Rain Water Harvesting in a building site includes storage or recharging the ground water by rainwater falling on the terrace or any paved or unpaved surface within the building site.
The following systems may be adopted for harvesting the rainwater drawn from terrace and the paved surface.
i) Open well of a minimum 1.00 mt diameter and 6mt in depth into which rain water may be channelled and allowed to filter for removing silt and floating material. The well shall be provided with ventilating covers. The water from the open well may be used for non-potable domestic purposes such as washing, flushing and for watering the garden etc.
ii) Rain Water Harvesting for recharge of groundwater may be done through a bore-well around which a pit of 1m width may be excavated upto a depth of at least 3m and refilled with stone aggregate and sand. The filtered rain water may be channelled to the refilled pit for recharging the bore-well.
iii) An impressive surface/underground storage tank of required capacity may be constructed in the setback or other open spaces and the rain water may be channelled to the storage tank. The storage tank shall always be provided with ventilating covers and shall have drawn-off taps suitably placed so that rain water may be drawn off for domestic, washing, gardening and such other purposes. The storage tank shall be provided with an overflow.
iv) The surplus rain water after storage may be recharged in to ground through percolation pits or trenches or combination of pits and trenches. Depending on the geo-morphological and topographical conditions, the pits may be of the size of 1.20 m width X 1.20 m length X 2 m to 2.50 m depth. The trenches can be of 0.60 m width X 2 to 6 m length X 1.50 to 2 m depth. Terrace water shall be channelled to pits or trenches. Such pits or trenches shall be back filled with filter media comprising the following materials :
a) 40 mm stone aggregate as bottom layer upto 50% of the depth.
b) 20 mm stone aggregate as lower middle layer upto 20% of the depth.
c) Coarse sand as upper middle layer upto 20% of the depth.
d) A thin layer of fine sand as top layer.
e) Top 10% of the pits/trenches will be empty and a splash is to be provided in this portion in such a way that roof top water falls on the splash pad.
f) Brick masonry wall is to be constructed on the exposed surface of pits/trenches and the cement mortar plastered. The depth of wall below ground shall be such that the wall prevents lose soil entering into pits/ trenches. The projection of the wall above ground shall at least be 15 cm.
g) Perforated concrete slabs shall be provided on the pits/trenches.
h) If the open space surrounding the building is not paved, the top layer up to a sufficient depth shall be removed and refilled with coarse sand to allow percolation of rain water into ground.
The terrace shall be connected to the open well/bore-well/storage tank/ recharge pit/trench by means of HDPE / PVC pipes through filter media. A valve system shall be provided to enable the first washing from roof or terrace catchment, as they would contain undesirable dirt. The mouth of all pipes and opening shall be covered with mosquito (insect) proof wire net. For the efficient discharge of rain water, there shall be at least two rain water pipes of 100 mm dia. for
a roof area of 100 sq.m.
vi) Rain Water Harvesting structures shall be sited as not to endanger the stability of building or earthwork. The structure shall be designed such that no dampness is caused in any part of the walls or foundation of the building or those of an adjacent building.
vii) The water so collected/recharged shall as far as possible be used for non-drinking and non-cooking purpose. Provided that when the rain water in exceptional circumstances will be utilised for drinking and/or cooking purpose, it shall be ensured that proper filter arrangement and the separate outlet for bypassing the first rain water has been provided. Provided further that, it will be ensured that for such use, proper disinfectants and the water purification arrangements have been made.
35.0 Regulation for Waste Water Recycling
35.1 Type of Waste Water
The Waste Water is of following types:--
Black Water.- means Waste Water from W.C. Urinals and M.S.W.
(ii) Grey Water.–means Waste Water from Bathrooms, Sinks, Shower and Wash Areas etc.
(iii) Apart from Residential Waste Water, Waste Water generated from Industrial, Medical, Commercial and Waste generated from Garbage shall also be treated as per the guidelines given by the Maharashtra Pollution Control Board.
35.2Applicability
These Regulations shall be applicable to all Developments/ Redevelopments/part Developments for the uses as mention under (C-1) to (C-6) shall have the provision for treatment, recycling and reuse of Waste Water. The applicant shall along with his application for obtaining necessary layout approval/ building permission shall submit a plan showing the location of Waste Water Treatment Plant, furnishing details of calculations, references, implementation, etc. This Plan shall accompany with the applicant‘s commitment to monitor the system periodically from the date of occupation of the respective building.
35.3Regulations
35.3.1 (C-1) For Layout Approval/Building Permission
(i) In case of Residential layouts, area admeasuring 10000 sq.m. or more, in addition to 10 % open space, prescribed in the bye- laws, a separate space for Waste Water Treatment and Recycling Plant should be proposed in the layout.
(ii) On the layout Plan, all Drainage lines, Chambers, Plumbing lines should be marked in different colour and submit the layout for approval to the Municipal Corporation.
(iii) The Recycled Water shall be used for Gardening, Car Washing, Toilet Flushing, Irrigation, etc. and in no case for drinking, bathing, washing utensils, clothes, etc
(iv) In the Estimate of Waste Water Recycling Plant only provision for basic civil work and required machinery will be proposed by the Municipal Corporation other than these provisions, additional machinery, plumbing, Water tank pipe, landscape should be provided by Owner or Developer on his Own Cost.
(v) A clause must be included by the Owner/ Developer in the purchase agreement that the purchaser, Owner of the Premises/Organization or Society of the purchasers shall ensure that:
a. The Recycled Water is tested every six months either in Municipal Laboratory or in the laboratory approved by Municipal Corporation or by State Government and the result of which shall be made accessible to the Competent Authority/ EHO of the respective Ward Office.
b. Any recommendation from testing laboratory for any form of corrective measures that are needed to be adopted shall be compiled. Copy of any such recommendation and necessary action taken shall also be sent by the testing laboratories to the Competent Authority/ EHO of respective Wards.
c. Maintenance of Recycling Plant should be done by the Developer or Housing Society or Owner.
35.3.2 (C-2) Group Housing/Apartment Building
In case of Group Housing if the area admeasuring 4000 sq.m. and above or if consumption of Water is 20,000 litres per day or if a multi-storeyed building where there are 20 or more tenements then Waste Water Recycling Plant as mentioned in (C-1) above should be constructed.
For all above buildings having built-up area 1500 sq.m. or more or if Water consumption is 20,000 litre per day whichever is minimum, then provision for Waste Water Treatment Plant as mentioned in (C-1) is applicable.
35.3.4 (C-4) Hospitals
Those Hospitals having 40 or more beds, Waste Water Recycling Plant as mentioned in (C-1) is applicable.
35.3.5 (C-5) Vehicle Servicing Garages
All Vehicle servicing garages shall ensure that the Waste Water generated through washing of vehicles is treated and recycled back for the same use as mentioned in (C-1)
35.3.6 (C-6) Other Hazardous uses
All other Establishments/ Buildings where chances of Waste Water generated containing harmful chemicals, toxins are likely and where such water cannot be directly led into municipal sewers, the concerned Competent Authority may direct the Owners, users of such Establishments, Buildings to treat their Waste Water as per the directions laid in (C-1)
35.4 Incentive
i. The Owner/Developer/Society setting up and agreeing to periodically maintain such Waste Water Treatment and Recycling Plant entirely through their own expenditure shall be eligible for an incentive in the form of fiscal benefits in Property Tax to the extent of 5% to Tenement holder/Society.
35.5Penalty Clause
(i) Any person / Owner / Developer / Organization / Society violating the provisions of these byelaws, he shall be fined Rs.2,500/- on the day of detection and if the violation continues, then he shall be fined Rs.100/- for every day as concrete action after written Notice from Municipal Corporation.
(ii) If any person / Owner /Developer / Organization / Society fails to operate as determined by the Authorised Officer of the Municipal Corporation and from the observations of test results and/or
physical verification) the Recycling plant, then he will be charged a penalty of Rs.300/- per day and disconnection of Water connection also.
36.0Solid Waste Management
It shall be mandatory for:
i) Housing complexes, Commercial establishments, hostels, hospitals having aggregate built-up area more than 4,000 sq.m. or more.
ii) All three star or higher category hotels.
to establish a dedicated Solid waste management system to treat 100% wet waste being generated in such buildings.
The treatment of wet waste shall be done through an organic waste composters/ vermiculture pits or other similar technologies of suitable capacity installed through reputed vendors.
The disposal of dry waste, e-waste, hazardous waste shall be carried out through authorised recyclers or any other system as specified by the Municipal Commissioner.
37.0Incentive for Green Builidngs
The municipal corporation shall strive to promote green building concepts within the municipal area. In order to do so it may empanel agencies of repute as listed/ recognised by the State / Central Government. The following incentives shall be provided for green rated buildings.
i) Green buildings shall be entitled for incentive FSI as below.
GRIHA Three star / IGBC Silver or equivalent rating – 3% incentive FSI on basic FSI.
GRIHA Four star / IGBC Gold or equivalent rating – 5% incentive FSI on basic FSI.
GRIHA Five star / IGBC Platinum or equivalent rating – 7% incentive FSI on basic FSI.
Provided, achieving minimum GRIHA Three star / IGBC Silver or equivalent rating for construction projects shall be mandatory for all buildings belonging to Government, Semi-Government, local bodies and public sector undertakings.
ii) Incentive FSI will be awarded after pre-certification from the empanelled agency. This FSI shall be exclusive of the limits specified in this DCPR.
iii) In case that the developer fails to achieve committed rating as per pre-certification at the time of final occupancy, a penalty shall be imposed at the rate 2 times of the land cost as per ASR for the incentive FSI for the rating not achieved.
Special Schemes/ Activities
38.0 Special Township Projects
The Regulations for Special Township Projects in Municipal Corporation area shall be as sanctioned by Government vide notification no.TPS-1806/ 135/CR-31/ 06/ 6031/UD-13, dated 3 r d June, 2006 and shall be subject to amendment by Government from time to time.
39.0 Conservation of Heritage Buildings / Precints / Natural Features
39.1 Applicability:
This regulation will apply to those buildings, artifacts, structures, areas and precincts of historic and/or architectural and /or cultural significance (hereinafter as ‗Listed Buildings/Heritage Buildings and listed precincts/Heritage precincts‘‘) and those natural features of environmental significance including scared graves, hills, hillocks, water bodies(and the areas adjoining the same) etc.
39.2Preparation of List of Heritage Buildings, Heritage Precincts and Natural Features.
The Municipal Commissioner on advice of Heritage Committee shall prepare heritage list and shall issue public notice in the local newspapers declaring his intention to include the buildings, artefacts, areas and precincts of historic and /or cultural significance and the list of natural features of environmental significance, including sacred graves, hills, hillocks, water bodies etc. and invite objections and suggestions from any person in respect of the proposed inclusion within a period of 30 days from the date of such notice.
The Municipal Commissioner shall issue notice to the owner of the buildings, artifacts, areas and precincts of historic and/or cultural significance etc. and invite objections and suggestions from such person in respect of proposed inclusion within 30 days from the date of such notice.
The Municipal Commissioner, on respect of any objections or suggestions, shall decide the same after giving hearing to the objector and send to Government for approval. Government will sanction the said heritage list with modification, if required. This list will be called Final Heritage List. For this Modification under Section 37 need not be necessary.
Thereafter, the Municipal Commissioner may amend the Final Heritage List from time to time as and when required, on the advice of the Heritage Committee. In such case it shall not be necessary to follow the procedure under Section 37 of Maharashtra Regional and Town Planning Act of 1966 or to take approval from Government, but the procedure as laid down above in this regulation regarding publication and objection / suggestion shall be followed before finalising it.
39.4Incentive uses for Heritage Buildings.
After the commencement of this Regulation, the Heritage Precincts or the Listed Buildings shall not be permitted to be used for any commercial or office purpose except with the permission of the Heritage Conservation Committee. However, in cases of buildings included in the Heritage Conservation List, if the owner /owners agree to maintain the listed Heritage Building as it is in the existing stage and to preserve its heritage with due repairs, the owner/owners may be allowed with the approval of the Heritage Conservation Committee to convert part of the whole of the non-commercial area to commercial /office use. Provided that, if the heritage building is not maintained suitably or if the heritage value of the building is allowed to be spoiled in any manner, the Municipal Commissioner shall withdraw the permission forthwith.
39.5 Grant of Transferable Development Rights to owners/lessees of heritage buildings/heritage precincts.
If the owner is deprived of using FSI on the said plot or development permission is granted to him with conditions which deprive him of use of FSI, then he shall be entitled for TDR as decided by the Commissioner in consultation of Heritage Conservation Committee. The utilization of this TDR shall be as per TDR Regulation.
39.6 Maintaining Skyline
Building included in heritage precincts shall maintain the skyline in the precincts (without any high rise development) as may be existing in the surrounding area, so as not to demolish or destroy the value and beauty of the said heritage buildings/heritage precincts. The development within the precincts shall be in accordance with the guidelines framed by the Municipal Commissioner on the advice of the Heritage Conservation Committee.
39.7 Restrictive Convenants
Regulations existing as on date of this Regulation imposed under covenants terms and conditions, on the leasehold plots either by State Government or by the Municipal Corporation shall continue to be imposed, in addition to the Development Control Regulations. However, in case of any conflict with the heritage preservation interest/environmental conservation and the said Development Control and Promotion Regulations, this regulation shall prevail.
39.3Restriction on development, Redevelopment/repairs etc.
No development or redevelopment or engineering operations or addition, repairs renovation including the painting of buildings, replacement of special features or plastering or demolition of any part thereof of the said listed buildings, or listed precincts or listed natural features shall be allowed except with the prior written permission of the Municipal Commissioner. Before granting any such permissions, the Municipal Commissioner shall consult the Heritage Conservation Committee to be appointed by the State Government (hereinafter referred to as ‗the said Heritage Conservation Committee‘) and shall act on the advice of the Heritage Conservation Committee.
Provided that before granting any permission for demolition or major alterations/addition to listed buildings (or buildings within listed precincts) objections and suggestions from the public shall be invited and duly considered by the Heritage Conservation Committee.
Provided that, in exceptional cases for reasons to be recorded in writing the Municipal Commissioner himself may overrule the advice of the Heritage Conservation Committee.
If the application for development, alteration, modification of the Heritage precincts or listed building is rejected under this regulation or while granting such permission any conditions are imposed on the owner which deprives him to use the FSI, the said owner shall be compensated by grant of Development Right Certificate.
39.8Grading of the listed buildings/Listed Precincts.
The Municipal Commissioner shall classify the Heritage Precincts, Heritage Buildings in ―Grades‖ such as (I),(II), (III). The meaning of these grades and basic guidelines for development permissions are as follows:
Grade-I
Grade-II
Grade-III
(A) Definitions
Heritage Grade-I comprisesBuildings and precincts ofNational or Historic importance,excellence in architectural style,design technology and materialusage and/or aesthetics;associated with a great historicevent, personality, movement orinstitution. They have been andare the prime landmarks of thecity and of National importance.
Heritage Grade -II (A and B)comprises buildings andprecincts of Regional
Heritage Grade -III comprisesbuildings and precincts of localimportance for townscape, they
Heritage Grade-I comprisesBuildings and precincts ofNational or Historic importance,excellence in architectural style,design technology and materialusage and/or aesthetics;associated with a great historicevent, personality, movement orinstitution. They have been andare the prime landmarks of thecity and of National importance.
importance, possessingspecial architectural oraesthetic merit, or cultural orhistorical significance thoughof a lower scale than HeritageGrade-I.They are locallandmarks, which contributeto the image and identity ofthe region. They may be thework of master craftsmen ormay be models of proportionand ornamentation ordesigned to suit a particularclimate.
evoke architectural, aesthetic, orsociological interest though notas in Heritage Grade -II. Thesecontribute to determine thecharacter of the locality and canbe representative of life-style ofaparticularcommunityorregion and, may alsobedistinguished by setting on astreet line or special character ofthe façade and uniformity ofheight width and scale.
Heritage Grade-III deservesintelligent conservation (thoughon a lesser scale than Grade-IIand special protection to uniquefeatures and attributes.)
I Scope for Change
39.10Composition of Heritage Conservation Committee.
There shall be Heritage Conservation Committee for the City. This Committee shall be constituted by the Municipal Commissioner. The committee shall comprise of the following members:
i)
Chairman Appointed by the Government
Chairman
ii)
Divisional/ District officer of Archaeological Survey ofIndia
Member
iii)
Divisional/ District officer of Archaeological Survey ofMaharashtra
Member
iv)
Joint Director Town Planning, Pune Division, Pune
Member
v)
Conveyor INTAC Pune Chapter
Member
vi)
Heritage Conservation Architect having 10 years ofexperience and membership of the Council of Architecture
Member
vii)
Historian having experience of 10 years in the field ofHistory.
