Note: The Directions/Guidelines issued by the Ministry of Environment, Forest, and Climate Change from time to time shall be part of this chapter of the Bye-Laws. Also, relevant sections from Chapter 14, as well as any other relevant sections from Model Building Bye Laws, 2016 shall be applicable in the same. The EIA requirements are already mandated by the Environment Protection Act, 1986. EIA shall be required for all buildings.
13.1 Environmental clearances for building and construction
(1) The competent authority shall approve and certify the compliance of environmental clearances requirements for following categories of buildings:
| Sr.No. | Building Category | Built up area (in square meters) |
|---|---|---|
| 1 | Category 1 | 5000-20000 |
| 2 | Category 2 | Above 20000-50000 |
| 3 | Category 3 | Above 50000-150000 |
(2) The Competent Authority shall ensure the conditions fulfilled before approving and certifying the compliance of environmental clearances stated below:
Environmental conditions for Category 1 buildings:
| Sr.No. | Medium | Environmental conditions | Schedule for submitting self-certification |
|---|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring non-obstructed flow of water | Along with Occupation Certificate application |
| 2 | Water Conservation-Rain Water Harvesting/Ground Water Recharge | i. A rainwater/snow-melt runoff harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rainwater / snow-melt harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rainwater harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. | Along with Occupation Certificate application |
| 2 | Water Conservation-Rain Water Harvesting/Ground Water Recharge | ii. The unpaved area shall be more than or equal to 20% of the recreational open spaces | Along with Occupation Certificate application |
| 3 | Solid Waste Management | Separate wet and dry bins must be provided at the ground level, as well as segregation areas on each floor for facilitating segregation of waste. | Along with Occupation Certificate application |
| 4 | Energy | In common areas, LED/solar lights must be provided. | Along with Occupation Certificate application |
| 5 | Air Quality and Noise | i. Dust, smoke and debris prevention measures such as screens, barricading shall be installed at the site during | Along with notice of commencement of |
| construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. | construction | ||
| ii. The exhaust pipe of the DG set, if installed, must be minimum 10 meters away from the building. In case it is less than 10 meters away, the exhaust pipe shall be taken up to 3 meters above the building. | Along with Occupation Certificate application | ||
| 6 | Green cover | i. A minimum of 1 tree for every 40 square meters of land shall be planted and maintained. The existing trees will be counted for this purpose. Preference should be given to planting native species. | Along with notice of commencement of construction |
| 6 | Green cover | ii. Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e., planting of 3 trees for 1 tree cut) shall be done with the obligation to provide continued maintenance for such plantations. | Along with notice of commencement of construction. |
Environmental conditions for Category 2 buildings:
| Sr.No. | Medium | Environmental conditions | Schedule for submitting self-certification |
|---|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring obstructed flow of water. | Along with Occupation Certificate application |
| 2 | Water Conservation-Rain Water Harvesting and Ground Water Recharge | i. A rainwater/snow-melt runoff harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rainwater/snow-melt harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rainwater/snow-melt harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. | Along with Occupation Certificate application |
| 3 | Solid Waste Management | i. The unpaved area shall be more than or equal to 20% of the recreational open spaces. | Along with Occupation Certificate application |
| 3 | Solid Waste Management | ii. Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | Along with Occupation Certificate application |
| 4 | Energy | i. In common areas, LED/solar lights must be provided. | Along with Occupation Certificate application |
| 4 | Energy | ii. At least 1% of connected applied load generated from renewable energy source such as photovoltaic cells. | Along with Occupation Certificate application |
| iii. As per the provisions of the Ministry of New and Renewable energy solar water heater of minimum capacity 10 liters/4 persons (2.5 liters per capita) be installed. | Along with Occupation Certificate application | ||
| iv. Sun dried/ rammed earth/earth blocks/ solar passive building materials should be used as building material | Along with notice of commencement of construction | ||
| 5 | Air Quality and Noise | i. Dust, smoke, and debris prevention measures such as screens, barricading shall be installed at the site during construction. Plastic/ tarpaulin sheet covers must be used for trucks bringing in sand and material at the site. | Along with notice of commencement of construction |
| 5 | Air Quality and Noise | ii. The exhaust pipe of the DG set, if installed, must be minimum 10 meters away from the building. In case it is less than 10 meters away, the exhaust pipe shall be taken up to 3 meters above the building. |
Environmental conditions for Category 3 buildings:
| Sr.No. | Medium | Environmental conditions | Schedule for submitting self-certification |
|---|---|---|---|
| 1 | Natural Drainage | The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring obstructed flow of water. | Along with Occupation Certificate application |
