Chapter 14Climate Resilient Construction – Integration of Environmental Clearance with Sanction
Land, Air, Noise, Water, Energy, biological/ socio-economic/ solid / other waste management are the main facets considered in relation to Pre, During and Post Building Construction for Sustainable Environment Management. Therefore, it is necessary for the building process to ensure compliance to various conditions laid down by the Ministry of Environment, Forest and Climate Change.
The building construction sector is a major contributor towards carbon footprints which affects climate change. India is committed towards mitigating the effects of climate change and moving towards internationally accepted norms for environmental friendly building construction. Currently this objective of environmental safeguard is achieved through obtaining a specific environmental clearance (EC) for any construction project having a size of more than 20,000 sq mts. This is administered under notification of Ministry of Environment, Forest and Climate Change.
With rapid urbanisation and growth of Indian economy, it is anticipated that the construction activity will experience a proportionate growth. Government is also committed towards streamlining of clearances for buildings and real estate sector and empowering the urban local bodies with an objective of Ease of Doing Business.
14.1Environmental conditions for compliance during Building approvals
The Ministry of Environment, Forest and Climate Change has now decided to integrate the environmental concerns into building plan approval process and empowering the concerned local body/development authority to approve and certify compliance of stipulated requirements. The new building construction proposals are classified in the following 3 categories:-
Conditions for Category ‘A’ Buildings: Built-up Area 5000 sqmt – 20000 sqmt
Conditions for Category ‘B’ Buildings: Built-up Area 20000 sqmt – 50000 sqmt
Conditions for Category ‘C’ Buildings: Built-up Area 50000sqmt – 150000 sqmt
A local Authority, i.e. ULB/DA/any other body authorized to sanction building plans shall approve the building plans by ensuring the stipulated conditions in Table 14.1, 14.2 and 14.3 for the respective categories of buildings.
These environmental conditions may be suitably integrated in the building permission conditions so that their effective implementation could be ensured by the local authority while sanctioning building plans in their respective urban areas.
However, in order to empower the Local Authority, the State/UT Governments will be required to amend their building by-laws to incorporate a specific set of conditions as
given in the Tables 14.1, 14.2 and 14.3. Once these conditions are incorporated through due process adopted by States/UTs into the Building Bye-Laws and made applicable and enforceable by their local authority, States / UTs will be required to approach M/o Environment, Forest and Climate Change alongwith the Draft notification for seeking clearance that the requirements have been met and after getting the clearance from M/o EFCC, State/UT shall issue notification of Building Bye-laws alongwith stipulated conditions. Copy of the notification shall be forwarded to Ministry of Environment, Forest and Climate Change so that they may notify the particular State or part thereof for which conditions have been suitably integrated to delegate the powers to the Local Authority. Thereafter, for such notified area no separate prior Environmental clearance will be required. However, for those States/UTs or part of the States/UTs where these conditions have not been incorporated in the Building Bye-Laws, the existing arrangement of mandatory prior Environment clearance by State Environment Impact Assessment Authority shall continue to hold.
States are, therefore, advised to amend their building by-laws by incorporating the set of conditions for each category A, B and C as mentioned above either for the entire State/UT or clearly identified part thereof, where they would like to integrate the environmental clearance conditions with building permissions and empower the local authority to examine, stipulate and ensure compliance of conditions required to address environmental concerns. The State/UT should submit such proposal/ notification at draft stage as well as a copy of the final notification to the M/o Environment, Forest and Climate Change.
i. For building plans with a total built-up area between 5,000 sqm and 1,50,000 sqm, environment clearance will be required to be synchronized with the bye-laws.
ii. The concerned Urban local body, authorized to sanction building plans, shall ensure at the time of sanctioning a building plan that the environmental requirements stipulated in Table 14.1 (for above 5,000 sqm and up to 20,000 sqm), Table 14.2 (for above 20,000 sqm and up to 50,000 sqm) and Table 14.3 (for above 50,000 sqm and up to 1,50,000 sqm), as the case may be, are complied with.
Table 14.1: Environmental Conditions for Building and Construction
(Category “A”: 5000 sqmt - 20000 sqmt)
Sl. No.
Medium
Environmental conditions
MBBL Ref. Clause
1
Natural Drainage
The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water.
-
2
Water conservations - Rain Water Harvesting and Ground Water Recharge
A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters.
Table 9.1
2(a)
The unpaved area shall be more than or equal to 20% of the recreational open spaces.
10.2.1 (iv)
3
Solid Waste Management
Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste.
10.2.5 (b)
4
Energy
In common areas, LED/ solar lights must be provided.
10.2 3c)
5
Air Quality and Noise
Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site.
-
5 (a)
The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3m above the building.
-
6
Green cover
A minimum of 1 tree for every 80 sqm of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species.
10.2.1 (i)
6(a)
Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations.
Table 14.2Environmental Conditions for Building and Construction (Category “B”: 20000 sqmt - 50000 sqmt)
Sl. No.
Medium
Environmental conditions
MBBL Ref. Clause
1
Natural Drainage
The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water.
-
2
Water conservations - Rain Water Harvesting and Ground Water Recharge
A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters.
Table 9.1
2(a)
The unpaved area shall be more than or equal to 20% of the recreational open spaces.
10.2.1 (iv)
3
Solid Waste Management
Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste.
10.2.5 (b)
4
Energy
In common areas, LED/ solar lights must be provided.
10.2 3c)
4(a)
At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided.
10.2
4(b)
As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed.
1-.2.4 - IV
4(c)
Use of flyash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time to time.
10.2.6 (b)
5
Air Quality and Noise
Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site.
-
5(a)
The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3m above the building.
Table 14.3: Environmental Conditions for Building and Construction
(Category “C”: 50000 sqmt - 150000 sqmt)
Sl. No.
Medium
Environmental conditions
MBBL Ref. Clause
1
Natural Drainage
The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water.
-
2
Water conservations - Rain Water Harvesting and Ground Water Recharge
A rain water harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rain water harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rain water harvested is to be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters.
Table 9.1
2(a)
The unpaved area shall be more than or equal to 20% of the recreational open spaces.
10.2.1 (iv)
2(b)
The ground water shall not be withdrawn without approval from the competent authority
2(c)
Use of potable water in construction should be minimized.
2(d)
Low flow fixtures and sensors must be used to promote water conservation.
2(e)
Separation of grey and black water should be done by the use of dual plumbing system.
3
Solid Waste Management
Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste.
10.2.5 (b)
3(a)
All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers.
3(b)
Organic waste composter/ vermiculture pit with a minimum capacity of 0.3 Kg/tenement/day must be installed wherein the STP sludge may be used to be converted to manure which could be used at the site or handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers.
4
Energy
In common areas, LED/ solar lights must be provided.
10.2 3c)
4(a)
At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells or wind mills or hybrid should be provided.
10.2
4(b)
As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 litres/4 persons (2.5 litres per capita) shall be installed.
