18.1 Applicability
The quality control and inspection shall apply to all non-residential buildings.
The owner / developer / occupants and registered appointed Persons on Record shall have to certify the inspection and safety report as per Schedule No.3.
The Administrator, UT of Lakshadweep shall have full powers to amend all or any provision of these Building Bye - laws.
Page No 130
Schedule
Page No 131
Minimum Qualification, Experience and Document Requirements for being considered for Registering with the Competent Authority as Persons on Record
(Refer Rule No. 3.2.1, 3.2.2, 3.2.3)
The procedure for registering persons with the Competent Authority is given in Rule No. 3.2.1. The registration shall be renewed annually. The following are the minimum qualifications and experience requirements for all persons to be considered for registering with the Competent Authority as Persons on Record, in order to determine their competence to fulfil their responsibilities as specified in Rule No. 3.2.2.
A Qualification and Experience:
Minimum qualifications and experience requirements for architects, for being considered for registration with the Competent Authority, as Architects on Record shall be as follows:
(a) Bachelor’s Degree in Architecture / Diploma in Architecture Equivalent to B. Arch and Architect must hold a valid registration with the Council of Architecture, India, issued as per the provisions of the Architects Act, 1972 and
(b) Architect must have a minimum of two years of experience in practice of architecture.
B Scope Work and Competence:
(a) Preparation & planning of all types of layouts; submission of drawings; submission of certificate of supervision, progress reports and submission of certificate of completion for all types of buildings in accordance with the provisions of these building Rules.
(b) Supervision & execution of construction work as per specifications & drawings prepared by authorised registered structural designer & engineer.
A Qualification and Experience:
Minimum qualifications and experience requirements for engineers, for being considered for registration with the Competent Authority, as Engineers on Record shall be as follows:
(a) Master’s Degree in Civil Engineering, a bachelor’s degree in Civil Engineering or Building construction or its equivalent qualification recognized by the All-India Board of Technical Education, or, a Diploma in Civil Engineering or Diploma in Building Construction recognized by State Board of Technical Examination of any State of India or Associate Membership (Civil Engineering) of the Institute of Engineers, India (AMIE), and
(b) Engineer having bachelor’s degree, or its equivalent qualification must have minimum of two years of experience and Diploma holder/or AMIE must have minimum of five years of experience in professional work.
Schedule No. 2
(a) Preparation & planning of all types of layouts except special structures / special buildings as per these Rules; submission of drawings and submission of certificate of supervision & completion for all types of buildings. A person having qualification of a Diploma in Civil Engineering shall be permitted to undertake low rise buildings only.
(b) Supervision & execution of construction work as per specifications & drawings prepared by authorized registered structural designer.
(c) He / she can prepare & submit structural details & calculations for buildings of load bearing structures.
Page No 132
Minimum qualifications and experience requirements for structural engineers, for being considered for registration with the Competent Authority as Structural Engineer on Record shall be as follows:
Table No. S1 – 1: SEOR Qualifications and Experience
| Grade | Scope of Work | Qualification | Minimum Years of Experience* |
| SEOR 1 | 1 Building with height above 25m 2 Total proposed built-up area for a building unit is more than10000sqm 3 Mercantile - 2, 3; Educational -1, 2, 3; Assembly; Health - 2, 3, 4; Hospitality, Utility; Public Office; Special Buildings | Category 1 | 10 |
| Category 2 | 3 | ||
| SEOR 2 | 1 Building with height above 15 m /17.5 m (with Stilt) and up to 25m 2 Total proposed built-up area for a building unit is more than 2000 sqm and up to 10000 sqm | Category 1 | 5 |
| Category 2 | 2 | ||
| SEOR 3 | 1 Building with height up to 15m /17.5 m (with Stilt). 2 Total proposed built-up area for building unit up to 2000sqm | Category 1 | 2 |
| Category 2 | ----- | ||
| Notes: 1 *Minimum years of experience of preparing structural design, detailed drawings, and specifications after attaining the degree/Diploma. 2 Category 1: B.E/ B. Tech Civil or equivalent degree recognized by the AICTE. 3 Category 2: M.E/ M. Tech Civil, or a Ph. D in Structural Engineering. 4 Person holding Higher grade license can also work for Lower Grade Work 5 Maximum Height of building shall be permissible as prescribed under prevailing Integrated Island Management Plan (IIMP) for Lakshadweep Islands. | |||
Page No 133
(Refer Rule No. 3.2.5)
1 Procedure for Ascertaining whether a Person on Record has failed to Discharge his Responsibility.
A four-member Professional Oversight Committee shall be established by the Union Territory to ascertain whether a Person on Record has failed to discharge his responsibilities.
