Chapter 14Climate Resilient Construction – Integration of Environmental Clearance with Sanction
Land, Air, Noise, Water, Energy, biological/ socio-economic/ solid / other waste management are the main facets considered in relation to Pre, During and Post Building Construction for Sustainable Environment Management. Therefore, it is necessary for the building process to ensure compliance to various conditions laid down by the Ministry of Environment, Forest and Climate Change.
The building construction sector is a major contributor towards carbon footprints which affects climate change. India is committed towards mitigating the effects of climate change and moving towards internationally accepted norms for environmental friendly building construction. Currently this objective of environmental safeguard is achieved through obtaining a specific environmental clearance (EC) for any construction project having a size of more than 20,000 sq mts. This is administered under notification of Ministry of Environment, Forest and Climate Change.
With rapid urbanisation and growth of Indian economy, it is anticipated that the construction activity will experience a proportionate growth. Government is also committed towards streamlining of clearances for buildings and real estate sector and empowering the urban local bodies with an objective of Ease of Doing Business.
14.1Environmental conditions for compliance during Building approvals
The Ministry of Environment, Forest and Climate Change has now decided to integrate the environmental concerns into building plan approval process and empowering the concerned local body/development authority to approve and certify compliance of stipulated requirements. The new building construction proposals are classified in the following 3 categories:-
Conditions for Category ‘A’ Buildings: Built-up Area 5000 sqmt – 20000 sqmt
Conditions for Category ‘B’ Buildings: Built-up Area 20000 sqmt – 50000 sqmt
Conditions for Category ‘C’ Buildings: Built-up Area 50000sqmt – 150000 sqmt
A local Authority, i.e. ULB/DA/any other body authorized to sanction building plans shall approve the building plans by ensuring the stipulated conditions in Table 14.1, 14.2 and 14.3 for the respective categories of buildings.
These environmental conditions may be suitably integrated in the building permission conditions so that their effective implementation could be ensured by the local authority while sanctioning building plans in their respective urban areas.
However, in order to empower the Local Authority, the State/UT Governments will be required to amend their building by-laws to incorporate a specific set of conditions as
given in the Tables 14.1, 14.2 and 14.3. Once these conditions are incorporated through due process adopted by States/UTs into the Building Bye-Laws and made applicable and enforceable by their local authority, States / UTs will be required to approach M/o Environment, Forest and Climate Change alongwith the Draft notification for seeking clearance that the requirements have been met and after getting the clearance from M/o EFCC, State/UT shall issue notification of Building Bye-laws alongwith stipulated conditions. Copy of the notification shall be forwarded to Ministry of Environment, Forest and Climate Change so that they may notify the particular State or part thereof for which conditions have been suitably integrated to delegate the powers to the Local Authority. Thereafter, for such notified area no separate prior Environmental clearance will be required. However, for those States/UTs or part of the States/UTs where these conditions have not been incorporated in the Building Bye-Laws, the existing arrangement of mandatory prior Environment clearance by State Environment Impact Assessment Authority shall continue to hold.
States are, therefore, advised to amend their building by-laws by incorporating the set of conditions for each category A, B and C as mentioned above either for the entire State/UT or clearly identified part thereof, where they would like to integrate the environmental clearance conditions with building permissions and empower the local authority to examine, stipulate and ensure compliance of conditions required to address environmental concerns. The State/UT should submit such proposal/ notification at draft stage as well as a copy of the final notification to the M/o Environment, Forest and Climate Change.
i. For building plans with a total built-up area between 5,000 sqm and 1,50,000 sqm, environment clearance will be required to be synchronized with the bye-laws.
ii. The concerned Urban local body, authorized to sanction building plans, shall ensure at the time of sanctioning a building plan that the environmental requirements stipulated in Table 14.1 (for above 5,000 sqm and up to 20,000 sqm), Table 14.2 (for above 20,000 sqm and up to 50,000 sqm) and Table 14.3 (for above 50,000 sqm and up to 1,50,000 sqm), as the case may be, are complied with.
Table 14.1: Environmental Conditions for Building and Construction
(Category “A”: 5000 sqmt - 20000 sqmt)
Sl. No.
Medium
Environmental conditions
MBBL Ref. Clause
1
Natural Drainage
The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water.
-
2
Water conservations - Rain Water Harvesting and Ground Water Recharge
A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters.
Table 9.1
2(a)
The unpaved area shall be more than or equal to 20% of the recreational open spaces.
10.2.1 (iv)
3
Solid Waste Management
Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste.
10.2.5 (b)
4
Energy
In common areas, LED/ solar lights must be provided.
10.2 3c)
5
Air Quality and Noise
Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site.
-
5 (a)
The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3m above the building.
-
6
Green cover
A minimum of 1 tree for every 80 sqm of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species.
10.2.1 (i)
6(a)
Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations.
Table 14.2Environmental Conditions for Building and Construction (Category “B”: 20000 sqmt - 50000 sqmt)
Sl. No.
Medium
Environmental conditions
MBBL Ref. Clause
1
Natural Drainage
The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water.
-
2
Water conservations - Rain Water Harvesting and Ground Water Recharge
A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters.
Table 9.1
2(a)
The unpaved area shall be more than or equal to 20% of the recreational open spaces.
10.2.1 (iv)
3
Solid Waste Management
Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste.
10.2.5 (b)
4
Energy
In common areas, LED/ solar lights must be provided.
10.2 3c)
4(a)
At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided.
10.2
4(b)
As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed.
1-.2.4 - IV
4(c)
Use of flyash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time to time.
10.2.6 (b)
5
Air Quality and Noise
Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site.
-
5(a)
The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3m above the building.
Table 14.3: Environmental Conditions for Building and Construction
(Category “C”: 50000 sqmt - 150000 sqmt)
Sl. No.
Medium
Environmental conditions
MBBL Ref. Clause
1
Natural Drainage
The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water.
-
2
Water conservations - Rain Water Harvesting and Ground Water Recharge
A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested is to be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters.
Table 9.1
2(a)
The unpaved area shall be more than or equal to 20% of the recreational open spaces.
10.2.1 (iv)
2(b)
The ground water shall not be withdrawn without approval from the competent authority
2(c)
Use of potable water in construction should be minimized.
2(d)
Low flow fixtures and sensors must be used to promote water conservation.
2(e)
Separation of grey and black water should be done by the use of dual plumbing system.
3
Solid Waste Management
Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste.
10.2.5 (b)
3(a)
All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers.
3(b)
Organic waste composter/ vermiculture pit with a minimum capacity of 0.3 Kg/tenement/day must be installed wherein the STP sludge may be used to be converted to manure which could be used at the site or handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers.
4
Energy
In common areas, LED/ solar lights must be provided.
10.2 3c)
4(a)
At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided.
10.2
4(b)
As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed.
Sl. Medium Environmental conditions MBBL No. Ref. Clause 5 (a) The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3m above the building. 6 Green cover A minimum of 1 tree for every 80 sqm of land shall be planted and 10.2.1 (i) maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. 6 (a) Where the trees need to be cut, compensatory plantation in the ratio 10.2.1 (ii) of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. 7 Sewage Treatment Sewage treatment plant with capacity of treating 100% waste water 4.32.4 Plant shall be installed. Treated water must be recycled for gardening and flushing. 8 Environment The environment infrastructure like Sewage Treatment Plant, Management Plan Landscaping, Rain Water Harvesting, Power backup for environment, Infrastructure, Environment Monitoring, Solid Waste Management and Solar and Energy conservation, should be kept operational through Environment Monitoring Committee with defined functions and responsibility.
The following listed documents and guidelines have been extensively referred in preparation, compilation and finalization of the Model Building Bye-Laws 2016
National Building Code, 2005, Bureau of Indian Standards.
Draft Unified Building Bye Laws for Delhi 2015, Delhi Urban Arts Commission.
Proposed Amendment in Town and Country Planning Legislations, Regulations for Land Use Zoning, Additional Provisions in Development Control Regulations for Safety Additional Provisions in Building Regulations / Byelaws for Structural Safety- in Natural Hazard Zones of India by Committee of Experts, Ministry of Home Affairs, GoI.
DC Regulations Greater Mumbai- 1991, Government of Maharashtra.
Kerala Municipal Building Rules – 1999, Government of Kerala.
Draft Harmonized Guidelines on the Norms and Standards for Barrier Free Environment for persons with disability and elderly persons, 2014
Energy Conservation Building Code, 2007, by Bureau of Energy Efficiency, Ministry of Power.
Page 167
Indian Green Building Council, 2001, by Confederation of Indian Industries.
Green Rating for Integrated Habitat Assessment (GRIHA) Guidelines, MNRE
CE 335 Design project preliminary design of structural members by R. Clarke
Building Bye-Laws notified by various State Governments of India
Annexure and Appendices
Annexure “A”
Occupancy Categorization of Buildings for Water and Other Requirement for Fire Fighting
Zone-I
Zone-II
Zone-III
GROUP “A”: RESIDENTIAL
GROUP “A”: RESIDENTIAL
GROUP “A”: RESIDENTIAL
A1 Lodging and Rooming HousesA2 One or two family private dwellingA3 DormitoriesA4 Apartment Houses
A5 Hotels
F2 Shops and stores, etc. above 500 sq.mt. floor areaF3 Underground shopping centers
GROUP “B” EDUCATIONALB1 Schools up to higher secondary level
GROUP “C” INSTITUTIONALC1 Hospitals and Sanitoria (More than 100 beds)
GROUP “G” INDUSTRIALG3 High hazard Industries
GROUP “C” INSTITUTIONALC1 Hospital & Sanitoria (upto 100 beds)C2 Custodial InstitutionsC3 Penal & mental Institutions
GROUP “D” ASSEMBLY BUILDINGSD1 For more than 1000 persons with permanent stage and fixed seatsD2 For less than 1000 persons with permanent stage and fixed seats
GROUP “H” STORAGE BUILDINGS
GROUP “D” ASSEMBLY BUILDINGSD3 Upto 300 persons without permanent stage and fixed seatsD4 Above 300 persons without permanent stage & fixed seats
GROUP “E” BUSINESS BUILDINGSE1 Offices, Banks, etc.E2 Laboratories, Libraries, etc.E3 Telephone Exchanges
GROUP “J” HAZARDOUS BUILDINGS
GROUP “E” BUSINESSE3 Computer InstallationsE5 Broadcasting stations
GROUP “F” MERCANTILEF1 Shops, Stores, etc. upto 500 m² floor area
GROUP “G” INDUSTRIALG1 Low hazard Industries
GROUP “G” INDUSTRIAL
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “B-I”
Fire Protection Requirements for Buildings in Zone-I Category
Sl. No.