Sl. Medium Environmental conditions MBBL No. Ref. Clause 5 (a) The exhaust pipe of the DG set, if installed, must be minimum 10m away from the building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3m above the building. 6 Green cover A minimum of 1 tree for every 80 sqm of land shall be planted and 10.2.1 (i) maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. 6 (a) Where the trees need to be cut, compensatory plantation in the ratio 10.2.1 (ii) of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations. 7 Sewage Treatment Sewage treatment plant with capacity of treating 100% waste water 4.32.4 Plant shall be installed. Treated water must be recycled for gardening and flushing. 8 Environment The environment infrastructure like Sewage Treatment Plant, Management Plan Landscaping, Rain Water Harvesting, Power backup for environment, Infrastructure, Environment Monitoring, Solid Waste Management and Solar and Energy conservation, should be kept operational through Environment Monitoring Committee with defined functions and responsibility.
The following listed documents and guidelines have been extensively referred in preparation, compilation and finalization of the Model Building Bye-Laws 2016
National Building Code, 2005, Bureau of Indian Standards.
Draft Unified Building Bye Laws for Delhi 2015, Delhi Urban Arts Commission.
Proposed Amendment in Town and Country Planning Legislations, Regulations for Land Use Zoning, Additional Provisions in Development Control Regulations for Safety Additional Provisions in Building Regulations / Byelaws for Structural Safety- in Natural Hazard Zones of India by Committee of Experts, Ministry of Home Affairs, GoI.
DC Regulations Greater Mumbai- 1991, Government of Maharashtra.
Kerala Municipal Building Rules – 1999, Government of Kerala.
Draft Harmonized Guidelines on the Norms and Standards for Barrier Free Environment for persons with disability and elderly persons, 2014
Energy Conservation Building Code, 2007, by Bureau of Energy Efficiency, Ministry of Power.
Page 167
Indian Green Building Council, 2001, by Confederation of Indian Industries.
Green Rating for Integrated Habitat Assessment (GRIHA) Guidelines, MNRE
CE 335 Design project preliminary design of structural members by R. Clarke
Building Bye-Laws notified by various State Governments of India
Annexure and Appendices
Legend
O Guest Houses/Lodging having up to 20 rooms or 40 beds and below
I Height less than 15 mt.
II Height 15 mt. and above up to 24 mt.
III Height above 24 mt
IV Height less than 15 mt. and plot area less than 250 sq.mt.
V Height less than 15 mt. and plot area 251 sq.mt. and above up to 500 sq.mt.
VI Height less than 15 mt. and plot area 501 sq.mt. and above up to 1000 sq.mt.
VII Height less than 15 mt. and plot area more than 1001 sq.mt.
VIII Height above 15 mt. and up to 18 mt.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
P To be Provided.
X Not to be provided.
S Sprinklers to be provided if basement area is 200 sq.mt. or more.
FS Fully Sprinklered.
To be provided if seating capacity exceed 750.
To be provided if building is more than ground floor, first floor and total covered area exceed 1500 sq. mt.
To be provided in building where total covered area exceeds 1000 sq. mt.
or
Building is more than ground floor except group housing.
To be provided if building is ground floor, first floor and total covered area exceeds 300 mt.
To be provided if building is more ground floor.
To be provided in building except educational buildings.
In case seating capacity is 1000 persons minimum or covered area above 1500 sq.mt. or basement area 200 sq.mt. and more (other than places or worships).
To be provided fore E-4 and E-5 buildings but not required if building is fully sprinklered.
To be provided for E-4 and E-5 buildings.
25,000 lt. capacity under ground water storage tank to be provided.
50,000 lt. capacity under ground water storage tank to be provided.
To be provided where ever sprinklers are not installed.
Terrace tank of 5,000 lt. capacity to be provided, if sprinklers and installed. The capacity shall be accordingly increased.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “A”
Occupancy Categorization of Buildings for Water and Other Requirement for Fire Fighting
Zone-I
Zone-II
Zone-III
GROUP “A”: RESIDENTIAL
GROUP “A”: RESIDENTIAL
GROUP “A”: RESIDENTIAL
A1 Lodging and Rooming HousesA2 One or two family private dwellingA3 DormitoriesA4 Apartment Houses
A5 Hotels
F2 Shops and stores, etc. above 500 sq.mt. floor areaF3 Underground shopping centers
GROUP “B” EDUCATIONALB1 Schools up to higher secondary level
GROUP “C” INSTITUTIONALC1 Hospitals and Sanitoria (More than 100 beds)
GROUP “G” INDUSTRIALG3 High hazard Industries
GROUP “C” INSTITUTIONALC1 Hospital & Sanitoria (upto 100 beds)C2 Custodial InstitutionsC3 Penal & mental Institutions
GROUP “D” ASSEMBLY BUILDINGSD1 For more than 1000 persons with permanent stage and fixed seatsD2 For less than 1000 persons with permanent stage and fixed seats
GROUP “H” STORAGE BUILDINGS
GROUP “D” ASSEMBLY BUILDINGSD3 Upto 300 persons without permanent stage and fixed seatsD4 Above 300 persons without permanent stage & fixed seats
GROUP “E” BUSINESS BUILDINGSE1 Offices, Banks, etc.E2 Laboratories, Libraries, etc.E3 Telephone Exchanges
GROUP “J” HAZARDOUS BUILDINGS
GROUP “E” BUSINESSE3 Computer InstallationsE5 Broadcasting stations
GROUP “F” MERCANTILEF1 Shops, Stores, etc. upto 500 m² floor area
GROUP “G” INDUSTRIALG1 Low hazard Industries
GROUP “G” INDUSTRIAL
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “B-I”
Fire Protection Requirements for Buildings in Zone-I Category
Sl. No.
Measures
Group-A: Residential A1, A2, A3, A4
Group-B: Educational
Group-C: Institutional
O
I
II
III
I
II
III
I
II
III
1
Access
P
P
P
P
P
P
P
P
P
P
2
Means of Escape
P
P
P
P
P
P
P
P
P
P
3
Compartmentation
P
P
P
P
P
P
P
P
P
P
4
Refuge Area
X
X
X
X
X
X
X
X
X
X
5
Emergency Lights
X
X
P
P
P
P
P
P
P
P
6
Exit Signs
P
P
P
P
P
P
P
P
P
P
7
PA System with Talk Back Facility
X
X
X
X
X
P
P
P
P
P
8
Moefa
X
X
X
P
X
P
P
P2
P
P
9
Extinguishers
P
P
P
P
P
P
P
P
P
P
10
Hose Reel
P3
P
P
P
P3
P
P
P
P
P
11
Yard Hydrant
X
X
X
P
X
P
P
X
P
P
12
Down Comer
X
X
X
P
X
P
X
P4
X
X
13
Wet Riser
X
X
P
X
X
X
P
X
P
P
14
Fire Detection System
X
X
X
X
X
P6
X
P2
P
P
15
Automatic Sprinkler System
S
S
S
S
S
S
FS
S
S
FS
16
Under Ground Tank
X
X
X
X
X
X
P
P2
P
P
17
Over Head Tank
P13
P
P
P
P
P
P
P
P
P
18
Fire Pumps
X
X
X
X
X
X
P
X
P
P
19
Booster Pumps
P3
P
P
P
P
P3
P
P
X
P
20
Auto D.G. Set
P3
X
P
P
P3
P
P
P
P
P
21
MCB/ELCB
P
P
P
P
P
P
P
P
P
P
22
Hose Boxes
X
X
X
P
X
P
P
P4
P
P
23
Fireman's Grounding Switch
P
P
P
P
P
P
P
P
P
P
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “B-I” (Contd.)