The Professional Oversight Committee shall comprise of the following four members:
Secretary(Works),UTLA
Superintending Engineer, LPWD, UTLA
Executive Engineer, LPWD, UTLA
Expert Architect / Engineer from the Private Sector
The Professional Oversight Committee shall undertake scrutiny of each case on an individual basis and shall provide at least one opportunity to the Person on Record under scrutiny to be heard. Its proceedings shall be recorded in writing.
The Professional Oversight Committee shall ascertain whether the Professional on Record has failed in discharging his responsibilities and shall determine and administer penalties for the same.
Page No 134
Table No. S2 – 1: Penalties for Person on Record
| Financial | Financial | Financial | Financial penalty<sup>1</sup> and | Delisting for 12 months and | |
|---|---|---|---|---|---|
| Violation of Reg. No.: | penalty<sup>1</sup> | penalty<sup>1</sup> | penalty<sup>1</sup> | delisting for 6 months | registration of complaint with professional body |
| Rule Nos. 4.4: Person on Record undertake construction on | 1<sup>st</sup> offence | 2<sup>nd</sup> offence | 3<sup>rd</sup> offence | 4<sup>th</sup> offence | |
| plot without revalidating a Lapsed Development Permission | (Rs. 10,000) | (Rs.15,000) | (Rs.20,000) | (Rs.25,000) | |
| or when a Development Permission has been cancelled | |||||
| Rule No. 5.4: Negligence of Person on Record leading to | 1<sup>st</sup> offence | ||||
| structural failure of a building | (Rs.50,000) | ||||
| Rule Nos. 4.10.1, 4.12.1 and 4.14.1: Architect on Record | 1<sup>st</sup> offence | 2<sup>nd</sup> offence | 3<sup>rd</sup> offence | 4<sup>th</sup> offence | |
| fails to register the Issue of Direct Development Permission / | (Rs. 10,000) | (Rs.15,000) | (Rs.20,000) | (Rs.25,000) | |
| Revision of Direct Development Permission / Revalidation of | |||||
| Direct Development Permission with the Competent | |||||
| Authority within the stipulated period | |||||
| Rule Nos. 4.10, 4.11, 4.12, 4.13, 4.14, 4.15, 4.16: Person on | 1<sup>st</sup> offence | 2<sup>nd</sup> offence | 3<sup>rd</sup> offence | 4<sup>th</sup> offence | |
| Record submits incomplete or inadequate drawings, | (Rs. 10,000) | (Rs.15,000) | (Rs.20,000) | (Rs.25,000) | |
| document, and specifications along with application to | |||||
| register Issue of Direct Development Permission / Revision | |||||
| of Direct Development Permission / Revalidation of Direct | |||||
| Development Permission to the Competent Authority. | |||||
| Rule Nos. 4.10, 4.11, 4.12, 4.13, : Person on Record | 1<sup>st</sup> offence | 2<sup>nd</sup> offence | |||
| intentionally and fraudulently misrepresents or hides material | (Rs. 15,000) | (Rs.25,000) | |||
| facts from the Commissioner in the application to register | |||||
| issue of or grant of Development Permission / Revised | |||||
| Development Permission / Revalidation of Development | |||||
| Permission | |||||
| Rule No. 5.2: Construction Engineer on Record fail to | 1<sup>st</sup> offence | 2<sup>nd</sup> offence | 3<sup>rd</sup> offence | 4<sup>th</sup> offence | 5<sup>th</sup> offence |
| display necessary information on the Notice Board at site | (Rs. | (Rs.15,000) | (Rs.20,000) | (Rs.25,000) | (Rs.30,000) |
Page No 135
| Violation of Reg. No.: | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financial penalty<sup>1</sup> and delisting for 6 months | Delisting for 12 months and registration of complaint with professional body |
|---|---|---|---|---|---|
| 10,000) | |||||
| Rule No. 5.3: Construction Engineer on Record fails to maintain necessary drawings and documents at site during Period of Construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) |
| Rule No. 5.4.1: Architect on Record and Construction Engineer on Record stack, store or dispose building material on public space or street without obtaining Permit to Use Abutting Street for Construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) |
