(a) Every owner/developer shall submit a Notice of Completion in the prescribed Form to the Authority regarding completion of the work of the building on or before the last date as stipulated in the building permission.
(b) The notice of completion shall be submitted by the owner/licensed builder/developer duly signed by the Licensed Technical Personnel, who has supervised the construction, accompanied by two sets of completion plans (as in the case of sanctioned plan including one cloth mounted copy) and the following documents along with the prescribed fee if any:
(i) Final Clearance of the Director General, A.P. Disasters Response and Fire Services Department, wherever required.
(ii) Structural Stability Certificate duly signed by the Structural Engineer in case of Buildings above 10m height.
(iii) Certificate of fitness of the Lift from concerned Agency which has erected /Department wherever required.
(iv) Two sets of photographs of the building from all sides duly signed by Owner, Developer and Licensed Technical Personnel.
(v) A certificate by the Owner, Developer and Licensed Technical Personnel for covering up the underground drain, sanitary and water supply work, under their supervision and in accordance with Building Rules and sanctioned building plans as applicable.
(vi) A certificate by the Owner, Developer and Licensed Technical Personnel with regard to the construction of Rain Water Harvesting Structures, Solar Energy Structures and Recycle of Water Treatment Plants wherever required as per the sanctioned plans.
(vii) Clearance from Chief Controller of Explosives, wherever required.
(viii) Any other information/document that the Authority may deem fit.