Measures
Group-A: Residential A1, A2, A3, A4
Group-B: Educational
Group-C: Institutional
O
I
II
III
I
II
III
I
II
III
1
Access
P
P
P
P
P
P
P
P
P
P
2
Means of Escape
P
P
P
P
P
P
P
P
P
P
3
Compartmentation
P
P
P
P
P
P
P
P
P
P
4
Refuge Area
X
X
X
X
X
X
X
X
X
X
5
Emergency Lights
X
X
P
P
P
P
P
P
P
P
6
Exit Signs
P
P
P
P
P
P
P
P
P
P
7
PA System with Talk Back Facility
X
X
X
X
X
P
P
P
P
P
8
Moefa
X
X
X
P
X
P
P
P2
P
P
9
Extinguishers
P
P
P
P
P
P
P
P
P
P
10
Hose Reel
P3
P
P
P
P3
P
P
P
P
P
11
Yard Hydrant
X
X
X
P
X
P
P
X
P
P
12
Down Comer
X
X
X
P
X
P
X
P4
X
X
13
Wet Riser
X
X
P
X
X
X
P
X
P
P
14
Fire Detection System
X
X
X
X
X
P6
X
P2
P
P
15
Automatic Sprinkler System
S
S
S
S
S
S
FS
S
S
FS
16
Under Ground Tank
X
X
X
X
X
X
P
P2
P
P
17
Over Head Tank
P13
P
P
P
P
P
P
P
P
P
18
Fire Pumps
X
X
X
X
X
X
P
X
P
P
19
Booster Pumps
P3
P
P
P
P
P3
P
P
X
P
20
Auto D.G. Set
P3
X
P
P
P3
P
P
P
P
P
21
MCB/ELCB
P
P
P
P
P
P
P
P
P
P
22
Hose Boxes
X
X
X
P
X
P
P
P4
P
P
23
Fireman's Grounding Switch
P
P
P
P
P
P
P
P
P
P
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “B-I” (Contd.)
Fire Protection Requirements for Buildings in Zone-I Category
Sl. No.
Measures
Group-D: Assembly D3, D4
Group-E: Business E3, E5
Group-G: Industrial G1
I
II
III
I
II
III
IV
V
VI
VII
VIII
1
Access
P
P
P
P
P
P
P
P
P
P
P
2
Means of Escape
P
P
P
P
P
P
P
P
P
P
P
3
Compartmentation
P
P
P
P
P
P
P
P
P
P
P
4
Refuge Area
X
X
X
X
X
X
X
X
X
X
X
5
Emergency Lights
P
P
P
P
P
P
P
P
P
P
P
6
Exit Signs
P
P
P
P
P
P
X
X
P
P
P
7
PA System with Talk Back Facility
P1
P
P
X
P
P
X
X
X
X
P
8
Moefa
P1
P
P
X
P
P
X
X
P
P
P
9
Extinguishers
P
P
P
P
P
P
P
P
P
P
P
10
Hose Reel
P2
P
P
P
P
P
X
P
P
P
P
11
Yard Hydrant
X
P
P
X
P
P
X
X
X
P
P
12
Down Comer
X
X
P
P2
X
X
X
X
X
X
X
13
Wet Riser
X
P
P
X
P
P
X
X
X
P5
P
14
Fire Detection System
P7
P
P
P2
P8
P9
X
X
X
P
P
15
Automatic Sprinkler System
S7
FS
FS
S
S
FS
S
S
S
S
FS
16
Under Ground Tank
P7
P
P
X
P
P
X
X
P10
P11
P
17
Over Head Tank
P2
P
P
P
P
P
P5
P
P
P
P
18
Fire Pumps
P11
P
P
X
P
P
X
X
X
P5
P
19
Booster Pumps
X
X
X
P
X
X
P12
P
P
P
P
20
Auto D.G. Set
P7
P
P
P
P
P
X
X
P
P
P
21
MCB/ELCB
P
P
P
P
P
P
P
P
P
P
P
22
Hose Boxes
P
P
P
P2
P
P
X
X
X
P5
P
23
Fireman's Grounding Switch
P
P
P
P
P
P
P
P
P
P
P
or
Building is more than ground floor except group housing.
To be provided if building is ground floor, first floor and total covered area exceeds 300 mt.
To be provided if building is more ground floor.
To be provided in building except educational buildings.
In case seating capacity is 1000 persons minimum or covered area above 1500 sq.mt. or basement area 200 sq.mt. and more (other than places or worships).
To be provided fore E-4 and E-5 buildings but not required if building is fully sprinklered.
To be provided for E-4 and E-5 buildings.
25,000 lt. capacity under ground water storage tank to be provided.
50,000 lt. capacity under ground water storage tank to be provided.
To be provided where ever sprinklers are not installed.
Terrace tank of 5,000 lt. capacity to be provided, if sprinklers and installed. The capacity shall be accordingly increased.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Legend
O Guest Houses/Lodging having up to 20 rooms or 40 beds and below
I Height less than 15 mt.
II Height 15 mt. and above up to 24 mt.
III Height above 24 mt
IV Height less than 15 mt. and plot area less than 250 sq.mt.
V Height less than 15 mt. and plot area 251 sq.mt. and above up to 500 sq.mt.
VI Height less than 15 mt. and plot area 501 sq.mt. and above up to 1000 sq.mt.
VII Height less than 15 mt. and plot area more than 1001 sq.mt.
VIII Height above 15 mt. and up to 18 mt.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
P To be Provided.
X Not to be provided.
S Sprinklers to be provided if basement area is 200 sq.mt. or more.
FS Fully Sprinklered.
To be provided if seating capacity exceed 750.
To be provided if building is more than ground floor, first floor and total covered area exceed 1500 sq. mt.
To be provided in building where total covered area exceeds 1000 sq. mt.
Annexure “B-II”
Fire Protection Requirements for Buildings in Zone-II Category
Sl. No.
Measures
Group-A: Residential A5 : Hotels
Group-C: C2: Hospital
Group-D: Assembly D1, D2, D5
I
II
III
IV
V
VI
V
VI
1
Access
P
P
P
P
P
P
P
P
2
Means Of Escape
P
P
P
P
P
P
P
P
3
Compartmentation
P
P
P
P
P
P
P
P
4
Refuge Area
X
X
X
X
X
X
X
X
5
Emergency Lights
P
P
P
P
P
P
P
P
6
Exit Signs
P
P
P
P
P
P
P
P
7
PA System With Talk Back Facility
X
P
P
P
P
P
P
P
8
Moefa
X
P
P
P
P
P
P
P
9
Extinguishers
P
P
P
P
P
P
P
P
10
Hose Reel
P
P
P
P
P
P
P
P
11
Yard Hydrant
X
X
P
P
X
P
X
P
12
Down Comer
X
P2
X
X
X
X
X
X
13
Wet Riser
X
X
P2
X
P4
P
P5
P
14
Fire Detection System
X
P
P
P
P3
P
P
P
15
Automatic Sprinkler System
S
S
FS
F S7
S
FS
S8
FS
16
Under Ground Tank
X
X
P
P
P3
P
P8
P
17
Over Head Tank
P
P
P
P
P
P
P
P
18
Fire Pumps
X
X
P
P
P4
P
P8
P
19
Booster Pumps
P
P
P
X
P
X
P
X
20
Auto D.G. Set
P
P
P
P
P
P
P
P
21
MCB/ELCB
P
P
P
P
P
P
P
P
22
Hose Boxes
X
P
P
P
P4
P
P
P
23
Fireman's Grounding Switch
P
P
P
P
P
P
P
P
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “B-II” (Contd.)
Fire Protection Requirements for Buildings in Zone-II Category
Sl. No.
Measures
Group-E: Business E1, E2, E4
Group-F: Mercantile
Group-G. Industrial G2
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
1
Access
P
P
P
P
P
P
P
P
P
2
Means of Escape
P
P
P
P
P
P
P
P
P
3
Compartmentation
P
P
P
P
P
P
P
P
P
4
Refuge Area
X
X
X
X
X
X
X
X
X
5
Emergency Lights
P
P
P
P
X
X
P
P
P
6
Exit Signs
P
P
P
P
X
X
P
P
P
7
PA System with Talk Back Facility
X
P
P
X
X
X
X
X
P
8
Moefa
X
P
P
X
X
X
P
P
P
9
Extinguishers
P
P
P
P
P
P
P
P
P
10
Hose Reel
P
P
P
P1
P
P
P
P
P
11
Yard Hydrant
X
P
P
X
X
X
X
P
P
12
Down Comer
P3
X
X
X
X
X
P4
X
X
13
Wet Riser
X
P
P
X
X
X
X
P6
P
14
Fire Detection System
P3
P
P
X
X
X
X
X
P
15
Automatic Sprinkler System
S
S
FS
S
S
S
S
FS
FS
16
Under Ground Tank
X
P
P
X
X
P9X
P10
P
P
17
Over Head Tank
P
P
P
P1
P
P
P
P
P
18
Fire Pumps
X
P
P
X
X
X
X
P
P
19
Booster Pumps
P
P
P
P1
P
P
P
P
P
20
Auto D.G. Set
P
P
P
X
X
P
P
P
P
21
MCB/ELCB
P
P
P
P
P
P
P
P
P
22
Hose Boxes
P3
P
P
X
X
X
P
P
P
23
Fireman's Grounding Switch
P
P
P
P
P
P
P
P
P
Legend for Appendix “B-II”
I Height less than 15 mt. and area up to 300 sq. mt. on each floor.
II Height less than 15 mt. and area above 300 sq. mt. up to 1000 sq. mt. on each floor.
III Height less than 15 mt. and area above 1000 sq. mt. on each floor.
IV Height 15 mt. and above.
V Height less than 15 mt.
VI Height 15 mt. and above up to 30 mt.
VII Height less 15 mt.
VIII Height 15 mt. and above up to 24 mt.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
IX Height more than 24 mt.
X Height less than 15 mt. and plot area up to 750 sq. mt.
XI Height less than 15 mt. and plot area less than 250 sq.mt.
XII Height less than 15 mt. and plot area 251 m2 and above up to 500 sq. mt.
XIII Height less than 15 mt. and plot area 501 m2 and above up to 1000 sq.mt.
XIV Height less than 15 mt. and plot area more than 1001 sq. mt..
XV Height above 15 mt. and up to 18 mt.