Member
viii)
Structural Engineer having experience of 10 years and member of Institute of Engineers.
Member
ix)
City Engineer, Pune Municipal Corporation
Member
x)
Executive Engineer Heritage Pune Municipal Corporation
Membersecretary
The tenure of the Members of categories (vi) to (viii) above shall change after every three years provided however that, the same person shall be eligible for reappointment as Member.
The Heritage Conservation Committee shall come into existence with effect from the date of its publication in the official Gazette.
No act of the Committee done in good faith, shall be deemed to be invalid by reason only of some defect subsequently discovered in the organization of the Committee or in the Constitution of the Committee or in the appointment of the Member or on the ground that such member was disqualified for being appointed.
The Chairman and in his absence the chosen Member of the Committee shall preside over the meeting of the Committee.
The Terms of reference of the Committee :-
(i) To consider whether development permission should be granted under this Regulation and the conditions of such permission.
40.0Erection of Mobile Towers:
Regulation for setting up of Telecommunication Cell Site(s)/Base Station(s) and installation of the equipments for Telecommunication Network in Municipal Corporation area shall be as per Appendix-Q
Appendices and Proformas
APPENDIX A-1 FORM FOR CONSTRUCTION OF BUILDING OR LAYOUT OF BUILDING / GROUP
HOUSING Application for permission for development under Section 44 / 58 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949.
From
(Name of the owner)
To,
The Municipal Commissioner,
Municipal Corporation, Pune
Sir, I intend to carry out the under mentioned development in the site/plot of land, on Plot No. Town and Revenue S.No..........City Survey No.... .....Mauje ...........situated at Road / Street
Society ............in accordance with Section 44 / 58 of the Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949. I forward herewith the following plans and statements (Item i to ix) wherever applicable, in
quadruplicate, signed by me (Name in block letters) ...and the Architect / Licensed Engineer / ....), who has prepared the plans, designs and a copy Structural Engineer / Supervisor, (License No...
of other statements /documents as applicable
Key Plan (Location Plan), (to be shown on first copy of the set of plans) i) ii) Site Plan showing the surrounding land and existing access to the land proposed to be developed; (to
be shown on first copy of the set of plans) ii) A detailed building plan showing the plan, section and elevations of the proposed development work
along with existing structure to be retained/ to be demolished, if any;
iv) Particulars of development in Form enclosed (to be submitted for development other than individual buildings);
Copy of sanctioned layout plan if any;
vi) An extract of record of rights, property register card (any other document showing ownership of land to be specified) alongwith consent of co-owners where third party interest is created;
39.9Signs and outdoor display structures
No display or advertising signs and outdoor display structures on listed building and / or the Heritage Precincts shall be permitted except accordance with part X (sign and outdoor display structure) National Building Code of India.
Prohibition of advertising signs and outdoor display structure in certain cases :
Notwithstanding the provisions mentioned above no advertising sign or outdoor display structures shall be permitted on buildings of architectural aesthetic historic or heritage importance as may be decided by the Municipal Commissioner, Committee or on Government buildings, save that in the case of Government buildings only advertising signs or outdoor display structures may be permitted if they relate to the activities for the said buildings’ own purposes or related programs.
Provided that, if the Heritage Conservation Committee so advises, the Municipal Commissioner shall refuse permission for any sign or outdoor display structure.
Form Giving Particulars of Development
(Item iv of Appendix A-1)
(a) (i) Full Name of Applicant
(ii) Address of applicant
(iii) e-mail ID
(iv) Contact / Mobile No.
(b)(i) Name and address of Architect/licensed Engineer/ StructuralEngineer/ Supervisor employed.
(ii) No. and date of issue of License
2.
(a) Is the plot of, a City Triangulation SurveyNumber, Revenue Survey Number or HissaNumber of a Survey Number or a Final PlotNumber of a Town Planning Scheme or a plotof an approved layout?
2.
(b)Please state Sanction Number and Date ofSub-division / Layout
2.
(c) Whether the land is situated in Core Area orOutside Core Area?
3.
(a) What is the total area of the plotaccording to the ownership document andmeasurement plan?
3.
(b)Does it tally with the Revenue/CTSRecord
3.
(c) What is the actual area available on sitemeasured by Architect/licensedEngineer/Structural EngineerSupervisor?(The permission shall be based on thearea whichever is minimum.)
3.
(d) Is there any deduction in the original areaof the plot on account of D.P. Roads, orreservation(s). If so, are they correctlymarked on the site plan? Please state thetotal area of such deductions?
3.
(e) Is there any water stream in the land?State the area of such land.
3.
(e) What is the area remainedfordevelopment after above deduction(s)?
3.
(f) What is the area proposed for recreationalopen space? (in case of land havingoriginal holding more than 0.4 hector)Please mention the area.
3.
(g) Whether amenity space as required underRegulation no.13.4 is left? Please mentionthe area.
3.
(f) What is the net plot area asperRegulationno.13.8? (excluding (g)above)
4.
Are all plans as required under Regulationno.6.2 enclosed?
Proforma - I
Drawing Sheet No.
X/Y
Stamps of Approval of Plans:
Appendix 'D-1'
A Area Statements
Area of land (Minimum area of a, b, c to be considered) a) As per ownership document (7/12, CTS extract) b) as per measurement sheet c) as per site
Deductions for (a) Proposed D.P./ D.P. Road widening Area (b) Any D.P. Reservation area
Gross Area of Plot (1-2)
(Total a+b)
Recreational Open space (a) Required - (b) Proposed -
Amenity Space (a) Required - (b) Proposed -
Service road and Highway widening
Internal Road area
Area under layout plots
Net area of plots for FSI Calculations = (3-5b)
Permissible FSI factor for layout plots = (9/8)
Area for inclusive housing (a) Required - (b) Proposed -
Certificate of Area:
Certified that the plot under reference was surveyed by me on and the dimensions of sides etc. of plot stated on plan are as measured on site and the area so worked out tallies with the area stated in document of Ownership/ T.P. Scheme Records/ Land Records Department/City Survey records
Signature
(Name of Architect/License Engineer/Supervisor.)
Owner (s) name and signature
Architect/ Licensed Engineer/ Supervisor name and signature
Statement of distribution of FSI on each plot(to be printed at suitable place on plan)
Plotno.
Plot area(sq.m.
Roundingarea ofRoad(if any)(sq.m.)
RemainingPlot area(b-c)(sq.m.)
Built up areaon pro-ratabasis i.e.(d x Pro-rataFSI factor)
FrontRoadwidth(m.)
basic FSI
PermissibleBuilt-up areaon Basic FSI(e X g)(sq.m.)
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
Form for Sanction of Building Permission and Commencement Certificate
To,
Sir,
With reference to your application No ,dated for the grant of sanction of Commencement Certificate under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work / Building on Plot No Revenue Survey No , City Survey No mauja situated at Road /Street Society the Commencement Certificate/Building Permit is granted under Section 45 of the said Act, subject to the following conditions:
The land vacated in consequence of the enforcement of the set-back rule shall form part of the public street.
No new building or part thereof shall be occupied or allowed to be occupied or used or permitted to be used by any person until occupancy permission has been granted.
You will have to handover the amenity space to the Corporation before approval of final layout as per Regulation no.13.4. (wherever applicable)
You will have to submit an undertaking in respect of recreational open spaces as stipulated in Regulation.(wherever applicable)
The Commencement Certificate/ Building permit shall remain valid for a period of one year commencing from the date of its issue unless the work is not commenced within the valid period.
This permission does not entitle you to develop the land which does not vest in you.
Office No.
Office Stamp
Date :
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
Appendix 'D-2'
Form for Final Approval to the Land Sub-division / Layout
To,
Sir,
With reference to your application No. ,dated for the land sub-division approval, under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work in respect of land bearing Revenue Survey No , City Survey No , mauje situated at Road /Street , Society , the land sub-division layout is finally approved as demarcated under Section 45 of the Maharashtra Regional & Town Planning Act, 1966, subject to the following conditions:
1.
It shall be the responsibility of the owner to carry out all the development work includingconstruction of roads, sewer lines, water supply lines, culverts, bridges, street lighting, etc. andhand it over to the Municipal Council after developing them to the satisfaction of the MunicipalCommissioner.
2.
If you wish that the Municipal Council should carry out these development works, then you willhave to deposit the estimated expenses to the Municipal Council in advance, as decided by theMunicipal Commissioner.
3.
As per the undertaking submitted by you in respect of recreational open space as stipulated inRegulation no.13.3, the said open space admeasuring ------- sq.m. stand vested in the name of plotholders of the layout or society of the plot holders and you have no right of ownership or interest inthe said recreational open space.
Since you have handed over the amenity space to the Corporation, you shall be entitled for FSIequivalent to TDR, on the remaining land. (wherever applicable)
4.
This permission does not entitle you to develop the land which does not vest in you.
5.
6.
7.
8.
Office No. ---- -Office Stamp
-Date :---------
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
Appendix 'E-1'
Form for Refusal of Building Permit / Commencement Certificate
Form for Refusal of Land Sub-division / Layout
To,
Sir,
With reference to your application No. dated for the grant of sanction for the development work bearing Revenue Survey No., City Survey No. _, mauje , I regret to inform you that the proposal has been refused under Section 45 of the Maharashtra Regional and Town Planning Act, 1966, on the following grounds
1.-
5.---------
Office Stamp
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
Appendix 'F' Form for Intimation of Completion of Work Upto Plinth Level
To,
The Municipal Commissioner,
Pune Municipal Corporation
Sir,
The construction up to plinth / column up to plinth level has been completed in Building No Plot No Revenue Survey No. City Survey No. _, Village Sector No. Ward No. , situated at Road/Street Society in accordance with your permission No dated under my supervision and in accordance with the sanctioned plan.
Please check the completed work and permit me to proceed with the rest of the work.
Yours faithfully
Signature of Architect /Licensed Engineer/
Structural Engineer/Supervisor
Name :
(In Block Letters)
Address :
E-mail ID :
Mobile No.:
Date:
Appendix 'G' Form of Approval / Disapproval of Development Work Upto Plinth Level
To,
Sir,
Please refer to your intimation No dated regarding the completion of construction work upto plinth / column upto plinth level in Building No Plot No, Revenue Survey No. , City Survey No, Village SectorNo. WardNo. ,situated at Road/Street Society You may proceed / are not allowed to proceed with the further work as per sanctioned plans / as the construction upto plinth level does / does not confirm to the sanctioned plans.
Yours faithfully,
Municipal Commissioner,
Pune Municipal Corporation
Office No
Office Stamp
Date :
Appendix 'H'
Form for Completion Certificate
To,
The Municipal Commissioner,
Pune Municipal Corporation
Sir,
I hereby certify that the erection / re-erection or part/ full development work in / on building / part building No Plot No Revenue Survey No. City Survey No. , mauje , has been supervised by me and has been completed on according to the plans sanctioned, vide office communication No dated The work has been completed to the best of my satisfaction. The workmanship and all the materials (type and grade) have been strictly in accordance with general and detailed specifications. No provisions of the Act or the building Regulations, no requisitions made, conditions prescribed or orders issued there under have been transgressed in the course of the work. I am enclosing three copies of the completion plans. The building is fit for occupancy for which it has been erected/ re-erected or altered, constructed and enlarged.
I have to request you to arrange for the inspection & grant permission for the occupation of the building.
Yours faithfully
Signature and name of Architect /Licensed Engineer/
The part / full development work / erection re-erection / or alteration in of building / part building No Plot No Revenue Survey No. City Survey No. mauje completedunderthesupervisionof Architect, Licensed Engineer/ Structural Engineer / Supervisor, / License No may be occupied on the following conditions-
A set of certified completion plans is returned herewith
The part / full development work / erection re-erection / or alteration in of building / part building No Plot No Revenue Survey No. City Survey No. mauje completedunderthesupervisionof Architect, Licensed Engineer/ Structural Engineer / Supervisor, / License No is not allowed to be occupied because of the following reasons -
The construction carried out by you does not conform to the sanctioned plans.
3.----------
A set of completion plan is retained with the Municipal Council and remaining sets are regretfully returned herewith.
Encl : As above.
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
Appendix 'K'
To,
Form of Indemnity for Part Occupancy Certificate
(On Stamp Paper)
(Of such value as decided by the Municipal Commissioner.)
Municipal Commissioner,
Pune Municipal Corporation.
Subject:-
Sir,
While thanking you for letting me occupy a portion of the above building before acceptance of the Completion Certificate of the whole building for the plans approved in communication No, dated I hereby indemnify the Municipal Corporation against any risk, damage and danger which may occur to occupants and users of the said portion of the building and also undertake to take necessary security measures for their safety. This undertaking will be binding on me /us, our heirs, administrators and our assignees.
Yours faithfully,
Signature and name of Owner
Witness:
Address:
Date:
Appendix 'L'
Fire Protection Requirements
1 All buildings shall be planned, designed and constructed to ensure fire safety and this shall be done in accordance with Part IV of Fire Protection of National Building Code of India and Maharashtra Fire Prevention and Life Safety Measures Act, 2006. as amended from time to time, and Part IV of Fire Protection of National Building Code of India (for the provisions which are not covered in these regulations.) In case of special buildings, the building schemes shall also be cleared by the Fire Officer, Fire Brigade Department of the Corporation.
1.2Lifts
General requirements of lifts shall be as follows:
a) Walls of lift enclosures shall have a fire rating of 2 h; lifts shall have a vent at the top of area not less than 0.2 sq.m.
b) Lift motor room shall be located preferably on top of the shaft and separated from the shaft by the floor of the room.
c) Landing doors in lift enclosures shall have a fire resistance of not less than 1 h.
d) The number of lifts in one row for a lift bank shall not exceed 4 and the total number of lifts in the bank (of two rows) shall not exceed 8. A wall of 2 h. fire rating shall separate individual shafts in a bank.
e) Lift car door shall have a fire resistance rating of half an hour.
f) Collapsible gates shall not be permitted for lifts and shall have solid doors with fire resistance of at least 1 h.
g) If the lift shaft and lobby is in the core of the building, a positive pressure between 25 and 30 Pa shall be maintained in the lobby and a positive pressure of 50 Pa shall be maintained in the lift shaft. The mechanism for pressurization shall act automatically with the fire alarm; it shall be possible to operate this mechanically also.
h) Exit from the lift lobby, if located in the core of the building, shall be through a self closing smoke stop door of half an hour fire resistance.
i) Lifts shall not normally communicate with the basement; if, however, lifts are in
communication, the lift lobby of the basements shall be pressurized as in (g), with self-closing door as in (h)
j) Grounding switch(es), at ground floor level, shall be provided on all the lifts to enable the fire service to ground the lifts.
k) Telephone or other communication facilities shall be provided in lift cars for building of 30 m. in height and above. Communication system for lifts shall be connected to fire control room for the building.
Suitable arrangements such as providing slope in the floor of lift lobby, shall be made to prevent water used during fire-fighting, etc., at any landing from entering the lift shafts.
m) A sign shall be posted and maintained on every floor at or near the lift indicating that in case of fire, occupants shall use the stairs unless instructed otherwise. The sign shall also contain a plan for each floor showing the locations of the stairways. Alternate source of power supply shall be provided for all the lifts through a manually operated changeover switch.
n) Fire Lifts -Following details shall apply for a fire lift :
i) To enable fire services personnel to reach the upper floors with the minimum delay, one fire lift per 1200 sq.m. of floor area shall be provided and shall be available for the exclusive use of the firemen in an emergency.
1.3Basements -
i) Each basement shall be separately ventilated. Vents with cross-sectional area (aggregate) not less than 2.5% of the floor area spread evenly round the perimeter of the basement shall be provided in the form of grills or breakable stall board lights or pavement lights or by way of shafts.
Alternatively, a system of air inlets shall be provided at basement floor level and smoke outlets at basement ceiling level. Inlets and extracts may be terminated at ground level with stall board or pavement lights as before, but ducts to convey fresh air to the basement floor level have to be laid Stall board and pavement lights should be in positions easily accessible to the fire brigade and clearly marked SMOKE OUTLET’ or AIR INLET’ with an indication of area served at or near the opening.
ii) The staircase of basements shall be of enclosed type having fire resistance of not less than 2 h and shall be situated at the periphery of the basement to be entered at ground level only from the open air and in such positions that smoke from any fire in the basement shall not obstruct any exit serving the ground and upper storeys of the building and shall communicate with basement through a lobby provided with fire resisting self-closing doors of 1 h resistance. For travel distance, if the travel distance exceeds as given therein, additional staircases shall be provided at proper places.
iii) In multi-storey basements, intake ducts may serve all basement levels, but each basement levels and basement compartment shall have separate smoke outlet duct or ducts. Ducts so provided shall have the same fire resistance rating as the compartment itself. Fire rating may be taken as the required smoke extraction time for smoke extraction ducts.
iv) Mechanical extractors for smoke venting system from lower basement levels shall also be provided. The system shall be of such design as to operate on actuation of heat / smoke sensitive detectors or sprinklers, if installed, and shall have a considerably superior performance compared to the standard units. It shall also have an arrangement to start it manually
v) Mechanical extractors shall have an internal locking arrangement, so that extractors shall continue to operate and supply fans shall stop automatically with the actuation of fire detectors.
vi) Mechanical extractors shall be designated to permit 30 air changes per hour in case of fire or distress call. However, for normal operation, air changes schedule shall be as given in Part 8, Building Services, Section 3, Air-conditioning, Heating and Mechanical Ventilation of National Building Code.
vii) Mechanical extractors shall have an alternative source of supply.
