11.1 Materials
The requirement of building materials to be used in construction shall conform to the Building Materials specified in the guideline issued by the Competent Authority.
11.2 Foundations
(1) All foundation designs shall be prepared in accordance with the relevant Indian Standards and shall be vetted as per the provisions of the said Building Bye-laws
11.3 Building Services
The planning, design, and installation of heating systems or air-conditioning as the case may be in a building shall be in accordance with Building Services, Section 2- Electrical Installations and Section 3- Air-Conditioning and Heating specified in as per the provisions of the said Building Bye-laws, or as may be notified through Orders, Guidelines, or Standard Operating Procedures by the Competent Authority as updated from time to time.
11.4 Plumbing Services
The planning design and installation of water supply systems, drainage, sanitary installations, and gas supply installations in a building shall be in accordance with Plumbing Services, Section 1- Water Supply, Section 2- Drainage and Sanitation and Section 3- Gas supply specified in the as per the provisions of the said Building Bye Laws, or as may be notified separately through Orders, Guidelines, or Standard Operating Procedures by the Competent Authority, as updated from time to time.
11.5 Construction Practices and Safety
(1) The various activities including demolition, excavation, blasting, construction from foundation level up to completion shall be in accordance with Construction Practices and Safety as per the provisions of the said Building Bye Laws, or as may be notified
separately through Orders, Guidelines, or Standard Operating Procedures by the Competent Authority, as updated from time to time.
(2) The Safety Measures to be adopted during various construction operations, including storage of materials on the construction site and municipal/public land shall be in accordance with Construction Practices and Safety specified in the as per the provisions of the said Building Bye Laws, or as may be notified separately through Orders, Guidelines, or Standard Operating Procedures by the Competent Authority, as updated from time to time.
11.6 Damp Proof Course
Wall of a building including a pier forming a part of the wall or a compound wall shall be provided with a damp-proof course, except when built in cement concrete rated of 1:2:4.