Fire Protection Requirements for Buildings in Zone-I Category
Sl. No.
Measures
Group-D: Assembly D3, D4
Group-E: Business E3, E5
Group-G: Industrial G1
I
II
III
I
II
III
IV
V
VI
VII
VIII
1
Access
P
P
P
P
P
P
P
P
P
P
P
2
Means of Escape
P
P
P
P
P
P
P
P
P
P
P
3
Compartmentation
P
P
P
P
P
P
P
P
P
P
P
4
Refuge Area
X
X
X
X
X
X
X
X
X
X
X
5
Emergency Lights
P
P
P
P
P
P
P
P
P
P
P
6
Exit Signs
P
P
P
P
P
P
X
X
P
P
P
7
PA System with Talk Back Facility
P1
P
P
X
P
P
X
X
X
X
P
8
Moefa
P1
P
P
X
P
P
X
X
P
P
P
9
Extinguishers
P
P
P
P
P
P
P
P
P
P
P
10
Hose Reel
P2
P
P
P
P
P
X
P
P
P
P
11
Yard Hydrant
X
P
P
X
P
P
X
X
X
P
P
12
Down Comer
X
X
P
P2
X
X
X
X
X
X
X
13
Wet Riser
X
P
P
X
P
P
X
X
X
P5
P
14
Fire Detection System
P7
P
P
P2
P8
P9
X
X
X
P
P
15
Automatic Sprinkler System
S7
FS
FS
S
S
FS
S
S
S
S
FS
16
Under Ground Tank
P7
P
P
X
P
P
X
X
P10
P11
P
17
Over Head Tank
P2
P
P
P
P
P
P5
P
P
P
P
18
Fire Pumps
P11
P
P
X
P
P
X
X
X
P5
P
19
Booster Pumps
X
X
X
P
X
X
P12
P
P
P
P
20
Auto D.G. Set
P7
P
P
P
P
P
X
X
P
P
P
21
MCB/ELCB
P
P
P
P
P
P
P
P
P
P
P
22
Hose Boxes
P
P
P
P2
P
P
X
X
X
P5
P
23
Fireman's Grounding Switch
P
P
P
P
P
P
P
P
P
P
P
Annexure “B-II”
Fire Protection Requirements for Buildings in Zone-II Category
Sl. No.
Measures
Group-A: Residential A5 : Hotels
Group-C: C2: Hospital
Group-D: Assembly D1, D2, D5
I
II
III
IV
V
VI
V
VI
1
Access
P
P
P
P
P
P
P
P
2
Means Of Escape
P
P
P
P
P
P
P
P
3
Compartmentation
P
P
P
P
P
P
P
P
4
Refuge Area
X
X
X
X
X
X
X
X
5
Emergency Lights
P
P
P
P
P
P
P
P
6
Exit Signs
P
P
P
P
P
P
P
P
7
PA System With Talk Back Facility
X
P
P
P
P
P
P
P
8
Moefa
X
P
P
P
P
P
P
P
9
Extinguishers
P
P
P
P
P
P
P
P
10
Hose Reel
P
P
P
P
P
P
P
P
11
Yard Hydrant
X
X
P
P
X
P
X
P
12
Down Comer
X
P2
X
X
X
X
X
X
13
Wet Riser
X
X
P2
X
P4
P
P5
P
14
Fire Detection System
X
P
P
P
P3
P
P
P
15
Automatic Sprinkler System
S
S
FS
F S7
S
FS
S8
FS
16
Under Ground Tank
X
X
P
P
P3
P
P8
P
17
Over Head Tank
P
P
P
P
P
P
P
P
18
Fire Pumps
X
X
P
P
P4
P
P8
P
19
Booster Pumps
P
P
P
X
P
X
P
X
20
Auto D.G. Set
P
P
P
P
P
P
P
P
21
MCB/ELCB
P
P
P
P
P
P
P
P
22
Hose Boxes
X
P
P
P
P4
P
P
P
23
Fireman's Grounding Switch
P
P
P
P
P
P
P
P
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Legend for Appendix “B-II”
I Height less than 15 mt. and area up to 300 sq. mt. on each floor.
II Height less than 15 mt. and area above 300 sq. mt. up to 1000 sq. mt. on each floor.
III Height less than 15 mt. and area above 1000 sq. mt. on each floor.
IV Height 15 mt. and above.
V Height less than 15 mt.
VI Height 15 mt. and above up to 30 mt.
VII Height less 15 mt.
VIII Height 15 mt. and above up to 24 mt.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
IX Height more than 24 mt.
X Height less than 15 mt. and plot area up to 750 sq. mt.
XI Height less than 15 mt. and plot area less than 250 sq.mt.
XII Height less than 15 mt. and plot area 251 m2 and above up to 500 sq. mt.
XIII Height less than 15 mt. and plot area 501 m2 and above up to 1000 sq.mt.
XIV Height less than 15 mt. and plot area more than 1001 sq. mt..
XV Height above 15 mt. and up to 18 mt.
P to be Provided
X not to be provided
S Sprinklers to be provided if basement area is 200 m2 or more
FS Fully Sprinklered.
To be provided if building is more than one floor.
To be provided in buildings above two floors.
To be provided if the building is more than ground floor, first floor and covered area exceeds 1500 sq. mt.
To be provided if building is more than first floor and the covered area exceeds 300 sq. mt.
To be provided for more than storeyed buildings and above.
To be provided if building is ground floor, first floor and above.
Buildings to be fully sprinklered if height exceeds 15 mt.
To be provided if seating capacity exceeds 1000 persons.
25,000 lt. capacity under ground tank to be provided.
50,000 lt. capacity a ground tank to be provided if riser is not provided.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “B-III”
Fire Protection Requirements for buildings in Zone-III Category
Sl. No.