| Rule No. 5.4.2: Construction Engineer on Record does not provide barricading or provides inadequate barricading of the plot during period of construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) |
| Rule No. 5.4.3: Construction Engineer on Record causes or fails to prevent damage or inconvenience during construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) |
| Rule Nos. 5.5.1: Architect on Record or Construction Engineer on Record fail to notify the Commissioner before commencing construction on the plot within the stipulated period | 1<sup>st</sup> offence (Rs. 15,000) | 2<sup>nd</sup> offence (Rs.20,000) | 3<sup>rd</sup> offence (Rs.25,000) | 4<sup>th</sup> offence (Rs.30,000) | |
| Rule Nos. 5.5.3: Architect on Record and Construction Engineer on Record fail to notify the CompetentAuthorityProgress of Construction, Compliance Certification and obtaining Permission to Proceed with Further Construction within the stipulated period | 1<sup>st</sup> offence (Rs. 15,000) | 2<sup>nd</sup> offence (Rs.20,000) | 3<sup>rd</sup> offence (Rs.25,000) | 4<sup>th</sup> offence (Rs.30,000) | |
Page No 136
Department of Panchayat, Union Territory of Lakshadweep
| Violation of Reg. No.: | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financial penalty<sup>1</sup> and delisting for 6 months | Delisting for 12 months and registration of complaint with professional body |
|---|---|---|---|---|---|
| fraudulently misrepresents or hides material facts from the CompetentAuthority in the application to register issue or grant of Development Use Permission or Permission to Change Sanctioned Use of Development | (Rs. 15,000) | (Rs.25,000) | |||
| Rule Nos. 3.3.2: If there is any deviation from building sanction plan the AOR blacklisted for 10 years |
All financial penalties are to be decided by the Professional Oversight Committee to ascertain whether a Person on Record has failed to discharge his responsibilities and to determine penalties for the same.
2 If the penalties imposed in the 1st offence are not complied with by the Person on Record within 1 month of the date of imposing the penalty, the penalty for 2nd offence shall apply and so forth.
3 If the penalties imposed in the 1st offence are not complied with by the Person on Record within 6 months of the date of imposing the penalty, the Person on Record shall be unregistered from the records of the CompetentAuthorityfor 1 year and complaint filed with his professional body.
Page No 137
Schedule No. 3 Technical Audit Report
(Refer Rule No. 3.3)
Table No. S3 – 1: Details of Technical Audit Report
| 1 | Design | Comments | |
| 1.1 | Design / Drawings available? | Y/N | |
| 1.2 | Design Category | ||
| 1.2.1 | Type Design? | Y/N | |
| 1.2.2 | Specific Design | Design to be collected to refer to Design Consultant /H.O. | |
| 1.3 | Drawings prepared / checked by competent Authority? | Y/ N | |
| 1.3 | Design Drawing/ Details | Y/ N | |
| 1.5 | Structural details included | Y/ N | |
| 1.6 | Earthquake/cyclone resistant features Included? | Y/ N | |
| 1.7 | Design verified/vetted by Dept./Govt. approved agency/competent authority? | Y/N | |
| 1.8 | Design changes approved by Dept./Govt. approved agency/competent authority | Y/N | |
| 2 | Foundation | ||
| 2.0 | Foundation used | Existing/ New | |
| 2.1 | If existing foundation used | ||
| 2.1.1 | Depth of foundation below ground | <50 cm @ 50-70/> 70cm | |
| 2.1.2 | Type of masonry | Stone / Bricks / PCC Blocks | |
| 2.1.3 | Thickness of masonry (above ground) | 23cin /35 />35 | |
| 2.1.4 | Mortar used | Cement - Sand | |
| 2.1.5 | Mix of cement mortar | As per NBC Indicate | |
| 2.1.6 | Height up to Plinth | _____m, as per Lakshadweep Building Bye-Laws Y/N | |
| 2.1.7 | If stone masonry | ||
| 2.1.7.1 | Through Stones | Yes / No. If Yes Adequate/Inadequate | |
| 2.1.7.2 | Corner Stones | Yes / No. If Yes Adequate/Inadequate | |
| 2.2 | If a new foundation used | ||
| 2.2.1 | Depth of foundation below ground | <50/50-70/>70 cm | |
| 2.2.2 | Type of masonry blocks | Stone / bricks / PCC | |