P to be Provided
X not to be provided
S Sprinklers to be provided if basement area is 200 m2 or more
FS Fully Sprinklered.
To be provided if building is more than one floor.
To be provided in buildings above two floors.
To be provided if the building is more than ground floor, first floor and covered area exceeds 1500 sq. mt.
To be provided if building is more than first floor and the covered area exceeds 300 sq. mt.
To be provided for more than storeyed buildings and above.
To be provided if building is ground floor, first floor and above.
Buildings to be fully sprinklered if height exceeds 15 mt.
To be provided if seating capacity exceeds 1000 persons.
25,000 lt. capacity under ground tank to be provided.
50,000 lt. capacity a ground tank to be provided if riser is not provided.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “B-III”
Fire Protection Requirements for buildings in Zone-III Category
Sl. No.
Measures
Group F mercantile (F2,F3)
Group G Industrial (G3)
Group H Storage
Group J Hazardous
H<15mA>750M2
H>15 m
UGS
I
II
III
IV
H<15mSingle Storey
H<15mMore than one Storey
H<15 m Single Storey
H<15mMore than one Storey
1
Access
P
P
P
P
P
P
P
P
P
P
P
2
Means of Escape
P
P
P
P
P
P
P
P
P
P
P
3
Compartmentation
P
P
P
P
P
P
P
P
P
P
P
4
Refuge Area
X
X
X
X
X
X
X
X
X
X
X
5
Emergency Lights
P
P
P
X
P
P
P
X
P
P
P
6
Exit Signs
P
P
P
X
P
P
P
X
P
P
P
7
PA System with talk back facility
P1
P
P
X
X
X
X
X
X
P
P
8
Moefa
P1
P
P
X
X
X
P
X
X
P
P
9
Extinguishers
P
P
P
P
P
P
P
P
P
P
P
10
Hose Reel
P
P
P
P
P
P
P
P
P
P
P
11
Yard Hydrant
P
P
P
X
X
P
P
P2
P2
P
P
12
Down Comer
X
X
X
X
X
X
X
X
X
X
X
13
Wet Riser
P1
P
P
X
X
P3
P1
X
P3
X
X
14
Fire Detection System
X
P
P
X
X
P
P
X
X
P
P
15
Automatic Sprinkler System
FS
FS
FS
FS
FS
FS
FS
FS4
FS
FS
FS
16
Under Ground Tank
P
P
P
P5
P6
P7
P
P6
P
P
P
17
Over Head Tank
P
P
X
P
P
P
P
P
P
X
P
18
Fire Pumps
P
P
P
P
P
P
P
P4
P
P
P
19
Booster Pumps
X
X
X
X
X
X
X
X
X
X
X
20
Auto D.G. Set
P
P
P
P
P
P
P
P
P
P
P
21
MCB/ELCB
P
P
P
P
P
P
P
P
P
P
P
22
Hose Boxes
P1
P
P
X
P
P
P
X
P3
P
P
23
Fireman's Grounding Switch in Lifts
P
P
P
P
P
P
P
X
P
X
P
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Legend for Annexure “B-III”
U.G.S. Under Ground Shopping complex
i) Height less 15 mt. shopping complex
ii) Height less 15 mt. and plot area 251 sq. mt. and above up to 500 sq. mt.
iii) Height less 15 mt. and plot area 501 sq.mt. and above up to 1000 sq.mt.
iv) Height less 15 mt. and plot area more than 1001 sq.mt.
P To be provided.
X Not to be provided.
S Sprinklers to be provided if basement area is 200 sq. mt. or more.
FS Fully Sprinklered.
To be provided in building of more than one floor.
To be provided if covered area exceeds 1000 sq.mt.
To be provided in building above two floors.
To be provided in buildings if covered area is more than 200 sq.mt.
50,000 lt. capacity underground state water storage tank to be provided.
1, 00,000 lt. capacity underground state water storage tank to be provided.
2, 00,000 lt. capacity underground state water storage tank to be provided.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “C”
Water Requirement Criterion: Unless otherwise specified in Annexure B, water requirement for fighting in different categories of occupancies shall be based on following.
Occupancy Category
Sprinkler Design Discharge Density (lt./min/sq.mt.)
Sprinkler Design Area (sq.mt.)
Max. area coverage/ Sprinkler (sq.mt.)
No. of House Streams* Fully other Sprinkled
Duration of Discharge (Min.)
Fully Sprinkled
Wet Riser Sprinkled
LEVEL-I
02.5
084
21
2 4
45
45
LEVEL-II
05.0
360
12
3 6
60
90
LEVEL-III
10.0
225
09
3 6
90
90
Note: The discharge through a standard hose stream shall be taken as 567 lt./min.
Estimation of Total Water Requirements Fully Sprinklered Buildings
Occupancy Category
Sprinkler (lt.)
Riser (lt.)
Total (lt.)
Wet Riser cum Down Comer (lt.)
LEVEL-I
9,450
51,030
60,480(60,000)
1,02060(1,00,000)
LEVEL-II
1,08,000
1,02,060
2,10,060(2,00,000)
2,04,120(2,00,000)
LEVEL-III
2,02,500
1,02,060
3,04,560(3,00,000)
3,06,180(3,00,000)
3. Water Storage Tanks
The design of the water storage tanks shall be as laid down in National Building Code of India.
The capacity of underground water storage tank shall not be more than 85% of the total water requirement.
The capacity of overhead tank shall not be less than 15% of the total water requirement.
The entire water requirement can be provided in over head tanks and pumping requirements shall be finalized in consultation with Chie Fire Officer.
Under ground water storage tank shall not be provided in the set back areas.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Storage Requirements
Occupancy Category
Under Ground Static Tank
Over Head Tank
Fully Spkd. (lt.)
Riser (lt.)
Fully Spkd. (lt.)
Riser (lt.)
LEVEL-I
50,000
85,000
10,000
15,000
LEVEL-II
1,70,000
1,70,000
30,000
30,000
LEVEL-III
2,50,000
2,50,000
50,000
50,000
4. Riser/Downcomer
The size of the riser/ downcomer shall be such that velocity of flow does not exceed 5 m/second subject to a minimum of 100 mm. diameter.
The number of riser/downcomer shall be calculated on the basis that if 30 mt. of delivery hose is laid, it reaches the farthest comer of the remotest compartment on the floor.
The riser/downcomer shall be provided in the staircase/staircase lobby in such a manner that it does not obstruct the means of escape.
Only single headed hydrants shall be used on the riser/downcomer.
The size of hose to be provided with the internal hydrants shall be 50 mm diameter and with 63 mm diameter instantaneous male/female couplings.
Diffuser branch shall only be provided in the hose boxes.
In case of partially sprinklered building tapping from the wet riser is permitted for sprinkler feed.
In case of fully sprinklered building separate rising mains and pumps shall be used for sprinkler system and wet riser.
5. Selection of Pumps
Pumping requirement shall be met by a single pump or combination of pumps.
If more than one pumps are installed to meet the pumping requirement they shall be so arranged that they come into operation one after another depending upon fall in pressure in the mains and the combined pumping capacity shall be 20% more than the actual pumping capacity needed.
Jockey pump shall be selected to give minimum 3% and maximum 5% of aggregate pumping requirement at the same pressure to that of the main pump subject to maximum discharge of 450 LPM.
Standard pumps shall only be used having discharge capacity as 1800 LPM, 2280 LPM 2850 LPM & 4550 LPM.
The pump shall be capable of giving the pressure as shown in the table below:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Occupancy Category
Pressure* At Terrace Level
Fully Spkd. (Kgf./Cm2)
Riser(Kgf./Cm2)
LEVEL-I
3.5
3.5
LEVEL-II
3.5
5.5
LEVEL-III
5.5
7.0
* Orifice plates shall be installed at the hydrants on rising mains / yard hydrants to ensure that the pressure does not exceed 7 Kgf./Cm2.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure "D"
Questionnaire for High Rise Buildings/Other Buildings
Fire Service Headquarters
Name of the building .....
Address of the building .....
Name and address of builder/promoter.....
Name and address of owners /occupiers of individual flats .....
Plot area .....
(a) Title .....
(b) Land use (in case of residential building indicate no. of dwelling units.....
Covered Area (at grade level) .....
Height of tile building .....
a) Overall height (from grade level up to terrace level ) .....
b) Whether set back areas are conforming to unified building bye-laws .....
a) Number of Basement(please indicate level below grade in each case)
b) If basement extends beyond the building line, please indicate the load bearing strength of the roof of basement) .....
c) Area of the basement .....
d) Whether any piazza is proposed? if so, details of the level of piazza and ramp etc. be indicated .....
Number of floors (including ground floor) .....
Occupancy use (please mention separately, use for basement and floors)
Covered area of typical floor .....
Parking areas (please give details) .....
Details of surrounding properties / features
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Compass direction In relation to the building
Type of Property/feature
Height in case of building
Distance wall to wall from building
Any other information
North
South
East
West
15. Approach to proposed building width of the road and connecting roads, if any
16. Please give details of water supply available exclusively for the fire fighting
17. Has wet riser(s) been provided? If so, please indicate the number of risers and internal dia of each
18. Has any down comer been provided? If so, please give details including pump capacity
19. Please indicate the present arrangement for replenishment of water for fire fighting
20. Is a public or other water storage facility available nearby? if so, please give the capacity and distance from your building, also please indicate if it is easily accessible
21. Please give any other information regarding availability of water supply for fire fighting
22. Have internal hydrants on each floor including basement (s) and terrace.
a) No. of hydrants on each floor including basement (s) and terrace
b) Bore and length of each floor including basement(s)
c) Size (bore) and type of nozzle fitted to each hose reel
d) Is the hose reel connected directly to the riser or to the hydrant outlet?
23. Has fire hose been provided near each hydrant? if so, Please indicate
a) The type hoses
b) The size (bore) of hose
c) The length of each hose
24. Have branch pipes been provided? if so, please indicate
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
a) The type of branch pipe.
b) Size of nozzle fitted to each branch.
25 a) If the basement is used for Car / Scooter parking or storage.
Has it been sprinkled?
b) Whether any cubicles proposed in the basement? If so, the area of each cubical be indicated?
c) Whether segregation/compartmentation of the basement has been provided? If so, please give details.
Is the building equipped with automatic fire detection and alarm system? If so, please indicate
a) The type of detectors used.
b) The standard to which the detectors conform.
c) The code to which the installation conform.
Have manual call boxes been installed in the building for raising an alarm in the event of outbreak of fire? If so, please give details.