Measures
Group F mercantile (F2,F3)
Group G Industrial (G3)
Group H Storage
Group J Hazardous
H<15mA>750M2
H>15 m
UGS
I
II
III
IV
H<15mSingle Storey
H<15mMore than one Storey
H<15 m Single Storey
H<15mMore than one Storey
1
Access
P
P
P
P
P
P
P
P
P
P
P
2
Means of Escape
P
P
P
P
P
P
P
P
P
P
P
3
Compartmentation
P
P
P
P
P
P
P
P
P
P
P
4
Refuge Area
X
X
X
X
X
X
X
X
X
X
X
5
Emergency Lights
P
P
P
X
P
P
P
X
P
P
P
6
Exit Signs
P
P
P
X
P
P
P
X
P
P
P
7
PA System with talk back facility
P1
P
P
X
X
X
X
X
X
P
P
8
Moefa
P1
P
P
X
X
X
P
X
X
P
P
9
Extinguishers
P
P
P
P
P
P
P
P
P
P
P
10
Hose Reel
P
P
P
P
P
P
P
P
P
P
P
11
Yard Hydrant
P
P
P
X
X
P
P
P2
P2
P
P
12
Down Comer
X
X
X
X
X
X
X
X
X
X
X
13
Wet Riser
P1
P
P
X
X
P3
P1
X
P3
X
X
14
Fire Detection System
X
P
P
X
X
P
P
X
X
P
P
15
Automatic Sprinkler System
FS
FS
FS
FS
FS
FS
FS
FS4
FS
FS
FS
16
Under Ground Tank
P
P
P
P5
P6
P7
P
P6
P
P
P
17
Over Head Tank
P
P
X
P
P
P
P
P
P
X
P
18
Fire Pumps
P
P
P
P
P
P
P
P4
P
P
P
19
Booster Pumps
X
X
X
X
X
X
X
X
X
X
X
20
Auto D.G. Set
P
P
P
P
P
P
P
P
P
P
P
21
MCB/ELCB
P
P
P
P
P
P
P
P
P
P
P
22
Hose Boxes
P1
P
P
X
P
P
P
X
P3
P
P
23
Fireman's Grounding Switch in Lifts
P
P
P
P
P
P
P
X
P
X
P
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “B-II” (Contd.)
Fire Protection Requirements for Buildings in Zone-II Category
Sl. No.
Measures
Group-E: Business E1, E2, E4
Group-F: Mercantile
Group-G. Industrial G2
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
1
Access
P
P
P
P
P
P
P
P
P
2
Means of Escape
P
P
P
P
P
P
P
P
P
3
Compartmentation
P
P
P
P
P
P
P
P
P
4
Refuge Area
X
X
X
X
X
X
X
X
X
5
Emergency Lights
P
P
P
P
X
X
P
P
P
6
Exit Signs
P
P
P
P
X
X
P
P
P
7
PA System with Talk Back Facility
X
P
P
X
X
X
X
X
P
8
Moefa
X
P
P
X
X
X
P
P
P
9
Extinguishers
P
P
P
P
P
P
P
P
P
10
Hose Reel
P
P
P
P1
P
P
P
P
P
11
Yard Hydrant
X
P
P
X
X
X
X
P
P
12
Down Comer
P3
X
X
X
X
X
P4
X
X
13
Wet Riser
X
P
P
X
X
X
X
P6
P
14
Fire Detection System
P3
P
P
X
X
X
X
X
P
15
Automatic Sprinkler System
S
S
FS
S
S
S
S
FS
FS
16
Under Ground Tank
X
P
P
X
X
P9X
P10
P
P
17
Over Head Tank
P
P
P
P1
P
P
P
P
P
18
Fire Pumps
X
P
P
X
X
X
X
P
P
19
Booster Pumps
P
P
P
P1
P
P
P
P
P
20
Auto D.G. Set
P
P
P
X
X
P
P
P
P
21
MCB/ELCB
P
P
P
P
P
P
P
P
P
22
Hose Boxes
P3
P
P
X
X
X
P
P
P
23
Fireman's Grounding Switch
P
P
P
P
P
P
P
P
P
Legend for Annexure “B-III”
U.G.S. Under Ground Shopping complex
i) Height less 15 mt. shopping complex
ii) Height less 15 mt. and plot area 251 sq. mt. and above up to 500 sq. mt.
iii) Height less 15 mt. and plot area 501 sq.mt. and above up to 1000 sq.mt.
iv) Height less 15 mt. and plot area more than 1001 sq.mt.
P To be provided.
X Not to be provided.
S Sprinklers to be provided if basement area is 200 sq. mt. or more.
FS Fully Sprinklered.
To be provided in building of more than one floor.
To be provided if covered area exceeds 1000 sq.mt.
To be provided in building above two floors.
To be provided in buildings if covered area is more than 200 sq.mt.
50,000 lt. capacity underground state water storage tank to be provided.
1, 00,000 lt. capacity underground state water storage tank to be provided.
2, 00,000 lt. capacity underground state water storage tank to be provided.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “C”
Water Requirement Criterion: Unless otherwise specified in Annexure B, water requirement for fighting in different categories of occupancies shall be based on following.
Occupancy Category
Sprinkler Design Discharge Density (lt./min/sq.mt.)
Sprinkler Design Area (sq.mt.)
Max. area coverage/ Sprinkler (sq.mt.)
No. of House Streams* Fully other Sprinkled
Duration of Discharge (Min.)
Fully Sprinkled
Wet Riser Sprinkled
LEVEL-I
02.5
084
21
2 4
45
45
LEVEL-II
05.0
360
12
3 6
60
90
LEVEL-III
10.0
225
09
3 6
90
90
Note: The discharge through a standard hose stream shall be taken as 567 lt./min.
Estimation of Total Water Requirements Fully Sprinklered Buildings
Occupancy Category
Sprinkler (lt.)
Riser (lt.)
Total (lt.)
Wet Riser cum Down Comer (lt.)
LEVEL-I
9,450
51,030
60,480(60,000)
1,02060(1,00,000)
LEVEL-II
1,08,000
1,02,060
2,10,060(2,00,000)
2,04,120(2,00,000)
LEVEL-III
2,02,500
1,02,060
3,04,560(3,00,000)
3,06,180(3,00,000)
3. Water Storage Tanks
The design of the water storage tanks shall be as laid down in National Building Code of India.
The capacity of underground water storage tank shall not be more than 85% of the total water requirement.
The capacity of overhead tank shall not be less than 15% of the total water requirement.
The entire water requirement can be provided in over head tanks and pumping requirements shall be finalized in consultation with Chie Fire Officer.
Under ground water storage tank shall not be provided in the set back areas.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Storage Requirements
Occupancy Category
Under Ground Static Tank
Over Head Tank
Fully Spkd. (lt.)
Riser (lt.)
Fully Spkd. (lt.)
Riser (lt.)
LEVEL-I
50,000
85,000
10,000
15,000
LEVEL-II
1,70,000
1,70,000
30,000
30,000
LEVEL-III
2,50,000
2,50,000
50,000
50,000
4. Riser/Downcomer
The size of the riser/ downcomer shall be such that velocity of flow does not exceed 5 m/second subject to a minimum of 100 mm. diameter.
The number of riser/downcomer shall be calculated on the basis that if 30 mt. of delivery hose is laid, it reaches the farthest comer of the remotest compartment on the floor.
The riser/downcomer shall be provided in the staircase/staircase lobby in such a manner that it does not obstruct the means of escape.
Only single headed hydrants shall be used on the riser/downcomer.
