These Regulations shall be applicable to all Developments/ Redevelopments/part Developments for the uses as mention under (C-1) to (C-6) shall have the provision for treatment, recycling and reuse of Waste Water. The applicant shall along with his application for obtaining necessary layout approval/ building permission shall submit a plan showing the location of Waste Water Treatment Plant, furnishing details of calculations, references, implementation, etc. This Plan shall accompany with the applicant‘s commitment to monitor the system periodically from the date of occupation of the respective building.
35.3Regulations
35.3.1 (C-1) For Layout Approval/Building Permission
(i) In case of Residential layouts, area admeasuring 10000 sq.m. or more, in addition to 10 % open space, prescribed in the bye- laws, a separate space for Waste Water Treatment and Recycling Plant should be proposed in the layout.
(ii) On the layout Plan, all Drainage lines, Chambers, Plumbing lines should be marked in different colour and submit the layout for approval to the Municipal Corporation.
(iii) The Recycled Water shall be used for Gardening, Car Washing, Toilet Flushing, Irrigation, etc. and in no case for drinking, bathing, washing utensils, clothes, etc
(iv) In the Estimate of Waste Water Recycling Plant only provision for basic civil work and required machinery will be proposed by the Municipal Corporation other than these provisions, additional machinery, plumbing, Water tank pipe, landscape should be provided by Owner or Developer on his Own Cost.
(v) A clause must be included by the Owner/ Developer in the purchase agreement that the purchaser, Owner of the Premises/Organization or Society of the purchasers shall ensure that:
a. The Recycled Water is tested every six months either in Municipal Laboratory or in the laboratory approved by Municipal Corporation or by State Government and the result of which shall be made accessible to the Competent Authority/ EHO of the respective Ward Office.
b. Any recommendation from testing laboratory for any form of corrective measures that are needed to be adopted shall be compiled. Copy of any such recommendation and necessary action taken shall also be sent by the testing laboratories to the Competent Authority/ EHO of respective Wards.
c. Maintenance of Recycling Plant should be done by the Developer or Housing Society or Owner.
35.3.2 (C-2) Group Housing/Apartment Building
In case of Group Housing if the area admeasuring 4000 sq.m. and above or if consumption of Water is 20,000 litres per day or if a multi-storeyed building where there are 20 or more tenements then Waste Water Recycling Plant as mentioned in (C-1) above should be constructed.
For all above buildings having built-up area 1500 sq.m. or more or if Water consumption is 20,000 litre per day whichever is minimum, then provision for Waste Water Treatment Plant as mentioned in (C-1) is applicable.
35.3.4 (C-4) Hospitals
Those Hospitals having 40 or more beds, Waste Water Recycling Plant as mentioned in (C-1) is applicable.
35.3.5 (C-5) Vehicle Servicing Garages
All Vehicle servicing garages shall ensure that the Waste Water generated through washing of vehicles is treated and recycled back for the same use as mentioned in (C-1)
35.3.6 (C-6) Other Hazardous uses
All other Establishments/ Buildings where chances of Waste Water generated containing harmful chemicals, toxins are likely and where such water cannot be directly led into municipal sewers, the concerned Competent Authority may direct the Owners, users of such Establishments, Buildings to treat their Waste Water as per the directions laid in (C-1)
35.4 Incentive
i. The Owner/Developer/Society setting up and agreeing to periodically maintain such Waste Water Treatment and Recycling Plant entirely through their own expenditure shall be eligible for an incentive in the form of fiscal benefits in Property Tax to the extent of 5% to Tenement holder/Society.
35.5Penalty Clause
(i) Any person / Owner / Developer / Organization / Society violating the provisions of these byelaws, he shall be fined Rs.2,500/- on the day of detection and if the violation continues, then he shall be fined Rs.100/- for every day as concrete action after written Notice from Municipal Corporation.
(ii) If any person / Owner /Developer / Organization / Society fails to operate as determined by the Authorised Officer of the Municipal Corporation and from the observations of test results and/or
physical verification) the Recycling plant, then he will be charged a penalty of Rs.300/- per day and disconnection of Water connection also.
36.0Solid Waste Management
It shall be mandatory for:
i) Housing complexes, Commercial establishments, hostels, hospitals having aggregate built-up area more than 4,000 sq.m. or more.
ii) All three star or higher category hotels.
to establish a dedicated Solid waste management system to treat 100% wet waste being generated in such buildings.
The treatment of wet waste shall be done through an organic waste composters/ vermiculture pits or other similar technologies of suitable capacity installed through reputed vendors.
The disposal of dry waste, e-waste, hazardous waste shall be carried out through authorised recyclers or any other system as specified by the Municipal Commissioner.
37.0Incentive for Green Builidngs
The municipal corporation shall strive to promote green building concepts within the municipal area. In order to do so it may empanel agencies of repute as listed/ recognised by the State / Central Government. The following incentives shall be provided for green rated buildings.
i) Green buildings shall be entitled for incentive FSI as below.
GRIHA Three star / IGBC Silver or equivalent rating – 3% incentive FSI on basic FSI.
GRIHA Four star / IGBC Gold or equivalent rating – 5% incentive FSI on basic FSI.
GRIHA Five star / IGBC Platinum or equivalent rating – 7% incentive FSI on basic FSI.
Provided, achieving minimum GRIHA Three star / IGBC Silver or equivalent rating for construction projects shall be mandatory for all buildings belonging to Government, Semi-Government, local bodies and public sector undertakings.
ii) Incentive FSI will be awarded after pre-certification from the empanelled agency. This FSI shall be exclusive of the limits specified in this DCPR.
iii) In case that the developer fails to achieve committed rating as per pre-certification at the time of final occupancy, a penalty shall be imposed at the rate 2 times of the land cost as per ASR for the incentive FSI for the rating not achieved.
Special Schemes/ Activities
38.0 Special Township Projects
The Regulations for Special Township Projects in Municipal Corporation area shall be as sanctioned by Government vide notification no.TPS-1806/ 135/CR-31/ 06/ 6031/UD-13, dated 3 r d June, 2006 and shall be subject to amendment by Government from time to time.
39.0 Conservation of Heritage Buildings / Precints / Natural Features
39.1 Applicability:
This regulation will apply to those buildings, artifacts, structures, areas and precincts of historic and/or architectural and /or cultural significance (hereinafter as ‗Listed Buildings/Heritage Buildings and listed precincts/Heritage precincts‘‘) and those natural features of environmental significance including scared graves, hills, hillocks, water bodies(and the areas adjoining the same) etc.
39.2Preparation of List of Heritage Buildings, Heritage Precincts and Natural Features.
The Municipal Commissioner on advice of Heritage Committee shall prepare heritage list and shall issue public notice in the local newspapers declaring his intention to include the buildings, artefacts, areas and precincts of historic and /or cultural significance and the list of natural features of environmental significance, including sacred graves, hills, hillocks, water bodies etc. and invite objections and suggestions from any person in respect of the proposed inclusion within a period of 30 days from the date of such notice.
The Municipal Commissioner shall issue notice to the owner of the buildings, artifacts, areas and precincts of historic and/or cultural significance etc. and invite objections and suggestions from such person in respect of proposed inclusion within 30 days from the date of such notice.
The Municipal Commissioner, on respect of any objections or suggestions, shall decide the same after giving hearing to the objector and send to Government for approval. Government will sanction the said heritage list with modification, if required. This list will be called Final Heritage List. For this Modification under Section 37 need not be necessary.
Thereafter, the Municipal Commissioner may amend the Final Heritage List from time to time as and when required, on the advice of the Heritage Committee. In such case it shall not be necessary to follow the procedure under Section 37 of Maharashtra Regional and Town Planning Act of 1966 or to take approval from Government, but the procedure as laid down above in this regulation regarding publication and objection / suggestion shall be followed before finalising it.
39.3Restriction on development, Redevelopment/repairs etc.