Has public address system been installed in the building with loudspeaker on each floor with talk back facility.
Has an intercom system been provided between the various floors and the fire control room in entrance lobby?
Has a fire control room been provided in the entrance lobby of the building?
How many staircases have been provided in the building? Please indicate in each case:
a) Width of the stairway.
b) Width of treads.
c) Height of risers.
d) If the treads are of the non-slip type.
What is the average occupant load per floor?
Whether fire tower has been proposed?
How many lifts have been installed in the building? Please indicate in each case:
a) The floors between which the lifts runs.
b) The type of doors fitted to the lift Car and at each landing.
c) Fire resistance raring of lift Car and landing doors, if known.
d) Floor area of the lift car.
e) Loading capacity of the lift car
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
f) Has communication system been installed in the lift car? .....
g) Has a fireman's switch been installed in the lift for grounding it in the event of fire .............
Have any stationary fire pump (s) been installed or pressuring the wet riser? If so, please indicate.
a) The number of pumps............
b) The size of suction and delivery connection of each pump ............
c) The output of each pump ............
Has the building been protected with sprinkler system, If so, detail of sprinkler pump............
Has a standby source of power supply been provided? If it is through a generator, please indicate.
a) The capacity (output) .............
b) The functions that can be maintained simultaneously by the use of the Generator, such as operating lift(s); fire pumps, emergency lighting etc. system; exit signs; PA system etc............
c) Is the generator automatic in action or has to be started manually?.......
Has any Yard hydrant been provided from the building's fire pump? .....
Where more than one lifts are installed in a common enclosure have individual lifts been separated by fire resisting walls or 2 hours fire rating? ............
Has the lift shaft(s) lift lobby or stairwell been pressurized? If so, give details............
Has the lift lobbies and staircase been effectively enclosed to prevent fire/smoke entering them from outside at any floor? .............
Have all exits and direction of travel to each exit been sign-posted with illuminated signs? ............
Has a false ceiling been provided in any portion of the building? If so, please indicate location and also mention if the material used for the false ceiling is combustible or non-combustible............
Is the building centrally air-conditioned? if so, please indicate:
a) The material used for construction of ducts and its fittings ............
b) The type of lining used for ducts, if any............
c) The type of lagging used for ducts, if any for insulating any portion of the duct; please also indicate how the lagging is secured............
d) If plenum is used for return air passage has it been protected with fire detectors? Please give details............
e) Has a separate A.H.U. been provided for each floor?
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
f) Whether automatic shutdown of A. H. U. is coupled with detection system/sprinkler system…
g) Is the ducting for each floor effectively isolated or is it continuous on more than one floor?
h) Are the fire dampers being provided?
Where are the switchgear and transformer located? If inside the building please indicate:
a) If the switchgear and transformer (s) have been housed in separate compartments, effectively separated from each other and other portions of the building by a four-hour's fire resistive wall?
b) What precautions have been taken to prevent a possible fire in the transformer (s) from spreading?
c) Are transformer protected by high velocity water spray system
I) Where electrical cables, telephone cables wet risers / down comers pass through a floor or wall has the spaces (apertures) round the cables /pipes been effectively sealed/plugged with noncombustible, fire resistance material?
II) Ventilation
a) Whether natural ventilation is relied upon? If so, give details of the vents for the stairwell life shafts
b) Whether mechanical ventilation has been proposed? If so, give details of the proposed system indicating the number of air changes for the basement and other floors
c) Whether mechanical ventilation is coupled with automatic detection system/sprinkler system? Please give details of the system…
Please indicate the number and type of fire extinguishers provided at various locations and the arrangement for the maintenance of the extinguishers
Please indicate if all fire extinguishers bear the BIS mark
Whether the refugee area has been provided? If so, the floor on which provided and the total area provided floor-wise…
Are the occupants of the building systematically trained in fire prevention, use of fire extinguishers and emergency procedures? If so, please give details…
Does an emergency organization exist in the building? If so, please give details and append a copy of the emergency (fire) orders
Has a qualified officer been appointed for the building either individually or jointly with other building(s)
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Has the building been protected against lighting? If so, does the lighting protection conform to any code? Please indicate details provision of MCB and ELCB in the building…
The work has not been started on site and construction will be started only after final approval of the Authority / the position of construction at site is given below:
Name and address of the consultant with Registration No…
Owner's Signatures
Signature of the Applicant / Architect
Name…
(In block letters)
Name… ……
(In block letters)
Designation…
Organization…
Signature of Fire Consultant
Dated:
Name…………
(In block letters)
Remark of the concerned Authority. The proposal has been broadly examined. The above information is correct and the proposal is permissible as far as development Authority is concerned (Additional comments, if any, may be given below or attached):
The proposal can be considered by Fire Services at conceptual stage/is forwarded to Fire Service along with 3 sets of drawings which are according to bye-laws, Master Plan, Zonal Plan, and fire fighting regulations and policy instructions of Government. The proposal involves relaxation in respect of height/set backs/ The architect has been advised to furnish the requisite material and documents given in the attached list, within one week time directly to the Fire Service.
Signature of Authority
Name:
Designation and office Seal:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A” (Bye laws 2.9.1 & 6.3.5) (To be submitted in duplicate)
Form for Application to Erect, Re-Erect or to make Material Alteration in any Place in a Building
To
Commissioner/Vice Chairman/Secretary
Development Authority
Sir,
I hereby give notice on behalf of Shri....(owner) that the owner intends to erect/demolish or make alteration in the building number or to on/in Plot No ....Block No.... House No ....situated at ....Scheme....an d in accordance with the building Bye-law No....
and I forward herewith, the following plans and specification duly signed by me and by the owner.
Site plan 2. Building Plan 3. Service Plan 4. Parking and circulation plan. 5. Landscape Plan 6. General Specifications (in attached form) 7. Ownership Title (Lease/Conveyance/Sale Deed, etc) 8. Other document, as required
ii) The building plan has been prepared strictly as per the approved building Byelaws and relevant IS Codes / provisions of NBC. The construction shall be carried out in accordance with the building plan and I shall be completely accountable for any lapse on my part up to within 6 months after obtaining completion certificate of the building.
iii) The Building permit fee as required under bye-laws 2.13 has been deposited vide receipt No dated. (Photocopy enclosed).
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
iv) I am aware that in the event of building being constructed in violation of the sanctioned building plan approval, the Authority shall have the right to take action against me as it may deem fit including referring the matter to concerned professional and statutory councils for taking disciplinary action against me.
Signature of the Owners
Name of owner(s)
Address of the owner(s)
Encl: As stated above
(Signature of Registered
Architect/Engineer/Supervisor)
Registration No. of the
Architect/Engineer/Supervisor
Address of the Architect/Engineer/
Supervisor
Dated:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-1” (Bye laws 2.9.1)
Statement of the Proposal and Certificate By the Owner and Registered Architect
Classification of the Proposal (To erect/re-erect/demolition)
Scheme /Colony Plot No. Plot Area sq.mt. Size (in meter)
Area Statement
Description
Permissible
Proposed sq.mt.
Remarks sq.mt.
Max. Ground coverage
Basement
Ground Floor
First Floor
Second Floor
Third Floor
Total Floor area
Floor Area Ratio
No. of Dwelling Units
Maximum height (in meters)
Setbacks
As per approved Layout plan (mt.)
Proposed (mt.)
Front
Rear
Left
Right
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Parking (for above 250 sq.mt)
Equivalent Car space @ 1.33 ECS per 100 sq.mt of permissible built floor area
Open Parking@ 23 sq.mt per ECS
Ground Floor covered parking@ 28 sq.mt per ECS
Basement Total parking (sq.mt)@32 sq.mt per ECS
Area in sq.mt
Area in sq.mt@ 23 sq.mt per ECS Open Parking
Area in sq.mt @ 28 sq.mt. per ECS Covered Gr. Floor
Area in sq.mt @ 32 sq.mt. per Basement
Total (sq.mt)
1
2
3
4
5
ii) Fee & Charges
a) Building permit fee Rs…
b) Use of City Infrastructure Charges Rs…
c) Additional floor space charges (provisional) Rs…
d) Peripheral charges (Provisional) only for Group IV CHBS Rs…
e) Any other charges (please specify) Rs…
Total amount (as per the details above) Rs…
Receipt No… Dated
We hereby certify that
The plot in question forms part of the approved layout plan and its location size and area conform to the approved layout plan and lease/sale deed/NOC of the lease Administration Branch of concerned Development Authority.
Plot is lying vacant and no construction shall be started before sanction.
The plot is free from all encumbrances (owner responsibility).
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
The period of construction valid up to As per the lease condition / further extension of time for construction granted by the lessor is valid up to Time construction obtained from the lease Administration Branch, Concerned Development Authority.
Size of each dwelling unit is not more than 300 sq.mt.
Signature of Owner(s)
Signature of Registered Architect
Name…
Name…
(In block letters)
(in block letters)
Registration No
Address… Address…
Dated:
Dated:
Authority Letter
I hereby authorize Mr./Mrs.… . to collect the sanction whose signature is verified below.
Specimen signature of signature of the owner(s)/Registered Architect/
Mr./Mrs…
Dated received… Date
(Signature of authorized person / owner / Registered Architect)
Dated: Remark, if any…
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-2” (Bye laws: 2.10.9)
Form for Specifications of Proposed Building
The purpose (Residence, Office, Restaurant, Hotel, Dharmshala, School, Hostel Cinema, Shop, Factory Others) for which it is intended to be used
Details of coverage on respective floor are given below:
1. Basement Floor......
Existing (sq.mt)
Proposed (sq.mt)
Total (sq.mt)
2. Ground Floor......
2. Mezzanine Floor......
3. First Floor......
4. Second Floor......
5. Third floor......
6. ......
7. ......
8. ......
9. ......
10. ......
e) The materials to be used in construction Walls/Columns/Foundations/Roof/ Floors…
Signature of Registered Architect/Engineer/Supervisor
Name…… Registration No………… Address…
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-3” (Bye laws: 2.10.10)
Form for Supervision
To The Commissioner/Vice-Chairman/Secretary Development Authority
Sir,
I hereby certify that erection/re-erection demolition or material alteration in / of Building No… .on / in .Plot No .in Block No situated at .. scheme shall be carried out under my supervision and I certify that all the materials (type & Grade) and workmanship of the work shall be generally in accordance with the general specification submitted along with and the work shall be carried out according to the sanctioned plans which also included the services like drainage, sanitary, water supply, and electrical.