Form for Tentative Approval for Demarcation of Land / Sub-division Layout
To,
Sir,
With reference to your application No ,dated for the land sub-division approval, under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work in respect of land bearing Revenue Survey No City Survey No , mauje situated at Road /Street Society , it is to inform you that, land sub-division layout is hereby tentatively approved and recommended for demarcation, subject to the following conditions:
You will get the land sub-division layout demarcated on the site by the Land Records Department and submit the certified copy to that effect for final approval.
It shall be the responsibility of the owner to carry out all the development work including construction of roads, sewer lines, water supply lines, culverts, bridges, street lighting, etc. and hand it over to the Municipal Corporation after developing them to the satisfaction of the Municipal Commissioner.
If you wish that the Municipal Corporation has to carry out these development works, then you will have to deposit the estimated expenses to the Municipal Corporation in advance, as decided by the Municipal Commissioner.
You will have to handover the amenity space to the Corporation before approval of final layout as per Regulation no.13.4. (applicable in case where owner is not allowed to develop)
You will have to submit an undertaking in respect of recreational open spaces as stipulated in Regulation.
This permission does not entitle you to develop the land which does not vest in you.
Office No.
Office Stamp
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
Appendix 'D-3'
No interventions be permittedeither on exterior or interiorunless it is necessaryin theinterest of strengtheningandprolonging the life of thebuildings or precincts or any partof features thereof. Forthispurpose absolutely essential andminimum changes would beallowed and they must beinaccordance with the original. (D) Procedure
Grade-II (A)Internal changes and adaptivereuse and external changesmay by and large be allowedbut subject to strict scrutiny.Care would be taken toensure the conservation of allspecial aspects for which it isincluded in Heritage Grade-IIGrade-II (B)In addition to the above,extension ofAdditional building in thesame plot or compound, incertain circumstances beallowed, provided that, theextension/additional buildingis in harmony with (and doesnot detract from) the existingheritage buildings orprecincts especially in termsof height, and facade.
External, internal changes andadaptive reuse would by andlarge be allowed. Changes caninclude extensions, andadditional buildings in the sameplot or compound. However anychanges should be such thatthey do not detract from theexisting heritage building/precinct.
Development permission for the changes would be given by the Commissioner on the advice of theHeritageConservation Committee.
Development permission for the changes / additional construction would be given by the Commissioner on the Heritage advice
Development permission for the additional changes construction would be given by the Commissioner on the advice of the Heritage Conservation
Vistas/ Surrounding Development
Conservation Committee.
Committee.
All developments in areas surrounding Heritage Grade-I shall be regulated and controlled by ensuring that it does not mark the grandeur of or view from
(ii) To prepare a list or supplementary list of building artefacts, structures, areas precincts of historic aesthetic architectural cultural significance and a supplementary list of natural features of environmental significance including scared groves, hills, hillocks etc. water bodies (and the areas adjoining the same) to which this regulation would apply
(iii) To consider whether any relaxation, modification, alteration, or variance of any of the Development Control and Promotion Regulations is called for.
(iv) To suggest amendments, changes or special regulations or modification to regulations for listed buildings and the heritage precincts regulated under these regulations
(v) To consider on the extent of Development Rights to be granted to the owners of listed Building of the Heritage Precincts.
(vi) To consider whether development Rights Certificates may be allowed to be consumed in a heritage precinct.
(vii) To consider whether to allow commercial /office user of any listed building of Heritage Precincts and when to terminate the same.
(viii) To regulate erection of outside advertisement/bill boards.
(ix) To recommend guidelines to be adopted by those private parties who sponsor beautification schemes at public intersection and elsewhere.
(x) To evaluate the cost of repairs to be given to the owners to bring the existing building back to the original condition. For this purpose, the Committee may suggest ways to raise funds through private sources.
(xi) To prepare special designs and elements and guidelines for listed buildings and control of height and essential façade characteristics such as maintenance of the buildings and to suggest suitable design adopting new materials for replacements keeping the old form intact to the extent possible.
(xii) To prepare guideline relating to design elements and conservation principles to be adhered to and to prepare other guideline for the purpose of this regulation.
(xiii) To consider any other issue as may be required from time to time during course of scrutiny of development permissions and in overall interest of heritage/environmental conservation.
In the absence of Heritage Conservation Committee, the Municipal Commissioner shall consult the Government before giving such permission.
vii) Attested copy of receipt of payment of scrutiny fees;
I request that the proposed development/ construction may be approved and permission be accorded to me
to execute the work. Signature of the Licensed / Signature of Owner
Surveyor/Architect Name of Owner Name Address of Owner License No. Contact No.
5.
(a) In what zone does the plot fall?
(b) For what purpose the building is proposed?Is it permissible according to the land use
6.
classification?
6.
(a) Is road available as an approach to theland? What is the average existing width of theroad? (If the plot abuts on two or more roads,the above information in respect of all roadsshould be given)
6.
(b) Is the land fronting on D.P. road? If so,width of the D.P. road
6.
(c) Is the land fronting on National or Statehighway? If so, is the Building line / controlline maintained? Please state the distance
6.
(c) What is the height of the building abovethe average ground level of the plot?
6.
(d) Is it within permissible limit of heightspecified in Regulation no. 15.9 i.e. 1.5 timesof the road width plus front margin?
6.
(e)Does height exceed the limit specified in (d)above? If so, is height approved by Director ofFire Services, M.S.?
7.
Is the land subject to restrictions of blue / redflood line, airport, railway, electric line, landfill sites, archaeology, etc.? Please state thedetails along with No objection certificate ’ifany.
8.
(a) If there are existing structures on the plot
(i) Are they correctly marked and numberedon the site plan?
(ii) Are those proposed to be demolishedimmediately and hatched in yellow colour?
(iii)What is the plinth area and total floor areaof all existing structures to be retained?(Please give details confirming to the plansubmitted)
9.
Is balcony area within the permissible limit of15 %? State said balcony area and area countedin FSI.
10.
Are double height terrace within the limit of20%? Are they of supported type? State saiddouble height terrace area and area counted inFSI.
11.
(a) Please state the total built up area,(existing + proposed + extra balconies +extra double height terraces.)
11.
(b) What is the basic permissible F.S.I. of thezone according to front road width?
11.
(c) What is the premium FSI proposed to beconsumed?
11.
(d) What is the area of TDR proposed to beconsumed?
11.
(e) What is the additional FSI proposed to beconsumed?
11.
(f) Please state the overall F.S.I. utilised in theproposal?
(g) Is built-up area of each flat /unitmentioned on the plan?
12.
Whether area for inclusive housing is requiredas per Regulation no.13.7? Please state thedetails.
13.
(a) What is the width of the front marginaldistance (s)? If the building abuts two or moreroads, does the front marginal distance complywith Regulation?
14.
(a) What is :
Permissible
Proposed
(i) the side marginal distance (s)?
(ii) the rear marginal distance (s)?
(iii) the distance between buildings?
15.16.
(a) What are the dimensions of the inner orouter chowk?
(b) Is / are room (s) dependent for its light andventilation on the chowk? If so, are thedimensions of the chowk as required?
(a) Whether sizes of the rooms comply withthe dimensions mentionedintheregulations?
(b) Whether use of everyroom partmentioned on the plan?
(c) Whether every room derives light andventilation required under the regulations?
17.
If the height of the building is more than 15meter above the average ground level, isprovision for lifts made?
(a) If so, give details of lift.
Passenger Capacity
No. of Lifts
No of Liills
(b) Details of Fire Lift.
Passenger Capacity
No. of Lifts
18.
(a) Does the building fall under purview ofRegulation no.6.2.6.1?
(b) If so, is fire escape staircase provided inaddition to regular staircase?
(c) Whether the ramps to the basement areprovided leaving 6 m marginal distance formovement of fire fighting vehicle?
(d) If podiums are proposed, does it allow themovement of fire fighting vehicleproperly?
19.
(a) What are the requirements of parkingspaces under the Regulation no.20? How manyare proposed?
Required
Proposed
Car
Scooter
Cycle
(b) (i) Are loading-unloading spacesnecessary?
(ii) If so, what is the requirement?
(iii) How many are proposed?
20.
Is the sanitary arrangement provided as per theregulation?
21.
Details of the source of water to be used in theconstruction
22.
Distance from the sewer.
23.
Please explain in detail in what respect theproposal does not comply with theDevelopment Controland PromotionRegulations and the reasons there for,attaching a separate sheet if necessary.
I hereby declare that I am the Architect/ licensed Engineer/ Structural Engineer/ Supervisor employed for the proposed work and that the statements made in this form are true and correct to the best of my knowledge.
Date: / /
Signature of the Architect/ licensed Engineer/ Structural Engineer/ Supervisor employed.
FORM OF STATEMENT 1(to be printed on plan)[Sr. No. 8 (a) (iii)]Existing Building to be retained
ExistingBuilding No.
Floor No.
Plinth Area
Total Floor Area ofExisting Building
Use / Occupancy ofFloors.
(1)
(2)
(3)
(4)
(5)
FORM OF STATEMENT 2(to be printed on plan)[Sr. No. 11 (a) ]Proposed Building
BuildingNo.
FloorNo.
TotalBuilt-upAreaoffloor.
Balconyareawithin15%
Excessbalconyareacounted inFSI.
Doubleheightterrace areawithin 20%
ExcessDoubleheightterrace areacounted inFSI.
Total FSI(3+5+7)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
FORM OF STATEMENT 2(to be printed on plan)[Sr. No. 11 (g) ]
Area details of Flat / unit
BuildingNo.
FloorNo.
Flatunit No.
Built up area of flat /unit along with Shareof Common areas likestaircase / passages
Area ofBalconyattached toflat / unit
Area ofDouble heightterracesattached to flat/ unit
Total area offlat / unit(4 + 5 + 6)
1
2
3
4
5
6
7
Note :1) Built up area of all flats / units on the respective floor shall tally with the total built up of that floor.2) Above statements may vary, wherever required.
PROFORMA -I(At Right Hand top Corner of Plans)
PROPOSED COMPLEX ON C.T.S. NO./PLOT NO. / S.NO. /F.P.NO.-- OF VILLAGE MAUJE
Drawing Sheet No.X/Y
Stamps of Approval of Plans:
A
AREA STATEMENTS
Area of plot(Minimum area of a, b, c to be considered)
a) As per ownership document (7/12, CTS extract)
b) as per measurement sheet
c) as per site
2. Deductions for
(a) Proposed D.P./ D.P. Road widening Area
(b)Any D.P.Reservation area
(Total a+b)
3. Gross Area of Plot (1-2)
4. Recreational Open space
(a) Required
(b) Proposed
5. Amenity Space -(a)Required -(b) Proposed -6. Service road and Highway widening7. Internal Road area
8. Net Area of Plot = [3 − 5(b)]
9. Built up area with reference to Basic F.S.I. as per front road width(sr. no. 8 X 1.1)
10. Addition of area for F.S.I.
(a) In-situ area against D.P. road [1.85x sr. no. 2 (a)], if any
(b) In-situ area against Amenity Space [2.00 or1.85 x sr. no. 5 (b)],
(c) Premium FSI area(subject to maximum of 0.3 of sr. no. 8)(d) TDR area(e) Additional FSI area under chapter VIII
(Total of a+b+c+d+e)
11. Total area available (9+10)
12. Maximum utilization of F.S.I. Permissible as per Road width (as perRegulation no. 15.4)
13. Total Built-up Area in proposal.(excluding area at Sr.No.15.b)
a) Existing Built-up Area.
b) Proposed Built-up Area
c) Excess Balcony area counted in F.S.I.
d) Excess Double Height terraces area counted in F.S.I.
Total (a+b+c+d)
14. F.S.I. Consumed (13/8) (should not be more than serial no.12 above.)
15. Area for Inclusive Housing, if any
a) Required (20% of sr.no.9)
b) Proposed
Certificate of Area:Certified that the plot under reference was surveyed by me on and the dimensions ofsides etc. of plot stated on plan are as measured on site and the area so worked out tallies with the areastated in document of Ownership/ T.P. Scheme Records/ Land Records Department/City Survey records.Signature(Name of Architect/Licensed Engineer/Supervisor.)
Owner's declaration –I/We undersigned hereby confirm that I/We would abide by plans sanctioned by Pune MunicipalCorporation. I/We would execute the structure as per sanctioned plans. Also I/We would execute the workunder supervision of proper technical person so as to ensure the quality and safety at the work site.Owner (s) name and signature
Architect/ Licensed Engineer/ Supervisor name and signature
JobNo.
Drawing No.
Scale
Drawn by
Checked by
Registration / License no. of Arch./Lic.Eng./ Supervisor
APPENDIX A-2 FORM FOR SUB-DIVISION OF LAND AS PLOTTED LAYOUT
Application for permission for development under Section 44 / 58 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949
From (Name of the owner)
To, The Municipal Commissioner, Municipal Corporation, Pune.
Sir, I intend to carry out the under mentioned development in the site/plot of land, bearing S.No./Gut No. ......., situated at Road/ Street City Survey No... …., Mouje . in accordance with Section 44/58 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949.
I forward herewith the following plans and statements (Item 1 to 6) wherever applicable, in quadruplicate, signed by me (Name in block letters) and the Architect / Licensed Engineer / Structural Engineer / Supervisor (License No.. .…), who has prepared
the plans, designs and a copy of other statements /documents as applicable (Items 7 to 10). (1) Key Plan (Location Plan);(to be shown on first copy of the set of plans) (2) Site Plan showing the surrounding land and existing access to the land included in the layout;(to be shown on first copy of the set of plans)
(3) A layout plan showing, (i) sub-divisions of the land or plot with dimensions and area of each of the proposed sub- divisions and its use according to prescribed regulations; (ii) width of the proposed streets; and
(iii) dimensions and area of recreational open spaces provided in the layout. (iv) dimensions and area of amenityspace provided in the layout.
(4) An extract of record of rights property register card (any other document showing ownership of land to be specified) alongwith consent of co-
owners where third party interest is created. (5) Particulars of development in Form enclosed. (6) Attested copy of Receipt for payment of scrutiny fees. (7) No Objection Certificate, wherever required.
I request that the proposed layout may please be approved and permission accorded to me to
FORM GIVING PARTICULARS OF DEVELOPMENT (PART OF APPENDIX 1........ITEM 5)
(a) (i) Full Name of Applicant
(ii) Address of applicant
(iii) e-mail ID
(iv) Mobile No.
(b) (i) Name and address of Architect/ licensedEngineer employed.
(ii) No. and date of issue of License
2.
(a) Is the plot of, a City Triangulation Survey Number,Revenue Survey Number or Hissa Number of a SurveyNumber or a Final Plot Number of a Town PlanningScheme?
(b)Whether the land is situated in Core Area or OutsideCore Area?
3.
(a) What is the total area of the plot according to theownership document and measurement plan?
(b)Does it tally with the Revenue/CTS Record
(c)What is the actual area available on site measuredby Architect/ licensed Engineer/ StructuralEngineer / Supervisor?(The permission shall be based on the areawhichever is minimum.)
(d)Is there any deduction in the original area of theplot on account of D.P.Roads, or reservation(s). Ifso, are they correctly marked on the site plan?Please state the total area of such deductions?
(e)Is there any water stream in the land? State the areaof such land and state whether it is excluded?
(e)What is the area remained for development afterabove deduction(s)?
(f) What is the area proposed for recreational openspace? (in case of land having original holdingmore than 0.4 hector) Please mention the area.
(g) Whether amenity space as required underRegulation no.13.4 is left? Please mention the area.
(f) What is the net plot area as per Regulation no.13.9?(excluding (g) above)
5.
Are all plans as required under Regulation no.6.2enclosed?
6.
(a) In what zone does the plot fall?
6.
(b) For what purpose the layout is proposed? Is itpermissible according to the land use classification?
7.