The size of hose to be provided with the internal hydrants shall be 50 mm diameter and with 63 mm diameter instantaneous male/female couplings.
Diffuser branch shall only be provided in the hose boxes.
In case of partially sprinklered building tapping from the wet riser is permitted for sprinkler feed.
In case of fully sprinklered building separate rising mains and pumps shall be used for sprinkler system and wet riser.
5. Selection of Pumps
Pumping requirement shall be met by a single pump or combination of pumps.
If more than one pumps are installed to meet the pumping requirement they shall be so arranged that they come into operation one after another depending upon fall in pressure in the mains and the combined pumping capacity shall be 20% more than the actual pumping capacity needed.
Jockey pump shall be selected to give minimum 3% and maximum 5% of aggregate pumping requirement at the same pressure to that of the main pump subject to maximum discharge of 450 LPM.
Standard pumps shall only be used having discharge capacity as 1800 LPM, 2280 LPM 2850 LPM & 4550 LPM.
The pump shall be capable of giving the pressure as shown in the table below:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Occupancy Category
Pressure* At Terrace Level
Fully Spkd. (Kgf./Cm2)
Riser(Kgf./Cm2)
LEVEL-I
3.5
3.5
LEVEL-II
3.5
5.5
LEVEL-III
5.5
7.0
* Orifice plates shall be installed at the hydrants on rising mains / yard hydrants to ensure that the pressure does not exceed 7 Kgf./Cm2.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure "D"
Questionnaire for High Rise Buildings/Other Buildings
Fire Service Headquarters
Name of the building .....
Address of the building .....
Name and address of builder/promoter.....
Name and address of owners /occupiers of individual flats .....
Plot area .....
(a) Title .....
(b) Land use (in case of residential building indicate no. of dwelling units.....
Covered Area (at grade level) .....
Height of tile building .....
a) Overall height (from grade level up to terrace level ) .....
b) Whether set back areas are conforming to unified building bye-laws .....
a) Number of Basement(please indicate level below grade in each case)
b) If basement extends beyond the building line, please indicate the load bearing strength of the roof of basement) .....
c) Area of the basement .....
d) Whether any piazza is proposed? if so, details of the level of piazza and ramp etc. be indicated .....
Number of floors (including ground floor) .....
Occupancy use (please mention separately, use for basement and floors)
Covered area of typical floor .....
Parking areas (please give details) .....
Details of surrounding properties / features
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Compass direction In relation to the building
Type of Property/feature
Height in case of building
Distance wall to wall from building
Any other information
North
South
East
West
15. Approach to proposed building width of the road and connecting roads, if any
16. Please give details of water supply available exclusively for the fire fighting
17. Has wet riser(s) been provided? If so, please indicate the number of risers and internal dia of each
18. Has any down comer been provided? If so, please give details including pump capacity
19. Please indicate the present arrangement for replenishment of water for fire fighting
20. Is a public or other water storage facility available nearby? if so, please give the capacity and distance from your building, also please indicate if it is easily accessible
21. Please give any other information regarding availability of water supply for fire fighting
22. Have internal hydrants on each floor including basement (s) and terrace.
a) No. of hydrants on each floor including basement (s) and terrace
b) Bore and length of each floor including basement(s)
c) Size (bore) and type of nozzle fitted to each hose reel
d) Is the hose reel connected directly to the riser or to the hydrant outlet?
23. Has fire hose been provided near each hydrant? if so, Please indicate
a) The type hoses
b) The size (bore) of hose
c) The length of each hose
24. Have branch pipes been provided? if so, please indicate
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
a) The type of branch pipe.
b) Size of nozzle fitted to each branch.
25 a) If the basement is used for Car / Scooter parking or storage.
Has it been sprinkled?
b) Whether any cubicles proposed in the basement? If so, the area of each cubical be indicated?
c) Whether segregation/compartmentation of the basement has been provided? If so, please give details.
Is the building equipped with automatic fire detection and alarm system? If so, please indicate
a) The type of detectors used.
b) The standard to which the detectors conform.
c) The code to which the installation conform.
Have manual call boxes been installed in the building for raising an alarm in the event of outbreak of fire? If so, please give details.
Has public address system been installed in the building with loudspeaker on each floor with talk back facility.
Has an intercom system been provided between the various floors and the fire control room in entrance lobby?
Has a fire control room been provided in the entrance lobby of the building?
How many staircases have been provided in the building? Please indicate in each case:
a) Width of the stairway.
b) Width of treads.
c) Height of risers.
d) If the treads are of the non-slip type.
What is the average occupant load per floor?
Whether fire tower has been proposed?
How many lifts have been installed in the building? Please indicate in each case:
a) The floors between which the lifts runs.
b) The type of doors fitted to the lift Car and at each landing.
c) Fire resistance raring of lift Car and landing doors, if known.
d) Floor area of the lift car.
e) Loading capacity of the lift car
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
f) Has communication system been installed in the lift car? .....
g) Has a fireman's switch been installed in the lift for grounding it in the event of fire .............
Have any stationary fire pump (s) been installed or pressuring the wet riser? If so, please indicate.
a) The number of pumps............
b) The size of suction and delivery connection of each pump ............
c) The output of each pump ............
Has the building been protected with sprinkler system, If so, detail of sprinkler pump............
Has a standby source of power supply been provided? If it is through a generator, please indicate.
a) The capacity (output) .............
b) The functions that can be maintained simultaneously by the use of the Generator, such as operating lift(s); fire pumps, emergency lighting etc. system; exit signs; PA system etc............
c) Is the generator automatic in action or has to be started manually?.......
Has any Yard hydrant been provided from the building's fire pump? .....
Where more than one lifts are installed in a common enclosure have individual lifts been separated by fire resisting walls or 2 hours fire rating? ............
Has the lift shaft(s) lift lobby or stairwell been pressurized? If so, give details............
Has the lift lobbies and staircase been effectively enclosed to prevent fire/smoke entering them from outside at any floor? .............
Have all exits and direction of travel to each exit been sign-posted with illuminated signs? ............
Has a false ceiling been provided in any portion of the building? If so, please indicate location and also mention if the material used for the false ceiling is combustible or non-combustible............
Is the building centrally air-conditioned? if so, please indicate:
a) The material used for construction of ducts and its fittings ............
b) The type of lining used for ducts, if any............
c) The type of lagging used for ducts, if any for insulating any portion of the duct; please also indicate how the lagging is secured............
d) If plenum is used for return air passage has it been protected with fire detectors? Please give details............
e) Has a separate A.H.U. been provided for each floor?
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
f) Whether automatic shutdown of A. H. U. is coupled with detection system/sprinkler system…
g) Is the ducting for each floor effectively isolated or is it continuous on more than one floor?
h) Are the fire dampers being provided?