Signature of Registered Architect Engineer/Supervisor
Name of Registered Architect/Engineer/Supervisor (In block letters)
Registration No. of Architect/Engineer/Supervisor
Address of Registered Architect/Engineer/Supervisor
Dated:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-4” (Bye laws: 2.13)
Undertaking for Payment of Other and Peripheral Charges Note: It should be on non-judicial stamp paper of specified amount attested by Notary Public / First class Magistrate.
Undertaking
I ....Son of Shri ....aged.... Years residents of ....Owner of Plot No .... in......Co-operative Housing Building Society Ltd.... hereby undertake to pay the balance of peripheral and other charges as and when required by the concerned Authority and in this regard Authority's decision will be finally binding on me.
Executed by me as....on day of....2004.
Executant
Witness:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
(Bye laws: 2.9.4 viii)
Affidavit-cum-Undertaking
(Affidavit of Competent Professional on Rs. 2/- Non-Judicial Stamp paper of specified amount to be attested by Notary Public/Metropolitan Magistrate)
I son of Architect by profession having office at… .Do hereby solemnly affirm and declare as under:
That I am a Licensed Architect/Engineer/Supervisor/Plumber duly registered with the Authority vide registration No.
That I have been engaged as a Competent professional as per Appendix ‘E’of the Bye-Laws for preparing the building plans and to supervise construction in respect of Plot No………...Block No situated at
That I have prepared the building plans in respect of the aforesaid plot.
That I have studied the layout plan of the colony and gone through the instructions, policy decisions and other relevant documents in respect of the plot and colony.
That I have personally inspected the site. The plot under proposal forms part of the approved layout plan with respect to its location, size shape and area of the plot and proposed land use is also in conformity with the approved layout plan. The plot has been demarcated at site and the size, shape and area of plot available at site tallies with the approved layout plan.
That the ownership documents are in the shape of registered sale-deed/leasedeed in favour of the applicants and have been thoroughly examined and the ownership in favour of the applicant is in order.
That there is no construction in existence at the plot and no construction shall be started before sanction of the building plans.
That there is no encroachment on the Municipal land/road/other property and road widths as shown in the layout plan are available at site.
That the proposal are in conformity with the terms and condition of lease deed which is still valid and period of construction as per lease-deed and the extension granted by the lessor is valid up to…
That the proposal have been prepared strictly in accordance with the Building Bye-laws rules regulation and practice of the department and no misinterpretation on inference of provision of Building Bye-Law has been done while preparing the plans. The construction shall be carried out strictly in accordance with the sanctioned building plans and in case any deviation is carried out, I shall inform the concerned Authority within 48 hours.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
That in case the owner dispenses with my services at any stage whatsoever, I shall inform the concerned Authority within 48 hours.
That the size of each dwelling unit is not more than 300 sq. mt.
That mandatory setbacks have been proposed and shall be maintained in accordance with the setbacks marked in the layout plan/Master Plan.
That before submission of the proposal, necessary information/clarification have been obtained from the concerned department of the concerned Authority. The plot is safe and is not affected in any scheme or the road widening. Building activities for residential use are allowed with number of storeys as per approved layout plan.
That no development/additional development/deficiency charges are payable, against this plot (in case development/additional development/deficiency charges are payable then its details be given in the separate para)
That no non-compoundable deviations shall be carried out during the course of construction.
That nothing has been concealed and no misrepresentation has been made while preparing and submitting the building plans.
That in case anything contrary to the above is found or established at any stage, the concerned Authority shall be at liberty to take any action as it may deem fit including revocation of sanction of building plans and debarring me for submission of building plans with the Authority under the scheme and also lodge a complaint with the Council of Architecture for appropriate action.
Deponent
Verification:
I the above named deponent do hereby verify at on this… ……. of …….. 20……… that contents of the above affidavit are true and correct to my knowledge. No part of it is false and nothing has been concealed there from.
Deponent
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-6” (Bye laws: 2.14.2)
Building Permit/Sanction
File No Dated…
To
Subject: Sanction u/s
Dear Sir or Madam,
With reference to your application dated… for the grant of sanction to erect/re-erect/add to/alteration in the building to carry out the development specified in the said application relating to Plot No…… Block No… …. situated in/at I have to state that the Authority subject to the following conditions and corrections done in the plans has sanctioned the same on
The plans are valid up to …………………day……………Months ………. year …
The construction will be undertaken as per sanctioned plan only and no deviation from the bye-laws will be permitted without prior sanction. Any deviation done against the bye-laws is liable to be demolished and the supervising Architect engaged on the job will run the risk of being black listed.
Violation of building bye-laws will not be compounded.
It will be the duty of the owner of the plot and the Architect preparing the plans to ensure that the sanctioned plans are as per prevalent Master Plan/Zonal Plan/Building Bye-laws. If any infringement of bye-laws remain unnoticed, the concerned Authority reserves the right to amend the plans as and when infringement come to the notice and concerned Authority will stand indemnified against any claim on this account.
A notice in writing shall be sent to Authority before commencement of the constructions of the building as per bye-laws. Similar notice will be sent to Authority when the building has reached up to plinth level.
The owner shall not occupy or permit to occupy the building or use or permit to use the building or any part thereof affected by any such work until occupancy certificate is issued by the concerned Authority.
Concerned Authority will stand indemnified and kept harmless from all proceedings in court and before other authorities of all expenses /claims
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
which the concerned Authority may incur or become liable to pay as a result or in consequences of the sanction accorded by it to these building plans.
The doors and window leaves shall be fixed in such a way that they shall not, when open project on any street.
The owner will not convert the house into more dwelling units on each floor then the sanctioned.
The building shall not be constructed within minimum distance as specified in Indian Electricity Rules from voltage lines running on side of the site.
The land left open as a consequence of the enforcement of the setback rule shall form part of the public street.
The owner shall ensure that the public areas like road, parks and other public opens spaces are not used for stacking the building materials or machineries to avoid public inconvenience and nuisance.
The sanction will be void if auxiliary conditions mentioned above and other conditions whatsoever imposed are not complied.
The owner will use the premises for the use, which has been sanctioned.
The owner will not proceed with the construction without having the supervision of an Architect/Engineer as the case may be. If he\she changes his Architect\Engineer, he\she shall inform the Authority about the appointment of new Architect\Engineer within 48 hours, with a proper certificate from him.
Yours Faithfully
For
Encl: A set of sanctioned plan.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-7” (Bye laws: 2.14.2)
Form for Refusal of Building Permit
With reference to your application No....dated.... for the grant of sanction for the erection of building/execution of work in House No.... Plot No....Block No.... Scheme.... Situated at .... I have you inform you that building permit under relevant provisions of the Act of.... has been refused on.... on the following grounds.
Yours faithfully
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Form of Revalidation
Appendix “A- 8” (Bye laws: 2.14.3)
File No… Dated
Shri /Madam
Subject: Revalidation of Building Plans relating to plot No… Block No………………….Scheme………
Dear Sir / Madam,
Block No.
With reference to your application dated…………on the subject cited above, I am directed to inform you that your building plan which were sanctioned on………. vide file No………………..have been revalidated up to
Original sanctioned plan submitted by you is also returned herewith.
3 Please acknowledge receipt.
Yours Faithfully,
For…
Authority
Encl: As above.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-9”
(Deleted vide amendment in Bye laws: revised clause 2.15.1 b)
Form for Notice for Commencement of Work
(contents deleted vide amendments)
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-10” (Bye laws: 2.15.3)
Information for Intimation of Completion of Work up to Plinth Level
To
The
Authority,
Sir,
The construction up to plinth/column up to plinth level has been completed in Building No… on/in Plot No Scheme No… Road/Street …Ward …in accordance with your permission No ..dated .under my supervision and in accordance with the sanctioned plan.
Yours faithfully,
Signature of Licensed Architect/Engineer/Supervisor
Name……………
(In Block letters)
Address:
…
Date:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Inspection Report
Appendix “A -11” (Bye laws: 2.15.3)
I working as a with have carried out the inspection of Building No ..on/in Plot No Scheme No.… ….Road/Street… ward.. .. in accordance with permission No… ..dated .The following deviation from the sanctioned plans have been noticed which are against the provision of Master Plan / Bye-laws are of non-compoundable nature.
Description of deviations noticed:
You may not proceed with further work till such time the deviations made are rectified and construction brought in conformity to sanction plans.
Yours Faithfully
For…
Competent Authority
Office No…
Office Stamp…
Date…
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-12” (Bye laws: 2.16)
Form of Notice of Completion (To be submitted along with prescribed fee for notice of completion and other relevant documents)
To
The
Authority,
Dear Sir,
I/We hereby give notice that I/We have completed the erection of building/execution of the works in Plot No Block No… ….Scheme situated at in pursuance of the sanction granted by the Authority vide File No dated… I/We are enclosing all reports of the Authority inspection carried out during construction period.
Permission to occupy or use the building may be granted.
Yours Faithfully,
Signature of owner…
Name of owner
(In Block letters)
Form for Certificate of Architect/Engineer/Supervisor (To be submitted along with notice of completion)
To
The
Authority,
Dear Sir,
We hereby certify that the erection, re-erection or material alteration in/at building No… ..on in Plot No Block No .Scheme… .situated at ..has been supervised by me and has been completed on according to the plans sanctioned, vide office communication No dated .The work has been completed to our best satisfaction, the workmanship and all the materials (type & grade) have been used strictly in accordance with general and detailed specifications. All the drainage/Sanitary/Water Supply work has been executed under our supervision and as per Building Bye-laws. No provisions of the Building Bye-laws and condition prescribed or order issued there under have been transgressed in the course of the work. The building is fit for use for which it has been erected /re-erected or altered/constructed and enlarged.
2. Certificate:
i) Certified that the building(s) has been constructed according to the sanctioned plan and structural design (one set of structural drawings as executed is enclosed) which incorporate the provisions of structural safety as specified in relevant prevailing NBC Part 6 and IS codes standards/Guidelines.
ii) Further certified that water harvesting as well as waste water re-cycling systems have been provided as per the sanctioned building plan.
iii) It is also certified that construction has been one under our supervision and guidelines and adheres to the drawings submitted and the records of supervision have been maintained by us.
Permission to occupy of use the building may be granted.
Any subsequent change from completion drawings will be the responsibility of the owner(s)
a) Signature of the owner b) Signature of the Architect/Engineer with date with date Name in Block letters Name in Block letter, Licence No.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Address
c) Signature of the Structural Engineer c) with date (for certificate 1) (as defined in NBC of India) Name in Block Letters Address
Dated :
Description of Construction Work Block Wise/Building Wise.