No development or redevelopment or engineering operations or addition, repairs renovation including the painting of buildings, replacement of special features or plastering or demolition of any part thereof of the said listed buildings, or listed precincts or listed natural features shall be allowed except with the prior written permission of the Municipal Commissioner. Before granting any such permissions, the Municipal Commissioner shall consult the Heritage Conservation Committee to be appointed by the State Government (hereinafter referred to as ‗the said Heritage Conservation Committee‘) and shall act on the advice of the Heritage Conservation Committee.
Provided that before granting any permission for demolition or major alterations/addition to listed buildings (or buildings within listed precincts) objections and suggestions from the public shall be invited and duly considered by the Heritage Conservation Committee.
Provided that, in exceptional cases for reasons to be recorded in writing the Municipal Commissioner himself may overrule the advice of the Heritage Conservation Committee.
If the application for development, alteration, modification of the Heritage precincts or listed building is rejected under this regulation or while granting such permission any conditions are imposed on the owner which deprives him to use the FSI, the said owner shall be compensated by grant of Development Right Certificate.
39.4Incentive uses for Heritage Buildings.
After the commencement of this Regulation, the Heritage Precincts or the Listed Buildings shall not be permitted to be used for any commercial or office purpose except with the permission of the Heritage Conservation Committee. However, in cases of buildings included in the Heritage Conservation List, if the owner /owners agree to maintain the listed Heritage Building as it is in the existing stage and to preserve its heritage with due repairs, the owner/owners may be allowed with the approval of the Heritage Conservation Committee to convert part of the whole of the non-commercial area to commercial /office use. Provided that, if the heritage building is not maintained suitably or if the heritage value of the building is allowed to be spoiled in any manner, the Municipal Commissioner shall withdraw the permission forthwith.
39.5 Grant of Transferable Development Rights to owners/lessees of heritage buildings/heritage precincts.
If the owner is deprived of using FSI on the said plot or development permission is granted to him with conditions which deprive him of use of FSI, then he shall be entitled for TDR as decided by the Commissioner in consultation of Heritage Conservation Committee. The utilization of this TDR shall be as per TDR Regulation.
39.6 Maintaining Skyline
Building included in heritage precincts shall maintain the skyline in the precincts (without any high rise development) as may be existing in the surrounding area, so as not to demolish or destroy the value and beauty of the said heritage buildings/heritage precincts. The development within the precincts shall be in accordance with the guidelines framed by the Municipal Commissioner on the advice of the Heritage Conservation Committee.
39.7 Restrictive Convenants
Regulations existing as on date of this Regulation imposed under covenants terms and conditions, on the leasehold plots either by State Government or by the Municipal Corporation shall continue to be imposed, in addition to the Development Control Regulations. However, in case of any conflict with the heritage preservation interest/environmental conservation and the said Development Control and Promotion Regulations, this regulation shall prevail.
39.8Grading of the listed buildings/Listed Precincts.
The Municipal Commissioner shall classify the Heritage Precincts, Heritage Buildings in ―Grades‖ such as (I),(II), (III). The meaning of these grades and basic guidelines for development permissions are as follows:
Grade-I
Grade-II
Grade-III
(A) Definitions
Heritage Grade-I comprisesBuildings and precincts ofNational or Historic importance,excellence in architectural style,design technology and materialusage and/or aesthetics;associated with a great historicevent, personality, movement orinstitution. They have been andare the prime landmarks of thecity and of National importance.
Heritage Grade -II (A and B)comprises buildings andprecincts of Regional
Heritage Grade -III comprisesbuildings and precincts of localimportance for townscape, they
Heritage Grade-I comprisesBuildings and precincts ofNational or Historic importance,excellence in architectural style,design technology and materialusage and/or aesthetics;associated with a great historicevent, personality, movement orinstitution. They have been andare the prime landmarks of thecity and of National importance.
importance, possessingspecial architectural oraesthetic merit, or cultural orhistorical significance thoughof a lower scale than HeritageGrade-I.They are locallandmarks, which contributeto the image and identity ofthe region. They may be thework of master craftsmen ormay be models of proportionand ornamentation ordesigned to suit a particularclimate.
evoke architectural, aesthetic, orsociological interest though notas in Heritage Grade -II. Thesecontribute to determine thecharacter of the locality and canbe representative of life-style ofaparticularcommunityorregion and, may alsobedistinguished by setting on astreet line or special character ofthe façade and uniformity ofheight width and scale.
Heritage Grade-III deservesintelligent conservation (thoughon a lesser scale than Grade-IIand special protection to uniquefeatures and attributes.)
I Scope for Change
No interventions be permittedeither on exterior or interiorunless it is necessaryin theinterest of strengtheningandprolonging the life of thebuildings or precincts or any partof features thereof. Forthispurpose absolutely essential andminimum changes would beallowed and they must beinaccordance with the original. (D) Procedure
Grade-II (A)Internal changes and adaptivereuse and external changesmay by and large be allowedbut subject to strict scrutiny.Care would be taken toensure the conservation of allspecial aspects for which it isincluded in Heritage Grade-IIGrade-II (B)In addition to the above,extension ofAdditional building in thesame plot or compound, incertain circumstances beallowed, provided that, theextension/additional buildingis in harmony with (and doesnot detract from) the existingheritage buildings orprecincts especially in termsof height, and facade.
External, internal changes andadaptive reuse would by andlarge be allowed. Changes caninclude extensions, andadditional buildings in the sameplot or compound. However anychanges should be such thatthey do not detract from theexisting heritage building/precinct.
Development permission for the changes would be given by the Commissioner on the advice of theHeritageConservation Committee.
Development permission for the changes / additional construction would be given by the Commissioner on the Heritage advice
Development permission for the additional changes construction would be given by the Commissioner on the advice of the Heritage Conservation
Vistas/ Surrounding Development
Conservation Committee.
Committee.
All developments in areas surrounding Heritage Grade-I shall be regulated and controlled by ensuring that it does not mark the grandeur of or view from
39.9Signs and outdoor display structures
No display or advertising signs and outdoor display structures on listed building and / or the Heritage Precincts shall be permitted except accordance with part X (sign and outdoor display structure) National Building Code of India.
Prohibition of advertising signs and outdoor display structure in certain cases :
Notwithstanding the provisions mentioned above no advertising sign or outdoor display structures shall be permitted on buildings of architectural aesthetic historic or heritage importance as may be decided by the Municipal Commissioner, Committee or on Government buildings, save that in the case of Government buildings only advertising signs or outdoor display structures may be permitted if they relate to the activities for the said buildings’ own purposes or related programs.
Provided that, if the Heritage Conservation Committee so advises, the Municipal Commissioner shall refuse permission for any sign or outdoor display structure.
39.10Composition of Heritage Conservation Committee.
There shall be Heritage Conservation Committee for the City. This Committee shall be constituted by the Municipal Commissioner. The committee shall comprise of the following members:
i)
Chairman Appointed by the Government
Chairman
ii)
Divisional/ District officer of Archaeological Survey ofIndia
Member
iii)
Divisional/ District officer of Archaeological Survey ofMaharashtra
Member
iv)
Joint Director Town Planning, Pune Division, Pune
Member
v)
Conveyor INTAC Pune Chapter
Member
vi)
Heritage Conservation Architect having 10 years ofexperience and membership of the Council of Architecture
Member
vii)
Historian having experience of 10 years in the field ofHistory.
Member
viii)
Structural Engineer having experience of 10 years and member of Institute of Engineers.
Member
ix)
City Engineer, Pune Municipal Corporation
Member
x)
Executive Engineer Heritage Pune Municipal Corporation
Membersecretary
The tenure of the Members of categories (vi) to (viii) above shall change after every three years provided however that, the same person shall be eligible for reappointment as Member.
The Heritage Conservation Committee shall come into existence with effect from the date of its publication in the official Gazette.
No act of the Committee done in good faith, shall be deemed to be invalid by reason only of some defect subsequently discovered in the organization of the Committee or in the Constitution of the Committee or in the appointment of the Member or on the ground that such member was disqualified for being appointed.
The Chairman and in his absence the chosen Member of the Committee shall preside over the meeting of the Committee.
The Terms of reference of the Committee :-
(i) To consider whether development permission should be granted under this Regulation and the conditions of such permission.
