12.1 Two pipe system in drainage
(1) The drainage system in a building shall be of two pipe system, one for soil and another for waste. The soil pipe(s) to be connected to the drain directly and the waste pipes first in a gully trapped and then to the drain. All traps to be ventilated vertically.
(2) In Group housing, commercial complexes, commercial (other than plotted), institutional, industrial, other building specified by the competent authority in accordance with Sub para 8.4, the water from waste pipes shall be treated within the premises and used for flushing, horticulture, cooling tower etc. purposes. Further, no soil/waste pipe shall be allowed in common wall/party wall.
12.2 Minimum sanitary facilities required for various type of buildings
(1) Dwellings with individual convenience shall have at least the following fitments:
(i) one bathroom provided with a tap:
(ii) one water closet; and
(iii) where only one water closet is provided in a dwelling, the bath and water closet shall be separately provided.
(iv) Kitchen with wash basin.
(v) All wastewater outlets shall be provided with suitable traps for preventing back flow of water or foul smell or both.
(2) Dwellings (tenements) without individual conveniences shall have the following fitments:
(i) one water taps with draining arrangements in each tenement;
(ii) one water closet and one bath for every two tenements; and
(iii) water tap in common bathroom and common water closet.
(3) The requirements for fitments for drainage and sanitation, in case of buildings other than residential such as office buildings, factories, cinemas, concert halls, theatres, hospitals, hotels, restaurants, schools and hostels shall be in accordance with the provisions of the said Building Bye-Laws, or as may be notified separately through Orders,
Guidelines, or Standard Operating Procedures by the Competent Authority for Water Supply, Drainage and Sanitation" with such updating as may be made from time to time.
12.3 Method of disposal
(1) Every water borne drainage installation shall be connected with the public sewer, but in case no public sewer exists in the vicinity of the said premises, the drainage system may as a temporary measure and subject to the previously written approval of the Competent Authority be connected to a septic tank from which the effluent shall be drained off:
(i) into absorption pits, or,
(ii) by sub-soil drain
- Provided that no absorption pit shall be allowed in the case of any premises or area in which domestic supply is taken from sub soil water.
- Provided further that if in future a public sewer is constructed in the nearby area, the owner shall at his own expense connect to the sewer.
(2) Effective arrangements shall be made to treat the effluents up to the parameters/ guidelines issued from time to time by Central Pollution Control Board (CPCB) or Administration of UT Ladakh to ensure that the untreated effluents do not enter into any river, canal or water body or a ground water zone.
12.4 Septic tank
(1) No septic tank shall be located :
(i) at a distance of less than 2.5 meters from a dwelling unit or any other building used for human habitation or for work or recreation.
(ii) in a public through fare
(iii) within 16 (sixteen) meters from any percolation well, watercourse or stream used or likely to be used for drinking or domestic purposes or for manufacture or preparation of any article of food or drink for human consumption and it shall be readily accessible so as to permit cleaning operation being carried out without interference with the operation of any water borne sanitary installation as a whole.
(2) Every septic tank intended to serve a population of 24 (twenty-four) or more persons shall have two separate compartments so that one compartment for alternate use for cleaning the filtered one. The capacity of every compartment of the septic tank shall be 2(1)/(2) (two and half) times the total water supply allowances for the total number of residents of the buildings in the premises.
(3) Every inlet pipe into a septic tank shall be effectively trapped.
(4) The design of septic tank shall be in accordance with the guidelines issued by Administration of UT Ladakh.
12.5 Absorption pit
(1) The location of every absorption pit shall conform to same restrictions as specified for a septic tank in Sub para 12.4.
(2) No absorption pit shall have any outlet into a storm water drain or surface drain.
(3) The walls of every absorption pit shall be at least 0.5 meters above the ground level to ensure that storm water does not enter into the absorption pit.
(4) The absorption pits shall be constructed in duplicate as laid in Sub para 12.4 (2). The capacity of the absorption pit shall be as approved by the Competent Authority.
(5) All details shall conform to the guidelines issued by the Competent Authority as updated from time to time.
12.6 Sub-soil irrigation for disposal of effluent
No Sub-soil irrigation work for disposal of effluent from a septic tank shall allowed.
12.7 Zero wastewater discharge
(1) The group housings, industries, commercial, institutions and any other building specified by the competent authority shall ensure zero wastewater discharge into main sewer line and shall install suitable treatment plant for treatment of wastewater. The applicant shall submit completion certificate of installation of treatment plant from independent expert agency along with the application of Occupation Certificate.
(2) For water conservation in the building, provision shall be made whereby the wastewater generated from the sources such as dishwashing or washing machines, is used for sub- surface irrigation, or if treated, for non-potable purposes as mentioned in these Bye-Laws.
Note: The above restriction shall not apply in case of plots up to 2000 square meters.
12.8 Sewerage Connection
All buildings need to be connected to public sewer and shall need prior permissions by Competent Authority. No connection to any public sewer shall be made nor any water borne sanitary and drainage installations intended to be connected until a certificate after completion by the Competent Authority has been issued.
12.9 Application for connection with public sewer
(1) After the grant of a certificate referred to in the building Byeln aws or in the event of the said certificate having been deemed to have been granted, every person intending to connect a drain to a public sewer shall apply to the Competent Authority at least seven days before the date on which such connection is required.
(2) The application shall be accompanied by a certificate referred to the Sub para12.8 and such amount as may be laid down from time to time by the Competent Authority and calculated on the basis of the current schedule of rates to meet the cost of the proposed connection.
(3) On receipt of the application and subject to the requirement of the foregoing clauses, the Competent Authority shall approve or reject the request.
12.10 Sewage Discharge
(1) Every drain discharging into a public sewer shall join the sewer obliquely in the direction the sewer is flowing.
(2) If practicable, the connection shall be made at an existing junction in the sewer and if not possible, then there shall be an intercepting manhole before the connection.
12.11 Drainage of roof
The roof of every building shall drain rainwater into gutters, chutes or trough and shall be carried down through adequate number of down pipes without causing dampness in any part of the wall or foundation of the building or any adjacent building.
12.12 Effect on the transferred areas
Where the planned areas are transferred to the Competent Authority then the norms/ byelaws/ zoning bye-laws applicable to them at the time of transfer of these areas shall remain same, as defined, and enforced by the concerned Authority.
12.13 Sustainable waste management
Wherever applicable, Chapter 4, Chapter 10.2.5, as well as any other relevant sections from Model Building Bye Laws, 2016 shall be applicable for sustainable waste management.
12.14 Provisions of Dry Toilets
The dry toilets should be in the traditional two-storied design to convert waste into compost, and the facility should be well ventilated and have smell free technology. The cleaning needs to be free of Manual Cleaning, carrying and disposal. Ventilation requirements shall be subjected to Chapter 4.30 and all other relevant sections from Model Building Bye-Laws, 2016. Approval by approval authority needs to be taken before construction.