Where are the switchgear and transformer located? If inside the building please indicate:
a) If the switchgear and transformer (s) have been housed in separate compartments, effectively separated from each other and other portions of the building by a four-hour's fire resistive wall?
b) What precautions have been taken to prevent a possible fire in the transformer (s) from spreading?
c) Are transformer protected by high velocity water spray system
I) Where electrical cables, telephone cables wet risers / down comers pass through a floor or wall has the spaces (apertures) round the cables /pipes been effectively sealed/plugged with noncombustible, fire resistance material?
II) Ventilation
a) Whether natural ventilation is relied upon? If so, give details of the vents for the stairwell life shafts
b) Whether mechanical ventilation has been proposed? If so, give details of the proposed system indicating the number of air changes for the basement and other floors
c) Whether mechanical ventilation is coupled with automatic detection system/sprinkler system? Please give details of the system…
Please indicate the number and type of fire extinguishers provided at various locations and the arrangement for the maintenance of the extinguishers
Please indicate if all fire extinguishers bear the BIS mark
Whether the refugee area has been provided? If so, the floor on which provided and the total area provided floor-wise…
Are the occupants of the building systematically trained in fire prevention, use of fire extinguishers and emergency procedures? If so, please give details…
Does an emergency organization exist in the building? If so, please give details and append a copy of the emergency (fire) orders
Has a qualified officer been appointed for the building either individually or jointly with other building(s)
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Has the building been protected against lighting? If so, does the lighting protection conform to any code? Please indicate details provision of MCB and ELCB in the building…
The work has not been started on site and construction will be started only after final approval of the Authority / the position of construction at site is given below:
Name and address of the consultant with Registration No…
Owner's Signatures
Signature of the Applicant / Architect
Name…
(In block letters)
Name… ……
(In block letters)
Designation…
Organization…
Signature of Fire Consultant
Dated:
Name…………
(In block letters)
Remark of the concerned Authority. The proposal has been broadly examined. The above information is correct and the proposal is permissible as far as development Authority is concerned (Additional comments, if any, may be given below or attached):
The proposal can be considered by Fire Services at conceptual stage/is forwarded to Fire Service along with 3 sets of drawings which are according to bye-laws, Master Plan, Zonal Plan, and fire fighting regulations and policy instructions of Government. The proposal involves relaxation in respect of height/set backs/ The architect has been advised to furnish the requisite material and documents given in the attached list, within one week time directly to the Fire Service.
Signature of Authority
Name:
Designation and office Seal:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A” (Bye laws 2.9.1 & 6.3.5) (To be submitted in duplicate)
Form for Application to Erect, Re-Erect or to make Material Alteration in any Place in a Building
To
Commissioner/Vice Chairman/Secretary
Development Authority
Area Statement
Description
Permissible
Proposed sq.mt.
Remarks sq.mt.
Max. Ground coverage
Basement
Ground Floor
First Floor
Second Floor
Third Floor
Total Floor area
Floor Area Ratio
No. of Dwelling Units
Maximum height (in meters)
Setbacks
As per approved Layout plan (mt.)
Proposed (mt.)
Front
Rear
Left
Right
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Parking (for above 250 sq.mt)
Equivalent Car space @ 1.33 ECS per 100 sq.mt of permissible built floor area
Open Parking@ 23 sq.mt per ECS
Ground Floor covered parking@ 28 sq.mt per ECS
Basement Total parking (sq.mt)@32 sq.mt per ECS
Area in sq.mt
Area in sq.mt@ 23 sq.mt per ECS Open Parking
Area in sq.mt @ 28 sq.mt. per ECS Covered Gr. Floor
Area in sq.mt @ 32 sq.mt. per Basement
Total (sq.mt)
1
2
3
4
5
ii) Fee & Charges
a) Building permit fee Rs…
b) Use of City Infrastructure Charges Rs…
c) Additional floor space charges (provisional) Rs…
d) Peripheral charges (Provisional) only for Group IV CHBS Rs…
e) Any other charges (please specify) Rs…
Total amount (as per the details above) Rs…
Receipt No… Dated
We hereby certify that
The plot in question forms part of the approved layout plan and its location size and area conform to the approved layout plan and lease/sale deed/NOC of the lease Administration Branch of concerned Development Authority.
Plot is lying vacant and no construction shall be started before sanction.
The plot is free from all encumbrances (owner responsibility).
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
The period of construction valid up to As per the lease condition / further extension of time for construction granted by the lessor is valid up to Time construction obtained from the lease Administration Branch, Concerned Development Authority.
Size of each dwelling unit is not more than 300 sq.mt.
Signature of Owner(s)
Signature of Registered Architect
Name…
Name…
(In block letters)
(in block letters)
Registration No
Address… Address…
Dated:
Dated:
Authority Letter
I hereby authorize Mr./Mrs.… . to collect the sanction whose signature is verified below.
Specimen signature of signature of the owner(s)/Registered Architect/
Mr./Mrs…
Dated received… Date
(Signature of authorized person / owner / Registered Architect)
Dated: Remark, if any…
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-2” (Bye laws: 2.10.9)
Form for Specifications of Proposed Building
The purpose (Residence, Office, Restaurant, Hotel, Dharmshala, School, Hostel Cinema, Shop, Factory Others) for which it is intended to be used
Sir,
I hereby give notice on behalf of Shri....(owner) that the owner intends to erect/demolish or make alteration in the building number or to on/in Plot No ....Block No.... House No ....situated at ....Scheme....an d in accordance with the building Bye-law No....
and I forward herewith, the following plans and specification duly signed by me and by the owner.
Site plan 2. Building Plan 3. Service Plan 4. Parking and circulation plan. 5. Landscape Plan 6. General Specifications (in attached form) 7. Ownership Title (Lease/Conveyance/Sale Deed, etc) 8. Other document, as required
ii) The building plan has been prepared strictly as per the approved building Byelaws and relevant IS Codes / provisions of NBC. The construction shall be carried out in accordance with the building plan and I shall be completely accountable for any lapse on my part up to within 6 months after obtaining completion certificate of the building.
iii) The Building permit fee as required under bye-laws 2.13 has been deposited vide receipt No dated. (Photocopy enclosed).
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
iv) I am aware that in the event of building being constructed in violation of the sanctioned building plan approval, the Authority shall have the right to take action against me as it may deem fit including referring the matter to concerned professional and statutory councils for taking disciplinary action against me.
Signature of the Owners
Name of owner(s)
Address of the owner(s)
Encl: As stated above
(Signature of Registered
Architect/Engineer/Supervisor)
Registration No. of the
Architect/Engineer/Supervisor
Address of the Architect/Engineer/
Supervisor
Dated:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-1” (Bye laws 2.9.1)
Statement of the Proposal and Certificate By the Owner and Registered Architect
Classification of the Proposal (To erect/re-erect/demolition)
Scheme /Colony Plot No. Plot Area sq.mt. Size (in meter)
Details of coverage on respective floor are given below:
1. Basement Floor......
Existing (sq.mt)
Proposed (sq.mt)
Total (sq.mt)
2. Ground Floor......
2. Mezzanine Floor......
3. First Floor......
4. Second Floor......
5. Third floor......
6. ......