(ii) To prepare a list or supplementary list of building artefacts, structures, areas precincts of historic aesthetic architectural cultural significance and a supplementary list of natural features of environmental significance including scared groves, hills, hillocks etc. water bodies (and the areas adjoining the same) to which this regulation would apply
(iii) To consider whether any relaxation, modification, alteration, or variance of any of the Development Control and Promotion Regulations is called for.
(iv) To suggest amendments, changes or special regulations or modification to regulations for listed buildings and the heritage precincts regulated under these regulations
(v) To consider on the extent of Development Rights to be granted to the owners of listed Building of the Heritage Precincts.
(vi) To consider whether development Rights Certificates may be allowed to be consumed in a heritage precinct.
(vii) To consider whether to allow commercial /office user of any listed building of Heritage Precincts and when to terminate the same.
(viii) To regulate erection of outside advertisement/bill boards.
(ix) To recommend guidelines to be adopted by those private parties who sponsor beautification schemes at public intersection and elsewhere.
(x) To evaluate the cost of repairs to be given to the owners to bring the existing building back to the original condition. For this purpose, the Committee may suggest ways to raise funds through private sources.
(xi) To prepare special designs and elements and guidelines for listed buildings and control of height and essential façade characteristics such as maintenance of the buildings and to suggest suitable design adopting new materials for replacements keeping the old form intact to the extent possible.
(xii) To prepare guideline relating to design elements and conservation principles to be adhered to and to prepare other guideline for the purpose of this regulation.
(xiii) To consider any other issue as may be required from time to time during course of scrutiny of development permissions and in overall interest of heritage/environmental conservation.
In the absence of Heritage Conservation Committee, the Municipal Commissioner shall consult the Government before giving such permission.
39.12Heritage Conservation Fund
Heritage buildings included in the said list shall be maintained by the owners of the said buildings themselves, with a view to give monetary help for such maintenance/repairs a separate fund may be created which would be kept at the disposal of the Municipal Commissioner, Pune Municipal Corporation, who will utilise these funds on the advice of the Heritage conservation Committee. The commissioner may, in such cases disburse appropriate amount to the owner or may get maintenance/ repair work done through Municipal Corporation.
2% of total development charges collected shall be transferred to the Heritage conservation fund.
The Municipal commissioner shall have right to remove any unauthorized construction in the property enlisted as heritage property as an encroachment for the Municipal land as defined and as per procedure laid down U/S 231 of the B.P.M.C. Act, 1941 and recover the expenses of such removal/ demolition work form the owner as arrears of land revenue.
The Municipal Commissioner shall have right to enter into any such heritage property to repair such property to avoid any damage or injury, and the amount shall be spent form Heritage conservation fund and shall be recovered from the owner as arrears of property tax.
If Heritage structure listed in Grade I needs conservation, preservation and immediate repairs and if the structure is affected due to vandalism by occupier/ owner ,then the Municipal commissioner shall have right to acquire such heritage property and conserve its heritage value.
Schedule
Rain Water Harvesting in a building site includes storage or recharging the ground water by rainwater falling on the terrace or any paved or unpaved surface within the building site.
The following systems may be adopted for harvesting the rainwater drawn from terrace and the paved surface.
i) Open well of a minimum 1.00 mt diameter and 6mt in depth into which rain water may be channelled and allowed to filter for removing silt and floating material. The well shall be provided with ventilating covers. The water from the open well may be used for non-potable domestic purposes such as washing, flushing and for watering the garden etc.
ii) Rain Water Harvesting for recharge of groundwater may be done through a bore-well around which a pit of 1m width may be excavated upto a depth of at least 3m and refilled with stone aggregate and sand. The filtered rain water may be channelled to the refilled pit for recharging the bore-well.
iii) An impressive surface/underground storage tank of required capacity may be constructed in the setback or other open spaces and the rain water may be channelled to the storage tank. The storage tank shall always be provided with ventilating covers and shall have drawn-off taps suitably placed so that rain water may be drawn off for domestic, washing, gardening and such other purposes. The storage tank shall be provided with an overflow.
iv) The surplus rain water after storage may be recharged in to ground through percolation pits or trenches or combination of pits and trenches. Depending on the geo-morphological and topographical conditions, the pits may be of the size of 1.20 m width X 1.20 m length X 2 m to 2.50 m depth. The trenches can be of 0.60 m width X 2 to 6 m length X 1.50 to 2 m depth. Terrace water shall be channelled to pits or trenches. Such pits or trenches shall be back filled with filter media comprising the following materials :
a) 40 mm stone aggregate as bottom layer upto 50% of the depth.
b) 20 mm stone aggregate as lower middle layer upto 20% of the depth.
c) Coarse sand as upper middle layer upto 20% of the depth.
d) A thin layer of fine sand as top layer.
e) Top 10% of the pits/trenches will be empty and a splash is to be provided in this portion in such a way that roof top water falls on the splash pad.
f) Brick masonry wall is to be constructed on the exposed surface of pits/trenches and the cement mortar plastered. The depth of wall below ground shall be such that the wall prevents lose soil entering into pits/ trenches. The projection of the wall above ground shall at least be 15 cm.
g) Perforated concrete slabs shall be provided on the pits/trenches.
40.0Erection of Mobile Towers:
Regulation for setting up of Telecommunication Cell Site(s)/Base Station(s) and installation of the equipments for Telecommunication Network in Municipal Corporation area shall be as per Appendix-Q
Appendices and Proformas
APPENDIX A-1 FORM FOR CONSTRUCTION OF BUILDING OR LAYOUT OF BUILDING / GROUP
HOUSING Application for permission for development under Section 44 / 58 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949.
From
(Name of the owner)
To,
The Municipal Commissioner,
Municipal Corporation, Pune
Sir, I intend to carry out the under mentioned development in the site/plot of land, on Plot No. Town and Revenue S.No..........City Survey No.... .....Mauje ...........situated at Road / Street
Society ............in accordance with Section 44 / 58 of the Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949. I forward herewith the following plans and statements (Item i to ix) wherever applicable, in
quadruplicate, signed by me (Name in block letters) ...and the Architect / Licensed Engineer / ....), who has prepared the plans, designs and a copy Structural Engineer / Supervisor, (License No...
of other statements /documents as applicable
Key Plan (Location Plan), (to be shown on first copy of the set of plans) i) ii) Site Plan showing the surrounding land and existing access to the land proposed to be developed; (to
be shown on first copy of the set of plans) ii) A detailed building plan showing the plan, section and elevations of the proposed development work
along with existing structure to be retained/ to be demolished, if any;
iv) Particulars of development in Form enclosed (to be submitted for development other than individual buildings);
Copy of sanctioned layout plan if any;
vi) An extract of record of rights, property register card (any other document showing ownership of land to be specified) alongwith consent of co-owners where third party interest is created;
Form Giving Particulars of Development
(Item iv of Appendix A-1)
(a) (i) Full Name of Applicant
(ii) Address of applicant
(iii) e-mail ID
(iv) Contact / Mobile No.
(b)(i) Name and address of Architect/licensed Engineer/ StructuralEngineer/ Supervisor employed.
(ii) No. and date of issue of License
2.
(a) Is the plot of, a City Triangulation SurveyNumber, Revenue Survey Number or HissaNumber of a Survey Number or a Final PlotNumber of a Town Planning Scheme or a plotof an approved layout?
2.
(b)Please state Sanction Number and Date ofSub-division / Layout
2.
(c) Whether the land is situated in Core Area orOutside Core Area?
3.
(a) What is the total area of the plotaccording to the ownership document andmeasurement plan?
3.
(b)Does it tally with the Revenue/CTSRecord
3.
(c) What is the actual area available on sitemeasured by Architect/licensedEngineer/Structural EngineerSupervisor?(The permission shall be based on thearea whichever is minimum.)
3.
(d) Is there any deduction in the original areaof the plot on account of D.P. Roads, orreservation(s). If so, are they correctlymarked on the site plan? Please state thetotal area of such deductions?
3.
(e) Is there any water stream in the land?State the area of such land.
3.
(e) What is the area remainedfordevelopment after above deduction(s)?
3.
