The provisions contained in Master Plan/Zonal Plan/Development Code or as per the Urban and Regional Development Plan Formulation and Implementation Guidelines, 2014 shall apply and where these are silent on such issues or which require interpretation the norms as decided by the Authority, shall apply. The provisions include but are not limited to the use/ activity of premises, ground coverage, FAR, setbacks, open space, height, density and number of dwelling units and parking standards for Residential premises on plotted development, Group housing, Resettlement colonies, Slums, In-situ upgradation ,Non-residential premises
The permission of uses/use activities in use premises shall permitted in accordance with provisions of Master Plan/Zonal Plan/ Local Area Plan/ Layout Plan.
The object of these regulations is to provide control for building/buildings within use premises excluding the internal arrangement, which is covered and controlled by Building Bye-Laws.
The premises for which building regulations have not been given shall be examined by the Authority on the basis of actual requirements and other relevant factors.
i) Wherever there is a need for relaxation in height for achieving urban form, the same may be permitted with the recommendation of the Authority.
ii) The provision of minimum setbacks for different sizes of plots for all categories of the plots shall be as per the Master Plan/Development Plan or as per simplified Development Promotion Regulations of the Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines.
3.1Flexible FAR
3.1.1 Additional FAR
Additional FAR, as provided in the Master Plan may also be examined with a view to provide flexibility and also to utilize the scarce urban land optimally. Flexible range of FAR on a site may be based upon its Additional FAR Factor which is a product of ‘creativity’ and ‘context’. Creativity can be defined by design parameters such as urban form, parking provision, pedestrian safety, concern for the poor through induced informal activities, and provisions for evacuation during an emergency due to disaster (for example, Delhi falls in the Zone 5). It also includes the impact of the design on essential services and environment. As a principle, the additional FAR should not result in a negative impact on the essential services and environment.
Locational attributes, of the site being assigned additional FAR, refer to its location with respect to land use as given in the approved Master/Zonal/Layout Plan (as the case may be), accessibility, level of congestion on the approach road and nearness to a heritage building if any.
Additional FAR Factor=Creativity x context=Design parameters x Locational attributes=x+y(a+b+c+d+e)
Where, a = Parking provision value
b = Disaster emergency provision value
c = Urban Form value
d = Pedestrian Safety value
Development Codes
e = Induced informal activities value
x = Impact on essential services value
y = Impact on environment value
m = Land Use value
n = Accessibility (Right of way of the approach road) value
o = Congestion (Mobility index in terms of travel speed) value
p = Heritage Value
3.1.2 Purchasable FAR
Provision of purchasable FAR in Group Housing, Commercial, Institutional, and Industrial, Sport and amusement complex, recreational greens and Low Density Sports plot may be considered, where:
(i) The Plots exist on ‘24mtrs. and above’ wide road.
(ii) The construction has not started, or
(iii) The allottee wants to construct a new additional building within the limits of permissible ground coverage, or
(iv) The allottee wants to construct new building on the vacant plot, or
(v) The allottee has already constructed building within purchasable F.A.R limits, or
(vi) Purchaseable F.A.R may be allowed on minimum 18.0mtrs. road width and above road width for institutional and industrial use.
Explanation: The Purchasable FAR shall be allowed up to the maximum limit of the applicable FAR in the Building Regulations.
Purchasable may FAR be allowed with the following provision/ conditions:
(i) No construction shall be allowed beyond the limit of maximum permissible ground Coverage.
(ii) Parking facilities shall be provided within the plot as per the provisions of the building bylaws.
(iii) No objection certificate from the Airport Authority of India/ Competent Authority shall be obtained for the height of the building.
(iv) Structure design duly checked and verified by the I.I.T/ N.I.T./ Government Engineering College shall be submitted along with the proposal in case where additional floors are being proposed.
(v) No objection certificate for Fire Safety and Environmental Clearance shall be obtained from the Competent Authorities.
(vi) Purchasable FAR shall be applicable only on the basis of assessment of planned and available physical infrastructure.
(vii) Use of purchaseable FAR shall be governed by the terms and conditions of lease deed.
(viii) In case where purchasable FAR is allowed, the Authority shall permit increase in the height of building as per requirement.
(ix) Additional proportionate residential units shall be allowed on purchaseable FAR for Group Housing.
(i) Purchasable FAR is an enabling provision. It shall not be allowed to any Allottee as a matter of right.
