2.14.1 a) Planning Permission/Norms with respect to the Provisions of Master Plan/ Development Plan:
The Owner, if she/he so desires, may apply to the Authority in a format (Appendix – ‘C’) for planning permission/Norms through his engaged Competent Professional for building plan design (as per Appendix ‘E’), submitting (i) Title documents; (ii) Development Code/Zoning Regulations of Master Plan/ Development Plan and (iii) Building Bye-Laws, which she / he intends to follow.
The Owner/engaged Competent professional (as per Appendix ‘E’) shall indicate the Development Code interpretation of Master Plan/Development Plan and may support this through schematic drawings/sketches.
The Authority shall verify the title document and scrutinize the interpretation of Development Code / Zoning Regulations and accord planning permission within 30 days of submission of the application to the Owner/ engaged Competent Professional as per Appendix ‘E’. Procedure may however, be prescribed by the Authority in this behalf.
b) Sanction by Empanelled Professionals: Competent Professionals (as per Appendix ‘E’) empanelled with the Authority, under the rules, shall be authorized to issue building permit subject to the various provisions of the said rules.
c) Instant Sanction / Deemed sanction by Certification:
i. Deemed building permit shall be applicable only in such cases where, a Competent Professional for building plan design as per Appendix ‘E’, has planned the building on an individual plot (forming part of an approved Layout Plan) and has certified that the building plans are within applicable building bye laws and Master plan Regulations.
This shall be applicable for buildings of height upto 15 mts / upto 17.5 mts with stilts of 2.5mts to be processed for instant sanction, if it is certified by 3 architects (including the architect who planned and designed the building), one structural engineer, one proof consultant and one services engineer, who are registered on a
panel, maintained by the Local Body/Authority, that the plans have been prepared within the framework of provisions of the Master Plan and applicable Building Bye Laws/ Regulations and the construction shall be carried out in accordance with Master Plan and BBL provisions under compoundable limits.
Proof check certification of design and detailed construction specification shall be mandatory. Drawings submitted shall be working drawings and no changes shall be permissible at site during construction.
ii. Procedure: The application along with the building plans, documents, fees and charges etc to be submitted to the Local Body/Authority for their records and after submission of all the requisite charges and documents it will issue instant sanction and owner can start the construction as per these plan which will be considered under Deemed building clause.
The Authority shall examine plans and documents within a period of 10 days and in case observes any deficiency, the owner/ engaged competent professional for building plan design (as per Appendix ‘E’) may be asked to rectify the same.
Notes – for proposals falling within the Prohibited and Regulated areas as defined by AMASR Act 2010, permission /NOC from Competent Authority shall have to be obtained as per Rules 2011 framed under the Act in addition to the given documentations required for “Deemed Sanction”
d) Standard Building Plans: In case of standard building plans prepared by the Authority for residential plots upto 105 sq.mt. in size and forming part of the approved layout plan, the owner shall be entitled to sign such standard plans and the required documents for sanction. In such cases, certificate from professionals would not be necessary and the owner shall be bound to follow the approved standard plan in detail. The Authority shall explore options of EWS/LIG/MIG plotted housing schemes to develop pre-approved Standardized building plans of Housing Units for variable plots sizes/carpet area (in the range 30sqm-105sqm). The owner shall undertake construction of the so formed standard housing units in compliance to clause d) above.
2.14.2 Grant of Permit or Refusal
a) The Authority shall either sanction or refuse sanction to the plans and specifications or may sanction them with such modification or directions as it may deem necessary and thereupon shall communicate its decision to the person giving the notice in the prescribed form given in Appendix “A-6" and Appendix "A- 7".
b) The building plans for buildings identified in Bye-Laws no. 2.10.5. shall be subject to the scrutiny of the Chief Fire Officer and building permit shall be given by the Authority only after the clearance from the Chief Fire Officer is obtained.
c) In case where the building scheme requires the clearance of an Urban Art Commission, if constituted for the city then the Authority shall issue the building permit only after getting the clearance from the Urban Art Commission.