| 2.2.3 | Thickness of Masonry above plinth - | 23cm/35/>35cm | |
| 2.2.4 | Mortar used | Cement-sand / lime / mud | |
| 2.2.5 | Mix of cement mortar (1:4)/As Per NBC | Yes/No | |
| 2.2.6 | Height up to plinth | _____m, as per Lakshadweep Building Bye-Laws Y/N | |
| 2.2.7 | If stone masonry | ||
| 2.2.7.1 | Through Stones | Yes / No. If Yes Adequate/Inadequate | |
| 2.2.7.2 | Comer Stones | Yes / No. If Yes Adequate/Inadequate | |
| 2.3 | Vertical reinforcement in foundation | Yes /No | |
| 3 | Walls | ||
| 3.1 | Type of masonry | Stone/ Brick / PCC Blocks | |
| 3.2 | Mortar used | Cement- Sand / Lime/Mud | |
| 3.3 | Mix of cement mortar | 1:4/1:1.6/Leaner | |
| 3.4 | Thickness of wall | >23cm/23cm/23cm | |
| 3.5 | Mixing of mortar | OK /Not OK | |
Page No 138
| 3.6 | Join property filled | OK /Not OK | |
| 3.7 | Wetting of bricks | Good / Medium /Poor | |
| 3.8 | Stonemasonry | ||
| 3.8.1 | Through Stones | Yes/No | |
| 3.8.2 | Corner Stones | Yes / No | |
| 3.9 | Overall workmanship | Good / Medium / Poor | |
| 4 | Roofing | ||
| 4.1 | Type of roof | Flat / Sloping | |
| 4.2 | If sloped | Morbid tiles / AC sheet / G.I. sheet | |
| 4.3 | Purlins | Angle - | |
| Material - Iron/ Timber/ NA | |||
| 4.4 | Truss type | ||
| 4.5 | Anchorage with wall | Adequate / Inadequate /NA | |
| 5 | Materials | Specifications must be conforming to NBC/Relevant IS Codes | |
| 5.1 | Cement | ||
| 5.1.1 | Source | Authorized Dealer / Market OPC/PPC/ PSC | |
| 5.1.2 | Type of cement | Grade (33 / 43 / 53) | |
| 5.1.3 | If OPC | OPC / PPC/ PSC | |
| 5.2 | Sand | ||
| 5.2.1 | Type of sand | Fine / Coarse | |
| 5.2.2 | Presence of deleterious materials | Mild / Moderate / High | |
| 5.3 | Coarse Aggregates | ||
| 5.3.1 | Type coarse Aggregates | Gravel / Crushed Stone | |
| 5.3.2 | Presence of deleterious material | Mild / Moderate / High | |
| 5.4 | P.C.C. Blocks (Applicable for onsite production) | ||
| 5.4.1 | Type of P.C.C. Blocks | Solid blocks / Hollow blocks | |
| 5.4.2 | Ratio of concrete in block | ||
| 5.4.3 | Interlocking feature | Yes / No | |
| 5.4.4 | Coarse aggregates used | Natural / Crushed stone | |
| 5.5 | Bricks Blocks, Stone etc. | ||
| 5.5.1 | Strength (field assessment) | Low / Medium / High | |
| 5.5.2 | Dimensional accuracy | Yes / No | |
Page No 139
| 5.9.4 | Bricks | ||
| 5.9.5 | PCC Blocks | ||
| 6 | Seismic Resistance Features for Masonry Structures | ||
| 6.1 | Provision of seismic band provided Adequate | Yes/No | |
| 6.1.1 | Plinth level | Yes/No | |
| 6.1.2 | Stilt level | Yes/No | |
| 6.1.3 | Lintel level | Yes/No | |
| 6.1.4 | Roof level (if applicable) | Yes/No | |
| 6.2 | If sloped roof, whether seismic bands are providedat | Yes/No | |
| 6.2.1 | Gable wall top | Yes/No | |
| 6.2.2 | Eaves level | Yes/No | |
| 6.3 | Provision of vertical street in masonry at | Yes/No | |
| 6.3.1 | Each corner | Yes/No | |
| 6.3.2 | Each T-junction | Yes/No | |
| 6.3.3 | Each door joint | Yes/No | |
| 6.3.4 | Around each window | Yes/No | |
| 6.4 | Openings | Yes/No | |
| 6.4.1 | Total width of openings (*-42% for double storey) | <50%/50*-60%/>60% | |
| 6.4.2 | Clearance from corner | Ok/ Not Ok | |
| 6.4.3 | Pier width between two opening | Ok/ Not Ok | |
| 7 | Workmanship | Specifications must be conforming to NBC/Relevant IS Codes | |
Name of AOR
Registration No.:
Name of EOR:
Address:
Registration No.:
Tel. No.:
Address:
Signature:
Tel No.:
Date:
Signature:
Date:
Name of SEOR
Registration No.:
Address:
Tel. No.:
Signature:
Date:
Page No 140
(Refer Rule No. 4.10.2, 4.11.2, 4.12.2, 4.13.2, 4.14.2, 4.15.2, 5.3, 5.4.1, 6.6.2)
A person applying for a Development Permission / Revised Development Permission / Revalidation of Permission shall have to pay the following Fees and Charges along with the application to the Competent Authority at the following rates:
The fees shall be paid for both – Direct Development Permission and Development Permission. The scrutiny fees shall be levied at the time of making an application for Development Permission.