(ii) With the consideration of Traffic density, conditions of approach road, availability of physical infrastructure, distance from the protected area and heritage sites or in the light of planning the Authority may identify the zones/ areas where purchasable FAR shall not be allowed.
(iii) In case of mixed land use permitted in any pocket/plot:
Permissible FAR for various uses shall be as applicable for respective use including the purchasable FAR The total FAR in the pocket/plot shall be subject to the overall permissible FAR for the pocket/plot.
Purchasable FAR shall be calculated on the basis of the FAR of the individual uses within that pocket/plot.
3.1.3 Floating FAR
The Authority shall allow development by restricting / regulating height of the building width of abutting road and plot sizes. This method is based on the carrying capacity analysis of the infrastructure planned. In keeping with the norm in the provision of infrastructure adjusted to the percentage, plot owners shall be permitted to use the additional FAR on payment basis.
Basis for increasing FAR: Carrying Capacity analysis tool is useful to rationalise fixation of FAR including increase in given FAR. Two major determining factors should be considered:
1. V/C (V= volume, C= capacity)
V/C: optimum level is 0.8; it can be relaxed upto 0.9. Above 0.9 is dysfunctional and 1.0 is not desirable.
2. LPCD of piped water supply
The planned LPCD should be as per the minimum of norm i.e. 135 litres. However, the density is to be capped by the Development/ Master Plan as per the threshold.
Note: Assignment of Values for flexible FAR and other calculations may be referred from URDPFI Guidelines, 2014
3.2 Development norms and standards for hill towns
The suggested norms and standards are only indicative and can be suitably modified depending upon the local conditions both physical and environmental. In hill areas, the space standards are affected by the topography and environment and therefore the following factors shall be considered while setting norms in such areas:
i) Exposure to sunlight
ii) Degree of slopes and accessibility in the form of distance traveled.
iii) Basic needs of the people
iv) The conservation principle.
v) Alternative modes of transportation Communication network.
vi) Mobile facilities and emergency facilities.
3.4Specific premises
3.4.1 Residential Use Zone
The residential areas are developed either as
a) Plotted development or
b) Group housing/flatted development.
The density pattern i.e. (high density, high medium density, low medium density or low density) are followed for working out the pattern of development with respect to:
i) Size of the plot
ii) Number of dwelling units on each plot
iii) Setbacks
iv) FAR
v) Number of storeys/ height of the building
The municipal and social infrastructure as per the norms and standards specified in the Master Plan shall be provided. The various sites/plots required for social and municipal infrastructure are to be indicated in the layout plans. The development norms for different use/activities and on different sizes of plots are applied for sanctioning of the plans. These are based on development control rules applicable to the city/town.
3.4.2 Buildings within the Residential Use Zone
Buildings for various uses/activities within the residential use zone forming part of the residential layout plan are to be constructed with the norms of the coverage, FAR, height and others as applicable to that size of a residential plot.
3.4.3 Residential Premises – Plotted Housing
The layout plans for residential scheme shall be formulated keeping in view:
Development Codes
i) that there should be sufficient daylight and fresh air in the habitable areas within the buildings, when constructed.
ii) that there would be protection against noise, dust and local hazards
iii) that there should be sufficient open space for various family needs and in accordance with the provisions of clause 4.26, 4.27 and 4.28.
iv) that the circulation and access is easy and is safe from accident point of view
v) that, as far as possible, the plots are of regular shape and size and
vi) these are logically arranged in a systematic manner so as to give a regular pattern of development in the form of row houses, detached and semi-detached houses and if necessary the regular bungalow type plots.
The plot size may vary depending upon the type of the housing, needed for a particular city based on general affordability of the people. The size of the plot would also depend on the number of dwelling units to be permitted on each plot. Normally, a plot should be built for two dwelling units on each plot. However, on bigger size plots, more than one dwelling unit per plot can be built. For low-income group, the minimum plot size should not be less than 30 sq.mt. The following Table 3.3 is suggested for different size of the plots applicable, ground coverage, FAR, height and number of dwelling units for a residential area:
Table 3.3Building control in Residential Premises
Sl.No.
Plot Area (sq.mt)
Maximum Ground Coverage %
FAR
No. of DUs.
Maximum Height (mt.)
1.
30
75
150
1
8
2.
Above 30 upto 50
75
150
2
8
3.
Above 50 upto 100
65
180
3
12
4.
Above 100 upto 250
65
180
3
12
5.
Above 250 upto 500
55
165
6
15
6.
Above 500 upto 1000
45
120
8
15
7.
