i. The collection, conveyance, and dispersal of rainwater for harvesting should only be of clear water to check contamination of ground water. This shall include ‘filtration and storage’ of surface run-off for limited range, and re-use of collected and filtered rainwater.
ii. The entry or pouring points of the rainwater shall be designed to remain covered.
iii. The arrangement of quick filtration of rainwater/snow-melt shall also be made in the rainwater/snow-melt harvesting well/tube well so that rainwater does not choke the strata.
iv. The complete rainwater/snow-melt harvesting system shall be constructed within the available area of the plot.
v. The recharge well shall be located at a distance of not less than 10 meters away from any structure handling sewage or industrial
Page:95 of 184
wastewater (such as septic tank or effluent treatment plant etc.). This minimum distance of 10 meters shall not be applicable to manholes or sewer lines although it shall be ensured that they are leak proof.
vi. The detailed proposal of the system comprising collection, conveyance and dispersion of rainwater harvesting well/ tube well shall have to be shown on the building plan submitted for approval.
vii. The Owner/ competent professional duly engaged for supervision and execution of the construction of the building shall submit the certificate stating that the rainwater harvesting system is functional at site and same conforms to the provisions of these Bye-Laws. However, if the said person is found guilty of misrepresentation of the facts, penal proceedings shall be initiated along with debarring the concerned professional from practicing in the UT of Ladakh.
viii. The construction of the building as laid down in sub-clause (1) shall be the part of occupation certificate. Unless such construction is completed as per the approval, occupation certificate shall not be issued.
ix. The owner of every building shall ensure that the rainwater/snow-melt harvesting structure, if any, is maintained in good repair for storage of water of non-potable purposes and recharge of ground water at all times.
x. Groundwater extraction needs to be regulated; water meters need to be installed for recording flow/quality of water extraction. District metered areas and connection to SCADA system needs to be incorporated for all connections.
xi. Snowmelt run-off drains, if any, need to be away from pathways in order to prevent hazards due to freeze-thaw cycles.
xii. Chapter-9 of Model Building Byelaws, 2016 need to be referred for incorporating further techniques and measures of Rainwater Harvesting.
xiii. Any further guidelines and rules released by Govt. of India/UT Acts, Laws, and Byelaws would be applicable as notified from time to time.