(f) What is the area proposed for recreationalopen space? (in case of land havingoriginal holding more than 0.4 hector)Please mention the area.
3.
(g) Whether amenity space as required underRegulation no.13.4 is left? Please mentionthe area.
3.
(f) What is the net plot area asperRegulationno.13.8? (excluding (g)above)
4.
Are all plans as required under Regulationno.6.2 enclosed?
Form for Sanction of Building Permission and Commencement Certificate
To,
Sir,
With reference to your application No ,dated for the grant of sanction of Commencement Certificate under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work / Building on Plot No Revenue Survey No , City Survey No mauja situated at Road /Street Society the Commencement Certificate/Building Permit is granted under Section 45 of the said Act, subject to the following conditions:
The land vacated in consequence of the enforcement of the set-back rule shall form part of the public street.
No new building or part thereof shall be occupied or allowed to be occupied or used or permitted to be used by any person until occupancy permission has been granted.
You will have to handover the amenity space to the Corporation before approval of final layout as per Regulation no.13.4. (wherever applicable)
You will have to submit an undertaking in respect of recreational open spaces as stipulated in Regulation.(wherever applicable)
The Commencement Certificate/ Building permit shall remain valid for a period of one year commencing from the date of its issue unless the work is not commenced within the valid period.
This permission does not entitle you to develop the land which does not vest in you.
Office No.
Office Stamp
Date :
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
Appendix 'D-2'
Proforma - I
Drawing Sheet No.
X/Y
Stamps of Approval of Plans:
Appendix 'D-1'
A Area Statements
Area of land (Minimum area of a, b, c to be considered) a) As per ownership document (7/12, CTS extract) b) as per measurement sheet c) as per site
Deductions for (a) Proposed D.P./ D.P. Road widening Area (b) Any D.P. Reservation area
Gross Area of Plot (1-2)
(Total a+b)
Recreational Open space (a) Required - (b) Proposed -
Amenity Space (a) Required - (b) Proposed -
Service road and Highway widening
Internal Road area
Area under layout plots
Net area of plots for FSI Calculations = (3-5b)
Permissible FSI factor for layout plots = (9/8)
Area for inclusive housing (a) Required - (b) Proposed -
Certificate of Area:
Certified that the plot under reference was surveyed by me on and the dimensions of sides etc. of plot stated on plan are as measured on site and the area so worked out tallies with the area stated in document of Ownership/ T.P. Scheme Records/ Land Records Department/City Survey records
Signature
(Name of Architect/License Engineer/Supervisor.)
Owner (s) name and signature
Architect/ Licensed Engineer/ Supervisor name and signature
Statement of distribution of FSI on each plot(to be printed at suitable place on plan)
Plotno.
Plot area(sq.m.
Roundingarea ofRoad(if any)(sq.m.)
RemainingPlot area(b-c)(sq.m.)
Built up areaon pro-ratabasis i.e.(d x Pro-rataFSI factor)
FrontRoadwidth(m.)
basic FSI
PermissibleBuilt-up areaon Basic FSI(e X g)(sq.m.)
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
Form for Tentative Approval for Demarcation of Land / Sub-division Layout
To,
Sir,
With reference to your application No ,dated for the land sub-division approval, under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work in respect of land bearing Revenue Survey No City Survey No , mauje situated at Road /Street Society , it is to inform you that, land sub-division layout is hereby tentatively approved and recommended for demarcation, subject to the following conditions:
You will get the land sub-division layout demarcated on the site by the Land Records Department and submit the certified copy to that effect for final approval.
It shall be the responsibility of the owner to carry out all the development work including construction of roads, sewer lines, water supply lines, culverts, bridges, street lighting, etc. and hand it over to the Municipal Corporation after developing them to the satisfaction of the Municipal Commissioner.
If you wish that the Municipal Corporation has to carry out these development works, then you will have to deposit the estimated expenses to the Municipal Corporation in advance, as decided by the Municipal Commissioner.
You will have to handover the amenity space to the Corporation before approval of final layout as per Regulation no.13.4. (applicable in case where owner is not allowed to develop)
You will have to submit an undertaking in respect of recreational open spaces as stipulated in Regulation.
This permission does not entitle you to develop the land which does not vest in you.
Office No.
Office Stamp
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
Appendix 'D-3'
Form for Final Approval to the Land Sub-division / Layout
To,
Sir,
With reference to your application No. ,dated for the land sub-division approval, under Section 44 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949 to carry out development work in respect of land bearing Revenue Survey No , City Survey No , mauje situated at Road /Street , Society , the land sub-division layout is finally approved as demarcated under Section 45 of the Maharashtra Regional & Town Planning Act, 1966, subject to the following conditions:
1.
It shall be the responsibility of the owner to carry out all the development work includingconstruction of roads, sewer lines, water supply lines, culverts, bridges, street lighting, etc. andhand it over to the Municipal Council after developing them to the satisfaction of the MunicipalCommissioner.
2.
If you wish that the Municipal Council should carry out these development works, then you willhave to deposit the estimated expenses to the Municipal Council in advance, as decided by theMunicipal Commissioner.
3.
As per the undertaking submitted by you in respect of recreational open space as stipulated inRegulation no.13.3, the said open space admeasuring ------- sq.m. stand vested in the name of plotholders of the layout or society of the plot holders and you have no right of ownership or interest inthe said recreational open space.
Since you have handed over the amenity space to the Corporation, you shall be entitled for FSIequivalent to TDR, on the remaining land. (wherever applicable)
4.
This permission does not entitle you to develop the land which does not vest in you.
5.
6.
7.
8.
Office No. ---- -Office Stamp
-Date :---------
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
Appendix 'E-1'
Form for Refusal of Building Permit / Commencement Certificate
Form for Completion Certificate
To,
The Municipal Commissioner,
Pune Municipal Corporation
Sir,
I hereby certify that the erection / re-erection or part/ full development work in / on building / part building No Plot No Revenue Survey No. City Survey No. , mauje , has been supervised by me and has been completed on according to the plans sanctioned, vide office communication No dated The work has been completed to the best of my satisfaction. The workmanship and all the materials (type and grade) have been strictly in accordance with general and detailed specifications. No provisions of the Act or the building Regulations, no requisitions made, conditions prescribed or orders issued there under have been transgressed in the course of the work. I am enclosing three copies of the completion plans. The building is fit for occupancy for which it has been erected/ re-erected or altered, constructed and enlarged.
I have to request you to arrange for the inspection & grant permission for the occupation of the building.
Yours faithfully
Signature and name of Architect /Licensed Engineer/
The part / full development work / erection re-erection / or alteration in of building / part building No Plot No Revenue Survey No. City Survey No. mauje completedunderthesupervisionof Architect, Licensed Engineer/ Structural Engineer / Supervisor, / License No may be occupied on the following conditions-
A set of certified completion plans is returned herewith
Encl : As above.
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
Appendix 'J'
Form for Refusal of Land Sub-division / Layout
To,
Sir,
With reference to your application No. dated for the grant of sanction for the development work bearing Revenue Survey No., City Survey No. _, mauje , I regret to inform you that the proposal has been refused under Section 45 of the Maharashtra Regional and Town Planning Act, 1966, on the following grounds
1.-
5.---------
Office Stamp
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
Appendix 'F' Form for Intimation of Completion of Work Upto Plinth Level
To,
The Municipal Commissioner,
Pune Municipal Corporation
Sir,
The construction up to plinth / column up to plinth level has been completed in Building No Plot No Revenue Survey No. City Survey No. _, Village Sector No. Ward No. , situated at Road/Street Society in accordance with your permission No dated under my supervision and in accordance with the sanctioned plan.
Please check the completed work and permit me to proceed with the rest of the work.
Yours faithfully
Signature of Architect /Licensed Engineer/
Structural Engineer/Supervisor
Name :
(In Block Letters)
Address :
E-mail ID :
Mobile No.:
Date:
Appendix 'G' Form of Approval / Disapproval of Development Work Upto Plinth Level
To,
Sir,
Please refer to your intimation No dated regarding the completion of construction work upto plinth / column upto plinth level in Building No Plot No, Revenue Survey No. , City Survey No, Village SectorNo. WardNo. ,situated at Road/Street Society You may proceed / are not allowed to proceed with the further work as per sanctioned plans / as the construction upto plinth level does / does not confirm to the sanctioned plans.
