13.1 Streamlining the building approval/sanction procedure (Ease of Doing Business)
Typically for any urban infrastructure development project, a number of clearances are required. As per World Bank‘s Report Doing Business, 2014 India is ranked 183, out of 189 countries in terms of dealing with construction permits and on an average there are 37 procedures involved and 162 days are spent before obtaining permission for undertaking construction. It clearly signifies that the procedure for obtaining clearances is time consuming and projects often get stalled due to delay in obtaining clearances from various agencies.
In order to attract investments into the country, efforts are being made to improve ‘Ease of Doing Business’. In this direction, the limit of Built-up Area (BUA) for Foreign Direct Investment (FDI) has been reduced from 50,000 sqm to 20,000 sqm. The local bodies have been directed to get the entire building approval process made online so that the building plan applications are submitted online alongwith building fees and other charges, and after due scrutiny, the approvals are also to be conveyed online.
Further, external bodies like Urban Art Commission (UAC), National Monuments Authority (NMA), Airports Authority of India (AAI), Metro Rail Corporation (MRC), Heritage Conservation Committee (HCC), etc. grant No Objection Certificate (NOC)/ approvals on the proposed building plans to the local bodies. All such external bodies are mandated to prepare online NOC systems compatible to and integrated with that of the local bodies and the desired information is to be sent to the concerned external bodies and their comments/ NOC/ approval are to be received online so that there is no need for building proponents to pursue matter with local bodies or external agencies. The specific requirements of the external bodies are to be added in the Common Application Form (CAF) of the local body so that building proponent has to file all information at a single customized online application. The objective is to make the whole process simplified and streamlined to ensure ease in getting the approvals for building permit within stipulated time.
Further, a procedure has been laid down in clause 2.14.1 d of the MBBL for sanction of building plans of small residential plots measuring up to 105 sqm based on standard or other designs. The process is to facilitate building proponents of such small sized plots to either adopt standard plans or get their building plans prepared by a competent professional, and submit to the concerned local bodies along with fees, other charges, drawings and documents before commencement of the construction where the submission itself shall be deemed sanction. Hence, such persons may not have to wait for processes of approval from the local bodies to commence construction.
Streamlining of Buidling Plan Approvals