Block Building No.
Details of Completed Work floor wise.
Vice Chairman
or
Commissioner of Authority
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-15” (Bye laws: 2.17.1)
Form of Rejection or Compliance in Respect of Occupancy Certificate
File No… Dated:
Sh/Smt
Subject: Occupancy Certificate in respect of Plot No…
Dear Sir / Madam,
With reference to your letter dated
With reference to your notice of completion dated
In continuation of this office letter of even No… …..dated on the subject noted above, I am directed to inform you that your case bas been examined and occupancy certificate is rejected for the reasons as given below:-
Yours Faithfully
Authority
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “B” (Bye laws: 2.9.4 & 6.3.8)
Affidavit/Undertaking (For Handing Over Land Required For Road Widening)
That I/We have submitted building plans for construction of building on plot No… Block No… ….located at… ……to the ….. under Sanction… …… of the ….. Act for favour of sanction.
I/We undertake to hand over the land required for road widening as shown on site plan to concerned Authority free of cost as and when asked by …to do so.
I/We have already understood that the… …is granting sanction on the basis of my undertaking.
If I/We fail to do so, the sanction so accorded shall be revoked and construction done as consequence thereof shall be deemed to have done unauthorisedly and shall be actionable u/s ..of the .Act.
Deponent
Verification
I/We verify that the contents of the above undertaking are correct to the best of my knowledge and belief and nothing material has been concealed there from.
Deponent
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “B-1” (Bye laws: 2.9.4. iv)
Indemnity Bond for Basement
This Indemnity Bond is executed by Shri/Smt. S/o, D/O, W/O Shri/Smt R/O .in favour of Development Authority.
Whereas the executant has submitted to the concerned Authority the plans for, sanction of basement over Plot No under the provisions of the Act and lie bye- laws made there under:-
And whereas the concerned Authority has agreed to sanction the aforesaid construction subject to the conditions that the owner shall indemnify the concerned Authority in the event of any loss or damage being cause to the adjoining building on account of the construction of the said basement either at the time of digging of its foundations or in the course of its construction or even thereafter and also against any claim of any concern thereto.
And whereas the executant has agreed to execute an indemnity bond to the above affect and also to abide by the terms imposed by the concerned Authority to the grant of sanction for construction of the basement.
Now this deed witnesses:
That in consideration of the sanction of the plans by for construction of the basement the executant undertakes that he/she shall at all times keep… …harmless and free from any liability, loss or damages/ flowing from any injury or damage caused to the adjoining built-up properties or to any person as a consequence of the construction of at the time of digging of its foundations or during the course of its construction or at any time thereafter.
The owner agreed and undertakes that in the event of any claim being made by any person or persons against the concerned Authority either in respect of the sanction granted by the concerned Authority to the owner for the construction of basement or in respect of the construction or manner of construction of the basement by the owner or the consequences flowing from the said sanction the executant shall be responsible and liable and not the concerned Authority.
The executant agrees and undertake to indemnify the concerned Authority fully in respect of any amount which the concerned Authority may be required to pay to any person either by way of compensation or damages or on any other account as a result of any claim or suit or any other proceedings concerning the sanctioning
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
of the construction of the basement of the making thereof and also in respect of the costs and expenses which the concerned Authority may incur on defending any action.
4 Without prejudice to the above undertaking the executant hereby binds itself to pay to the concerned Authority to the full extent any amount which the concerned Authority may be required to pay to any person in connection with, relating to or concerning the sanctioning of the basement or the making thereof.
5 The owner further agrees and undertakes that this bond shall remain in full force and effect till the executant faithfully observes/performs the undertaking herein before contained.
In witness whereof the executant above named has signed this bond on this day of ..at
Indemnifier
Witness:
(Signatures)…
Name… Full Address… (Signatures)…
Name…… Full Address…
Model Building Bye-Law, 2015, TCPO
Appendix “C” (Bye laws: 2.12.1)
Annexure and Appendices
Performa to BE Submitted by Owner
Name, Status, and Address of the applicant
Name of the Architect and address with Registration number with Council of Architecture.
Details of the property/plot
a) Location
b) Boundaries
c) Area in sq.mt. with dimensions (net plot area)
d) Width of the roads
4. Land use
a) Master Plan
b) Zonal Development Plan
c) Approved Layout Plan
Title
Model Building Bye-Law, 2015, TCPO
a) Free Hold
b) Leasehold under notification for acquisition if lease hold permission of lessor for construction under the leasehold condition obtained.
c) Whether under acquisition, if so give details.
Whether the plot/land is affected under the Urban Land (Ceiling & Regulation) Act, 1976. If so, copy of the NCO from the concerned Authority be furnished.
7. Proposals
a) Land Use
b) Coverage on each floor with proposed use of the floor space including basement.
c) FAR
d) Height
e) No. of floors.
f) Envelope controls/set backs
g) Parking norms
Annexure and Appendices
Encl:
Ownership title
Permission to construct under the lease
Permission under the Land Ceiling Act, 1976.
Site/Location Plan
Tentative proposals to explain the scheme
Signature of Architect
Signature of the owner
Name…
Reg. No…
Name…
Address…
Address
Model Building Bye-Law, 2015, TCPO
Appendix “D” (Bye laws: 4.32.2)
Annexure and Appendices
Number and Type of Lifts Required for Different Occupancies and Space for Electrical Installations
The number and type of lifts required depending on the capacity of lift, desired speed nature of operation are as given in table below:
Table: Number and types of lifts for non-residential Multistoried Building
D.2 Spaces for Electrical Installations
The spaces required for different electrical installations are given at 3.1 to 3.3
D.2.1 Electric Sub-station – The norms given in 3.1.1 and 3.1.2 shall be adopted for provision of space for sub-station.
D.2.1.1 Area Requirements for Sub-Station for buildings
Sl.No.
Total covered Area (sq.mt)
Transformer Capacity (KVA)
S/Stn. Size Required (sq.mt)
1
2500
1 X 400
70
2
4500
1 X 630
70
3
8000
2 X 630
100
4
10,000
2 X 630
130
5
15,000
4 X 630
160
6
20,000
5 X 630
175
7
25,000
6 X 630
200
8
30,000
7 X 630
220
Note:
For additional 1000 sq.mt. covered area, a load of 90 KVA will come up with 150 KVA TR. Capacity at 60 % loading.
For additional of one transformer as per covered area, a space of additional 16 sq.mt. is to be provided.
In case of any deviation in space size due to unavoidable circumstance, the same may be considered with the approval of Electricity Board.
The floor of the sub-station shall have cable trenches of 0.6 mt. depth, the layout for which will be given at the time of actual construction. For this purpose, a dummy floor of 0.6 mt. depth shall be provided to facilitate cutting/digging of floor for installation of equipment’s and making subsequent changes in trenches. This floor shall be capable to withstand minimum load of 10 tones of each transformer mounted on flour wheels.
The break-up spaces required for different installations in a sub-station are given as below:
Supply company’s Switchgear room and or space of meters.
D.2.1.1.A: Location of electric sub-station in basement of multistoreyed buildings:
The electric sub-station should be provided in the approved/sanctioned covered area of the buildings not below the first basement level and should be on the periphery of the building with clear independent round the clock approach having proper ramp with slope.
The ramp should be designed in such a manner that in case of fire no smoke should enter the main buildings. The exit from basement electric sub-station shall have self-closing fire/smoke check doors of 2 hours. F.R. near entry to ramp. Additional exit shall be provided if traveled distance from the farthest corner of the ramp is more than 15mt.
The electric sub-station should be totally segregated from rest of the basement having 4 hours. F.R. wall and should have adequate internal lighting and ventilation. A perfect independent ventilation system of 30 air charges per hour linked with detection as well as automatic medium velocity water spray system for individual transformer shall be located outside the building at ground floor, fire control room shall be manned round the clock and shall also have and audio system in the basement as well as in the control room. No service such as water, sewer, airconditioning, gas pipes or telegraphs services should pass through electric substation of the cable trench.
The rising mains should be of metal bus bars. The floor of electric substation should be 2 ft above the rest of basement floor and designed suitably to carry 10 tons of transformer weight on wheels also having provision of proper cable trenches 0 . 6 X 0 . 6 mt. depth. Dummy floor of
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
0.6 mt. depth be provided to facilitate laying of cables inside the building connecting to equipment. Fire retarding cables should be provided and cable trenches be filed with said cables. R.C.C. pipes at suitably places as required will be provided for cable entries to the sub-station spaces with suitable water proofing arrangement. A provision of 12 ft. clear height below beams should be made in the electric sub-station area along with adequate arrangement for fixing chain pulley block for a load of 15 tons. Provision of sumps shall be kept in the floor so that complete volume of transformer oil in the event of spillover could be accommodated. Sufficient arrangement to prevent spread of fire to oil pumps be made.
D.2.1.2. Other Requirements for Sub-station
The sub-station will preferably be located on the ground level failing which it can be in the basement floor in no case at higher level.
The entire space will be provided at one floor in continuation.
The minimum width of the sub-station space shall not be less than 6 mt.
The areas given above in respect of the different categories of rooms hold good if they are provided with windows and independent access doors.
All the rooms should be provided with partition up to the Ceilings and shall have proper ventilation. Special care should be taken to ventilate the transformer rooms and where necessary, louvers at lower levels and exhaust fans at higher level shall be provided at suitable locations.
In order to prevent storm water entering the transformer and switch rooms through the soak pits, the floor level of the sub-station shall be at least 15 cm above the highest flood water level that may be anticipated in the locality.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
D.2.2 Cable Trenches Shafts Etc.
D.2.2.1 Suitable number of vertical shafts, rising mains, distribution boxes, etc. shall also be provided as per the requirements at suitable location. Cable trenches with suitable handy covers for entry of the cables up to the substation onwards up to the street adjoining other building shall also be provided as per the requirements. These vertical shafts, rising mains, distribution boxes, cable trenches, etc. shall be so constructed as to be accessible only to authorized personnel. The rising mains and other installations in the vertical shafts, tap off boxes distribution boxes etc. required at each floor shall be provided, installed and maintained by the owner at their own cost.
Adequate enclosed space shall also be provided at each floor for installation of equipment’s for distribution on respective floors such as distribution boxes, cut-out, and meter boxes and main switches.