Table No. S4A – 1: Scrutiny Fees for Building
| Rate per sq m of Built-Up Area | ||
|---|---|---|
| No | Type of Use | (Subject to minimum fees of Rs. 1000/-) |
| 1 | Residential | Rs. 5.00 |
| 2 | Commercial | Rs. 8.00 |
| 3 | Residential Cum Commercial | Rs. 6.00 |
| 4 | Industrial | Rs. 7.00 |
| 5 | Public Offices, Utilities | Rs. 4.00 |
| 6 | Others | Rs. 5.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
• In case of a revised development permission, these shall be paid again.
In case of revalidation of lapsed / suspended development permission, these shall not be paid again, only a revalidation fee will be paid which will be 25% of the Scrutiny Fee already paid.
• In case of cancellation of development permission, these shall be forfeited.
A One-time payment shall be made for approval of subdivision / amalgamation / layout of land. It shall be valid for a period of 5 years.
Table No. S4A – 2: Fees for Subdivision /Amalgamation / Layout of Building Unit / Plot
| No | Type of land Use | Rate per sq m of land (Subject to minimum fees of Rs. 1000/-) | |
| Amalgamation | Subdivision / Layout of Building Unit / Plot | ||
| 1 | Residential | Rs. 3.00 | Rs. 6.00 |
| 2 | Commercial | Rs. 4.00 | Rs. 8.00 |
| 3 | Residential Cum Commercial | Rs. 3.50 | Rs. 7.00 |
| 4 | Industrial | Rs. 5.00 | Rs. 10.00 |
| 5 | Public Offices, Utilities | Rs. 3.00 | Rs. 6.00 |
| 6 | Others | Rs. 4.00 | Rs. 8.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
In case of a revised development permission, these shall be paid again.
Page No 141
In case of revalidation of lapsed / suspended development permission, these shall not be paid again, only a revalidation fee will be paid which will be 25% of the Scrutiny Fee already paid.
In case of cancellation of development permission, it shall be forfeited.
1 Development Charges for Infrastructure:
• The Development Charges for infrastructure shall be paidboth – Direct Development Permission andfor Development Permission.
The development charges for infrastructure shall be levied at the time of making an application for Development Permission.
Table No. S4A – 4: Development Charges for Buildings
| No | Type of land Use | Rate per sq m of Built up (Subject to minimum fees of Rs. 1000/-) |
|---|---|---|
| 1 | Residential | Rs. 50.00 |
| 2 | Commercial | Rs. 80.00 |
| 3 | Residential Cum Commercial | Rs. 80.00 |
| 4 | Industrial | Rs. 100.00 |
| 5 | Public Offices, Utilities | Rs. 20.00 |
| 6 | Others | Rs. 80.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
• In case of a revision of development permission, the differential shall be paid.
• In case of revalidation of lapsed / suspended development permission, these shall not be paid again.
In case of cancellation of development permission, it shall be forfeited.
Stacking Charges shall be levied during grant of commencement certificate and charges will be taken per week.