(a) Is road available as an approach to the land? What isthe average existing width of the road? (If the plot abutson two or more roads, the above information in respectof all roads should be given) (b) Is the land fronting on D.P. road? If so, width of theD.P. road
(c) Is the land fronting on National or State highway? Ifso, is the Building line / control line maintained? Pleasestate the distance.
8.
Is the land subject to restrictions of blue / red flood line,airport, railway, electric line, land fill sites, archaeology,etc.? Please state the details along with No objectioncertificate' if any.
9.
Whether the internal roads proposed in the layoutconform to the Regulation no.12.
10
Whether roads in the layout are co-ordinated with theroads in the surrounding layout?
11
Whether the area and dimensions of plots are proposedas per prescribed regulations?
11.
Whether area for inclusive housing is required as perRegulation no. 13.7? Please state the details
I hereby declare that I am the Architect/ licensed Engineer employed for the proposed work and that the statements made in this form are true and correct to the best of my knowledge.
Date: / /
Signature of the Architect/ licensed Engineer/ Structural Engineer/ Supervisor employed.
APPENDIX 'B' FORM FOR SUPERVISION
To, The Municipal Commissioner, Municipal Corporation, Pune.
Sir,
I hereby certify that the development/erection/re-erection/demolition or material alteration in/ or on / in Plot No. in Block No. Building No situated at Road
shall be carried out under my City Survey No. / street supervision and I certify that all the materials (types and grade) and the workmanship of the work shall be generally in accordance with the general specifications and that the work shall be carried out according to the
sanctioned plans. I shall be responsible for the execution of the work in all respects. Signature and name of the Architect or Licensed
Engineer/Structural Engineer/ Supervisor
License No. Date :
APPENDIX 'C'
QUALIFICATION, COMPETENCE, DUTIES AND RESPONSIBILITES ETC. OF LICENSED TECHNICAL PERSONNEL OR ARCHITECT FOR PREPARATION OF SCHEMES FOR DEVELOPMENT PERMISSION AND SUPERVISION
C-1
General
C-1.1
The qualifications of the technical personnel and their competence to carry out different jobs forbuilding permit and supervision for the purpose of licensing by the Authority shall be as given inRegulation no. C-2 to C-6. The procedure for licensing the technical personnel is given inRegulation no.C-6.
C-2
ARCHITECT
C-2.1
Qualifications-The minimum qualifications for an architect shall be the qualifications as providedfor in the Architects Act, 1972for registration with the Council of Architecture. Such registeredArchitects shall not be required to again register their names with the Corporation. However, heshall submit the registration certificate to the Corporation.
C-2.2
Competence of Architect: To carry out work related to development permission as given belowand shall be entitled to submit -(a) All plans and information connected with development permission.(b) Structural details and calculations for building on plot upto 500 sq. m. and upto 3 storeys or 11m. height and(c) Certificate of supervision and completion for all buildings.
C-3
A )ENGINEER
C-3.1
Qualifications-
C-3.1
1) The qualifications for Licensing Engineer will be the corporate membership (Civil) of theInstitution of Engineers or such Degree or Diploma in Civil or Structural Engineering orequivalent;2) Diploma in Civil Engineering or equivalent, having experience of 10 years in the field of landand building planning.
C-3.2
Competence- To carry out work related to development permission as given below and shall beentitled to submit-(a) All plans and related information connected with development permission.(b) Structural details and calculations for building on plot upto 500 sq.m. and upto 3 storeys or 11m.height, and(c) Certificate of supervision and completion for all building
C-4
STRUCTURAL ENGINEER
C-4.1Qualifications- Qualifications for Licensing of structural engineers shall be as given below, withminimum 3 years of experience of structural engineering practice in designing and field work;(a) Graduate in Civil Engineering of recognised Indian or Foreign University and CharteredEngineer or Associated Member in Civil Engineering Division of Institution of Engineers (India)
or equivalent Overseas Institution; and
(b)Shall have post graduate degree in structural engineering. In the case of doctorate in structural
C-4.2 and supervision.
engineering the experience shall not be required. Competence-he shall be entitled to submit the structural details and calculations for all buildings
C-4.2.1
Complicated buildings and sophisticated structures, as decided by the Municipal Commissioner, which are not within the horizontal areas and vertical limits under C-2.2 (b), C-3.2 (b), C-5.2 (a)
C-5 SUPERVISOR:
(i)& C-5.2 (b) (i) shall be designed only by Structural Engineer.
C-5.1 Qualification (a)For Supervisor 1 :-
experience, or
(i) Three years architectural assistantship or intermediate in architecture with two years' (ii) Diploma in Civil engineering or equivalent qualifications with two years’ experience.
(iii) Draftsman in Civil Engineering from ITI or equivalent qualifications with Ten years experience out of which five year shall be under Architect/Engineer.
(b) For Supervisor - 2:- experience under Architect / Engineer.
(i) Draftsman in Civil Engineering from ITI or equivalent qualifications with five years'
C-5.2 Competence
sq.m.; and
(a) For Supervisor-1: he shall be entitled to submit - (i) All plans and related information connected with development permission on plot upto 500
(ii) Certificate of supervision of buildings on plot upto 500 sq. m. and completion thereof.
(b) For Supervisor-2 : he shall be entitled to submit -
C-6. LICENSING-
(i) All Plans and related information upto 200 sq. m. built up area, and (ii) Certificate of supervision for limits at (i) above and completion thereof,
C-6.1 Technical Personnel to be licensed:-
The Qualified technical personnel or group as given in regulations; No C-3, C-4, C-5 shall be
licensed with the authority and the license shall be valid for three calendar years ending
C-6.2
31stDecember after which it shall be renewed annually or every three years.
Fees for Licensing- The annual licensing fees shall be as follows:-
1000 p.a. For Engineer and structural Engineer
For supervisor (1)
500 p. a.
For supervisor (2)
300 p. a
The Municipal Commissioner may revise above fees from time to time, if necessary.
C-6.3
Duties and Responsibilities of Architects / Licensed Technical Personnel: The duties and responsibilities of architects / licensed technical personnel shall be as follows:- (1) It will be incumbent on every architect / licensed technical personnel, in all matters in which he may be professionally consulted or engaged, to assist and co-operate with the Municipal
To,
Appendix 'E-2'
Sir,
With reference to your application No. dated for the grant of sanction for the development work / the erection of a building / execution of work on Plot No. , Revenue Survey No., City Survey No. , mauje , I regret to inform you that the proposal has been refused under Section 45 of the Maharashtra Regional and Town Planning Act, 1966, on the following grounds.
5.---------
Office Stamp
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
ii) The lift shall have a floor area of not less than 1.4 sq.m. It shall have loading capacity of not less than 545 kg (8 persons lift) with automatic closing doors of minimum 0.8 m. width.
iii) The electric supply shall be on a separate service from electric supply mains in a building and the cables run in a route safe from fire, that is, within the lift shaft. Lights and fans in the elevators having wooden panelling or sheet steel construction shall be operated on 24 V supply.
iv) Fire-fighting lift should be provided with a ceiling hatch for use in case of emergency, so that when the car gets stuck up, it shall be easily openable.
v) In case of failure of normal electric supply, it shall automatically trip over to alternate supply. For apartment houses, this changeover of supply could be done through manually operated changeover switch. Alternatively, the lift shall be so wired that in case of power failure, it comes down at the ground level and comes to stand-still with door open.
vi) The operation of a fire lift is by a simple toggle or two-button switch situated in a glassfronted box adjacent to the lift at the entrance level. When the switch is on, landing callpoints will become inoperative and the lift will be on car control only or on a priority control device. When the switch is off, the lift will return to normal working. This lift can be used by the occupants in normal times.
vii) The words Fire Lift’shall be conspicuously displayed in fluorescent paint on the lift landing doors at each floor level.
viii) The speed of the fire lift shall be such that it can reach the top floor from ground level within 1 minute.
viii) Ventilating ducts shall be integrated with the structure and made out of brick masonry or reinforced cement concrete as far as possible and when this duct crosses the transformer area or electrical switchboard, fire dampers shall be provided
ix) Use of basements for kitchens working on gas fuel shall not be permitted, unless air conditioned. The basement shall not be permitted below the ward block of a hospital/nursing home unless it is fully sprinkled. Building services such as electrical sub-stations, boiler rooms in basements shall comply with the provisions of the Indian Electricity Act / Rules.
x) If cut-outs are provided from basements to the upper floors or to the atmospheres, all sides cutout openings in the basements shall be protected by sprinkler head at close spacing so as to form a water curtain in the event of a fire.
xi) Openable windows on external wall shall be fitted with such locks that can be opened by a fireman's axe.
xii) All floors shall be compartmented with area not exceeding 750 sq.m. by a separation wall with 2 h fire rating, for floors with sprinklers the area may be increased by 50 percent. In long building the fire separation walls shall be at distances not exceeding 40 m. For departmental stores shopping centres and basements, the area may be reduced to 500 sq.m. for compartmentation.
Where this is not possible, the spacing of the sprinklers, care should be taken to prevent spray from one sprinkler impending the performance of an adjacent sprinkler head.
1.4 Service Ducts/Shafts
a) Service ducts and shafts shall be enclosed by walls of 2 h and doors of 1 h. fire rating. All such ducts/shafts shall be properly sealed and fire stopped at all floor levels.
b) A vent opening at the top of the service shaft shall be provided having between one- fourth and one-half of the area of the shaft.
1.5 Refuse chutes
shall have opening at least 1 m. above roof level for venting purpose and they shall have an enclosure wall of non-combustible material with fire resistance of not less than 2 h. They shall not be located within the staircase enclosure or service shafts, or air-conditioning shafts inspection panel and doors shall be tight fitting with 1 h fire resistance; the chutes should be as far away as possible from exit.
1.6Refuge Area
Provisions contained in Regulation No 18.28.6 shall apply for all buildings :
1.7 Electrical services shall conform to the following :
(a) The electric distribution cables / wiring shall be laid in a separate duct. The duct shall be sealed at every floor with non-combustible materials having the same fire resistance as that of the duct. Low and medium voltage wiring running in shaft and in false ceiling shall run in separate conduits;
(b) Water mains, telephone lines, intercom lines, gas pipes or any other service line shall not be laid in the duct for electrical cables; use of bus ducts / solid rising mains instead of cables is preferred;
(c) Separate circuits for fire-fighting pumps, lifts, staircases and corridor lighting and blowers for pressurizing system shall be provided directly from the main switch gear panel and these circuits shall be laid in separate conduit pipes, so that fire in one circuit will not affect the others. Such circuits shall be protected at origin by an automatic circuit breaker with its novolt coil removed. Master switches controlling essential service circuits shall be clearly labelled;
(d) The inspection panel doors and any other opening in the shaft shall be provided with air-tight fire doors having fire resistance of not less than 2 h;
(e) Medium and low voltage wiring running in shafts and within false ceiling shall run in metal conduit. Any 230 V wiring for lighting or other services above false ceiling shall have 660 V grade insulation. The false ceiling including all fixtures used for its suspension, shall be of non-combustible material and shall provide adequate fire resistance to the ceiling in order to prevent spread of fire across ceiling. Reference may be made to good practice;
(f) An independent and well ventilated service room shall be provided on the ground level or first basement with direct access from outside or from the corridor for the purpose of termination of electric supply from the licensees' service and alternative supply cables. The doors provided for the service room shall have fire resistance of not less than 2 h.
Note : If service room is located at the first basement, it should have automatic fire extinguishing system.
(g) If the licensees agree to provide meters on upper floors, the licensees' cable shall be segregated from consumers’ cable by providing a partition in the duct. Meter rooms on upper floors shall not open into staircase enclosures and shall be ventilated directly to open air outside; and
(h) Suitable circuit breakers shall be provided at the appropriate points.
1.1Construction materials
All materials of constructions in load bearing elements, stairways and corridors and facades shall be non-combustible.
The interior finish materials shall not have a flame spread ability rating exceeding Class I (see 3.4.15.2 of Part 4 of National Building Code)
The internal walls or staircase shall be of brick or reinforced concrete with a minimum of 2 h. fire rating.
The staircase shall be ventilated to the atmosphere at each landing and a vent at the top; the vent openings shall be of 0.5sq.m in the external wall and the top. If the staircase cannot be ventilated because of location or other reasons, a positive pressure 50 Pa shall be maintained inside. The mechanism for pressurizing the staircase shall operate automatically with the fire alarm. The roof of the shaft shall be 1 m. above the surrounding roof. Glazing or glass bricks, if used in staircase, shall have fire resistance rating of minimum 2 h.
39.12Heritage Conservation Fund
Heritage buildings included in the said list shall be maintained by the owners of the said buildings themselves, with a view to give monetary help for such maintenance/repairs a separate fund may be created which would be kept at the disposal of the Municipal Commissioner, Pune Municipal Corporation, who will utilise these funds on the advice of the Heritage conservation Committee. The commissioner may, in such cases disburse appropriate amount to the owner or may get maintenance/ repair work done through Municipal Corporation.
2% of total development charges collected shall be transferred to the Heritage conservation fund.
The Municipal commissioner shall have right to remove any unauthorized construction in the property enlisted as heritage property as an encroachment for the Municipal land as defined and as per procedure laid down U/S 231 of the B.P.M.C. Act, 1941 and recover the expenses of such removal/ demolition work form the owner as arrears of land revenue.
The Municipal Commissioner shall have right to enter into any such heritage property to repair such property to avoid any damage or injury, and the amount shall be spent form Heritage conservation fund and shall be recovered from the owner as arrears of property tax.
If Heritage structure listed in Grade I needs conservation, preservation and immediate repairs and if the structure is affected due to vandalism by occupier/ owner ,then the Municipal commissioner shall have right to acquire such heritage property and conserve its heritage value.
1.11Transformers shall conform to the following:-
a) A sub-station or a switch-station with oil filled equipment shall not be located in the building The sub-station structure shall have separate fire resisting walls/surroundings and shall necessarily be located at the periphery of the floor having separate access from fire escape staircase. The outside walls, ceiling, floor, openings including doors and windows to the sub-station area shall be provided with a fire resisting door of 2 h fire rating. Direct access to the transformer room shall be provided, preferably from outside fire escape staircase.
b) The sub-station area needs to be maintained at negative air pressures and area in sub-station shall not be used as storage / dump areas.
c) When housed inside the building, the transformer shall be of dry type and shall be cut off from the other portion of premises by walls/ doors / cut-outs having fire resistance rating of 4 h.
1.9Illumination of means of exit
Staircase and corridor lights shall conform to the following:
a) The staircase and corridor lighting shall be on separate circuits and shall be independently connected so as it could be operated by one switch installation on the ground floor easily accessible to fire-fighting staff at any time irrespective of the position of the individual control of the light points, if any. It should be of miniature circuit breaker type of switch so as to avoid replacement of fuse in case of crisis;
b) Staircase and corridor lighting shall also be connected to alternative supply. The alternative source of supply may be provided by battery continuously trickle charged from the electric mains;
c) Suitable arrangements shall be made by installing double throw switches to ensure that the lighting installed in the staircase and the corridor does not get connected to two sources of supply simultaneously. Double throw switch shall be installed in the service room for terminating the stand-by supply.
d) Emergency lights shall be provided in the staircase and corridor; and
e) All wires and other accessories used for emergency light shall have fire retardant property.
1.10 A stand-by electric generator shall be installed to supply power to staircase and corridor lighting circuits, fire lifts, the stand-by fire pump, pressurisation fans and blowers, smoke extraction and
damper systems in case of failure of normal electric supply. The generator shall be capable of taking starting current of all the machines and circuits stated above simultaneously. If the stand-by pump is driven by diesel engine, the generator supply need not be connected to the stand-by pump Where parallel HV / LV supply from a separate sub-station is provided with appropriate transformer for emergency, the provision of generator may be waived in consultation with the Authority.
1.8Gas supply shall conform to the following:-
a) Town Gas / L.P.Gas Supply Pipes – Where gas pipes are run in buildings, the same shall be run in separate shafts exclusively for this purpose and these shall be on external walls, away from the staircases. There shall be no interconnection of this shaft with the rest of the floors. LPG distribution pipes shall always be below the false ceiling. The length of these pipes shall be as short as possible. In the case of kitchen cooking range area, apart from providing hood, covering the entire cooking range, the exhaust system should be designed to take care of 30 cu.m. per minute per sq.m. of hood protected area. It should have grease filters using metallic grill to trip oil vapours escaping into the fume hood
Note:- For detailed information on gas pipe installations, reference may be made to Para.9 Plumbing Services, Section 3 Gas Supply', of National Building Code of India.
b) All wiring in fume hoods shall be of fibre glass insulation. Thermal detectors shall be installed into fume hoods of large kitchens for hotels, hospitals and similar areas located in high rise buildings. Arrangements shall be made for automatic tripping of the exhaust fan in case of fire If LPG is used, the same shall be shut off. The voltage shall be of 24 V or 100 V dc operated with the external rectifier. The valve shall be of the hand re-set type and shall be located in an area segregated from cooking ranges. Valves shall be easily accessible. The hood shall have manual facility for steam or carbon dioxide gas injection, depending on duty condition; and
c) Gas meters shall be housed in a suitably constructed metal cupboard located in a well-ventilated space, keeping in view the fact that LPG is heavier than air and town gas is lighter than air.