D.2.2.2 Location of Switch Room: In large installations other than where a substation is provided, a separate switch room shall be provided. This shall be located as closely possible to the electrical load center and suitable ducts shall be laid with minimum number of bends form the point of entry of the supply to the position of the main switchgear. The switch room shall also be placed in such a position that rising ducts may readily be provided there from to the upper floors of the building in one straight vertical run. In larger building, more than one rising duct and horizontal ducts may also be required for running cables from the switch room to the foot of each rising main. Such cable ducts shall be reserved for the electrical services only, which may, however, include medium and low voltage installations, such as call bell systems. Telephone installation should be suitably segregated.
D.2.2.3 Location and Requirement of Distribution Panels: The electrical gear distribution panels and other apparatus, which are required on such floor may conveniently be mounted adjacent to the rising mains, and adequate space should be provided at each floor for this purpose.
D.2.2.4 Location and Requirement of PBX/PABX Room: Information regarding provision and location of PBX/PABX room, telephone outlets and riser shall be ascertained form the relevant Authority.
Adequate space should be provided for installation of Sub-Distribution Board.
D.2.3. General
D.2.3.1 The maintenance of the built up space for electric sub-station, distribution equipment, vertical shafts and enclosure at each floor shall be done by the owner.
1.0General
Building/Development work for which permission is sought, shall be planned, designed and supervised by registered professionals. The registered professionals for carrying out the various activities shall be:
Architect, Engineer, Structural engineer, Town planner, Landscape architect, Urban designer, Supervisor. Requirements of registration/license for these professionals by the Authority or by the body governing such profession and constituted under a statute, as applicable to practice within the local body’s jurisdiction, are given in items 1 to 7 of the following table:
(items 8-10 Plumber, Electrician and Fire Consultant may not need registration)
Sl No
Professional
Qualifications
Competence / Functions
1
Architect
Registered with valid membership of the Council of Architecture, India as prescribed under Architect's Act 1972.
The registered architect shall be competent to carry out the work related to the building/development permit as given below: a. Prepare and sign all plans, sub-division/layout plans and information connected with building permit except engineering services of multi-storeyed/ special buildings. b. Preparation of building plans, drawings and related information connected with development permit of area up to 1 hectare for metro-cities and 2 hectare for other places. c. Issuing certificate of supervision for development permit of area up to 1 hectare for metro-cities and 2 hectare for other places. (related to building layout and other architectural aspects) d. Issuing certificate of supervision and completion of all buildings pertaining to architectural aspects.
2
Engineer
Graduate in Civil Engineering from recognized Indian or foreign university. Registered with valid membership (Civil) of the Institution of Engineers, India.
The registered engineer shall be competent to carry out the work related to the building/development permit as given below: a. Prepare and sign all building plans, structural drawings and service plans and information connected with building permit; b. Preparation of structural drawings, details and calculations of buildings on plot up to 500 m<sup>2</sup> and up to 5 storeys or 16 m in height, all service plans and related information connected with development permit of area up to 1 hectare for metro-cities and 2 hectare for other places. c. Issuing certificate of supervision for development permit of area up to 1 hectare and 2 hectare for other places (pertaining to building layout, Building structure, civil works and service installations); d. Issuing certificate of supervision and completion of all buildings pertaining including structure and building services.
Empanelment of Competent professional
Definition: In these rules, unless the context otherwise requires:
a) “Act” – the Act of the concerned Authority
b) “Empanelled Architect” – A person empanelled by the Authority as per rules under these bye-laws as authorized person to sanction building plans of residential buildings up to 15 mt. in height and for plot size up to 500sqm, forming part of an approved lay-out plan and for other buildings as authorized in section 13.5 of the Bye-laws.
c) “Person Authorized” – means a qualified and duly registered Architect having a degree in Architecture or equivalent qualification and registered with the Council of Architects, India with minimum 5 years of experience.
d) “Sanctioned Building Plan” means a building plan of a building/premises to be constructed on a plot and approved by the Competent Authority/ Architect in accordance with the provisions of Master Plan/Zonal development plan and Building Bye-laws.
e) “Fee” means a fee to be charged by the Authority/Architect for sanction of building plans. (Design and consultations fees agreed between the architect and his/her client is independent of this ‘Fee’)
For the empanelment, the qualified Architect/Engineer shall submit list of projects handled with proof and credentials along with recommendations from Council of Architecture, India.
Authority should obtain security deposit/professional indemnity bond and professional liability insurance from empanelled Architects as decided in value from time-to-time.
The empanelment of an Architect shall be for a period of two years and can be extended from time to time subject to review by the Authority at the end of every two years.
The Architect shall be empowered to sanction building plans of residential buildings up to 15 mt. height and for plot size up to 500sqmt, forming part of approved layout plan. And for other buildings the criteria of empanelment shall be as per section 13.5 of the Bye-laws.
In respect of sanction of building plans of Government buildings, the plans shall be sanctioned by the Chief Architect/ Senior Architect of the concerned Department of the Government, provided it conform to Master Plan/Zonal Development Plan, approved layout plan and Building Bye-laws.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
(A) Non-Compoundable Items
Any deviations except those set in para “AA” hereunder, from the maximum, minimum prescribed limits regarding:
Coverage,
F.A.R.
Setbacks,
Open spaces,
Total height of the building
No. of floors,
No. of DUs & density
Parking norms,
Light and Ventilation provisions,
Use
All other provisions of these bye-laws except item given in para ‘B’ below shall not be compounded/regularized and shall have to rectified by altering/ demolition at the risk and cost of owner. Besides this any other action as per terms and conditions of lease and provisions of Act shall proceed.
Green cover
A minimum of 1 tree for every 80 sqm of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species.
10.2.1 (i)
6(a)
Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations.
10.2.1 (ii)
10.2.4 - IV
4( c)
Use of flyash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time to time.
10.2.6 (b)
4(d)
Use of concept of passive solar design of buildings using architectural design approaches that minimize energy consumption in buildings by integrating conventional energy-efficient devices, such as mechanical and electric pumps, fans, lighting fixtures and other equipment, with the passive design elements, such as building orientation, landscaping, efficient building envelope, appropriate fenestration, increased day lighting design and thermal mass.
10.2 (3)
4(e)
Optimize use of energy systems in buildings that should maintain a specific indoor environment conducive to the functional requirements of the building by following mandatory compliance measures (for all applicable buildings) as recommended in the Energy Conservation Building Code (ECBC) 2007 of the Bureau of Energy Efficiency, Government of India.
10.2 (3)
5
Air Quality and Noise
Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site.
-
Address of the owner
Dated:
Encl : As above
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-13” (Bye laws: 2.16 x)
Address
Signature of Supervisor/Engineer/
Group/Engineer with date
Name in Block letters, Licence No.
Address
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-14” (Bye laws: 2.17.1)
File No… Plan No… Dated:
Shri/Miss/Smt
Qualification and Competence of Technical Personnel for Preparations of Schemes for Building Permit and Supervision
Completion-cum-Occupancy Certificate
With reference to your notice of completion dated……………I hereby certify that building as per description below certified plan at Plot No… ……Block No… Scheme ...situated at
whose plans were sanctioned vide No has been inspected with reference to building bye-laws in respect to the structural safety, fire safety, hygienic and sanitary conditions and proposed rainwater harvesting systems inside and in the surroundings and is declared fit for occupation and release of regular water and electricity connections. The description of the construction work completed is given as under:
Sl. No.
No. of floors
Capacity of lifts in person
No. of persons that can be carried by a lift
Speedm/s
In 6 min
In 30 min.
In 50 min.
In 60 min.
Manually Operated
Automatic
Manually Operated
Automatic
Manually Operated
Automatic
Manually Operated
Automatic
1
2
3
4
5
6
7
8
9
10
11
12
1
7
6
0.6-0.75
17
-
102
-
170
-
204
-
2
7
8
0.6-0.75
22
-
132
-
220
-
-
-
3
7
10
0.6-0.75
26
-
156
-
260
-
312
-
4
7
10
1.0
30
-
180
-
300
-
360
-
5
7
13
1.0
37
-
122
-
370
-
444
-
6
11
6
0.6-0.75
11
-
70
-
115
-
140
-
7
11
8
0.6-0.75
15
-
90
-
150
-
180
-
8
11
10
0.6-0.75
18
-
108
-
180
-
216
-
9
11
13
0.6-0.75
22
-
132
-
220
-
264
-
10
11
10
1.0
21
-
126
-
210
-
252
-
11
11
10
1.5
24
-
144
-
240
-
288
-
12
11
13
1.5
28
-
156
-
260
-
312
-
13
11
13
1.5
32
-
180
-
300
-
-
-
14
16
10
1.0
17
-
100
126
170
210
-
252
15
16
13
1.5
20
24
120
145
200
240
248
290
16
16
13
1.5
23
30
138
180
230
300
-
360
17
16
16
1.5
25
33
150
198
250
330
300
356
18
21
10
1.5
18
32
108
132
180
220
214
264
19
21
13
1.5
21
26
126
156
210
250
250
312
20
21
14
1.5
23
28
138
168
230
280
-
-
Note-1:
a) For all non-residential buildings, the traffic cleared in 50 minutes is considered adequate and is approved by Authority. As such for calculation the number of lifts required, the rate of the clearance of traffic in column 9 and 10 and the population may be taken into consideration.
b) In addition to total number of lifts required as above, provision of one lift of the same capacity may be considered to serve as stand-by.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Note-2: The population may be worked out on the basis of useful carpet area which the person occupy (excluding area of Verandah, Lobbies, Halls, Passages, Lavatory blocks, etc.)
Note-3: The population on ground and first floor may not be taken into consideration since these floors are not generally served by lifts.
Note-4: 0.75 meter per sec. Equivalent to 150 ft. per Min. 1.00 meter per sec. Equivalent to 200 ft. per Min. 1.5 meter per sec. Equivalent to 300 ft. per Min.
Note-5: The height of buildings for lift installation i.e. the travel on the lift presumed in the above statements is as below: 7 floors 21.0 mt. 11 floors 33.0 mt. 16 floors 48.0 mt. 21 floors 64.0 mt.
Table: Number and types of lifts for Residential Building
Sl. No.
No. of floors
No
Passenger unit capacity Persons
Speed in m/s
Landing Gate Type
Central System
Service Lift No.
Capacity Persons
Type of Gate
Central System
1
5 to 8
2
6
0.0 to 0.5
*
Automatic push button operation both from car and landing
-
-
-
-
2
9 to 11
2
8
0.6 to 1
*
--Do--
1
8
-
Push button car handle switch control
3
11 to 13
21
86
0.6 to 0.74
*Power operated doors
--Do--and without collection system --do--
1
8
-
--do--
4
13 to 19
22
88
11
-power operated doors
--do--
1
8
-
--do--
* For buildings more than 15 mt. in height collapsible gates shall not be permitted. (see bye-law No. 7.9.1(f) )
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “D-1” (Bye laws: 4.32.2)
The dimensions and relevant information for lift installations like lift well, pit depth, machine room, clearance from top floor landing to machine room flooring is given in table below:
Table: Dimensions and required information for Lift Installation in Building
Carrying Capacity of lift (persons) Number
Load (kg)
Lift speed
Dimension of Lift well front depth (In cm.)