7. ......
8. ......
9. ......
10. ......
e) The materials to be used in construction Walls/Columns/Foundations/Roof/ Floors…
Signature of Registered Architect/Engineer/Supervisor
Name…… Registration No………… Address…
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-3” (Bye laws: 2.10.10)
Form for Supervision
To The Commissioner/Vice-Chairman/Secretary Development Authority
Sir,
I hereby certify that erection/re-erection demolition or material alteration in / of Building No… .on / in .Plot No .in Block No situated at .. scheme shall be carried out under my supervision and I certify that all the materials (type & Grade) and workmanship of the work shall be generally in accordance with the general specification submitted along with and the work shall be carried out according to the sanctioned plans which also included the services like drainage, sanitary, water supply, and electrical.
Signature of Registered Architect Engineer/Supervisor
Name of Registered Architect/Engineer/Supervisor (In block letters)
Registration No. of Architect/Engineer/Supervisor
Address of Registered Architect/Engineer/Supervisor
Dated:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-4” (Bye laws: 2.13)
Undertaking for Payment of Other and Peripheral Charges Note: It should be on non-judicial stamp paper of specified amount attested by Notary Public / First class Magistrate.
Undertaking
I ....Son of Shri ....aged.... Years residents of ....Owner of Plot No .... in......Co-operative Housing Building Society Ltd.... hereby undertake to pay the balance of peripheral and other charges as and when required by the concerned Authority and in this regard Authority's decision will be finally binding on me.
Executed by me as....on day of....2004.
Executant
Witness:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
(Bye laws: 2.9.4 viii)
Affidavit-cum-Undertaking
(Affidavit of Competent Professional on Rs. 2/- Non-Judicial Stamp paper of specified amount to be attested by Notary Public/Metropolitan Magistrate)
I son of Architect by profession having office at… .Do hereby solemnly affirm and declare as under:
That I am a Licensed Architect/Engineer/Supervisor/Plumber duly registered with the Authority vide registration No.
That I have been engaged as a Competent professional as per Appendix ‘E’of the Bye-Laws for preparing the building plans and to supervise construction in respect of Plot No………...Block No situated at
That I have prepared the building plans in respect of the aforesaid plot.
That I have studied the layout plan of the colony and gone through the instructions, policy decisions and other relevant documents in respect of the plot and colony.
That I have personally inspected the site. The plot under proposal forms part of the approved layout plan with respect to its location, size shape and area of the plot and proposed land use is also in conformity with the approved layout plan. The plot has been demarcated at site and the size, shape and area of plot available at site tallies with the approved layout plan.
That the ownership documents are in the shape of registered sale-deed/leasedeed in favour of the applicants and have been thoroughly examined and the ownership in favour of the applicant is in order.
That there is no construction in existence at the plot and no construction shall be started before sanction of the building plans.
That there is no encroachment on the Municipal land/road/other property and road widths as shown in the layout plan are available at site.
That the proposal are in conformity with the terms and condition of lease deed which is still valid and period of construction as per lease-deed and the extension granted by the lessor is valid up to…
That the proposal have been prepared strictly in accordance with the Building Bye-laws rules regulation and practice of the department and no misinterpretation on inference of provision of Building Bye-Law has been done while preparing the plans. The construction shall be carried out strictly in accordance with the sanctioned building plans and in case any deviation is carried out, I shall inform the concerned Authority within 48 hours.
Building Permit/Sanction
File No Dated…
To
Subject: Sanction u/s
Dear Sir or Madam,
With reference to your application dated… for the grant of sanction to erect/re-erect/add to/alteration in the building to carry out the development specified in the said application relating to Plot No…… Block No… …. situated in/at I have to state that the Authority subject to the following conditions and corrections done in the plans has sanctioned the same on
The plans are valid up to …………………day……………Months ………. year …
The construction will be undertaken as per sanctioned plan only and no deviation from the bye-laws will be permitted without prior sanction. Any deviation done against the bye-laws is liable to be demolished and the supervising Architect engaged on the job will run the risk of being black listed.
Violation of building bye-laws will not be compounded.
It will be the duty of the owner of the plot and the Architect preparing the plans to ensure that the sanctioned plans are as per prevalent Master Plan/Zonal Plan/Building Bye-laws. If any infringement of bye-laws remain unnoticed, the concerned Authority reserves the right to amend the plans as and when infringement come to the notice and concerned Authority will stand indemnified against any claim on this account.
A notice in writing shall be sent to Authority before commencement of the constructions of the building as per bye-laws. Similar notice will be sent to Authority when the building has reached up to plinth level.
The owner shall not occupy or permit to occupy the building or use or permit to use the building or any part thereof affected by any such work until occupancy certificate is issued by the concerned Authority.
Concerned Authority will stand indemnified and kept harmless from all proceedings in court and before other authorities of all expenses /claims
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
which the concerned Authority may incur or become liable to pay as a result or in consequences of the sanction accorded by it to these building plans.
The doors and window leaves shall be fixed in such a way that they shall not, when open project on any street.
The owner will not convert the house into more dwelling units on each floor then the sanctioned.
Green cover
A minimum of 1 tree for every 80 sqm of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species.
10.2.1 (i)
6(a)
Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the obligation to provide continued maintenance for such plantations.
10.2.1 (ii)
10.2.4 - IV
4( c)
Use of flyash bricks: Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended from time to time.
10.2.6 (b)
4(d)
Use of concept of passive solar design of buildings using architectural design approaches that minimize energy consumption in buildings by integrating conventional energy-efficient devices, such as mechanical and electric pumps, fans, lighting fixtures and other equipment, with the passive design elements, such as building orientation, landscaping, efficient building envelope, appropriate fenestration, increased day lighting design and thermal mass.
10.2 (3)
4(e)
Optimize use of energy systems in buildings that should maintain a specific indoor environment conducive to the functional requirements of the building by following mandatory compliance measures (for all applicable buildings) as recommended in the Energy Conservation Building Code (ECBC) 2007 of the Bureau of Energy Efficiency, Government of India.
10.2 (3)
5
Air Quality and Noise
Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site.
-
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
That in case the owner dispenses with my services at any stage whatsoever, I shall inform the concerned Authority within 48 hours.
That the size of each dwelling unit is not more than 300 sq. mt.
That mandatory setbacks have been proposed and shall be maintained in accordance with the setbacks marked in the layout plan/Master Plan.
That before submission of the proposal, necessary information/clarification have been obtained from the concerned department of the concerned Authority. The plot is safe and is not affected in any scheme or the road widening. Building activities for residential use are allowed with number of storeys as per approved layout plan.
That no development/additional development/deficiency charges are payable, against this plot (in case development/additional development/deficiency charges are payable then its details be given in the separate para)
That no non-compoundable deviations shall be carried out during the course of construction.
That nothing has been concealed and no misrepresentation has been made while preparing and submitting the building plans.