Table No. S4A – 5: Charges for Stacking Building Material on Public Roads
| No | Type of land Use | Rate per sq m of Building Unit (Subject to minimum fees of Rs. 1000/-) |
|---|---|---|
| 1 | Residential | Rs. 4.00 |
| 2 | Commercial | Rs. 8.00 |
| 3 | Residential Cum Commercial | Rs. 6.00 |
| 4 | Industrial | Rs. 10.00 |
| 5 | Public Offices, Utilities | Exempted |
| 6 | Others | Rs. 4.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
Page No 142
A person applying for permission to carry out any development shall have to pay tree plantation deposit (Rs. 500 / tree required to be planted) along with his application to the Competent Authority. This deposit shall be refundable after the period of five years with the condition that trees planted on the site shall be grown up and maintained properly, otherwise the deposit shall be forfeited.
Other Charges / Fees shall be levied under the provisions of other Act and or instructed by Government.
Note: All Charges and Fees may be revised by competent Authority from time to time.
Page No 143
Fees and Charges for Grant of Occupancy Certificate / Change of Occupancy Certificate
(Refer Rule No. 6.5.2)
A person applying for an Occupancy Certificate shall have to pay Fees along with the application to the Competent Authority at the following rates:
Table No. S4B – 1: Fees for Occupancy Certificate
| No. | Description | Fees equal to |
|---|---|---|
| (1) | (2) | (3) |
| 1 | If the Occupancy is in conformity with these Bye-Laws and no change from the permission granted. | 10% of the Development Permission Scrutiny Fees that is leviable on the building unit, as the case may be |
If the development use is in conformity with the Lakshadweep Building Bye-Lawsbut there is change of use, then a fee equal to two times of the Scrutiny Fees paid shall be paid. The Development Charges as per the new proposed use shall be paid – the earlier shall be forfeited.
Table No. S4B – 2: Fees for Change of Occupancy
| No. | Description | Fees equal to |
|---|---|---|
| (1) | (2) | (3) |
| 1 | In conformity with these Bye laws but with internal modification without any change in overall location and/or overall dimension or margins of the building. | Two times of the Development Permission Scrutiny Fees that is leviable on the building unit, as the case may be. |
Page No 144
(Refer Rule No. 4.16.2)
Table No. S4C – 1: Fees for Applying for Temporary Construction
| No. | Type of Temporary Construction | Rate per sq m of land (Subject to minimum fees of Rs. 1000/-) | |
| 1 | Pandals for fair, ceremonies, religious functions or for vendors | Rs 75 | |
| 2 | Temporary Shed | Rs 50 | |
| 3 | Temporary construction like tent city, camping ground or base camp. | Rs 500 | |
| 4 | a) | Structures of exhibitions/ circuses etc | Rs 100 |
| b) | Structures for ancillary works for quarrying operations in conforming zones. | ||
| c) | Government booths and temporary shelters. | ||
| d) | Transit accommodation for persons to be rehabilitated in a new construction. | ||
| e) | Structures for educational and medical facilities within the site of the proposed building during the phase of planning and constructing the said permanent buildings. | ||
| f) | Ready mix concrete plant. | ||
Equal amounts of fees shall be payable as deposit, which will be refundable provided by end of the stipulated period, such temporary structures are removed without fail by the owner / applicant.
Failure to remove such temporary sheds will be liable for forfeiture of the deposit and any such failure continuing beyond the said period shall be liable for imposition of penalty which will, be three times the rate of 100/ per sq m per week.
Page No 145
Penalties
Schedule No. 4D
(Refer Rule No. 4.4.4, 4.6, 4.7.2, 4.10.4, 4.11.4, 4.12.4, 4.13.4,4.14.4, 4.15.4, 4.16.4 6.5.4, 6.6.4)
Table No. S4D – 1: Penalties for Unauthorised Construction and Occupancy
| No. | Type | Penalty (Rs/ Sq m) | Remarks | |
| 1 | Construction/Occupancy started / completed before applying for permission. | Applicable to total constructed area. | ||
| 1.1 | For Residential | 300 | ||
| 1.2 | For Commercial | 500 | ||
| 1.3 | For Industrial | 800 | ||
| 1.4 | For Others use | 600 | ||
| 2 | Construction/Occupancy started / completed before granting permission but had applied for permission. | Applicable to total constructed area. | ||
| 1.1 | For Residential | 200 | ||
| 1.2 | For Commercial | 300 | ||
| 1.3 | For Industrial | 500 | ||
| 1.4 | For Others use | 400 | ||
| 3 | Minor Deviation from the approved construction plan, but within these Rules. | Twice the scrutiny fees | Deviation in this respect would be only for minor alteration within the approved building plan without deviation in approved built up area | |
B Other Penalites
Lift auditor shall provide certificate at interval not more than 2 years that the lifts and escalator in the building are kept in good working condition. For not doing so penalties will be levied as decided by Competent Authority.
