(1) If during the construction of a building(s), any deviation from the sanctioned plan (s) is intended to be made, approval of the Competent
Authority for the same may be obtained before the change is made. The revised plan(s) showing deviations shall be submitted and the procedure laid down for the sanction of building plan as stated in sub-para No. 5.1 and 5.2, shall be followed for all revised plans, along with depositing scrutiny fee for the area proposed to be revised, as well as previously sanctioned plans and revised drawings in the same format.
(2) No notice and or building approval is necessary for compoundable alterations/violations, which do not violate any provision (s) concerning building requirements, structural stability, and fire safety requirements of these Building Bye-Laws.
5.7 Revocation of sanction
The sanction granted under sub-para 5.2 and sub-para 5.4 can be revoked by the competent authority, if it is found that such sanction has been obtained by the owner by means of misrepresentation of material facts or fraudulent document(s) submitted along with the building plan application or otherwise or the construction is not being done in accordance with the sanction granted and or in accordance with these Bye-Laws.
5.8 Maintenance of E-Register for sanction/ Registration of Building Plans
An online E-register integrated with the existing E-Governance module shall be maintained for all building applications received, whether offline or online, by the Municipal Committee, permissions granted or deemed to have been granted or refused and or returned under these Bye-Laws. The said register shall be available online to the public for inspection on the website of the competent authority.
5.9 Damp Proof Course (DPC) Certificate
The owner or the architect shall submit a certificate, in case of self-certification, that the construction of building up to DPC level is as per the sanctioned plan(s). The competent authority shall verify the certification and shall issue consent/comments within three (3) days of receiving the certificate. DPC certificate shall be deemed to have been accepted if it is in conformity with Bye-Laws and no orders have been passed by competent authority within specified days.