Above 1000 upto 1500
40
100
8
15
8.
Above 1500 upto 3000
33.3
100
12
15
Note:
In the already developed plots the pattern of development should conform to the existing regulations.
Basement, if constructed, may be used for incidental use such as parking, servicing and household storage. It is not to be used as a dwelling unit.
The area of the basement should not be more than the ground coverage.
Parking as per the prescribed norms should be provided with the plot or provision should be made in the layout plan without affecting the circulation pattern.
50% of the open area of the plot should be used for proper landscaping and for plantation.
3.4.4 Group Housing
The number of dwelling units are calculated on the basis of the density pattern given in the development plan, taking into consideration a population of 4.5 persons per dwelling unit.
Minimum size of the plot
3000 sq m.
In hill towns
5000 sq m.
Maximum ground coverage
25% to 35%
Maximum FAR
50 to 175 (higher FAR may be given depending on the pattern of development)
In hill areas
Development Codes
50 (higher FAR may be given depending on the pattern of development and should not exceed 150) Maximum Height 15 m. (for plot sizes upto 4000 sq m.) 26 m. for plots above 4000 sq m. In hill areas 15 m. for all size of plots. Number of dwelling units To be calculated on the basis of the net plot area of a particular neighbourhood. This may vary between 25 DUs. to 175 DUs. per ha
Basement, if constructed, is to be used for parking, services and for essential household storage and for providing facilities without counting in FAR.
The quantum of basement may vary between 33 % to 50% of the plot area.
3.4.5 Resettlement and Slum in-situ upgradation
i) Maximum net density 250 tenements per hectare.
ii) Plot size- minimum 25 sq m. However it may be reduced to 18 sq m. with 100% coverage provided an area @ 7 sq m. per plot/tenement is clubbed with the cluster open space.
iii) Path ways:
a) 2 m. upto 30 m. in length
b) 3 m. upto 50 m. in length
Table 3.4Net residential density of group housing, controls
S.N.
Net Residential Density (DU/ha)
Maximum Ground Coverage (%)
FAR
1
25
25
0.50
2
50
30
0.75
3
75
33
0.90
4
100
35
1.00
5
125
35
1.25
6
150
35
1.50
7
175
35
1.75
The size of the habitable room shall be minimum of 9.5 sqm, where there is only one room with a minimum width of 2.4m. Where there are two rooms, one of these shall be minimum of 9.5 sqm and other 7.5 sqm, with a minimum width of 2.1 m.
3.4.6 Low Income Housing
The minimum plot size shall not be less than 30 sqm.
i) It is recommended to provide cluster housing instead of single room dwelling.
ii) The minimum plot size with ground coverage not exceeding 75%, shall be minimum 40 sqm in small and medium towns and minimum 30 sqm in metropolitan cities.
iii) Plot sizes below 30 sqm and not less than 15 sqm may be permitted in case of cluster planning. In such a case the ground coverage and FAR can be 100 and 200 respectively.
iv) Size of room: Every dwelling unit should have at least two habitable rooms, first room of minimum 9 sqm and width of 2.5 m. Other room shall be min 6.5 sqm with minimum width of 2.1 m provided the total area of both the rooms shall not be less than 15.5 sqm.
Development Codes
3.4.7 Studio Apartments:
Minimum size of plot
2000 sqm.
Maximum Ground Coverage
33.3%
Maximum FAR
2.00
Height
NR (Subject to clearance from AAI/Fire Department and Other Statutory bodies)
Parking
2.0 ECS/100 sqm built up area
Other controls for studio apartments:
i. The maximum size of the apartment shall be 60 sqm built-up.
ii. The plots shall be located on road facing minimum width of 12m.
iii. Basement, if constructed, and used only for parking, utilities and services shall not be counted towards FAR.
3.6Commercial
3.6.1 Convenience Shopping
Maximum ground coverage
40%
Maximum floor area ratio
0.60
Maximum Height
15 m.
In hills
6 m.
Maximum ground coverage
30%
Maximum floor area ratio
0.80
Maximum height
As per requirement
Other Controls:
Other Controls:
i) Basement upto the building envelope to the maximum extent of 50% plot area shall be allowed and if used for parking and services should not be counted in FAR.
i) Basement upto the building envelope to the maximum extent of 50% plot area shall be allowed and if used for parking and services should not be counted in FAR.
ii) Further, for Risk based approval of types of Warehouses / IFC refer clause 13.5, Table 13.4
ii) Further, for Risk based approval of types of Warehouses / IFC refer clause 13.5, Table 13.4
Development Codes
3.6.2 Local Shopping/ Neighbourhood Shopping Centre
Maximum ground coverage
30%
In hills
35%
Maximum FAR
1.00
Maximum Height
15 m.
