Occupancy Categorization of Buildings for Water and Other Requirement for Fire Fighting
| Zone-I | Zone-II | Zone-III |
|---|---|---|
| GROUP “A”: RESIDENTIAL | GROUP “A”: RESIDENTIAL | GROUP “A”: RESIDENTIAL |
| A1 Lodging and Rooming HousesA2 One or two family private dwellingA3 DormitoriesA4 Apartment Houses | A5 Hotels | F2 Shops and stores, etc. above 500 sq.mt. floor areaF3 Underground shopping centers |
| GROUP “B” EDUCATIONALB1 Schools up to higher secondary level | GROUP “C” INSTITUTIONALC1 Hospitals and Sanitoria (More than 100 beds) | GROUP “G” INDUSTRIALG3 High hazard Industries |
| GROUP “C” INSTITUTIONALC1 Hospital & Sanitoria (upto 100 beds)C2 Custodial InstitutionsC3 Penal & mental Institutions | GROUP “D” ASSEMBLY BUILDINGSD1 For more than 1000 persons with permanent stage and fixed seatsD2 For less than 1000 persons with permanent stage and fixed seats | GROUP “H” STORAGE BUILDINGS |
| GROUP “D” ASSEMBLY BUILDINGSD3 Upto 300 persons without permanent stage and fixed seatsD4 Above 300 persons without permanent stage & fixed seats | GROUP “E” BUSINESS BUILDINGSE1 Offices, Banks, etc.E2 Laboratories, Libraries, etc.E3 Telephone Exchanges | GROUP “J” HAZARDOUS BUILDINGS |
| GROUP “E” BUSINESSE3 Computer InstallationsE5 Broadcasting stations | GROUP “F” MERCANTILEF1 Shops, Stores, etc. upto 500 m² floor area | |
| GROUP “G” INDUSTRIALG1 Low hazard Industries | GROUP “G” INDUSTRIAL |
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices
Annexure “B-I”
Fire Protection Requirements for Buildings in Zone-I Category
| Sl. No. | Measures | Group-A: Residential A1, A2, A3, A4 | Group-B: Educational | Group-C: Institutional | |||||||
| O | I | II | III | I | II | III | I | II | III | ||
| 1 | Access | P | P | P | P | P | P | P | P | P | P |
| 2 | Means of Escape | P | P | P | P | P | P | P | P | P | P |
| 3 | Compartmentation | P | P | P | P | P | P | P | P | P | P |
| 4 | Refuge Area | X | X | X | X | X | X | X | X | X | X |
| 5 | Emergency Lights | X | X | P | P | P | P | P | P | P | P |
| 6 | Exit Signs | P | P | P | P | P | P | P | P | P | P |
| 7 | PA System with Talk Back Facility | X | X | X | X | X | P | P | P | P | P |
| 8 | Moefa | X | X | X | P | X | P | P | P2 | P | P |
| 9 | Extinguishers | P | P | P | P | P | P | P | P | P | P |
| 10 | Hose Reel | P3 | P | P | P | P3 | P | P | P | P | P |
| 11 | Yard Hydrant | X | X | X | P | X | P | P | X | P | P |
| 12 | Down Comer | X | X | X | P | X | P | X | P4 | X | X |
| 13 | Wet Riser | X | X | P | X | X | X | P | X | P | P |
| 14 | Fire Detection System | X | X | X | X | X | P6 | X | P2 | P | P |
| 15 | Automatic Sprinkler System | S | S | S | S | S | S | FS | S | S | FS |
| 16 | Under Ground Tank | X | X | X | X | X | X | P | P2 | P | P |
| 17 | Over Head Tank | P13 | P | P | P | P | P | P | P | P | P |
| 18 | Fire Pumps | X | X | X | X | X | X | P | X | P | P |
| 19 | Booster Pumps | P3 | P | P | P | P | P3 | P | P | X | P |
| 20 | Auto D.G. Set | P3 | X | P | P | P3 | P | P | P | P | P |
| 21 | MCB/ELCB | P | P | P | P | P | P | P | P | P | P |
| 22 | Hose Boxes | X | X | X | P | X | P | P | P4 | P | P |
| 23 | Fireman's Grounding Switch | P | P | P | P | P | P | P | P | P | P |
Model Building Bye-Law, 2015, TCPO
Annexure and Appendices