The part / full development work / erection re-erection / or alteration in of building / part building No Plot No Revenue Survey No. City Survey No. mauje completedunderthesupervisionof Architect, Licensed Engineer/ Structural Engineer / Supervisor, / License No is not allowed to be occupied because of the following reasons -
The construction carried out by you does not conform to the sanctioned plans.
3.----------
A set of completion plan is retained with the Municipal Council and remaining sets are regretfully returned herewith.
Encl : As above.
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
Appendix 'K'
To,
Form of Indemnity for Part Occupancy Certificate
(On Stamp Paper)
(Of such value as decided by the Municipal Commissioner.)
Municipal Commissioner,
Pune Municipal Corporation.
Subject:-
Sir,
While thanking you for letting me occupy a portion of the above building before acceptance of the Completion Certificate of the whole building for the plans approved in communication No, dated I hereby indemnify the Municipal Corporation against any risk, damage and danger which may occur to occupants and users of the said portion of the building and also undertake to take necessary security measures for their safety. This undertaking will be binding on me /us, our heirs, administrators and our assignees.
Yours faithfully,
Signature and name of Owner
Witness:
Address:
Date:
Appendix 'L'
Fire Protection Requirements
1 All buildings shall be planned, designed and constructed to ensure fire safety and this shall be done in accordance with Part IV of Fire Protection of National Building Code of India and Maharashtra Fire Prevention and Life Safety Measures Act, 2006. as amended from time to time, and Part IV of Fire Protection of National Building Code of India (for the provisions which are not covered in these regulations.) In case of special buildings, the building schemes shall also be cleared by the Fire Officer, Fire Brigade Department of the Corporation.
1.1Construction materials
All materials of constructions in load bearing elements, stairways and corridors and facades shall be non-combustible.
The interior finish materials shall not have a flame spread ability rating exceeding Class I (see 3.4.15.2 of Part 4 of National Building Code)
The internal walls or staircase shall be of brick or reinforced concrete with a minimum of 2 h. fire rating.
The staircase shall be ventilated to the atmosphere at each landing and a vent at the top; the vent openings shall be of 0.5sq.m in the external wall and the top. If the staircase cannot be ventilated because of location or other reasons, a positive pressure 50 Pa shall be maintained inside. The mechanism for pressurizing the staircase shall operate automatically with the fire alarm. The roof of the shaft shall be 1 m. above the surrounding roof. Glazing or glass bricks, if used in staircase, shall have fire resistance rating of minimum 2 h.
1.2Lifts
General requirements of lifts shall be as follows:
a) Walls of lift enclosures shall have a fire rating of 2 h; lifts shall have a vent at the top of area not less than 0.2 sq.m.
b) Lift motor room shall be located preferably on top of the shaft and separated from the shaft by the floor of the room.
c) Landing doors in lift enclosures shall have a fire resistance of not less than 1 h.
d) The number of lifts in one row for a lift bank shall not exceed 4 and the total number of lifts in the bank (of two rows) shall not exceed 8. A wall of 2 h. fire rating shall separate individual shafts in a bank.
e) Lift car door shall have a fire resistance rating of half an hour.
f) Collapsible gates shall not be permitted for lifts and shall have solid doors with fire resistance of at least 1 h.
g) If the lift shaft and lobby is in the core of the building, a positive pressure between 25 and 30 Pa shall be maintained in the lobby and a positive pressure of 50 Pa shall be maintained in the lift shaft. The mechanism for pressurization shall act automatically with the fire alarm; it shall be possible to operate this mechanically also.
h) Exit from the lift lobby, if located in the core of the building, shall be through a self closing smoke stop door of half an hour fire resistance.
i) Lifts shall not normally communicate with the basement; if, however, lifts are in
communication, the lift lobby of the basements shall be pressurized as in (g), with self-closing door as in (h)
j) Grounding switch(es), at ground floor level, shall be provided on all the lifts to enable the fire service to ground the lifts.
k) Telephone or other communication facilities shall be provided in lift cars for building of 30 m. in height and above. Communication system for lifts shall be connected to fire control room for the building.
Suitable arrangements such as providing slope in the floor of lift lobby, shall be made to prevent water used during fire-fighting, etc., at any landing from entering the lift shafts.
m) A sign shall be posted and maintained on every floor at or near the lift indicating that in case of fire, occupants shall use the stairs unless instructed otherwise. The sign shall also contain a plan for each floor showing the locations of the stairways. Alternate source of power supply shall be provided for all the lifts through a manually operated changeover switch.
n) Fire Lifts -Following details shall apply for a fire lift :
i) To enable fire services personnel to reach the upper floors with the minimum delay, one fire lift per 1200 sq.m. of floor area shall be provided and shall be available for the exclusive use of the firemen in an emergency.
1.3Basements -
i) Each basement shall be separately ventilated. Vents with cross-sectional area (aggregate) not less than 2.5% of the floor area spread evenly round the perimeter of the basement shall be provided in the form of grills or breakable stall board lights or pavement lights or by way of shafts.
Alternatively, a system of air inlets shall be provided at basement floor level and smoke outlets at basement ceiling level. Inlets and extracts may be terminated at ground level with stall board or pavement lights as before, but ducts to convey fresh air to the basement floor level have to be laid Stall board and pavement lights should be in positions easily accessible to the fire brigade and clearly marked SMOKE OUTLET’ or AIR INLET’ with an indication of area served at or near the opening.
ii) The staircase of basements shall be of enclosed type having fire resistance of not less than 2 h and shall be situated at the periphery of the basement to be entered at ground level only from the open air and in such positions that smoke from any fire in the basement shall not obstruct any exit serving the ground and upper storeys of the building and shall communicate with basement through a lobby provided with fire resisting self-closing doors of 1 h resistance. For travel distance, if the travel distance exceeds as given therein, additional staircases shall be provided at proper places.
iii) In multi-storey basements, intake ducts may serve all basement levels, but each basement levels and basement compartment shall have separate smoke outlet duct or ducts. Ducts so provided shall have the same fire resistance rating as the compartment itself. Fire rating may be taken as the required smoke extraction time for smoke extraction ducts.
iv) Mechanical extractors for smoke venting system from lower basement levels shall also be provided. The system shall be of such design as to operate on actuation of heat / smoke sensitive detectors or sprinklers, if installed, and shall have a considerably superior performance compared to the standard units. It shall also have an arrangement to start it manually
v) Mechanical extractors shall have an internal locking arrangement, so that extractors shall continue to operate and supply fans shall stop automatically with the actuation of fire detectors.
vi) Mechanical extractors shall be designated to permit 30 air changes per hour in case of fire or distress call. However, for normal operation, air changes schedule shall be as given in Part 8, Building Services, Section 3, Air-conditioning, Heating and Mechanical Ventilation of National Building Code.
vii) Mechanical extractors shall have an alternative source of supply.
1.6Refuge Area
Provisions contained in Regulation No 18.28.6 shall apply for all buildings :
1.7 Electrical services shall conform to the following :
(a) The electric distribution cables / wiring shall be laid in a separate duct. The duct shall be sealed at every floor with non-combustible materials having the same fire resistance as that of the duct. Low and medium voltage wiring running in shaft and in false ceiling shall run in separate conduits;
(b) Water mains, telephone lines, intercom lines, gas pipes or any other service line shall not be laid in the duct for electrical cables; use of bus ducts / solid rising mains instead of cables is preferred;
(c) Separate circuits for fire-fighting pumps, lifts, staircases and corridor lighting and blowers for pressurizing system shall be provided directly from the main switch gear panel and these circuits shall be laid in separate conduit pipes, so that fire in one circuit will not affect the others. Such circuits shall be protected at origin by an automatic circuit breaker with its novolt coil removed. Master switches controlling essential service circuits shall be clearly labelled;
(d) The inspection panel doors and any other opening in the shaft shall be provided with air-tight fire doors having fire resistance of not less than 2 h;
(e) Medium and low voltage wiring running in shafts and within false ceiling shall run in metal conduit. Any 230 V wiring for lighting or other services above false ceiling shall have 660 V grade insulation. The false ceiling including all fixtures used for its suspension, shall be of non-combustible material and shall provide adequate fire resistance to the ceiling in order to prevent spread of fire across ceiling. Reference may be made to good practice;
(f) An independent and well ventilated service room shall be provided on the ground level or first basement with direct access from outside or from the corridor for the purpose of termination of electric supply from the licensees' service and alternative supply cables. The doors provided for the service room shall have fire resistance of not less than 2 h.