1.13Provisions of boiler and boiler rooms shall conform to Indian Boiler Act. Further, the following additional aspects may be taken into account in the location of boiler room:
a) The boilers shall not be allowed in sub-basement, may be allowed in the basements away from the escape routes.
b) The boilers shall be installed in a fire resisting room of 4 h fire resistance rating and this room shall be situated on the periphery of the basement. Catch-pits shall be provided at the low level.
c) Entry to this room shall be provided with a composite door of 2 h fire resistance.
d) The boiler room shall be provided with fresh air inlets and smoke exhausts directly to the atmosphere.
e) The furnace oil tank for the boiler, if located in the adjoining room shall be separated by fire resisting wall of 4 h rating. The entrance to this room shall be provided with double composite doors. A curb of suitable height shall be provided at the entrance in order to prevent the flow of
oil into the boiler room in case of tank rupture.
f) Foam inlets shall be provided on the external walls of the building near the ground level to enable the fire services to use foam in case of fire.
1.14 Provision of first-aid and fire-fighting appliances.
The first-aid fire-fighting equipment shall be provided on all floors, including basements, lift rooms, etc. in accordance with good practice in consultation with the Authority
1.12Air-conditioning shall conform to the following:
a) Escape routes like staircases, common corridors, lift lobbies, etc. shall not be used as return air passage.
b) The ducting shall be constructed of substantial gauge metal in accordance with good practice
c) Wherever the ducts pass through fire walls or floors, the opening around the ducts shall be sealed with materials having fire resistance rating of the compartment.
d) Where duct crosses a compartment which is fire rated, the ducts shall be fire rated for same fire rating. Further depending on services passing around the duct work, which may get affected in case of fire temperature rising, the ducts shall be insulated.
e) As far as possible, metallic ducts shall be used even for the return air instead of space above the false ceiling.
f) Where plenum is used for return air passage, ceiling and its fixtures shall be of non-combustible material.
g) The materials used for insulating the duct system (inside or outside) shall be of non-combustible material, glass wool shall not be wrapped or secured by any material of combustible nature.
h) Area more than 750sq.m. on individual floor shall be segregated by a fire wall and automatic fire dampers for isolation shall be provided.
i) Air ducts serving main floor areas, corridors, etc. shall not pass through the staircase enclosure.
j) The air-handling units shall be separate for each floor and air ducts for every floor shall be separated and in no way inter-connected with the ducting of any other floor.
k) If the air-handling unit serves more than one floor, the recommendations given above shall be compiled with in addition to the conditions given below:
i) Proper arrangements by way of automatic fire dampers working on smoke detector / or
fusible link for isolating all ducting at every floor from the main riser shall be made.
ii) When the automatic fire alarm operates, the respective air-handling units of the airconditioning system shall automatically be switched off.
The vertical shaft for treated fresh air shall be of masonry construction.
m) The air filters of the air-handling units shall be of non-combustible materials.
n) The air-handling unit room shall not be used for storage of any combustible materials.
o) Inspection panels shall be provided in the main trunking to facilitate the cleaning of ducts of accumulated dust and to obtain access for maintenance of fire dampers.
p) No combustible material shall be fixed nearer than 150 mm to any duct unless such duct is properly enclosed and protected with non-combustible material (glass wool or spyglass with neoprene facing enclosed and wrapped with aluminium sheeting) at least 3.2 mm thick and which would not readily conduct heat.
q) Fire Dampers:-
These shall be located in conditioned air ducts and return air ducts/ passages at the following points:
i) At the fire separation wall.
ii) Where ducts/passages enter the central vertical shaft.
iii) Where the ducts pass though floors.
iv) At the inlet of supply air duct and the return air duct of each compartment on every floor.
The dampers shall operate automatically and shall simultaneously switch off the air-handling fans. Manual operation facilities shall also be provided.(Note- For blowers, where extraction system and duct accumulators are used, dampers shall be provided)
Fire/smoke dampers (for smoke extraction shafts) for buildings more than 24 mt in height.
a) For apartment houses in non-ventilated lobbies / corridors operated by fusible link / smoke detectors and with manual control.
b) For other buildings on operation of smoke detection system and with manual control.
Automatic fire dampers shall be so arranged as to close by gravity in the direction of air movement and to remain tightly closed on operation of a fusible link / smoke detector.
1.15Fire alarm system :
i) All buildings with heights of 15 m or above shall be equipped with manually operated electrical fire alarm (MOEFA) system automatic fire alarm system in accordance with good practice. However, apartment buildings between 15 m and 30 m in height may be exempted from the installation of automatic fire alarm system provided the local fire brigade is suitably equipped for dealing with fire in a building of 15 m in height or above and in the opinion of the Authority, such building does not constitute a hazard to the safety of the adjacent property or occupants of the building itself.
ii) Manually operated electrical fire alarm system shall be installed in a building with one or more call boxes located at each floor. The call boxes shall conform of good practice.
iii) The installation of call boxes in hostels and such other places where these are likely to be misused shall as far as possible be provided. Location of call boxes in dwelling units shall preferably be inside the building
1.16 Lightening protection of buildings:-
The lightning protection for buildings shall be provided as given in Para.8 Building Services Section 2, Electrical Installations' of National Building Code of India.
1.22Fire Escape Chutes/ Controlled Lowering Device for evacuation :-
(A) High rise building having height more than 70 mt., shall necessarily be provided with ;
(i) fire escape chute shaft/s for every wing adjacent to staircase.
(ii) Walls of the shaft shall have 4 hours fire resistance.
(iii) One side of the shaft shall be at external face of the building with proper ventilation. (iv) The dimension of the shaft shall not be less than 2.5 m X 1.5m.
(v) The access to the fire escape chute‘s shaft shall be made at alternate floor level from staircase mid-landing with self-closing door having fire resistance of at least one hour.
(vi) The fire chute shall be of staggered type with landing of each section at the vertical height of not more than 21 m.
1.17Fire control room:-
For all buildings 15 mt in height or above and apartment buildings with a height of 30 m and above, there shall be a control room on the entrance floor of the building with communication system (suitable public address system) to all floors and facilities for receiving the message from different floors. Details of all floor plans alongwith the details of fire-fighting equipment and installations shall be maintained in the fire control room. The fire control room shall also have facilities to detect the fire on any floor through indicator board connections; fire detection and alarm systems on all floors. The fire staff in-charge of the fire control room shall be responsible for the maintenance of the various services and fire-fighting equipment and installations in co-ordination with security, electrical and civil staff of the building
1.18 Housekeeping:-
To eliminate fire hazards, good housekeeping, both inside and outside the building, shall be strictly maintained by the occupants and / or the owner of the building
1.19 Fire drills and fire orders:-
Fire notices/orders shall be prepared to fulfil the requirements of fire-fighting and evacuation from the buildings in the event of fire and other emergency. The occupants shall be made thoroughly conversant with their actions in the event of emergency, by displaying fire notices at vantage points and through regular training. Such notices should be displayed prominently in broad lettering.
For guidelines for fire drills and evacuation procedures for high-rise buildings, Annexure E
of National Building Code of India may be referred.
1.20 Compartmentation:-
The building shall be suitably compartmentalized so that fire/smoke remain confined to the area where fire incident has occurred and does not spread to the remaining part of the building.
1.21 Materials for interior decoration / furnishing
The use of materials, which are combustible in nature and may spread toxic fume / gases should not be used for interior decoration / furnishing, etc.
For various types of occupancies, requirements given in National Building Code, Part IV shall be followed.
Alternatively,
(B) For High rise building having height more than 70 mt., ―Controlled Lowering Device for evacuation‖ or ―External Evacuation System‖ as approved by Chief Fire Officer of Corporation, shall be provided.
1.23 Fire Check Floor A high rise building having height more than 70 m, shall be provided with fire check floor (entire floor) at every 70 m. level. Height of the fire check floor shall not be more than 1.8 m. The fire check floor shall not be used for any purpose and it shall be the responsibility of the owner/occupier to maintain the same clean and free of encumbrances and encroachments at all times. Periphery of the Fire Check floor shall not be enclosed. Fire Drenchers shall be provided at the periphery of the each fire check floor externally.
1.24 Municipal Corporation shall charge Fire Infrastructure charges as may be decided by Municipal Commissioner with the approval of the Government, such charges shall be deposited in the separate account under the head of Fire Infrastructure charges and such amount shall only be used for establishment and expansion of Fire Infrastructure facilities.
Appendix 'P ' Provisions for Barrier Free Access
Provisions for Barrier Free access in buildings for differently abled persons shall be as given below
1 Definitions
1.1 Non-ambulatory Disabilities: – Impairments that, regardless of cause or manifestation, for all practical purposes, confine individuals to wheelchairs.
1.2 Semi - ambulatory Disabilities: - Impairments that cause individuals to walk with difficulty or insecurity, individuals using braces or crutches, amputees, arthritics, spastics, and those with pulmonary and cardiac ills may be semi-ambulatory.
1.3 Hearing Disabilities:- Deafness or hearing handicaps that might make an individual insecure in public areas because he is unable to communicate or hear warning signals.
1.4 Sight Disabilities: - Total blindness or impairments, which affect sight to the extent that the individual, functioning in public areas, is insecure or exposed to danger.
1.5 Wheel Chair: - Chair used by disabled people for mobility. The standard size of wheel chair shall be taken as 1050 mm x 750 mm.
2 Scope:-These regulations are applicable to all buildings and facilities used by the public such as educational, institutional, assembly, commercial, business, mercantile buildings constructed on plot having an area of more than 2000 sq.m. It does not apply to private and public residences.
3 Site development:-Level of the roads, access paths and parking areas shall be described in the plan along with specification of the materials.
3.1 Access Path / Walk Way: - Access path from plot entry and surface parking to building entrance shall be minimum 1800 mm wide having even surface without any steps. Slope, if any, shall not have gradient greater than 5%. Selection of floor material shall be made suitably to attract or to guide visually impaired persons (limited to coloured floor material whose colour and brightness is conspicuously different from that of the surrounding floor material or the material that emits different sound to guide visually impaired persons; hereinafter referred to as ―guiding floor material‖). Finishes shall have a non-slip surface with a texture traversable by a wheel chair. Curbs wherever provided should blend to a common level.
3.2 Parking: For parking of vehicles of differently abled people, the following provisions shall be made-
i) Surface parking for two car spaces shall be provided near entrance, with maximum travel distance of 30.0 m. from building entrance.
ii) The width of parking bay shall be minimum 3.6 meter.
iii) The information stating that the space is reserved for wheel chair users shall be conspicuously displayed.
iv) Guiding floor materials shall be provided or a device, which guides visually impaired persons with audible signals, or other devices, which serves the same purpose, shall be
provided.
4 Building requirements
The specified facilities for the buildings for differently abled persons shall be as follows:
i) Approach to plinth level
ii) Corridor connecting the entrance/exit for the differently abled.
iii) Stair-ways
iv) Lift
v) Toilet
vi) Drinking Water
4.1 Approach to plinth level - Every building should have at least one entrance accessible to the differently abled and shall be indicated by proper signage. This entrance shall be approached through a ramp together with the stepped entry.
4.1.1 Ramped Approach – Ramp shall be finished with non-slip material to enter the building. Minimum width of ramp shall be 1800mm with maximum gradient 1:12. Length of ramp shall not exceed 9.0 meter having 800mm high hand rail on both sides extending 300mm beyond top and bottom of the ramp. Minimum gap from the adjacent wall to the hand rail shall be 50mm.
4.1.2 Stepped Approach:- For stepped approach size of tread shall not be less than 300mm and maximum riser shall be 150mm. Provision of 800mm high hand rail on both sides of the stepped approach similar to the ramped approach.
4.1.3 Exit/Entrance Door:- Minimum & clear opening of the entrance door shall be 900mm and it shall not be provided with a step that obstructs the passage of a wheel chair user. Threshold shall not be raised more than 12mm.
4.1.4 Entrance Landing:- Entrance landing shall be provided adjacent to ramp with the minimum dimension 1800mm x 2000mm. The entrance landing that adjoins the top end of a slope shall be provided with floor materials to attract the attention of visually impaired persons (limited to coloured floor material whose colour and brightness is conspicuously different from that of the surrounding floor material or the material that emits different sound to guide visually impaired persons hereinafter referred to as ―guiding floor material‖). Finishes shall have a non-slip surface with a texture traversable by a wheel chair. Curbs wherever provided should blend to a common level.
4.2 Corridor connecting the entrance / exit for the differently abled: The corridor connecting the entrance / exit for differently abled, leading directly outdoors to a place where information concerning the overall use of the specified building can be provided to visually impaired persons either by a person or by signs, shall be provided as follows:
a) ‗Guiding floor materials‘ shall be provided or device that emits sound to guide visually impaired persons.
b) The minimum width shall be 1500mm.
c) In case there is a difference of level, slope ways shall be provided with a slope of 1:12.
d) Hand rails shall be provided for ramps/slope ways.
4.3 Stair-ways - One of the stair-ways near the entrance / exit for the differently abled shall have the
following provisions:
a) The minimum width shall be 1350 mm.
Guiding / Warning Floor Material:
The floor material to guide or to warn the visually impaired persons with a change of colour or material with conspicuously different texture and easily distinguishable from the rest of the surrounding floor materials is called guiding or warning floor material. The material with different texture gives audible signals with sensory warning when a person moves on this surface with walking stick. The guiding/warning floor material is meant to give the directional effect or warn a
person at critical places. This floor material shall be provided in the following areas:
a) The access path to the building and to the parking area.
b) The landing lobby towards the information board, reception, lifts, staircases and toilets.
c) Immediately at the beginning/end of walkway where there is a vehicular traffic.
d) At the location abruptly changing in level or beginning/end of a ramp.
e) Immediately in front of an entrance/exit and the landing.
Proper signage:
Appropriate identification of specific facilities within a building for the differently abled persons should be done with proper signals. Visually impaired persons make use of other senses such as hearing and touch to compensate for the lack of vision, whereas visual signals benefit those with hearing disabilities.
Signs should be designed and located so that they are easily legible by using suitable letter size (not less than 20 mm high). For visually impaired persons, information board in brail should be installed on the wall at a suitable height and it should be possible to approach them closely. To ensure safe walking, there should not be any protruding sign which creates obstruction in walking. Public Address System may also be provided in busy public areas.
The symbols/information should be in contrasting colour and properly illuminated because people with limited vision may be able to differentiate amongst primary colours. International Symbol Mark for wheel chair be installed in a lift, toilet, staircase, parking areas, etc., that have been provided for the differently abled.
1.0 Erection of Mobile Towers:
Regulation for setting up of Telecommunication Cell Site(s)/Base Station(s) and installation of the equipments for Telecommunication Network in Pune Municipal Corporation area.
1.1 Applicability:
This Regulation, shall apply to all existing and/or proposed Telecommunication Cell Sites/Base Stations installed or to be installed in Pune Municipal Corporation area.
1.3Procedure for Obtaining Development Permission
A All the applications for setting up or installation of any Telecommunication Cell Site/ Base Station (TCS/BS) or erection of a part thereof, shall be made to the Municipal Commissioner by the concerned Telecom Service Provider (TSP) or the concerned Infrastructure Provider (IP), in such form and containing such particulars as may be prescribed by the Municipal Commissioner.
B The application to the Municipal Commissioner for obtaining the aforesaid development permission shall be accompanied by the following documents-
(a) All the documents as otherwise required to be attached for any development permission under the sanctioned Development Control Regulations for the area in which the site under application is located.
(b) Plans showing Location Map, Key Plan, Site Plan, Block Plan and Plans of the proposed work. In case of roof-top tower, the copy of Occupation Certificate or copy of sanctioned building plans or copy of Commencement Certificate issued by the Municipal Commissioner or any other valid proof, in respect of the building on which the erection of roof-top tower is proposed, showing that such building is authorised.
(c) Notarised consent of the Owner of premises, which shall mean and include consent of the owner of property or no-objection certificate of the concerned registered Co-op Housing Society or notarised consent of 70% of the total number legal occupants in case of Apartments or Condominium or no-objection certificate of the lessor in case of a lease -hold property.
(d) Copy of agreement between the TSP/IP and the Owner of premises.