d) If, within 15 days of the receipt of notice under 2.9.1 of the Bye-Laws, the Authority fails to intimate in writing to the person who has given the notice, of its refusal or sanction to the notice with its plans and statements, the same shall be deemed to have been sanctioned provide the fact is immediately brought to the notice of the Authority in writing by the person who has given notice and having not received any intimation from the Authority within 15 days of giving such notice subject to the conditions
mentioned in these Bye-Laws, nothing shall be construed to authorize any person to do anything in contravention or against the terms of the lease or title of the land or against any regulations, Bye-Laws or ordinance operating at the time of execution of the work at site.
e) Once the plan has been scrutinized and objections have been pointed out, the Owner who has given the notice under Section 2.9.1 shall modify the plan to comply with the objections raised and resubmit the modified plans. The Authority shall scrutinize the resubmitted plans and if, there are still some objections that shall be intimated to the applicant for compliance. Only thereafter the plans shall be sanctioned. It is further clarified that:
i) The above provision of deemed sanction shall be applicable only in those cases where construction is to be carried on plot forming part of an approved layout plan of the Authority.
ii) No notice under Section 2.9.1 shall be valid unless the information required by the Authority under these Bye-Laws or any further information which may be required has been furnished to the satisfaction of the Authority.
iii) The Owner/ engaged Competent Professional for building plan design (as per Appendix ‘E’) and others shall be fully responsible for any violation of Master Plan/Zonal Plan/ Building Bye-Laws, architectural controls, lease deed conditions etc. In case of any default they shall be liable for action. Any construction so raised shall be deemed to be unauthorized and shall be liable for action.
2.14.3 Duration of Sanction/Revalidation:
Once a building permit is sanctioned, it shall remain valid for three years from the date of sanction for residential, industrial and commercial buildings (4 storeyed) and for a period of four years from the date of sanction for multi-storeyed buildings of 15 m. and above in height. However, the validity period of sanction in case of additions/alterations in both the cases, shall be two years from the date of sanction. The building permit shall be got revalidated in the prescribed form (Appendix- ‘A-8’) before the expiry of this period on year-to-year basis. Revalidation shall be subject to the Master Plan/Zonal Plan regulation and building Bye-laws, as in force, for the area where construction has not started.
2.14.4 Revocation of Permit:
The Authority shall revoke any building permit issued under the provisions of the Bye-Laws, wherever there has been any false statement, mis-representation of material facts in the application on which the building permit was based. Or If during construction it is found that the Owner has violated any of the provisions of the Building Bye-Laws or sanctioned plan or compoundable limits.
Fresh sanction of building plans and occupancy certificate shall be taken from the Authority after bringing the building within the framework of Master Plan/ Zonal Plan/ Building Bye-Laws.
2.14.5 Qualification and Competence
Qualification and competence of all professionals including Architect/ Engineer/ Structural Engineer/ Town Planner/ Landscape Architect/ Urban designer/ Supervisor/ Plumber/ Electrician/ Fire Consultant shall be as given in Appendix -"E".
2.14.6 Penal Action
a) The Authority reserves the right to take action and to debar/blacklist the Town Planner, Architect, Engineer, Supervisor or Plumber, if found to have deviated from professional conduct or to have made any false statement or on account of misrepresentation of any material facts or default either in authentication of a plan or in supervision of the construction against the building Bye-Laws and the sanctioned building plans.
b) If the sanctioning Authority finds at any time any violation of the building Bye-Laws or misrepresentation of facts, or construction at variance with the sanction or building Bye-Laws, inclusive of the prescribed documents, the Authority shall revoke the sanction and take appropriate action against such professional and such professional shall not be authorized to submit fresh plans till finalization of the case. Before debarring or blacklisting such professional if found to be indulging in professional misconduct or where she/he has misrepresented any material facts, the Authority shall issue a show cause notice with an opportunity of a personal hearing and shall pass an order to debar her/him for submission and supervision of the construction with full justification for the same. An appeal against this order shall lie with the Authority with whom she/he is registered.
2.14.7 Unauthorized Development
In case of unauthorized development, the Authority shall take suitable action, which may include demolition of unauthorized works, sealing of premises, prosecution and criminal proceeding against the offender in pursuance of relevant laws in force.