Note : If service room is located at the first basement, it should have automatic fire extinguishing system.
(g) If the licensees agree to provide meters on upper floors, the licensees' cable shall be segregated from consumers’ cable by providing a partition in the duct. Meter rooms on upper floors shall not open into staircase enclosures and shall be ventilated directly to open air outside; and
(h) Suitable circuit breakers shall be provided at the appropriate points.
h) If the open space surrounding the building is not paved, the top layer up to a sufficient depth shall be removed and refilled with coarse sand to allow percolation of rain water into ground.
The terrace shall be connected to the open well/bore-well/storage tank/ recharge pit/trench by means of HDPE / PVC pipes through filter media. A valve system shall be provided to enable the first washing from roof or terrace catchment, as they would contain undesirable dirt. The mouth of all pipes and opening shall be covered with mosquito (insect) proof wire net. For the efficient discharge of rain water, there shall be at least two rain water pipes of 100 mm dia. for
a roof area of 100 sq.m.
vi) Rain Water Harvesting structures shall be sited as not to endanger the stability of building or earthwork. The structure shall be designed such that no dampness is caused in any part of the walls or foundation of the building or those of an adjacent building.
vii) The water so collected/recharged shall as far as possible be used for non-drinking and non-cooking purpose. Provided that when the rain water in exceptional circumstances will be utilised for drinking and/or cooking purpose, it shall be ensured that proper filter arrangement and the separate outlet for bypassing the first rain water has been provided. Provided further that, it will be ensured that for such use, proper disinfectants and the water purification arrangements have been made.
35.0 Regulation for Waste Water Recycling
35.1 Type of Waste Water
The Waste Water is of following types:--
Black Water.- means Waste Water from W.C. Urinals and M.S.W.
(ii) Grey Water.–means Waste Water from Bathrooms, Sinks, Shower and Wash Areas etc.
(iii) Apart from Residential Waste Water, Waste Water generated from Industrial, Medical, Commercial and Waste generated from Garbage shall also be treated as per the guidelines given by the Maharashtra Pollution Control Board.
vii) Attested copy of receipt of payment of scrutiny fees;
I request that the proposed development/ construction may be approved and permission be accorded to me
to execute the work. Signature of the Licensed / Signature of Owner
Surveyor/Architect Name of Owner Name Address of Owner License No. Contact No.
5.
(a) In what zone does the plot fall?
(b) For what purpose the building is proposed?Is it permissible according to the land use
6.
classification?
6.
(a) Is road available as an approach to theland? What is the average existing width of theroad? (If the plot abuts on two or more roads,the above information in respect of all roadsshould be given)
6.
(b) Is the land fronting on D.P. road? If so,width of the D.P. road
6.
(c) Is the land fronting on National or Statehighway? If so, is the Building line / controlline maintained? Please state the distance
6.
(c) What is the height of the building abovethe average ground level of the plot?
6.
(d) Is it within permissible limit of heightspecified in Regulation no. 15.9 i.e. 1.5 timesof the road width plus front margin?
6.
(e)Does height exceed the limit specified in (d)above? If so, is height approved by Director ofFire Services, M.S.?
7.
Is the land subject to restrictions of blue / redflood line, airport, railway, electric line, landfill sites, archaeology, etc.? Please state thedetails along with No objection certificate ’ifany.
8.
(a) If there are existing structures on the plot
(i) Are they correctly marked and numberedon the site plan?
(ii) Are those proposed to be demolishedimmediately and hatched in yellow colour?
(iii)What is the plinth area and total floor areaof all existing structures to be retained?(Please give details confirming to the plansubmitted)
9.
Is balcony area within the permissible limit of15 %? State said balcony area and area countedin FSI.
10.
Are double height terrace within the limit of20%? Are they of supported type? State saiddouble height terrace area and area counted inFSI.
11.
(a) Please state the total built up area,(existing + proposed + extra balconies +extra double height terraces.)
11.
(b) What is the basic permissible F.S.I. of thezone according to front road width?
11.
(c) What is the premium FSI proposed to beconsumed?
11.
(d) What is the area of TDR proposed to beconsumed?
11.
(e) What is the additional FSI proposed to beconsumed?
11.
(f) Please state the overall F.S.I. utilised in theproposal?
(g) Is built-up area of each flat /unitmentioned on the plan?
12.
Whether area for inclusive housing is requiredas per Regulation no.13.7? Please state thedetails.
13.
(a) What is the width of the front marginaldistance (s)? If the building abuts two or moreroads, does the front marginal distance complywith Regulation?
14.
(a) What is :
Permissible
Proposed
(i) the side marginal distance (s)?
(ii) the rear marginal distance (s)?
(iii) the distance between buildings?
15.16.
(a) What are the dimensions of the inner orouter chowk?
(b) Is / are room (s) dependent for its light andventilation on the chowk? If so, are thedimensions of the chowk as required?
(a) Whether sizes of the rooms comply withthe dimensions mentionedintheregulations?
(b) Whether use of everyroom partmentioned on the plan?
(c) Whether every room derives light andventilation required under the regulations?
17.
If the height of the building is more than 15meter above the average ground level, isprovision for lifts made?
(a) If so, give details of lift.
Passenger Capacity
No. of Lifts
No of Liills
(b) Details of Fire Lift.
Passenger Capacity
No. of Lifts
18.
(a) Does the building fall under purview ofRegulation no.6.2.6.1?
(b) If so, is fire escape staircase provided inaddition to regular staircase?
(c) Whether the ramps to the basement areprovided leaving 6 m marginal distance formovement of fire fighting vehicle?
(d) If podiums are proposed, does it allow themovement of fire fighting vehicleproperly?
19.
(a) What are the requirements of parkingspaces under the Regulation no.20? How manyare proposed?
Required
Proposed
Car
Scooter
Cycle
(b) (i) Are loading-unloading spacesnecessary?
(ii) If so, what is the requirement?
(iii) How many are proposed?
20.
Is the sanitary arrangement provided as per theregulation?
21.
Details of the source of water to be used in theconstruction
22.
Distance from the sewer.
23.
Please explain in detail in what respect theproposal does not comply with theDevelopment Controland PromotionRegulations and the reasons there for,attaching a separate sheet if necessary.
I hereby declare that I am the Architect/ licensed Engineer/ Structural Engineer/ Supervisor employed for the proposed work and that the statements made in this form are true and correct to the best of my knowledge.
Date: / /
Signature of the Architect/ licensed Engineer/ Structural Engineer/ Supervisor employed.
FORM OF STATEMENT 1(to be printed on plan)[Sr. No. 8 (a) (iii)]Existing Building to be retained
ExistingBuilding No.
Floor No.
Plinth Area
Total Floor Area ofExisting Building
Use / Occupancy ofFloors.
(1)
(2)
(3)
(4)
(5)
FORM OF STATEMENT 2(to be printed on plan)[Sr. No. 11 (a) ]Proposed Building
BuildingNo.
FloorNo.
TotalBuilt-upAreaoffloor.
Balconyareawithin15%
Excessbalconyareacounted inFSI.
Doubleheightterrace areawithin 20%
ExcessDoubleheightterrace areacounted inFSI.
Total FSI(3+5+7)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
FORM OF STATEMENT 2(to be printed on plan)[Sr. No. 11 (g) ]
Area details of Flat / unit
BuildingNo.
FloorNo.
Flatunit No.