In cases where misuse of parking space is noticed, the use of the entire building shall be discontinued by the Competent Authority. Building use shall be permitted only after the required parking spaces are provided. High penalty shall be levied considering the period of misuse of the parking space and the benefit derived out of misuse as decided by the Competent Authority from time to time.
Page No 146
Drawings, Specifications and Documents to be Submitted with Application for Obtaining/ Revising Development Permission for Building and for Sub- division & Amalgamation of Building Unit / Plot
(Refer Regulation No. 4.10.1, 4.11.1, 4.12.1, 4.13.1,4.14.1, 4.15.1)
The owner / developer shall submit to the Competent Authority the following documents, drawings, and specifications along with application for obtaining and revising a development permission. These are common documents for obtaining / revising development permission for buildings and for sub-division & amalgamation of building unit / plot.
1 Five copies of all plans and statements shall be made available along with the notice. Soft copy of the drawings in cad format shall also be submitted.
2 All documents, drawings, and specifications to be submitted along with the notice shall be duly signed by all the Ownersand the appropriate Person on Record and shall indicate their names, contact information and registration number.
3 Every drawing, document and report shall be signed by all the Owners and the Architect on Record or Civil Engineer on Record, and the Structural Engineer on Record as the case may be and in accordance with the Lakshadweep Building Bye-Laws.
1 Satisfactory documentary legal evidence of the Right to Develop or Build on the Building Unit, including original copies of the relevant extract from the Property Register for Survey Lands or Record of Rights for Revenue Lands as applicable.
2 Certified copies of approved sub‐divisions or layout of the final plot from the concerned Authority as the case may be showing:
a City Survey No. or Revenue No.
b Area and measurements of the building unit. Authority may dispense with this requirement in the cases where it is satisfied regarding the ownership of land on the basis of any documentary evidence or proof produced by the applicant.
c Land map (to the scale) certified by the Revenue department clearly depicting the shape and size of the proposed plot for development.
3 Copy of Sanctioned Layout including date of sanction and Reference No.
4 Form No 10A/15: Application for obtaining / revising a development permission.
5 Form No. 2: Certificate of Undertaking by the Persons on Record or Engineer on Record as applicable.
6 Form No. 11A: Area Statement for Buildings or Form No. 11B: Area Statement for Subdivision and Amalgamation or Form No. 11C: Area Statement for Temporary Construction (whichever is applicable)
7 NOC from Appropriate Authority as per Rules as applicable.
8 Calculation statement for payment of all relevant Development Permission Fees / Charges or any other charges.
9 Photographic Identity Proof of Owner or Developer and person on records.
10 Photograph of Building Unit
11 Certificate, NOC, opinions as may be required by Competent Authority.
12 In case of application for buildings, in addition to above, the following shall be submitted:
a) Soil Test Report for buildings with more than 3 floors or frame structures.
Page No 147
b) Form No. 2: Certificate of Undertaking by the Structural Engineer on Record.
c) Form No. 2: Certificate of Undertaking by the Architect/ Engineer on Record.
d) Form No. 2: Certificate undertaking for HazardSafety
1 Key Plan for both Building Plan and Sub-division & Amalgamation shall be asunder:
a) Minimum Scale: 1:8000 and
b) The plan should explain the boundary and location of the site with respect to neighbourhood landmarks.
2 Site Plan for buildings shall be drawn as under:
a) Minimum Scale: 1:500 for plots less than 100 hectares and 1:1000 for others.
b) Boundaries of the plot and of any contiguous plots belonging to the owner.
c) Position of the building unit / plot in relation to the neighbouring streets and street names.
d) Direction of north point relative to the plan of buildings.
e) Building unit level in relation to the neighbouring street level.
f) Building unit number or plot number of the plot on which the building is intended to be erected.
g) All existing buildings standing on, over or under the building unit / plot.
h) Any existing natural or manmade physical features, such as wells, drains, trees, high tension line, gas pipeline, railway line, etc.
i) Proposed use of every building.
j) The position of building(s) and construction which the applicant intends to erect in relation to:
i The boundaries of the plot and in case where the plot has been partitioned, the boundaries of the portion owned by the applicant and also of the portions owned by others.