In hills
9 m.
3.6.3 Community Centre
Maximum ground coverage
25%
In hills
30%
Maximum FAR
1.00
Maximum Height
26 m.
In hills
15 m.
3.6.4 District Centre
Maximum ground coverage
25%
Maximum FAR
1.25
In hills
1.25
Maximum Height
37m.(upto 50 as per requirement)
In hills
15 m.
i) Some of the buildings in a district centre in non-hill towns could be permitted upto 50 m. height with the approval of the Government for achieving interesting urban form.
3.6.5 Central Business District/ City Centre
Maximum ground coverage
25%
Maximum floor area ratio
3.00
Maximum height
As per requirement
3.6.6 Sub-Central Business District Same regulations as for district center and flexible at discretion of competent authority
The following regulations are recommended for locating the petrol pump cum service stations-
i) Minimum distance from the road intersections.
a) For minor roads having less than 30 m. R/W 50 m.
b) For major roads having R/W 30 m. or more 100 m.
ii) The minimum distance of the property line of pump from the center line of the Road should not be less than 15 meters on roads having less than 30 m. R/W. In case of roads having 30 m. or more R/W, the R/W of the road should be protected.
iii) Plot Size
a) Only filling stations 30 m. x 17 m. and small size 18 m. x 15 m. (for two and three wheelers)
b) Filling-cum-service station minimum size 36 m. x 30 m. and maximum 45 m. x 33 m.
c) Frontage of the plot should not be less than 30 m.
d) Longer side of the plot should be the frontage.
iv) New Petrol Pump shall not be located on roads having less than 30 m. R/W.
a) Filling-cum-service station size 36 m. x 30 m. and 45 m. x 33 m.)
i) Ground coverage 0 20%
ii) FAR 0.20
iii) Max. Height 6 m.
iv) Canopy Equivalent to permissible ground coverage within setback line.
v) Front Setback Min. 6 m.
b) Filling Station (size 30 mt. x 17 mt. and 18 mt. x 15 mt.)
i) Ground coverage 10%
ii) FAR 0.10
iii) Max. Height 6 m.
iv) Canopy Equivalent to permissible ground coverage within setback line.
v) Front Setback Min. 3 m.
c) Other Regulations
i) Shall be approved by Explosives/Fire Deptt.
ii) Ground coverage will exclude canopy area.
iii) Mezzanine if provided will be counted in FAR
iv) Wherever the plot is more than 33 m. x 45 m. development norms shall be restricted to as
d) Compressed Natural Gas (CNG) Mother Station
i) Plot Size (Max.) 36 m. x 30 m.
ii) Maximum ground coverage 20%
iii) Maximum Height 4.5 m. (single storey)
iv) Building Component Control room/office/Dispensing room, store, pantry and W.C.
3.6.11 Hotels
Maximum ground coverage
40%
Maximum floor area ratio
3.00
In hills
1.75
Maximum height
As per requirement
Page 39
i) 5% of the FAR can be used the commercial space related to hotel function.
ii) Basement(s) up to the building envelope to the maximum extent of plot area shall be allowed and if used for parking and services should not be counted in FAR.
Development Codes
3.6.12 Motels
Motels are permitted in Rural Zone/ Green Belt and in commercial zones on National Highways and Inter-State roads.
The following norms and building standards are recommended.
Minimum plot size
1.0 Ha
Minimum Setbacks
front 15 m.
Rear and sides
9 m.
Maximum FAR
0.15
Maximum Ground Coverage
15%
Maximum Height
9 m.
Basement equivalent to the ground coverage shall be allowed free of FAR to the extent necessary for air conditioning plant, filtration plant, electric sub- station, parking and other essential services.
Parking space shall be provided on a minimum scale of 1.67 ECS per 100 sq m. of floor area, including the provision made in this regard in the basement.
Retail and service shops shall be limited to a maximum of 5% of the floor area.
3.6.13 Service Apartments
Maximum ground coverage
30%
Maximum FAR
1.50
In hills
1.50
Maximum Height
As per requirement
Parking space shall be provided on a minimum scale of 2 ECS per 100 sq m. of floor area, including the provision made in this regard in the basement.