That in case anything contrary to the above is found or established at any stage, the concerned Authority shall be at liberty to take any action as it may deem fit including revocation of sanction of building plans and debarring me for submission of building plans with the Authority under the scheme and also lodge a complaint with the Council of Architecture for appropriate action.
Deponent
Verification:
I the above named deponent do hereby verify at on this… ……. of …….. 20……… that contents of the above affidavit are true and correct to my knowledge. No part of it is false and nothing has been concealed there from.
Deponent
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-6” (Bye laws: 2.14.2)
The building shall not be constructed within minimum distance as specified in Indian Electricity Rules from voltage lines running on side of the site.
The land left open as a consequence of the enforcement of the setback rule shall form part of the public street.
The owner shall ensure that the public areas like road, parks and other public opens spaces are not used for stacking the building materials or machineries to avoid public inconvenience and nuisance.
The sanction will be void if auxiliary conditions mentioned above and other conditions whatsoever imposed are not complied.
The owner will use the premises for the use, which has been sanctioned.
The owner will not proceed with the construction without having the supervision of an Architect/Engineer as the case may be. If he\she changes his Architect\Engineer, he\she shall inform the Authority about the appointment of new Architect\Engineer within 48 hours, with a proper certificate from him.
Yours Faithfully
For
Encl: A set of sanctioned plan.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-7” (Bye laws: 2.14.2)
Form for Refusal of Building Permit
With reference to your application No....dated.... for the grant of sanction for the erection of building/execution of work in House No.... Plot No....Block No.... Scheme.... Situated at .... I have you inform you that building permit under relevant provisions of the Act of.... has been refused on.... on the following grounds.
Yours faithfully
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Form of Revalidation
Appendix “A- 8” (Bye laws: 2.14.3)
File No… Dated
Shri /Madam
Subject: Revalidation of Building Plans relating to plot No… Block No………………….Scheme………
Dear Sir / Madam,
Block No.
With reference to your application dated…………on the subject cited above, I am directed to inform you that your building plan which were sanctioned on………. vide file No………………..have been revalidated up to
Original sanctioned plan submitted by you is also returned herewith.
3 Please acknowledge receipt.
Yours Faithfully,
For…
Authority
Encl: As above.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-9”
(Deleted vide amendment in Bye laws: revised clause 2.15.1 b)
Form for Notice for Commencement of Work
(contents deleted vide amendments)
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-10” (Bye laws: 2.15.3)
Form for Certificate of Architect/Engineer/Supervisor (To be submitted along with notice of completion)
To
The
Authority,
Dear Sir,
We hereby certify that the erection, re-erection or material alteration in/at building No… ..on in Plot No Block No .Scheme… .situated at ..has been supervised by me and has been completed on according to the plans sanctioned, vide office communication No dated .The work has been completed to our best satisfaction, the workmanship and all the materials (type & grade) have been used strictly in accordance with general and detailed specifications. All the drainage/Sanitary/Water Supply work has been executed under our supervision and as per Building Bye-laws. No provisions of the Building Bye-laws and condition prescribed or order issued there under have been transgressed in the course of the work. The building is fit for use for which it has been erected /re-erected or altered/constructed and enlarged.
2. Certificate:
i) Certified that the building(s) has been constructed according to the sanctioned plan and structural design (one set of structural drawings as executed is enclosed) which incorporate the provisions of structural safety as specified in relevant prevailing NBC Part 6 and IS codes standards/Guidelines.
ii) Further certified that water harvesting as well as waste water re-cycling systems have been provided as per the sanctioned building plan.
iii) It is also certified that construction has been one under our supervision and guidelines and adheres to the drawings submitted and the records of supervision have been maintained by us.
Permission to occupy of use the building may be granted.
Any subsequent change from completion drawings will be the responsibility of the owner(s)
a) Signature of the owner b) Signature of the Architect/Engineer with date with date Name in Block letters Name in Block letter, Licence No.
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Address
c) Signature of the Structural Engineer c) with date (for certificate 1) (as defined in NBC of India) Name in Block Letters Address
Dated :
Address
Signature of Supervisor/Engineer/
Group/Engineer with date
Name in Block letters, Licence No.
Address
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-14” (Bye laws: 2.17.1)
File No… Plan No… Dated:
Shri/Miss/Smt
Qualification and Competence of Technical Personnel for Preparations of Schemes for Building Permit and Supervision
Completion-cum-Occupancy Certificate
With reference to your notice of completion dated……………I hereby certify that building as per description below certified plan at Plot No… ……Block No… Scheme ...situated at
whose plans were sanctioned vide No has been inspected with reference to building bye-laws in respect to the structural safety, fire safety, hygienic and sanitary conditions and proposed rainwater harvesting systems inside and in the surroundings and is declared fit for occupation and release of regular water and electricity connections. The description of the construction work completed is given as under:
Information for Intimation of Completion of Work up to Plinth Level
To
The
Authority,
Sir,
The construction up to plinth/column up to plinth level has been completed in Building No… on/in Plot No Scheme No… Road/Street …Ward …in accordance with your permission No ..dated .under my supervision and in accordance with the sanctioned plan.
Yours faithfully,
Signature of Licensed Architect/Engineer/Supervisor
Name……………
(In Block letters)
Address:
…
Date:
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Inspection Report
Appendix “A -11” (Bye laws: 2.15.3)
I working as a with have carried out the inspection of Building No ..on/in Plot No Scheme No.… ….Road/Street… ward.. .. in accordance with permission No… ..dated .The following deviation from the sanctioned plans have been noticed which are against the provision of Master Plan / Bye-laws are of non-compoundable nature.
Description of deviations noticed:
You may not proceed with further work till such time the deviations made are rectified and construction brought in conformity to sanction plans.
Yours Faithfully
For…
Competent Authority
Office No…
Office Stamp…
Date…
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-12” (Bye laws: 2.16)
Form of Notice of Completion (To be submitted along with prescribed fee for notice of completion and other relevant documents)
To
The
Authority,
Dear Sir,
I/We hereby give notice that I/We have completed the erection of building/execution of the works in Plot No Block No… ….Scheme situated at in pursuance of the sanction granted by the Authority vide File No dated… I/We are enclosing all reports of the Authority inspection carried out during construction period.
Permission to occupy or use the building may be granted.
Yours Faithfully,
Signature of owner…
Name of owner
(In Block letters)
Address of the owner
Dated:
Encl : As above
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-13” (Bye laws: 2.16 x)
Description of Construction Work Block Wise/Building Wise.
Block Building No.
Details of Completed Work floor wise.
Vice Chairman
or
Commissioner of Authority
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Appendix “A-15” (Bye laws: 2.17.1)
Form of Rejection or Compliance in Respect of Occupancy Certificate
File No… Dated:
Sh/Smt
Subject: Occupancy Certificate in respect of Plot No…
Dear Sir / Madam,
With reference to your letter dated
With reference to your notice of completion dated
In continuation of this office letter of even No… …..dated on the subject noted above, I am directed to inform you that your case bas been examined and occupancy certificate is rejected for the reasons as given below:-