality at various stages can be reduced. The treated water contains many useful plant nutrients and will be beneficial for the environment when discharged as soil infiltration. Re-use of the recycled water for gardening and toilet flushing should also be encouraged. The sludge obtained after drying provide excellent manure for agriculture and gardening. The performance of the STP need to be constantly monitored by testing of influent and effluent samples at regular intervals.
The Sewage treatment is to be made mandatory in all major housing projects and commercial complexes. Its functioning and performance also need to be assessed regularly. Improved septic tanks which will give better bacterial filtration efficiency should also be encouraged by giving subsidies in their construction.
Energy
Sufficient depth is available in areas frequented to dredging especially near container road. Sea cages can be established in these areas without disturbance to the movement of ships/boats and with the permission of NAVY/Port.
• Training to be provided for fishermen to notice variations in the sea and security related aspects.
Division/ Name
1
Mundamveli
20
22, Mundamveli
2
Manapattiparambu, near Kaloor
5
65, Kaloor South
3
Vennala
10
42, Vennala
4
Elamakkara
5
33, Elamakkara North
5
Ravipuram
10
55, Girinagar
Source: LSGD (Planning)
Kochi Municipal Corporation
Figure 32:35 Location of Proposed Solid waste management plant Source: Generated by LSGD (Planning)
A new RRF is to be provided near Nobert Pavana Road in GCDA land of 74.75 cents. A Bamboo Forest can be integrated with the waste collection facilities. The biodegradable waste from RRF can be used for the growth of bamboo forest.