3.3Parking standard
Parking space shall be provided for different types of development as per norms given in Master Plan/Development Plan or as given below:
3.3.1 The following Table 3.1 may be referred to for deciding the parking norms for different use zone/activities only minimum required value of ECS and NOT a range should be specified in the development plan. It can be changed in subsequent plan depending upon need based upon local vehicle ownership, mass transportation and consequent parking needs.
Development Codes
Table 3.1Parking standards
S.No.
Land use
Parking Standards
Remark
1
Residential
Residential Plot-Plotted Housing
2 Equivalent Car Space (ECS) in plots of size 250-300 sqm and 1ECS for every 100 sqm. built up area, in plots exceeding 300 sqm.
--
Residential Plot - Group Housing
2.0 ECS/100 sqm built up area
--
Cluster Court Housing
2.0 ECS/100 sqm built up area
--
Guest House / Lodging & Boarding House / Dharamshala
2 ECS per 100 sqm. of built up area
--
2
Commercial Centres
Convenience Shopping Centre/Local Shopping Centre / Local Level Commercial areas
2 ECS / 100 sqm of floor area
--
Service Market
2 ECS / 100 sqm of floor area
--
Community Centre / Non- hierarchical Commercial Centre
3 ECS / 100 sqm of floor area
--
District Centre/ Sub-Central Business District/Sub-City Level Commercial areas
3 ECS / 100 sqm of floor area
--
Commercial Plot: Retail & Commerce Metropolitan City Centre
3 ECS / 100 sqm of floor area
--
Hotel
3 ECS / 100 sqm of floor area
For Population between 2- 10 lakh - 1 car parking space for every 4 guest room. For Population between 10-50 lakh - 1 car parking space for every 3 guest room. For Population more than 50 lakh - 1 car parking space for every 2 guest room2.
Service Apartments
3 ECS / 100 sqm of floor area
--
Any other commercial centre including commercial component along with Railway/MRTS and ISBT
3 ECS / 100 sqm of floor area
--
Integrated Freight Complex/ Wholesale Market
3 ECS / 100 sqm of floor area
In case of plots up to 300 sqm. common parking is to be provided
3
Socio-Cultural Facilities
Community Hall
3.0 ECS / 100 sqm of floor area
--
Recreational Club
2 ECS / 100 sqm of floor area
--
Socio-cultural activities such as auditorium, music, dance & drama, centre / meditation, spiritual centre etc.
2 ECS / 100 sqm of floor area
--
Science Centre
2 ECS / 100 sqm of floor area
--
International Convention centre
2 ECS / 100 sqm of floor area
--
2 National Building Code, 2005.
Development Codes
S.No.
Land use
Parking Standards
Remark
Old Age Home / Care Centre for Physically / Mentally challenged / Working women / men hostel /Adult Education Centre / Orphanage / Children's Centre / Night Shelter
1.8 ECS / 100 sqm of floor area
--
Sport facility for international sports event
2 ECS / 100 sqm of floor area.
--
4
Public-Semi Public
Integrated Office Complex
1.8 ECS / 100 sq m of floor area
The norms for Local Government offices / Public Sector Undertakings under Government Land use shall be as per Integrated office complex
District Court
1.8 ECS / 100 sqm of floor area
--
Head Post Office with Administrative office & with / without delivery office
1.33 ECS / 100 sqm. of floor area
--
Amusement Park
3 ECS / 100 sqm. of floor area
--
ISBT/Metro
2 ECS / 100 sqm. of floor area
--
Hospitals
2 ECS / 100 sqm. of floor area
--
Veterinary Hospital
1.33 ECS / 100 sqm. of floor area
--
Veterinary Dispensary
1.33 ECS / 100 sqm. of floor area
--
Nursing and Paramedic institute
2 ECS / 100 sqm. of floor area
--
Medical College
As per norms of Medical Council of India / Regulatory Body
--
5
Industry
Industrial Plot up to 50 sqm area
2 ECS / 100 sqm of floor area
--
Industrial Plot 51sqm -400 sqm area
2 ECS / 100 sqm of floor area
--
Industrial Plot 401 sqm and above
2 ECS / 100 sqm of floor area
--
Flatted group Industry (Min Plot size 400 sqm)
2 ECS / 100 sqm of floor area
--
6
Mixed Land use
Parking @ 2.0 ECS / 100 sqm built up area shall be provided within the premises.
Where this is not available, cost of development of parking, shall be payable by the plot allottee / owner to the local body concerned or Multi-level parking to be provided as an option. This condition shall apply even if residential premises are used only for professional activity.