(e) Copy of Access Service License/ Infrastructure Provider (IP) Registration Certificate, granted
to the TSP/IP by the Department of Telecommunications (DoT), Government of India (GoI).
(f) Copy of clearance from the Standing Advisory Committee for Frequency Allocations (SACFA) or copy of application made to SACFA for the said Location submitted to Wireless Planning Commission (WPC) wing of the Department of Telecommunications (DoT), with registration number as WPC Acknowledgement, along with an undertaking that in case of any objection/ rejection, TSPs/IPs will take corrective actions or remove the TCS/BS.
(g) Acknowledgement receipt issued by Telecom Enforcement Resource and Monitoring (TERM) Cells in respect of the self-certificate submitted by TSP/IP regarding mobile towers/Base Transceiver Station (BTS) (Ground-based or Roof-Top or Pole/wall-mounted) in the format as prescribed by Telecom Engineering Centre (TEC), DoT, establishing/certifying that all General Public areas around the TCS/BS will be within safe Electro-Magnetic Radiation (EMR) exposure limit as per peak traffic measurement after the antennae starts radiating.
(h) Copy of Structural Stability Certificate for any ground-based Base Transceiver Station (BTS).
OR
In case of any roof-top BTS tower, Structural Stability Certificate for the building, based on written approval of any authorized Structural Engineer of the State/local Body/Central Building Research Institute (CBRT), Roorkee/ IIT/ NIT or any other Agency, authorized by the Municipal Commissioner.
Provided that such NOC shall not be required for the single pole antennae or cellular signal boosters.
(i) Copy of the type test certificate issued by Automotive Research Association of India (ARAI) to the manufacturers of the Diesel Generator (DG) Sets.
(j) Notarised undertaking from the Applicant/Owner of premises :-
(i) That the cabin will not be utilized for any purpose other than the Telecommunication Cell Site/Base Station.
(ii) That if the said activity is discontinued by the Applicant, the said cabin will be demolished forthwith by the Applicant /Owner of premises.
(k) No objection certificate from the Authority concerned under the Civil Aviation Ministry (hereinafter referred to as the said Authority) in case of any building falling in any area where such no objection certificate of the said Authority is required under the relevant rules or law.
(l) No objection certificate of the Maharashtra Pollution Control Board regarding compliance with the norms prescribed for noise levels and smoke levels for the power generating sets having capacity above 100 kw, to be provided for Base Transceiver Stations.
(m) No objection certificate of the Chief Fire Officer of the Municipal Corporation only in case of High Rise buildings having height of 15 mtr. or more measured from ground level.
(n) Copy of clearance from the State Environment Department as well as the Forest Department, in case of forest, protected areas, if applicable.
(o) Data Sheet containing the information regarding –
(a) Name of Telecom Service Provider/ Infrastructure Provider,
(b) Location,
(c) Tower Reference-
(i) Height and Weight of Tower,
(ii) Ground Based Tower/Roof Top Tower,
(iii) Number of Antennae planned on Tower,
(iv) Permissible maximum EMF Radiation Level,
(v) Proposed maximum EMF Radiation Level.
(p) Requisite fees, charges, as applicable.
C In case of a listed Heritage building/ Heritage precinct and/or in case of cessed buildings and/or in case of area under Environmentally Sensitive Zone (ESZ), notified by the Ministry of Environment and Forest (MoEF), Government of India (GoI), all the applications for installation of any TCS/BS or erection of a part thereof, shall be made to the concerned Municipal Commissioner, which will forward it to the Heritage Conservation Committee concerned and/or High Level Monitoring Committee (HLMC) appointed/constituted by MoEF respectively.
D The erection of the Base Station including tower, shall be commenced within 90 days from the date of receipt of permission from the Municipal Commissioner and report of erection shall be made to the Municipal Commissioner.
1.2Control Over Development
No Telecommunication Cell Site/Base Station shall be setup or installed without the previous permission in writing of the Municipal Commissioner. The permission shall be granted in the same manner as prescribed under Sections 44 to 47 of the Maharashtra Regional and Town Planning Act, 1966.
If the Municipal Commissioner does not dispose of the application within a period of 60 days from the date of submission, the said application by the Telecom Service Provider/Infrastructure Provider (TSP/IP) shall be deemed to have been approved as per the provisions under Section 45 of the Maharashtra Regional and Town Planning Act, 1966.
1.4Leviable charges
The Municipal Commissioner, while granting permission under sub regulation (3) hereinabove, shall levy and collect the following charges:-
(a) Development Charge.-Development charge shall be levied and collected by the Municipal Commissioner as per the provisions under section L24-B of The Maharashtra Regional and Town Planning Act, 1966. For the purpose of assessing the development charge, the setting up of Base Station on land and on roof-tops shall be classified under commercial category, calculated over the foot print area occupied by the Telecommunication Cell Site/Base Station.
(b) Administrative Fee.-Over and above the development charge as stipulated in clause 4 (a) above, TSP/IP shall pay to the Municipal Corporation, a onetime non-refundable Administrative fee of Rs.30000, or as per the rates revised from time to time by the Government.
APPENDIX 'M' Regulation For Koregaon Park area.
1 Koregaon Park Area is bounded as below:-
i) The Koregaon Park North Road on the north ;
ii) The Ghorpadi village boundary on the east ;
iii) The Southern Railway line on the south ; and
iv) The Circuit House - Fitzgerald Bridge Road on the west.
2 Special Building Rules framed by the Collector of Pune for this area shall be applicable which are as given below.
The minimum area of a building plot shall be as mentioned in the layout. No building plot as shown in the layout shall be sub-divided.
No building shall be allowed to be erected in any plot unless the said plot has suitable access by an existing metalled road or by projected road which shall be previously constructed (i.e. metalled in conformity with the layout sanctioned by the Collector)
Only one main building together with such outhouses as are reasonably required for the bona fide use and enjoyment by its occupants and their domestic servants shall be permitted to be erected in any building plot. Provided that this restriction shall not prevent the erection of two or more building on the same plot, if the plot admeasures at least twice or thrice as the case may be (according to the number of buildings) the minimum size required. Provided also that the same open space shall be required around each main building as if each of these were in a separate building plot.
Every building to be built shall face the road and where the plot has frontage on more than one road the building shall face the more important road.
Every building shall be set back at least 20 feet from the boundary of any road, 40feet or more in width and 15 feet from the other roads as shown in the layout.
No building shall be constructed within 10 feet of the side boundaries of the plot.
The distance between the main building and the rear boundary of the plot shall be; not less than 20 feet. Provided that , subsidiary buildings such as outhouse, a garage, stable, privy and the like may be permitted at the rear of the main building subject to the condition that such building shall be at a distance of not less than 10 feet from either any building in the compound or boundary of the plot.
The open space to be kept around every building shall be open to sky and free from any erection except projection of roof, chajja or weather sheds, steps or houds or fountains with parapet walls not more than 4 feet high. Provided that balcony or gallery may be allowed to project over such open space if the distance between the outer edge of such a projection and the boundary of the plot is not less than 10 feet.
1.6Electro-Magnetic Field (EMF) Radiation Norms
(a) Prior to installation of TCS/BS, the TSP/IP shall have to obtain Site clearance from the Standing Advisory Committee on Frequency Allocation (SACFA) of the Department of Telecommunication (DoT) for every site from the point of view of interference with other wireless users, aviation hazards and obstruction to any other existing microwave links.
(b) The Electro-Magnetic Field (EMF) radiation from BTS towers shall be subject to the regulations framed by the DoT from time to time. The TSP/IP shall periodically conduct audit and monitor EMF radiation in Urban localities, hospitals and educational/industrial /residential / recreational premises, especially around the Protected Areas (PAs) and ecologically sensitive areas, in accordance with the guidelines issued by DoT in this regard. It shall be binding on TSP/ IP to follow the mechanism prescribed by the DoT/TERM Cell at local level for ensuring control on the EMF radiation and for notifying on continual basis the radiation level at critical location. For all the existing as well as new BTSs/Towers, TSPs are required to submit self-certificates periodically in the format prescribed by TEC, DoT, in order to ensure that normally all general public areas around the TCS/BS site are within the safe EMR exposure limits. Audit of the self-certification furnished by the TSPs shall be done by the TERM Cell periodically. TERM Cell shall carry out test audit of the BTS sites on random basis as per the guidelines received from DoT and also in respect of al1 cases where there is a public complaint. The TERM Cell shall have due regard to the instructions issued by DoT regarding technical audit of TCS/BS, including radiation of towers within safe limits. These shall include Roof Top/Ground Based./Pole Mounted/Wall Mounted Towers. The TERM Cell shall also verify antenna orientation, safe distance from the Tower (exclusion zone) etc. For non-compliance of EMF standards, Telecom Service Provider shall be liable for penal action by the TERM Cell and/or Department of Telecommunication (DoT). Any violation noticed may attract heavy penalties on TSPs and may also lead to shut down of TCS/ BS, in case the violation persists.
1.5Planning Norms For Erection of TCS /BS
(a) Notwithstanding the land use provisions under these regulations, subject to the compliance of other provisions of these Regulations, it shall be permissible to install TCB/BS, on
(i) all land uses as earmarked in development plan,
(ii) all lands which are designated for non-buildable reservations in development plan, subject to the condition that the maximum permissible area for installation of such TCS/BS shall not be more than 5% of the area of the reserved site or 100 sq.m., whichever is less, and shall be located in one corner of the reserved site.
(iii) all lands which are designated as open spaces/recreational open spaces/recreational grounds in a sanctioned layout, where such installation shall be permissible only with the no-objection certificate of the concerned registered co-operative housing society or consent of 70% of the total number of legal occupants/plot holders of such layout, subject to the condition that the maximum permissible area for installation of such TCS/BS shall not be more than 5%of such area or 100 sq.m, whichever is less, and the same shall be located in one corner of such area.
(iv) all buildable reservations in development plan, except for buildings of uses mentioned in Regulation no.36.5(f), where such installation shall be permissible on the roof top, but only after development of the said reservation.
(v) all open lands in slum areas belonging to the Government/public Authority planning Authority, where only ground-based TCS/BS shall be permissible and no Roof-Top Tower shall be permissible, save as provided in Regulation no.36.5(a)(vi) herein below.
(vi) public buildings in slum areas, like public toilets, community centres etc., constructed by any Public Authority or to be constructed by the TSP/IP, where construction of Roof Top Towers shall be permissible, subject to maintenance and compliance of other terms and conditions specified by the Municipal Commissioner.
(b) No permission for installation of TCS/BS shall be granted in ecologically important areas, without ecological impact assessment and review of installation site. The Forest Department should be consulted before installation of TCS/BS in and-around protected areas and Zoos.
(c) The TCS/BS must have clear access by means of an existing road having minimum width of 6 mtr. for locations falling in Congested area as earmarked on DP and 9 mtr., for locations falling outside such Congested area. However, in exceptional circumstances, the Municipal Commissioner may relax such road width suitably, but in no case, shall it be less than 5 mtr.
1.7Miscellaneous Provisions
(a) Any complaint concerning illegal installation of TCS/BS on any building or any query of any nature regarding the installation of telecommunication equipment, shall be addressed to the Municipal Commissioner which shall intimate the concerned TSP/IP about the same with a direction to resolve the issue under intimation to the Municipal Commissioner, within such period as may be prescribed by the Municipal Commissioner.
(b) The TSP/IP, who has erected TCS/BS without due permission, shall apply to the concerned Municipal Commissioner for regularization within 180 days from the date of coming into force of this Regulation. In case such application is made within the prescribed period, then the offence, if any, registered against the TSP/IP may be compounded by the Municipal Commissioner under section 143 of the Maharashtra Regional and Town Planning Act, 1966, subject to the provisions of these regulations.
(c) The TSPs/IPs who have earlier erected TCS/BS with due permission, shall apply afresh, for validation of the previous permission, to the Municipal Commissioner within a period of 90 days from the date of commencement of this Regulation, in order to ensure due compliance of this Regulation. However Administrative fee in such cases shall not be leviable if appropriate fee/ Development charge, not less than the amount prescribed under Regulation no.36.4 (b)above, has already been paid. In case the amount paid is less than what is prescribed hereinabove, the difference in amount shall be recovered from the TSP/IP.
(d) Any existing TCS/BS not conforming to any of the above provisions shall have to be removed within one year from the date of commencement of this Regulation, unless the same is specifically regularized by the Municipal Commissioner following due compliance by TSP/IP. However, operation of such non-conforming Telecommunication Cell Site/Base station shall be discontinued within a period of 30 days from the date of receipt of notice from the Municipal Commissioner to that effect, which shall however be issued only after obtaining the consent of the TERM Cell of DoT.
(e) The Licensees shall try to share the tower for fixing their respective antennae provided the prescribed conditions are duty fulfilled, so as to ensure curtailing of multiple towers and optimizing the use of the existing ones.
(f) Sign boards and Warning signs ("Danger", "RF Radiation", "Restricted Area", "Don't Enter" etc.) shall be provided at TCS/BS antenna sites which are clearly visible and identifiable.
(g) The TSP/IP shall display the details of the following on a board (minimum size 24" x 48") separately or prominently on the cabin, for the perusal of general public in such a way that the same shall be clearly visible and identifiable.
b) Height of the riser shall not be more than 150 mm and width of the tread 300mm. The steps shall not have abrupt (square) nosing.
c) Maximum number of risers on a flight shall be limited to 12.
d) Hand rails shall be provided on both sides and shall extend300 mm on the top and bottom of each flight of steps.
4.4 Lifts -Wherever lift is required as per regulations, provision of at least one lift shall be made for the wheel chair user with the following cage dimensions of lift recommended for passenger lift of 13 person capacity of Bureau of Indian Standards.
Clear internal width
1100 mm
Clear internal width
2000 mm
Entrance door width
900 mm
a) A hand rail not less than 600mm long at 1000mm above floor level shall be fixed adjacent to the control panel.
b) The lift lobby shall be of an inside measurement of 1800 mm x 1800 mm or more.
c) The time of an automatically closing door should be minimum 5 seconds and the closing speed should not exceed 0.25 m/ sec.
d) The interior of the cage shall be provided with a device that audibly indicates the floor, the cage has reached indicates that the door of the cage of entrance/exit is either open or closed.
4.5 Toilets - One special W.C. in a set of toilets shall be provided for the use of differently abled with essential provision of washbasin near the entrance for them.
a) The minimum size shall be 1500 mm x 1750 mm.
b) Minimum clear opening of the door shall be 900mm and the door shall swing out.
c) Suitable arrangement of vertical/horizontal handrails with 50mm clearance from wall shall be made in the toilet.
d) The W.C. seat shall be 500mm from the floor.
4.6 Drinking Water:-Suitable provision of drinking water shall be made for the differently abled near the special toilet provided for them.
4.7 Designing for Children - In the buildings meant for the pre-dominant use of the children, it will be necessary to suitably alter the height of the handrail and other fittings & fixtures, etc.
Explanatory notes:
Appendix 'Q' Regulations for Erection of Mobile Towers
Not more than one-third of the total area of any building plot shall be built upon. In calculating the area covered by buildings the plinth area of the ;buildings and other structures excepting compound walls, steps, open ottas and open houds or wells with parapet walls not more than 4 feet high or Chajja and weather sheds shall be taken into account. Area covered by a staircase and projections of any kind shall be considered as built over. Provided a balcony or gallery which
a) is open on three sides;
b) has no structure underneath on ground floor;
c) projects not more than 4 feet from the walls; and
d) length of which measured in a straight line does not exceed 2/3rd the length of the wall to which it is attached; shall not be counted in calculating the built over area.
No building shall contain more than two storeys including the ground floor.
If flats are constructed there shall be not more than two self-contained flats on each floor, each flat being occupied by one family only.
The minimum standard of accommodation to be provided exclusively for one family shall consist of one living room and one bed room together admeasuring not less than 250 sq.ft. one kitchen. one verandah not less than 6 ft. in width in front and rear, a bathroom and a watercloset or latrine.
In no circumstances shall one roomed tenements be allowed to be constructed or used as residence. No chawls or temporary sheds shall be allowed to be constructed.
Every building shall have a plinth of at least 2 feet above the general level of the ground.
No building shall exceed 100 feet in length in any direction.
All subsidiary buildings such as an outhouse providing auxiliary accommodation such as a garage, servant's quarter, stable, storeroom, privy etc. appurtenant to the main building but detached thereon shall be ground floor structures only and shall be constructed at the rear of the plot at a distance of not less than 10 feet from one another or from the main building or from the boundary of the plot.
Owner of the adjoining plots may be permitted with their mutual consent to group the subsidiary ground floor buildings, such as outhouses, stables, privies etc. along the common boundary in the rear of their plots provided that such building shall be at a distance of not less than 10 feet from any other building in the compound.