(Cm)
Leading Pit Entrance (Cm)
Dimension of Machine Room
Clearance from top floor landing to machine room flooring cm
Imposed load in tones on top of lift well due to installation. It may be noted that figures do not include weight of the machine from floors and well, etc.
1
2
3
4
5
6
7
8
9
10
11
12
4
272
Up to & including 1 m/s
175
115
70
140
230
275
245
450
6.5
6
408
--do--
195
135
80
140
230
335
275
450
7.0
8
544
Up to & including 1 m/s
200
170
80
150
245
395
275
450
8.5
10
680
Up to & including 1.5 m/s
225
170
90
150
245
395
305
470
10.5
13
884
--do--
235
188
90
150
245
425
335
470
13.0
16
1088
--do--
255
205
105
150
245
520
335
480
15.0
20
1360
--do--
255
220
105
150
245
520
335
480
15.0
Note:
i) All lift well dimensions are minimum clear finished plumb requirements.
ii) Where more than one lift is located in the lift well, extra width of 10 cm. Separator beam should be provided.
iii) 1 m/s = 200 ft./min.
iv) The height of landing entrance should be 210 cm. (about 7 ft.) for all lifts.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “D-2”
(Bye laws: 4.32.3)
Transformer Rooms: The number and size of transformer rooms shall be ascertained from the total power requirements of the company. To determine the size of transformer and clearance around a transformer, reference may be made to good practice (I.S.1887-1967 code of practice for installation and maintenance of Transformer). A 500 KVA transformer may be provided with a minimum space of 4 mt. X 4 mt.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
If transformer is to be installed outdoor space shall be provided on similar considerations and adequate provision for safety enclosure is to be made. For transformer having large oil content (more than 2000 lt.) soak pits are to be provided in accordance with rule 64 of Indian Electricity Rules, 1956.
High Voltage Switch Rooms: In case of sub-station having one transformer, the owner is required to provide only one high voltage switch. In the case of single point supply for two transformers, the number of switches required is 3 and for " n " transformers the number of switches is n+1. The floor area required in case of a single switch will be roughly 4 mt. X 1mt. and for every additional switch the length should be increased by 1mt.
Low Voltage Switch Rooms: The floor area requirement in respect of low voltage switchgear room cannot be determined by any formula.
Room for Stand-by-Generator: A room space not less then 6 mt. X 9 mt. may be provided for housing a standby Generator set of 50 KW.
Transformers room and sub-station room shall be provided with steel shutters of 8 ° X 8 ° with suitable grills. Sufficient arrangement for pumping the water out, in case of flooding should be made to minimize loss to switchgear and transformer.
In view of experience of installation of exhaust chimneys in the multi-storeyed buildings at undesirable locations, proper provision in the form of vertical exhaust leading to above terrace level should be made for the substation.
Electric sub-station space should be made available free of cost by promoters and should be free of seepage/leakage of water. There should be no combustible material kept in side or in the vicinity. Periodic inspection of electric sub-station shall be mandatory and violation of any bye-law will be dealt, sternly with penalty and immediate disconnection.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
The standby arrangement for electricity supply up to and including the substation equipment and distribution pillars at the sub-station shall be provided compulsorily.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “E”
(Bye laws: 2.12.5 & 6.3.6)
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Sl No
Professional
Qualifications
Competence / Functions
3
Structural Engineer
Graduate in Civil engineering from recognized Indian or foreign university, or Corporate Member (Civil) of Institution of Engineers (India), minimum 3 years experience in structural engineering practice with designing and field work. NOTE - The 3 years experience shall be relaxed to 2 years in the case of post-graduate degree of recognized Indian or foreign university in the branch of structural engineering. In case of doctorate in structural engineering, the experience required would be one year.
The registered structural engineer shall be competent to prepare the structural design, calculations and details for all buildings and undertake their supervision. In case of buildings having special structural features, as decided by the Authority, they shall be designed only by Structural engineers.
4
Town Planner
Graduate or Post-graduate degree in Town and country planning with valid Associate Membership of the Institute of Town Planners, India.
The registered town planner shall be competent to carry out the work related to the development permit as given below: a. Preparation of plans for land sub-division/ layout and related information connected with development permit for all areas more than 1 Hectare.. b. Issuing of certificate of supervision for development of land of all areas. NOTE - However, for land layouts for development permit above 5 hectare in area, landscape architect shall also be associated, and for land development infrastructural services for roads, water supplies, sewerage/drainage, electrification, etc, the registered engineers for utility services shall be associated.
5
Landscape Architect
Bachelor or Master's degree in landscape architecture or equivalent from recognized Indian or foreign university.
The registered landscape architect shall be competent to carry out the work related to landscape design for building/development permit for land areas 5 hectares and above. In case of metro-cities, this limit of land area shall be 2 hectares and above. NOTE - For smaller areas below the limits indicated above, association of landscape architect may also be considered from the point of view of desired landscape development.
6
Urban Designer
Master's degree in Urban Design or equivalent from recognized Indian or foreign university.
The registered urban designer shall be competent to carry out the work related to urban design for city areas more than 5 hectares and campus area more than 2 hectares. He/She shall also be competent to carry out the work of urban renewal for all blighted/congested areas. NOTE - For smaller areas below the limits indicated above, association of urban designer may be considered from the point of view of desired urban design.
7
Supervisor
Diploma in Civil engineering / Architectural Assistantship from recognized institute with 2yrs working experience or Civil Draftsmanship from I.T.I with 5yrs experience under a qualified Architect / Civil Engineer for building construction and supervision.
The registered supervisor shall be competent to carry out the work related to the building permit as given below: a. All plans and related information connected with building permit for residential buildings on plot up to 100 m<sup>2</sup> and up to two storeys or 7.5 m in height; and b. Issuing certificate of supervision for buildings as per (a).
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Sl No
Professional
Qualifications
Competence / Functions
8
Plumber
licensed by the concerned Authority through examination of candidates-Certificate of training from ITI, with min. 2yrs experience of execution of sanitary and plumbing works under any govt. Dept./ Local body or a qualified Architect / Engineer. Knowledge of working drawings and dimensioned sketches.
A plumber shall be competent to do the following jobs: a. Execution / supervision of sanitary works up to 500 sq mt plot size and 4 storeyed buildings.
9
Electrician
As prescribed by the concerned electricity company
10
Fire Consultant
As prescribed by Chief Fire Officer, Town/City Fire Service.
Model Building Bye-Law, 2015, TCPO
Appendix “E-1”
Annexure and Appendices
(Bye laws: 1.1 - 37)
The Architect shall charge building application fee, other charges as prescribed under Building Bye-laws and other charges as prescribed form time to time. He will be permitted to retain 50% of the building application fee towards his service charges and balance amount along with other charges shall be deposited with the Authority along with two sets of building plans and other required documents. If the Authority wants to raise any objection, the same shall be communicated to the architect within 10 days of filing the application with the Authority. The architect while sanctioning the building plans shall take due cognizance of the objections raised by the Authority.
Before sanction of building plans, the Architect shall ensure and satisfied himself that various permissions as required by the law from different Authorities have been obtained.
The Empanelled Architect shall also ensure at the time of sanction of building plans as well as during the inspections at construction stage and also at the time of giving completion certificate that there is no violation of Master Plan/Zonal Development Plan, Approved Layout Plan and Building Bye-laws and other related rules and regulations in force.
In case it is found that there had been a violation of Master Plan/Zonal Development Plan, approved layout plan and Building Bye-laws and other related rules and regulations in force at the time of sanction of building plans/ construction stage / issue of completion certificate, action for penalising the Architect shall be taken including removal from the panel and referring the matter to the Council of Architecture, India for appropriate action.
The Empanelled Architect shall be required to file a quarterly return of building plans received for sanction, fee received, etc. to the Concerned Authorities. His work shall be monitored to check the backlog and performance.
Before issue of a completion certificate a joint inspection is to be carried out by the officer authorized by the Authority in this behalf and the empanelled Architect. Within 10 days of the joint inspection, the Architect shall be informed about the non-compoundable deviations to be removed and composition fee to be charged for minor deviations under the rules.
The Architect shall issue the completion certificate after having satisfied himself that non-compoundable deviations have been removed form the building and necessary compounding/regularization fee has been deposited with the concerned Authority.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix: “F”
(Bye laws: 7.12.1)
Penal Action for violation of provisions of Development Code of Master Plan, Zonal Regulation and Building Bye-laws.
(A.A) Compounding Excess Coverage/FAR
i) Deviations in the coverage/FAR to the extent of 5% of the permissible coverage/FAR or 13.5 sq.mt. whichever is less in building(s) use premises, other than building(s) use premises where 100% ground coverage and fixed height is allowed as per Architectural control forming part of comprehensive schemes like District Centre, Community Centres, Cluster Court Housing etc. may be compounded after levying penalty at the following Rates:
Rates of excess coverage/floor area:
Up to 5% of excess coverage/FAR a one time compounding fee equivalent to the land rated in the concerned locality applicable at the time of the application for compounding.
ii) For excess coverage / FAR for above 5%
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Any excess coverage above 5% or 13.5 sq.mt whichever is applicable would be liable to demolish to that extent.
iii) Compounding at set back Infringements
The infringements of the set backs maximum to the extent of 30 cm (1 ft.) may be compounded by way of levying compounding fee at the following rates:
Infringements
Residential Buildings
Non-Residential Buildings
Upto 15 cm (6 inch)
Rs. 1000 per sq.mt. of area infringing the set back
Rs. 2500 per sq.mt. of area infringing the set back
Above 15 cm (6 inch)
Rs. 2000 per sq.mt of area infringing the set back
Rs. 5000 of area of the infringing the set back
(B.B) Compoundable Items
If a building or part thereof has been constructed unauthorized, i.e. without obtaining the requisite building permit from the concerned Authority as required under the building bye-laws, the same shall be compounded at the following rates provided the building or part thereof so constructed other wise conforms to the provisions contained in the Building Bye-laws and Master/Zonal Plan regulations. For this party shall have to submit the request for building permit in the prescribed procedure.