Parking standards are prescribed in above table, however, the following Table 3.2 could be followed for different types of land use.
Development Codes
Table 3.2Permissible ECS for different land uses
S.No.
Use Premises
Permissible Equivalent Car Spaces (ECS) per 100 sqm. of floor area
1
Residential
2.0
2
Commercial
3.0
3
Industrial
2.0
4
Public Building
1.8
5
Semi-Public Facilities
2.0
6
Mixed Land use
2.0
3.3.2 Multi storeyed parking
Special permission shall be sought for development of buildings specifically for parking. Permission shall be granted based on width of road, requirement for parking space, FAR available and other parameters as specified by the competent authority.
2000 sq. mt. in plain areas
1000 sq. m. in hilly areas
Minimum number of car parking spaces: 50
Development of such parking lots may be undertaken by offering tradable FAR to the developer in lieu of development of parking lots which may be surrendered to competent authority on completion.
3.5Non-residential premises
3.5.1 Foreign Mission
Maximum ground coverage
25%
Maximum floor area ratio
0.75
Maximum height
15 m.
i) Basement up to the building envelope to the maximum extent of 50% plot area shall be allowed if used for parking and services and should not be counted in FAR.
3.5.2 Guest House, Boarding House and Lodging House, Hostel
Minimum plot size
500 sq m.
Maximum ground coverage
30%
Maximum floor area ratio
1.20
Maximum height
15 m.
i) Minimum R/W in front 20 m.
ii) Basement upto the building envelope to the maximum extent of 50% of plot area shall be allowed and if used for parking and services should not be counted in FAR.
3.5.3 Dharmshala, Baratghar, and Night Shelter
Minimum plot size
1000 sq m.
Maximum ground coverage
30%
Maximum floor area ratio
1.20
Maximum height
26 m.
i) Minimum R/W in front 16 m.
ii) Basement upto the building envelope to the maximum extent of 50% plot area shall be allowed and if used for parking and services should not be counted in FAR.
3.7Industrial plot
3.7.1 Flatted Group Industry and Service Centre
Minimum plot size
2000 sq m.
Maximum ground coverage
30%
Maximum floor area ratio
1.20
In hills
1.00
Maximum height
15 m.
In hills
15 m.
Other Controls:
i) Basement upto the building envelope line to the maximum extent of 50% plot area shall be allowed and if used for parking and services should not be counted in FAR
3.7.2 Light and Service Industry
Table 3.5Development Controls on Service and Light Industrial Plots
Sl.No.
Plot Size (Sq m.)
Maximum Ground Coverage
Maximum FAR in
Maximum height in (m)
Plains
Hills
Plains
Hills
1.
Less than 400
60%
1.25
1.00
12
9
2.
Above 400 & upto 4000
50%
1.25
1.00
12
12
3.
Above 4000 & upto 12000
45%
1.25
1.00
12
12
4.
Above 12000
40%
1.00
0.75
12
9
Development Codes
i) Maximum floors allowed shall be basement, ground floor and first floor; basement should be below ground floor and to the maximum extent of ground coverage shall be counted in FAR. In case the basement is not constructed, the permissible FAR can be achieved on the second floor.
ii) In case of roof trusses, height of buildings could be adjusted/ relaxed.
3.7.3 Extensive Industry
Table 3.6Development Controls on Extensive Industrial Plots
Sl.No.
Plot Size (Sq m.)
Maximum Ground Coverage
Maximum FAR in
Maximum height in (m.)
Plains
Hills
1.
400 to 4000
50%
1.00
0.75
9
2.
Above 4000 & upto 12000
45%
0.90
0.60
9
3.
Above 12000 & upto 28000
40%
0.80
0.50
9
4.
Above 28000
30%
0.60
0.45
9
Other controls:
i) Single Storey building with basement is allowed. Basement shall be below the ground floor and the maximum extent of ground coverage and shall be counted in FAR.
ii) In case of roof trusses, height of building could be adjusted/relaxed.
i) A new planned industrial area to have minimum 100 300 sqm size of plot and its width shall not be < 15 m.
ii) For industrial plots upto 1000 sq.m, 5% of the total area shall be reserved as amenity open space which shall also serve as general parking space. When such amenity open space exceeds 1500 sq.m, the excess area could be utilised for construction of buildings for banks, canteen, welfare centre and such other common purposes.
iii) For industrial plots more than 1000 sq m, 10% of the total area to be reserved as amenity/ open space to a maximum of 25 sq. m.