The minimum floor area of any room intended for human habitation shall be not less than 120 square feet.
No sides of a room for residential purposes shall be less than 10 feet long at least one side of every such room shall be an external wall abutting on the surrounding open space through its length or on an interior open yard (chowk) not less than300 sq.ft in area and l5 feet in any direction or on an open verandah.
The height of every room inside the building shall be not less than 10 feet from the floor to ceiling and in the case of a sloping roof the height of the lowest point thereof shall be not less than 7 feet and 6 inches from the floor.
Every room shall be provided with windows or other apertures other than doors opening out into the internal air for the admission of light and air and the aggregate area of such openings shall not be less than 1/7th of the floor area of the room in which they are provided.
Privies shall be at the rear of the main building and not less than 10 feet from it. They shall be innocuous to the neighbors. They shall not be within 30 feet of a well and shall be screened from public view.
No cesspools shall be allowed to be constructed unless there exists an agency for clearing them regularly and properly.
No cesspool shall be used or made within 100 feet of any well.
No Khalkuwa Khalketi shall be used for reception of night soil.
No cattle shall be kept in any part of the residential buildings. No. stable or cattle shed shall be constructed within 10 feet of a residential building.
Shops may be allowed on the ground floor of the building in the plots reserved for shops only. The upper floor of the building may be used for residence. Provided all regulations applicable to residential building are adopted.
The Collector may within his discretion sanction or license the erection of any building other than a dwelling house if he is satisfied after necessary inquiry in the locality that the erection and user of such building will not adversely affect the amenities of the adjoining lands or buildings.
All buildings shall be of pucca construction and no easily combustible materials shall be used in their construction.
No boundary or compound wall or fence shall be erected on the boundary not to any street of a greater height than 4 feet measured from the centre of the road in front.
No addition to or alterations in a building shall be carried out without the previous written permission of the Collector.
In the case of land or building situate within the limits of a Municipal Corporation or any other local authority, the rules and bylaws of the Municipal Corporation or local Authority in that behalf shall apply in addition to regulations prescribed above.
The permission shall be liable to be revoked on breach of any of the conditions.
All the roads within lay-out will be constructed and got ready within six months from the date of sanctioning the layout.
Central arrangements for the delivery of water to the individual plot holder will be made and got ready within six months from the date of sanctioning the layout.
No building shall be used for other than the residential purposes.
Appendix 'N' SCHEDULE FOR SERVICE INDUSTRIES
Appendix 'N' SCHEDULE FOR SERVICE INDUSTRIES
Appendix 'N' SCHEDULE FOR SERVICE INDUSTRIES
Appendix 'N' SCHEDULE FOR SERVICE INDUSTRIES
Appendix 'N' SCHEDULE FOR SERVICE INDUSTRIES
Appendix 'N' SCHEDULE FOR SERVICE INDUSTRIES
Sr. No.
Category of Industry
Service Industry Class -A (Permitted in R2 and C) Criteria for Classification and special conditions
Service Industry Class -A (Permitted in R2 and C) Criteria for Classification and special conditions
Service Industry Class -A (Permitted in R2 and C) Criteria for Classification and special conditions
Service Industry Class -A (Permitted in R2 and C) Criteria for Classification and special conditions
Sr. No.
Category of Industry
Maximum Permissible
Maximum Permissible
Maximum Permissible
Maximum Permissible
Sr. No.
Category of Industry
Power requirement (in H.P.)
Employment (in persons)
Floor area (in sq. m.)
Special Conditions if any
(1)
(2)
(3)
(4)
(5)
(6)
I.
Food Product
Food Product
Food Product
Food Product
Food Product
1.
Preservation of meat, canning preserving and processing of fish crust aces and similar foods
-
-
-
Not permissible
2.
Manufacture of milk and dairy products such as butter, ghee, etc.
10
9
50
-
3.
Canning & preservation of Fruits & Vegetables including production of Jam, Jelly, Sauce, etc.
-
-
-
-
4.
(a) Rice huller (b) Groundnut decorticators (c) Grain Mill for production of flour (d Manufacture of supari and Masala grindings. (e) Baby oil expellers
1010101010
99999
5050505050
-
5.
Manufacture of bakery products with no Floor above
10
9
75
(i) Operation shall be permitted only between 8.00 hrs. to 20.00 hrs. (ii) Fuel used shall be electricity, gas or smokeless coal.
6.
Manufacture of cocoa, chocolate, Sugar confectionary
-
-
-
Not permissible
7.
Coffee, curing roasting and grinding
2
9
50
-
8.
Cashew nut processing like drying, shelling, roasting, salting etc.
-
-
-
Not permissible
9.
Manufacture of Ice
45
20
250
-
10.
Sugarcane crushing & Fruit Juice
2
9
25
-
II.
BEVERAGES & TOBACCO
BEVERAGES & TOBACCO
BEVERAGES & TOBACCO
BEVERAGES & TOBACCO
BEVERAGES & TOBACCO
11.
Manufacture of soft drinks and carbonated water
-
-
-
Not permissible
12.
Manufacture of bidi
No Power to be used
as permitted
250
May also be permitted in R-1 zone
III.
TEXTILE & TEXTILEPRODUCTS
TEXTILE & TEXTILEPRODUCTS
TEXTILE & TEXTILEPRODUCTS
TEXTILE & TEXTILEPRODUCTS
TEXTILE & TEXTILEPRODUCTS
13.
Handloom / power-loom of yarn for a maximum of 4 looms.
5
9
50
May also be permitted in R-1 zone in areas designated by the Municipal Commissioner.
i) Operation shall be permitted only between 8.00 hrs. and 20.00 hrs. ii) No restrictions of power, number of employees, area of hours of operation shall apply if located in a building, in separate plot not less than 500 sq. m. and if special permission of the Municipal Commissioner is obtained
26.
Engraving etching block making etc.
10
9
120
Operation shall be permitted only between 8.00 hrs. to 20.00 hrs.
27.
Book binding
10
9
120
-
VI.
LEATHER PRODUCTS
28.
Manufacture of leather footwear
-
-
-
Not permissible
29.
Manufacture of wearing apparel like coats, gloves etc.
-
-
-
Not permissible
30.
Manufacture of leather consumers goods such as upholstery suitcases, pocket books, cigarette and key cases, purses etc.
-
-
-
Not permissible
31.
Repair of footwear and other leather
5
9
50
VII.
RUBBER AND PLASTIC :
32.
Re-treading and vulcanizing works
2
9
50
33.
Manufacture of rubber balloons, hand gloves and allied products
2
9
50
VIII
NON-METALLIC MINERAL PRODUCTS
34.
Manufacture of structural stone goods, stone dressing, stone crushing and polishing
-
-
-
Not permissible
35.
Manufacture of earthen & plaster states and images, toys and art wares.
-
-
-
Not permissible
36.
Manufacture of cement concrete building components, concrete jellies, septic tank, plaster or paris work lime mortar etc.
-
-
-
Not permissible
IX.
METAL PRODUCTS :
37.
Manufacture of furniture and fixtures primarily of metal.
-
-
-
Not permissible
38.
Plating & Polishing and buffing of metal products
-
-
-
Not permissible
39.
Manufacture of metal building components such as grills, gates. Doors and window frames, water tanks, wire nets, etc.
5
9
50
40.
Manufacture and repair of sundry ferrous engineering products done by jobbing concerns such as mechanical works, shops with lathes, drills, grinders, welding equipment etc
-
-
-
Not permissible
41.
Total sharpening and razor sharpening works
1
6
25
Operation shall be permitted only between 8.00 hrs. to 20.00 hrs.
X
ELECTRICAL GOODS :
42.
Repairs of household electrical appliances such as radio set. Television set, tape recorders, heaters, irons, shavers, vacuum cleaners, refrigerators, air-conditioners, washing machines, electric cooking ranges, motor rewinding works etc.
3
9
50
(i) Operation shall be permitted only between 8.00 hrs. 20.00 hrs. (ii) No spray painting permitted.
XI
TRANSPORT EQUIPMENT
43.
Manufacturing of push cart, hand cart, etc.
10
9
50
44.
(a) Servicing and repairing of bicycle, rickshaws, motor cycle and motor vehicles (b) Battery charging and repairs.
105
96
5025
Operation shall be permitted only between 8.00 hrs. to 20.00 hrs. No spray painting permitted
XII.
OTHER MANUFACATURING AND REPAIR INDUSTRIES AND SERVICES
OTHER MANUFACATURING AND REPAIR INDUSTRIES AND SERVICES
OTHER MANUFACATURING AND REPAIR INDUSTRIES AND SERVICES
OTHER MANUFACATURING AND REPAIR INDUSTRIES AND SERVICES
OTHER MANUFACATURING AND REPAIR INDUSTRIES AND SERVICES
46.
Manufacture of jewellery and related articles
3
9
50
Operation shall be permitted only between 8.00 hrs. to 20.00 hrs.
47.
Repair of watch, clock and jewellery
3
9
50
Operation shall be permitted only between 8.00 hrs. to 20.00 hrs.
48.
Manufacture of sports and athletic goods
-
-
-
Not permissible
49.
Manufacture of Musical instruments and its repair.
3
9
50
Operation shall be permitted only between 8.00 hrs. to 20.00 hrs.
50
Mass manufacture of miscellaneous Products such as costume, jewellery, costume novelties, feather, plumes, artificial flowers, brooms, brushes, lamp shades, tobacco, pipes, cigarette holders, ivory goods, bandages, wigs and similar articles.
-
-
-
Not permissible
51.
(a)Repairs of locks, stoves, umbrellas, sewing machines, gas burners, buckets & other sundry household equipment. (b) Optical glass grinding and repairs
33
99
5050
Operation shall be permitted only between 8.00 hrs. to 20.00 hrs.
52.
Petrol filling stations/ CNG stations
10
9
(i) 30.5x16.75m. (ii) 36.5x30.5m
Plot size - without service bay Plot size - with service bay
53.
Laundries, Laundry service and cleaning, dyeing, bleaching and dry cleaning
5
9
50
(i) Cleaning & dyeing fluid used shall not have flash point lower than 1380 F. (ii) Operation shall be permitted between 8.00 hrs. to 20.00 hrs. (iii) Machinery having day load capacity of 20 kg and above.
54.
Photo processing laboratories.
5
9
50
Operation shall be permitted between 8.00 hrs. to 20.00 hrs.
55.
Electronic Industry of assembly type (and not of manufacturing type including heating load).
10
20
250
In independent structure on independent plot with special permission of the Municipal Commissioner
56.
Bio-technology Unit
--
--
--
As per Regulation no.23.8
57.
Information Technology Unit
--
--
--
As per Regulation no.23.9
Appendix O-1
Sanitation Requirements - Office Buildings
Sr. No.
Fixtures
Public Toilets
Staff Toilets
Male
Female
Male
Female
(1)
(2)
(3)
(4)
(5)
(6)
i)
Executive Rooms and Conference Halls in Office Buildings Toilet suite comprising one WC, one washbasin (with optional shower stall if building is used round the clock at user's option) Pantry optional as per user requirement
Unit could be common for Male / Female or separate depending on the number of user of each facility
For individual officer rooms
ii)
Main Office Toilets for Staff and Visitors
a) Water-closet
1 per 25
1 per 15
1 per 25
1 per 15
b) Ablution tap with each water-closet
1 in each water-closet
c) Urinals
Nil up to 6 1 for 7-20 2 for 21-45 3 for 46-70 4 for 71-100
-
Nil up to 6 1 for 7-20 2 for 21-45 3 for 46-70 4 for 71-100
-
Add @ 3% for
101-200
101-200
Add @ 2.5 %
Over 200
Over 200
d) Washbasins
1 per 25
1 per 25
1 per 25
1 per 25
e) Drinking water fountain
1 per 100
1 per 100
1 per 100
1 per 100
f) Cleaner's sink
1 per floor
Appendix O-2
Sanitation Requirements – Factories
Sr. No.
Fixtures
Offices/Visitors
Workers
Male
Female
Male
Female
(1)
(2)
(3)
(4)
(5)
(6)
i)
Water-closets (Workers & Staff)
1 for up to 25 2 for 16-35 3 for 36-65 4 for 66-100
1 for up to 15 2 for 16-25 3 for 26-40 4 for 41-57 5 for 58-77 6 for 78-100
1 for up to 15 2 for 16-35 3 for 36-65 4 for 66-100
1 for up to 12 2 for 13-25 3 for 26-40 4 for 41-57 5 for 58-77 6 for 78-100
For persons 101-200 add
3 %
5 %
3 %
5 %
For persons over 200 add
2.5 %
4 %
2.5 %
4 %
ii)
Ablution tap
1 in each WC
1 in each WC
1 in each WC
1 in each WC
iii)
Urinals
Nil up to 6 1 for 7-20 2 for 21-45 3 for 46-70 4 for 71-100
-
Nil up to 6 1 for 7-20 2 for 21-45 3 for 46-70 4 for 71-100
-
For persons 101-200 add
3 %
3 %
For persons over 200 add
2.5 %
2.5 %
iv)
Washbasins Washbasins in rows or troughs and taps spaced 750 mm c/c
1 per 25 or part thereof
1 per 25 or part thereof
1 per 25 or part thereof
1 per 25 or part thereof
v)
Drinking water fountain
1 per every 100 or part thereof with minimum one on each floor
1 per every 100 or part thereof with minimum one on each floor
vi)
Cleaner's sink
1 on each floor
1 on each floor
1 on each floor
1on each floor
vii)
Showers/Bathing rooms
As per trade requirements
viii)
Emergency shower and eye wash fountain
-
-
1 per every shop floor per 500 persons
NOTE- For factories requiring workers to be engaged in dirty and dangerous operations or requiring them to being extremely clean and sanitized conditions additional and separate (if required so) toilet facilities and if required by applicable Industrial and Safety Laws and the Factories Act must be provided in consultation with the user.
Toilet suite comprising one WC and one washbasin (with optional shower stall if building used for 24 h)
For individual doctor's/officer's rooms
ii)
Water-closets
1per 25 persons or part thereof
1per 15 persons or part thereof
iii)
Ablution tap
One in each water-closet
One in each water-closet
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals
iv)
Urinals
Nil up to 6 1 per 7 to 20 2 per 21-45
-
v)
Washbasins
1per 25 persons or part thereof
1per 25 persons or part thereof
vi)
Drinking water fountain
1 per 100 persons or part thereof
vii)
Cleaner's sink
1 per floor, Min
viii)
Kitchen sink
1 per floor, Min
note - Some WC‘s may be European style if desired.
Appendix O-8
Sanitation Requirements -Hospitals’ Staff Quarters and Nurses Homes
Sr. No.
Fixtures
Staff Quarters
Nurses Homes
Male
Female
Male
Female
(1)
(2)
(3)
(4)
(5)
(6)
i)
Water-closets
1 per 4 persons or part thereof
1per 4 persons or part thereof
1 per 4 persons or part thereof 2 for 16-35
1per 4 persons or part thereof 2 for 16-35
ii)
Ablution tap
One in each water-closet
One in each water-closet
One in each water-closet
One in each water-closet
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals
iii)
Washbasins
1 per 8 persons or part thereof
1 per 8 persons or part thereof
iv)
Bath (Showers)
1 per 4 persons or part thereof
1 per 4 persons or part thereof
v)
Drinking water fountain
1 per 100 persons or part thereof, minimum 1 per floor
1 per 100 persons or part thereof, minimum 1 per floor
vi)
Cleaner's sink
1 per Floor
1 per Floor
NOTES - 1) Some WC‘s may be European style if desired.
For independent housing units fixtures shall be provided as for residences.
Appendix O-9
Sanitation Requirements -Hotels
Sr. No.
Fixtures
Public Rooms
Public Rooms
Non-Residential Staff
Non-Residential Staff
Sr. No.