| 2 | Water Conservation-Rain Water Harvesting / Ground Water Recharge | i. A rainwater/snow-melt runoff harvesting plan needs to be designed where the recharge bores (minimum one per 5000 sqm of built-up area) shall be provided. The rainwater/snow-melt harvested should be stored in a tank for reuse in household through a provision of separate water tank and pipeline to avoid mixing with potable municipal water supply. The excess rainwater/snow-melt runoff harvested be linked to the tube well bore in the premise through a pipeline after filtration in the installed filters. | Along with Occupation Certificate application |
| ii. The unpaved area shall be more than or equal to 20% of the recreational open spaces. | Along with Occupation Certificate application | ||
| iii. The ground water shall not be withdrawn without approval from the competent authority. | Along with notice of commencement of construction | ||
| iv. Use of potable water in construction should be minimized. | Along with notice of commencement of construction | ||
| v. Low flow fixtures and sensors must be used to promote water conservation. | Along with notice of commencement of construction | ||
| vi. Separation of grey and black water should be adopted by the use of dual plumbing system. | Along with notice of commencement of construction | ||
| 3 | Solid Waste Management | i. Separate wet and dry bins must be provided at the ground level for facilitating segregation of waste. | Along with Occupation Certificate application |
| 3 | Solid Waste Management | ii. All non-biodegradable waste shall be handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers. | Along with Occupation Certificate application |
| iii. Organic waste composter/vermiculture pit with a minimum capacity of 0.3 Kg/tenement/day must be installed wherein the STP sludge may be used to be converted to manure which could be used at the site or handed over to authorized recyclers for which a written tie-up must be done with the authorized recyclers. | Along with Occupation Certificate application | ||
| 4 |
(3) All the provisions mentioned under Municipal Solid Waste (Management and Handling) Rule, 2016 and their subsequent amendments; Plastic Waste Management Rules, 2016 and their
subsequent amendments and adoptions by the UT and any other competent authority and their notifications would be applicable.
(4) The applicant shall self-certify the above stated environmental conditions with the certification of supervision/ completion from the competent professional or Bureau of Energy Efficiency Certified Energy Auditors, as the case may be, responsible for supervising the construction of building and/ or installing the solar photovoltaic power unit. Sewage Treatment Plant, Solid waste management system, ECBC Code, Ladakh ECBC 2021 (once notified) & others.
(5) The applicant shall submit the self-certification on environmental conditions to the Competent Authority as per schedule given in sub para 13.1(2).
(6) The Competent Authority shall verify the certification and issue consent/ comments within 10 (Ten) working days of receiving the certification. The Environmental Clearance certificate shall be deemed accepted, if it is in conformity with conditions stated herein before, but no consent/ comments have been passed by Competent Authority within specified time.
(7) If the owner or the competent professional as mentioned in sub para 13.1(3) or as the case may be, submits a wrong or false self-certification or if any additional construction or violation is reported to exist at site or has concealed any fact or misrepresented regarding environmental conditions stated in sub para 13.1(2), they shall be jointly and severally responsible for such omission/commission and complaint against the competent professional for suspension of registration, and/or any penalties as deemed fit by the UT Administration against the competent professional and the owner shall be liable to pay for the penalty as may be decided by the Competent Authority after giving an opportunity of being heard. Further, if it emerges that the information was concealed by Competent Professional/Owner, necessary penal proceedings, as decided by the administration will be initiated along with barring the competent professional from practicing in the UT of Ladakh.
(8) In case environmental clearance is issued by Competent Authority, no separate prior environmental clearance shall be required.
(9) In case the building is certified from GRIHA/LEED/IGBC, there is no requirement to issue environmental clearance.
(10) Any Govt. of India/UT Acts, Laws, Byelaws would be applicable as notified from time to time
(11) EV Charging rationale, options and infrastructure shall be guided by Amendments in Model Building Bye Laws, 2016 for Electric Vehicle Infrastructure
(12) Indoor Air Quality rationale, options and infrastructure shall be guided by Amendments in Model Building Bye Laws, 2016 for Electric Vehicle Infrastructure, as and when applicable
(13) In-building solutions for IT Infrastructure rationale, options and infrastructure shall be guided by Amendments in Model Building Bye Laws, 2016 for Electric Vehicle Infrastructure, as and when applicable
(14) Environmental Impact Assessment and Environmental Clearance shall be in-line with Environmental (Protection) Act 1986, and its subsequent amendments, specifically 2006 amendment, which define the requirement of mandates and screening for Category A, B1 and B2 projects.
Chapter-14: Heritage and Protected Monuments
Conservation of heritage sites shall include buildings, artifacts, structures, areas, and precincts of historic, aesthetic, architectural, cultural or environmentally significant nature (heritage buildings and heritage precincts), natural feature areas of environmental significance or sites of scenic beauty.