Built up area of flat /unit along with Shareof Common areas likestaircase / passages
Area ofBalconyattached toflat / unit
Area ofDouble heightterracesattached to flat/ unit
Total area offlat / unit(4 + 5 + 6)
1
2
3
4
5
6
7
Note :1) Built up area of all flats / units on the respective floor shall tally with the total built up of that floor.2) Above statements may vary, wherever required.
PROFORMA -I(At Right Hand top Corner of Plans)
PROPOSED COMPLEX ON C.T.S. NO./PLOT NO. / S.NO. /F.P.NO.-- OF VILLAGE MAUJE
Drawing Sheet No.X/Y
Stamps of Approval of Plans:
A
AREA STATEMENTS
Area of plot(Minimum area of a, b, c to be considered)
a) As per ownership document (7/12, CTS extract)
b) as per measurement sheet
c) as per site
2. Deductions for
(a) Proposed D.P./ D.P. Road widening Area
(b)Any D.P.Reservation area
(Total a+b)
3. Gross Area of Plot (1-2)
4. Recreational Open space
(a) Required
(b) Proposed
5. Amenity Space -(a)Required -(b) Proposed -6. Service road and Highway widening7. Internal Road area
8. Net Area of Plot = [3 − 5(b)]
9. Built up area with reference to Basic F.S.I. as per front road width(sr. no. 8 X 1.1)
10. Addition of area for F.S.I.
(a) In-situ area against D.P. road [1.85x sr. no. 2 (a)], if any
(b) In-situ area against Amenity Space [2.00 or1.85 x sr. no. 5 (b)],
(c) Premium FSI area(subject to maximum of 0.3 of sr. no. 8)(d) TDR area(e) Additional FSI area under chapter VIII
(Total of a+b+c+d+e)
11. Total area available (9+10)
12. Maximum utilization of F.S.I. Permissible as per Road width (as perRegulation no. 15.4)
13. Total Built-up Area in proposal.(excluding area at Sr.No.15.b)
a) Existing Built-up Area.
b) Proposed Built-up Area
c) Excess Balcony area counted in F.S.I.
d) Excess Double Height terraces area counted in F.S.I.
Total (a+b+c+d)
14. F.S.I. Consumed (13/8) (should not be more than serial no.12 above.)
15. Area for Inclusive Housing, if any
a) Required (20% of sr.no.9)
b) Proposed
Certificate of Area:Certified that the plot under reference was surveyed by me on and the dimensions ofsides etc. of plot stated on plan are as measured on site and the area so worked out tallies with the areastated in document of Ownership/ T.P. Scheme Records/ Land Records Department/City Survey records.Signature(Name of Architect/Licensed Engineer/Supervisor.)
Owner's declaration –I/We undersigned hereby confirm that I/We would abide by plans sanctioned by Pune MunicipalCorporation. I/We would execute the structure as per sanctioned plans. Also I/We would execute the workunder supervision of proper technical person so as to ensure the quality and safety at the work site.Owner (s) name and signature
Architect/ Licensed Engineer/ Supervisor name and signature
JobNo.
Drawing No.
Scale
Drawn by
Checked by
Registration / License no. of Arch./Lic.Eng./ Supervisor
APPENDIX A-2 FORM FOR SUB-DIVISION OF LAND AS PLOTTED LAYOUT
Application for permission for development under Section 44 / 58 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949
From (Name of the owner)
To, The Municipal Commissioner, Municipal Corporation, Pune.
Sir, I intend to carry out the under mentioned development in the site/plot of land, bearing S.No./Gut No. ......., situated at Road/ Street City Survey No... …., Mouje . in accordance with Section 44/58 of The Maharashtra Regional and Town Planning Act, 1966 read with Section 253 of the BPMC Act, 1949.
I forward herewith the following plans and statements (Item 1 to 6) wherever applicable, in quadruplicate, signed by me (Name in block letters) and the Architect / Licensed Engineer / Structural Engineer / Supervisor (License No.. .…), who has prepared
the plans, designs and a copy of other statements /documents as applicable (Items 7 to 10). (1) Key Plan (Location Plan);(to be shown on first copy of the set of plans) (2) Site Plan showing the surrounding land and existing access to the land included in the layout;(to be shown on first copy of the set of plans)
(3) A layout plan showing, (i) sub-divisions of the land or plot with dimensions and area of each of the proposed sub- divisions and its use according to prescribed regulations; (ii) width of the proposed streets; and
(iii) dimensions and area of recreational open spaces provided in the layout. (iv) dimensions and area of amenityspace provided in the layout.
(4) An extract of record of rights property register card (any other document showing ownership of land to be specified) alongwith consent of co-
owners where third party interest is created. (5) Particulars of development in Form enclosed. (6) Attested copy of Receipt for payment of scrutiny fees. (7) No Objection Certificate, wherever required.
I request that the proposed layout may please be approved and permission accorded to me to
FORM GIVING PARTICULARS OF DEVELOPMENT (PART OF APPENDIX 1........ITEM 5)
(a) (i) Full Name of Applicant
(ii) Address of applicant
(iii) e-mail ID
(iv) Mobile No.
(b) (i) Name and address of Architect/ licensedEngineer employed.
(ii) No. and date of issue of License
2.
(a) Is the plot of, a City Triangulation Survey Number,Revenue Survey Number or Hissa Number of a SurveyNumber or a Final Plot Number of a Town PlanningScheme?
(b)Whether the land is situated in Core Area or OutsideCore Area?
3.
(a) What is the total area of the plot according to theownership document and measurement plan?
(b)Does it tally with the Revenue/CTS Record
(c)What is the actual area available on site measuredby Architect/ licensed Engineer/ StructuralEngineer / Supervisor?(The permission shall be based on the areawhichever is minimum.)
(d)Is there any deduction in the original area of theplot on account of D.P.Roads, or reservation(s). Ifso, are they correctly marked on the site plan?Please state the total area of such deductions?
(e)Is there any water stream in the land? State the areaof such land and state whether it is excluded?
(e)What is the area remained for development afterabove deduction(s)?
(f) What is the area proposed for recreational openspace? (in case of land having original holdingmore than 0.4 hector) Please mention the area.
(g) Whether amenity space as required underRegulation no.13.4 is left? Please mention the area.
(f) What is the net plot area as per Regulation no.13.9?(excluding (g) above)
5.
Are all plans as required under Regulation no.6.2enclosed?
6.
(a) In what zone does the plot fall?
6.
(b) For what purpose the layout is proposed? Is itpermissible according to the land use classification?
7.
(a) Is road available as an approach to the land? What isthe average existing width of the road? (If the plot abutson two or more roads, the above information in respectof all roads should be given) (b) Is the land fronting on D.P. road? If so, width of theD.P. road
(c) Is the land fronting on National or State highway? Ifso, is the Building line / control line maintained? Pleasestate the distance.
8.
Is the land subject to restrictions of blue / red flood line,airport, railway, electric line, land fill sites, archaeology,etc.? Please state the details along with No objectioncertificate' if any.
9.
Whether the internal roads proposed in the layoutconform to the Regulation no.12.
10
Whether roads in the layout are co-ordinated with theroads in the surrounding layout?
11
Whether the area and dimensions of plots are proposedas per prescribed regulations?
11.
Whether area for inclusive housing is required as perRegulation no. 13.7? Please state the details
I hereby declare that I am the Architect/ licensed Engineer employed for the proposed work and that the statements made in this form are true and correct to the best of my knowledge.
Date: / /
Signature of the Architect/ licensed Engineer/ Structural Engineer/ Supervisor employed.
APPENDIX 'B' FORM FOR SUPERVISION
To, The Municipal Commissioner, Municipal Corporation, Pune.
Sir,
I hereby certify that the development/erection/re-erection/demolition or material alteration in/ or on / in Plot No. in Block No. Building No situated at Road
shall be carried out under my City Survey No. / street supervision and I certify that all the materials (types and grade) and the workmanship of the work shall be generally in accordance with the general specifications and that the work shall be carried out according to the
sanctioned plans. I shall be responsible for the execution of the work in all respects. Signature and name of the Architect or Licensed
Engineer/Structural Engineer/ Supervisor
License No. Date :
APPENDIX 'C'
QUALIFICATION, COMPETENCE, DUTIES AND RESPONSIBILITES ETC. OF LICENSED TECHNICAL PERSONNEL OR ARCHITECT FOR PREPARATION OF SCHEMES FOR DEVELOPMENT PERMISSION AND SUPERVISION
C-1
General
C-1.1
The qualifications of the technical personnel and their competence to carry out different jobs forbuilding permit and supervision for the purpose of licensing by the Authority shall be as given inRegulation no. C-2 to C-6. The procedure for licensing the technical personnel is given inRegulation no.C-6.