Fixtures
Male
Female
Male
Female
(1)
(2)
(3)
(4)
(5)
(6)
i)
Toilet suite comprising one WC, washbasin with shower or a bath tub
Individual guest rooms with attached toilets
Individual guest rooms with attached toilets
-
-
Guest Rooms with Common Facilities
Guest Rooms with Common Facilities
Guest Rooms with Common Facilities
Guest Rooms with Common Facilities
Guest Rooms with Common Facilities
Guest Rooms with Common Facilities
ii)
Water-closets
1 per 100 persons up to 400 Over 400 add at 1 per 250 or part thereof
2 per 100 persons up to 200 Over 200 add at 1 per 100 or part thereof
1 for up to 15 2 for 16-35 3 for 36-65 4 for 66-100
1 for up to 12 2 for 13-25 3 for 26-40 4 for 41-57 5 for 58-77 6 for 78-100
iii)
Ablution tap
1 in each WC
1 in each WC
1 in each WC
1 in each WC
iii)
Ablution tap
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals
iv)
Urinals
1 per 50 persons or part thereof
Nil, upto 6 persons 1 for 7-20 persons 2 for 21-45 persons 3 for 46-70 persons 4 for 71-100 persons
Nil up to 6 1 for 7 to 20 2 for 21-45 3 for 46-70 4 for 71-100
-
v)
Washbasins
1 per WC/Urinal
1 per WC
1 for up to 15 2 for 16-35 3 for 36-65 4 for 66-100
1 for up to 12 2 for 13-25 3 for 26-40 4 for 41-57
vi)
Bath (Showers)
1 per 10 persons or part thereof
1 per 10 persons or part thereof
-
-
vii)
Cleaner's sink
1 per 30 rooms, minimum 1 per floor
1 per 30 rooms, minimum 1 per floor
1 per 30 rooms, minimum 1 per floor
1 per 30 rooms, minimum 1 per floor
viii)
Kitchen sink
1 per kitchen
1 per kitchen
1 per kitchen
1 per kitchen
NOTES
1) Some WC's may be European style if desired. 2) Male population may be assumed as two-third and female population as one-third. 3) Provision for additional and special hospital fittings where required shall be made.
1) Some WC's may be European style if desired. 2) Male population may be assumed as two-third and female population as one-third. 3) Provision for additional and special hospital fittings where required shall be made.
1) Some WC's may be European style if desired. 2) Male population may be assumed as two-third and female population as one-third. 3) Provision for additional and special hospital fittings where required shall be made.
1) Some WC's may be European style if desired. 2) Male population may be assumed as two-third and female population as one-third. 3) Provision for additional and special hospital fittings where required shall be made.
1) Some WC's may be European style if desired. 2) Male population may be assumed as two-third and female population as one-third. 3) Provision for additional and special hospital fittings where required shall be made.
1 per 50 seats up to 200 Over 200 add at 1 per 100 or part thereof
2 per 50 seats up to 200 Over 200 add at 1 per 100 or part thereof
1 for up to 15 2 for 16-35 3 for 36-65 4 for 66-100
1 for up to 12 2 for 13-25 3 for 26-40 4 for 41-57 5 for 58-77 6 for 78-100
ii)
Ablution tap
1 in each WC
1 in each WC
1 in each WC
1 in each WC
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals.
iii)
Urinals
1 per 50 persons or part thereof
----
Nil up to 6 1 for 7-20 2 for 21-45 3 for 46-70 4 for 71-100
----
iv)
Washbasins
1 per WC
1 per WC
1 per WC
1 per WC
v)
Cleaner's sink
1 per restaurant
vi)
Kitchen sink /Dish washer
1 per kitchen
NOTES: 1) Some WC‘s may be European style if desired.
Male population may be assumed as two-third and female population as one-third.
Provision for additional and special fittings where required shall be made.
Appendix O-11
Sanitation Requirements –Schools and Educational Institutions
Sr. No.
Fixtures
Nursery School
Non-Residential
Residential
Boys
Girls
Boys
Girls
(1)
(2)
(3)
(4)
(5)
(6)
(7)
i)
Water-closets
1 per 15 pupils or part thereof
1 for 40 pupils or part thereof
1 per 25 pupils or part thereof
1 per 8 pupils or part thereof
1 per 6 pupils or part thereof
ii)
Ablution tap
1 in each WC
1 in each WC
1 in each WC
1 in each WC
1 in each WC
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals.
iii)
Urinals
----
1 per 20 pupils or part thereof
----
1 per 25 pupils or part thereof
----
iv)
Washbasins
1 per 15 pupils or part thereof
1 per 60 pupils or part thereof
1 per 40 pupils or part thereof
1 per 8 pupils or part thereof
1 per 6 pupils or part thereof
v)
Bath/Showers
1 per 40 pupils or part thereof
----
----
1 per 8 pupils or part thereof
1 per 6 pupils or part thereof
vi)
Drinking water fountain or taps
1 per 50 pupils or part thereof
1 per 50 pupils or part thereof
1 per 50 pupils or part thereof
1 per 50 pupils or part thereof
1 per 50 pupils or part thereof
vi)
Cleaner's Sink
1 per floor
NOTES:
Some WC‘s may be European style if desired. 2) For teaching staff, the schedule of fixtures to be provided shall be the same as in case of office building.
Appendix O-12
Sanitation Requirements –Hostels
Sr. No.
Fixtures
Resident
Non-Resident
Visitor/Common Rooms
Male
Female
Male
Female
Male
Female
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
i)
Water-closet
1 per 8 or part thereof
1 per 6 or part thereof
1 for upto 15 2 for 16-35 3 for 36-65 4 for 66-100
1 for upto 12 2 for 13-25 3 for 26-40 4 for 41-57 5 for 58-77 6 for 78-100
1 per 100 up to 400 Over 400 add at 1 per 250
1 per 200 up to 200 Over 200 add at 1 per 100
ii)
Ablution tap
1 in each WC
1 in each WC
1 in each WC
1 in each WC
1 in each WC
1 in each WC
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals.
iii)
Urinals
1 per 25 or part thereof
----
Nil up to 6 1 for 7-20 2 for 21-45 3 for 46-70 4 for 71-100
1 for up to 15 2 for 16-35 3 for 36-65 4 for 66-100
1 for up to 12 2 for 13-25 3 for 26-40 4 for 41-57 5 for 58-77 6 for 78-100
1 per 50 (Minimum 2)
1 per 50 (Minimum 2)
ii)
Ablution tap
1in each WC
1 in each WC
1 in each WC
1 in each WC
1 in each WC
1 in each WC
1 water tap with draining arrangements shall be provided in receiving / sale area of each shop and for every 50 persons or part thereof in the vicinity of water-closets and urinals.
iii)
Urinals
----
----
Nil up to 6 1 for 7-20 2 for 21-45 3 for 46-70 4 for 71-100
----
1 per 50
----
iv)
Washbasins
1 per 8 persons or part thereof
1 for up to 15 2 for 16-35 3 for 36-65 4 for 66-100
1 for up to 12 2 for 13-25 3 for 26-40 4 for 41-57
----
----
v)
Bath / Showers
1 per 8 persons or part thereof
1 per 6 persons or part thereof
----
----
1 per 50 persons
1 per 50 persons
NOTES: 1) Toilet facilities for individual buildings in a market should be taken same as that for office buildings.
Common toilets in the market buildings provide facilities for persons working in shops and their regular visitors.
Appendix O-14
Sanitation Requirements – Airports and Railway Stations
Sr. No.
Fixtures
Junction Stations, Intermediate Stations and Bus Stations
Junction Stations, Intermediate Stations and Bus Stations
Terminal Railway and Bus Stations
Terminal Railway and Bus Stations
Domestic and International Airports
Domestic and International Airports
Sr. No.
Fixtures
Male
Female
Male
Female
Male
Female
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
i)
Water-closet
3 for up to 1000 Add 1 per additional 1000 or part thereof
4 for up to 1000 Add 1 per additional 1000 or part thereof
4 for up to 1000 Add 1 per additional 1000 or part thereof
5 for up to 1000 Add 1 per additional 1000 or part thereof
Minimum 2 for 200 2 For 400 9 For 600 12 For 800 16 For 1000 18
Minimum 2 For 200 2 For 400 9 For 600 12 For 800 16 For 1000 18
ii)
Ablution tap
1 in each WC
1 in each WC
1 in each WC
1 in each WC
1 in each WC
1 in each WC
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals.
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals.
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals.
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals.
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals.
1 water tap with draining arrangements shall be provided for every 50 persons or part thereof in the vicinity of water-closets and urinals.
iii)
Urinals
4 for up to 1000 Add 1 per additional 1000
----
6 for up to 1000 Add 1 per additional 1000
----
1 per 40 or part thereof
----
iv)
Washbasins
1 per WC / Urinal
1 per WC
1 per WC / Urinal
1 per WC
1 per WC / Urinal
1 per WC
v)
Bath/Showers
2 per 1000
2 per 1000
3 per 1000
3 per 1000
4 per 1000
4 per 1000
vi)
Drinking water fountain or taps (in common lobby for male/ female)
2 per 1000 or part thereof
2 per 1000 or part thereof
3 per 1000 or part thereof
3 per 1000 or part thereof
4 per 1000 or part thereof
4 per 1000 or part thereof
vii)
Cleaner's sink
1 per toilet compartment with 3 WC's
1 per toilet compartment with 3 WC's
1 per toilet compartment with 3 WC's
1 per toilet compartment with 3 WC's
1 per toilet compartment with 3 WC's
1 per toilet compartment with 3 WC's
viii)
Toilet for Disabled
1 per 4000
1 per 4000
1 per 4000
1 per 4000
1 per 4000 (Minimum 1)
1 per 4000 (Minimum 1)
NOTES: 1) Some WC's may be European style if desired. 2) Male population may be assumed as three-fifth and female population as two-fifth. 3) Separate provision shall be made for staff and workers.
NOTES: 1) Some WC's may be European style if desired. 2) Male population may be assumed as three-fifth and female population as two-fifth. 3) Separate provision shall be made for staff and workers.
NOTES: 1) Some WC's may be European style if desired. 2) Male population may be assumed as three-fifth and female population as two-fifth. 3) Separate provision shall be made for staff and workers.
NOTES: 1) Some WC's may be European style if desired. 2) Male population may be assumed as three-fifth and female population as two-fifth. 3) Separate provision shall be made for staff and workers.
NOTES: 1) Some WC's may be European style if desired. 2) Male population may be assumed as three-fifth and female population as two-fifth. 3) Separate provision shall be made for staff and workers.
NOTES: 1) Some WC's may be European style if desired. 2) Male population may be assumed as three-fifth and female population as two-fifth. 3) Separate provision shall be made for staff and workers.
NOTES: 1) Some WC's may be European style if desired. 2) Male population may be assumed as three-fifth and female population as two-fifth. 3) Separate provision shall be made for staff and workers.
NOTES: 1) Some WC's may be European style if desired. 2) Male population may be assumed as three-fifth and female population as two-fifth. 3) Separate provision shall be made for staff and workers.
(d) In case of both ground-based towers and roof-top towers, there shall be no nearby buildings right in front of the antenna(e) of equivalent height, taking into account the tilt of the lowest antenna on tower, as per the details in the Table No.32 below:-
Table No.32
Sr. No.
Number of Antenna(e) Pointed in the Same Direction
Building/ Structure Safe Distance from the Antenna(e) at the Same Height (in mtr.)
(1)
(2)
(3)
1
1
20
2
2
35
3
4
45
4
6
55
Provided that the antennae at the same height only are to be counted, as the beam width of mobile antennae, in the vertical direction, is very narrow.
(Explanation.-The distance figures in the above Table are based on empirical estimation considering that all the antennae are emitting at their maximum RF power of 20 Watts and exactly in the same direction with the same height.)
Provided further that above norms shall automatically stand revised as per the latest guidelines, issued by the DoT from time to time.
(e) In case of Wall Mounted/Pole Mounted Antenna(e) :-
(i) Wherever the antennae are mounted on the wall of a building or pole or along the road, their height should be at least 5 mtr., above ground level/road level. Provided that such installations
shall have to comply with the prescribed radiation limits.
(ii) As far as safe distance of buildings from antenna(e) is concerned, guidelines as in Regulation no.36.5 (d) above shall apply.
(f) Installation of Base Station antenna(e) shall not be permissible within the premises of schools, colleges, and hospitals as well as on the adjoining land /building within 3 mtr., from the boundary of premises of schools, colleges and hospitals. Also antenna(e) shall not be directed/ positioned towards any school/college/ hospital building.
(g) The existing Base Station antenna(e) approved earlier on any school/college/ hospital, building shall not be renewed further after the expiry of period of approval and the same shall be removed immediately thereafter, subject to the provisions of Regulation no.36.7 (d).
(h) Access to Base Station Antenna site shall be prohibited for the general public, by putting in place suitable measures such as wire-fencing, locking of the door to the roof, etc.
(i) The roof-top TCS, IBS towers shall be put only on buildings which are declared structurally strong enough to bear the load of such installation. The base connection to the building should be got designed from a qualified structural engineer. Structural safety certificate of the composite structure [Building + Tower(s)] shall have to be obtained from any of the recognized Government Institutes.
(j) While according permission for installation of TCS/BS, permissible for erection of a cabin at ground level may be granted. However, the same shall not be allowed in the prescribed marginal distances. The area of such cabin shall not be more than 20 sq. mt. for each TSP/IP, subject to the certificate of structural safety. Built-up area of such cabin(s) shall not be counted towards built-up area or FSI.
(k) No permission for installation of TCS/BS shall be granted on buildings which are unauthorized and structurally unsafe. If permission for installation of such structures is granted on a building, which is declared as unauthorized at a later point of time, the Municipal Commissioner shall first take recourse to the provisions of sections 52, 53, 54 and 55 of the Maharashtra Regional and Town Planning Act, 1966 or other relevant laws, as the case may be, against such unauthorized building and in case the Municipal Commissioner, after completing the due process of law, decides to undertake any action of demolition against such unauthorised building then such decision shall also be conveyed to the concerned TSP/IP with a direction to relocate the TCS/BS within a period of 90 days, after which the Municipal Commissioner shall not be under any obligation to send any further intimation to the TSP/IP concerned before demolishing such unauthorised building, and it shall not be liable to pay compensation for the loss of the Base Station as a consequence of the demolition of the unauthorised building. The TSP/IP shall indemnify the Municipal Commissioner to this effect, while seeking permission for installation of TCS/BS.
(l) Permission for installation of TCS/BS, once granted shall remain valid for next 5 years. The TSP/IP shall apply for renewal of permission to the Municipal Commissioner. The Municipal Commissioner, while considering renewal, shall insist upon submission of fresh structural stability certificate for buildings more than 30 years of age. Administrative fee shall be levied and collected as prescribed in Regulation no.36.4 (b) hereinabove, for every such renewal. If TSP/IP fails to apply for renewal alongwith all necessary documents before the expiry of earlier permission, then such TSP/IP shall be liable for action under the provisions of the Maharashtra Regional and Town Planning Act, 1966.
(m) In case of any existing TCS/BS on a slum structure, every effort shall be made to relocate such
TCS/BS on a nearby suitable public building or any other authorised structure or open land in the slum. If such relocation is not possible, then such TCS/BS may be allowed to be continued on such slum structure subject to its structural suitability, till the TCS/BS is shifted to any other authorised structure or till the redevelopment of the slum, whichever is earlier.
(n) While granting permission for TCS/BS, the Municipal Commissioner shall stipulate that TSP/IP shall conduct regular audit in accordance with the directions/guidelines issued by TERM Cell or DoT from time to time.
i. Name of TSP/IP :-
ii. Location :-
iii. Tower Reference :-
(a) Height, (b) Weight (c) Number of antennae planned on tower, (d) Permissible EMF radiation level (e) Proposed EMF radiation level.
iv. Due date for next renewal.
v. Contact Person's name, address and Telephone Number
vi. Address of Complaint Redressing Authority with Telephone Numbers
vii. Police Control Room- 100
viii. Fire Control Room – 101
ix. Ambulance – 102
x. Other important information, if any.
Provided that in case of Telecommunication Cell Site/Base station on roof-top, the aforesaid information shall be displayed on the ground floor of the building.
(h) The Municipal Commissioner shall display the list of authorized TCS/BS on their official web site, along with the date of permission and due date for renewal of permission.
(i) TCS/BS Tower shall be inspected for distortion of members, torques of nuts and bolts at least once in five years. However, in case of areas affected by any natural calamity, such as cyclone,
earthquake, flood, etc., such inspection shall be carried out immediately after such incident suo motu or on being directed by the Municipal Commissioner. Such inspection shall be carried out only by a qualified structural engineer and a certificate to that effect shall be submitted to the Municipal Commissioner.
(j) TCS/BS Towers located in highly corrosive environment shall be painted every year. Other towers shall be painted at least once in five years to give additional protection.
(k) The Municipal Commissioner shall make efforts to provide Single Window clearance to TSP/ IP for disposal of their applications in a time bound manner.
1.8 Notwithstanding anything contained hereinabove, all the Regulations/Bye-Laws/ Memorandum /Directions /Guidelines in this regard, issued or to be issued from time to time, by the Department of Telecommunications, Government of India, shall prevail and be binding on TSP/IP and also on the Municipal Corporation, in which case, this Regulation shall stand modified to that extent.
1.9 Powers of Interpretation and Removal of Doubt.-
If any interpretation is required regarding the clauses of this Regulation, then the matter shall be referred to the Urban Development Department, Government of Maharashtra, whose decision shall be final.