C-2
ARCHITECT
C-2.1
Qualifications-The minimum qualifications for an architect shall be the qualifications as providedfor in the Architects Act, 1972for registration with the Council of Architecture. Such registeredArchitects shall not be required to again register their names with the Corporation. However, heshall submit the registration certificate to the Corporation.
C-2.2
Competence of Architect: To carry out work related to development permission as given belowand shall be entitled to submit -(a) All plans and information connected with development permission.(b) Structural details and calculations for building on plot upto 500 sq. m. and upto 3 storeys or 11m. height and(c) Certificate of supervision and completion for all buildings.
C-3
A )ENGINEER
C-3.1
Qualifications-
C-3.1
1) The qualifications for Licensing Engineer will be the corporate membership (Civil) of theInstitution of Engineers or such Degree or Diploma in Civil or Structural Engineering orequivalent;2) Diploma in Civil Engineering or equivalent, having experience of 10 years in the field of landand building planning.
C-3.2
Competence- To carry out work related to development permission as given below and shall beentitled to submit-(a) All plans and related information connected with development permission.(b) Structural details and calculations for building on plot upto 500 sq.m. and upto 3 storeys or 11m.height, and(c) Certificate of supervision and completion for all building
C-4
STRUCTURAL ENGINEER
C-4.1Qualifications- Qualifications for Licensing of structural engineers shall be as given below, withminimum 3 years of experience of structural engineering practice in designing and field work;(a) Graduate in Civil Engineering of recognised Indian or Foreign University and CharteredEngineer or Associated Member in Civil Engineering Division of Institution of Engineers (India)
or equivalent Overseas Institution; and
(b)Shall have post graduate degree in structural engineering. In the case of doctorate in structural
C-4.2 and supervision.
engineering the experience shall not be required. Competence-he shall be entitled to submit the structural details and calculations for all buildings
C-4.2.1
Complicated buildings and sophisticated structures, as decided by the Municipal Commissioner, which are not within the horizontal areas and vertical limits under C-2.2 (b), C-3.2 (b), C-5.2 (a)
C-5 SUPERVISOR:
(i)& C-5.2 (b) (i) shall be designed only by Structural Engineer.
C-5.1 Qualification (a)For Supervisor 1 :-
experience, or
(i) Three years architectural assistantship or intermediate in architecture with two years' (ii) Diploma in Civil engineering or equivalent qualifications with two years’ experience.
(iii) Draftsman in Civil Engineering from ITI or equivalent qualifications with Ten years experience out of which five year shall be under Architect/Engineer.
(b) For Supervisor - 2:- experience under Architect / Engineer.
(i) Draftsman in Civil Engineering from ITI or equivalent qualifications with five years'
C-5.2 Competence
sq.m.; and
(a) For Supervisor-1: he shall be entitled to submit - (i) All plans and related information connected with development permission on plot upto 500
(ii) Certificate of supervision of buildings on plot upto 500 sq. m. and completion thereof.
(b) For Supervisor-2 : he shall be entitled to submit -
C-6. LICENSING-
(i) All Plans and related information upto 200 sq. m. built up area, and (ii) Certificate of supervision for limits at (i) above and completion thereof,
C-6.1 Technical Personnel to be licensed:-
The Qualified technical personnel or group as given in regulations; No C-3, C-4, C-5 shall be
licensed with the authority and the license shall be valid for three calendar years ending
C-6.2
31stDecember after which it shall be renewed annually or every three years.
Fees for Licensing- The annual licensing fees shall be as follows:-
1000 p.a. For Engineer and structural Engineer
For supervisor (1)
500 p. a.
For supervisor (2)
300 p. a
The Municipal Commissioner may revise above fees from time to time, if necessary.
C-6.3
Duties and Responsibilities of Architects / Licensed Technical Personnel: The duties and responsibilities of architects / licensed technical personnel shall be as follows:- (1) It will be incumbent on every architect / licensed technical personnel, in all matters in which he may be professionally consulted or engaged, to assist and co-operate with the Municipal
To,
Appendix 'E-2'
Sir,
With reference to your application No. dated for the grant of sanction for the development work / the erection of a building / execution of work on Plot No. , Revenue Survey No., City Survey No. , mauje , I regret to inform you that the proposal has been refused under Section 45 of the Maharashtra Regional and Town Planning Act, 1966, on the following grounds.
5.---------
Office Stamp
Yours faithfully,
Municipal Commissioner, Pune
or an officer appointed by him
ii) The lift shall have a floor area of not less than 1.4 sq.m. It shall have loading capacity of not less than 545 kg (8 persons lift) with automatic closing doors of minimum 0.8 m. width.
iii) The electric supply shall be on a separate service from electric supply mains in a building and the cables run in a route safe from fire, that is, within the lift shaft. Lights and fans in the elevators having wooden panelling or sheet steel construction shall be operated on 24 V supply.
iv) Fire-fighting lift should be provided with a ceiling hatch for use in case of emergency, so that when the car gets stuck up, it shall be easily openable.
v) In case of failure of normal electric supply, it shall automatically trip over to alternate supply. For apartment houses, this changeover of supply could be done through manually operated changeover switch. Alternatively, the lift shall be so wired that in case of power failure, it comes down at the ground level and comes to stand-still with door open.
vi) The operation of a fire lift is by a simple toggle or two-button switch situated in a glassfronted box adjacent to the lift at the entrance level. When the switch is on, landing callpoints will become inoperative and the lift will be on car control only or on a priority control device. When the switch is off, the lift will return to normal working. This lift can be used by the occupants in normal times.
vii) The words Fire Lift’shall be conspicuously displayed in fluorescent paint on the lift landing doors at each floor level.
viii) The speed of the fire lift shall be such that it can reach the top floor from ground level within 1 minute.
viii) Ventilating ducts shall be integrated with the structure and made out of brick masonry or reinforced cement concrete as far as possible and when this duct crosses the transformer area or electrical switchboard, fire dampers shall be provided
ix) Use of basements for kitchens working on gas fuel shall not be permitted, unless air conditioned. The basement shall not be permitted below the ward block of a hospital/nursing home unless it is fully sprinkled. Building services such as electrical sub-stations, boiler rooms in basements shall comply with the provisions of the Indian Electricity Act / Rules.
x) If cut-outs are provided from basements to the upper floors or to the atmospheres, all sides cutout openings in the basements shall be protected by sprinkler head at close spacing so as to form a water curtain in the event of a fire.
xi) Openable windows on external wall shall be fitted with such locks that can be opened by a fireman's axe.
xii) All floors shall be compartmented with area not exceeding 750 sq.m. by a separation wall with 2 h fire rating, for floors with sprinklers the area may be increased by 50 percent. In long building the fire separation walls shall be at distances not exceeding 40 m. For departmental stores shopping centres and basements, the area may be reduced to 500 sq.m. for compartmentation.
Where this is not possible, the spacing of the sprinklers, care should be taken to prevent spray from one sprinkler impending the performance of an adjacent sprinkler head.
1.4 Service Ducts/Shafts
a) Service ducts and shafts shall be enclosed by walls of 2 h and doors of 1 h. fire rating. All such ducts/shafts shall be properly sealed and fire stopped at all floor levels.
b) A vent opening at the top of the service shaft shall be provided having between one- fourth and one-half of the area of the shaft.
1.5 Refuse chutes
shall have opening at least 1 m. above roof level for venting purpose and they shall have an enclosure wall of non-combustible material with fire resistance of not less than 2 h. They shall not be located within the staircase enclosure or service shafts, or air-conditioning shafts inspection panel and doors shall be tight fitting with 1 h fire resistance; the chutes should be as far away as possible from exit.