ii All buildings (with number of storeys and height) and premises adjacent to the plot and of the contiguous land, if any, referred to in (a), and.
iii Any street passing through the building unit/s clearly indicating the regular line of streets.
iv The area within the regular line of the street not to be built upon but to be added to the street, hatched in green together with its measurements.
v Building lines and margins of streets.
k) The width and level of the street in front, and of the street, if any, at the side or rear of building clearly indicating the regular line of streets.
l) The means of access from the street to the site and all existing and proposed buildings.
m) Open space to be left around the building to secure free circulation of air, admission of light and access.
n) Open space to be provided under these Bye-Laws.
o) The area of the whole plot and the break‐up of Total built‐up area on each floor
p) Area classified for exemption of built-up area calculations.
q) Dimensions and areas of common plot, as required under these Bye-Laws,
r) Parking layout, indicating the parking spaces, access lane, driveway, or ramp.
s) Layout and details of rainwater harvesting required under the Lakshadweep building Bye-Laws, if any.
t) The position of every water closet, privy, urinal, bathrooms, cess pool, well or cistern in connection with the building other than those shown in the building plan.
1 Detailed Drawings shall be submitted showing the boundary walls and gates.
Minimum Scale: 1:100 for plots less than 500 sq m and 1:500 for others and shall contain the following:
a) Space for circulation and parking.
b) Paved pathways.
c) Existing trees.
d) Proposed tree plantation.
e) Green areas.
f) Unpaved areas.
Page No 149
The plans, elevations and sections of the proposed building shall be drawn to a scale of 1:100 showing the following details, wherever applicable:
a) All floor plans together with the covered area, size and spacing of framing members, size of rooms and the position and width of staircases, ramps and other exit ways, lift wells, lift machine room and lift pit details.
b) Built‐up area of each dwelling unit, or shop or office space at every floor level.
c) Use or occupancy of all parts of the building.
d) Exact location of essential services, like WC, sink, bathroom, kitchen, cesspool, water tank, cistern, etc.
e) Section drawings clearly showing the size of the footings, wall construction, sizes and spacing of structural members, floor slabs and roof slabs with their materials. The section shall indicate the heights of building and rooms and also the height of the parapet, and the drainage and the slope of the roof. At least one section should be taken through the staircase. Access to the various parts of the building and its appurtenances also should be shown in one section.
f) Levels of the site and all floors in relation to the datum or crown level of the access street.
g) All elevations.
h) Details of service privy, if any.
i) Dimensions of the projected portions beyond the permissible building line.
j) Terrace plan including cabin structure.
k) Parking spaces provided and the parking layout.
l) Direction of north point relative to the plan of buildings.
m) Such other particulars as may be required to explain the proposed building clearly.
4 Services Plans:
The buildings shall be required to have adequate amount of soak pit and septic tank.
5 Specifications
General specifications of the proposed building giving type and grade of material shall be signed by the Architect on Record and the Structural Engineer on Record.
1 Detailed drawing shall be submitted showing the boundary walls and gates.
2 Landscape plan
Minimum Scale: 1:100 for plots less than 500 sqm and 1:500 for others and shall contain the following:
a The space for circulation and parking;
b Paved pathways.
c Existing trees.
d Proposed tree plantation.
e Green areas.
Receipt of development permission fees and charges paid as per Schedule No. 4A and of other charges leviable on the building unit shall be attached with the application.
Page No 150
Page No 151
| Rule No. 6.5.1 and 6.6.1: Person on Record submits incomplete or inadequate drawings, document, and specifications to the CompetentAuthority along with application to register Issue or grant of Development Use Permission or Permission to Change Sanctioned Use of Development |
| 1<sup>st</sup> offence (Rs. 10,000) |
| 2<sup>nd</sup> offence (Rs.15,000) |
| 3<sup>rd</sup> offence (Rs.20,000) |
| 4<sup>th</sup> offence (Rs.25,000) |
| Rule Nos. 6.5 and 6.6: Person on Record intentionally and | 1<sup>st</sup> offence | 2<sup>nd</sup> offence |
| 5.6 |
| Concrete |
| 5.6.1 | Mix of concrete | (1:1 1/2:3)/ (1:2:4)/ Design Mix |
| 5.6.2 | Batching | Weight batching/ Volume batching |
| 5.6.3 | Compaction | Vibrators / Thappies and rods |
| 5.6.4 | Workability | Low / Medium / High |
| 5.6.5 | Availability of water | Sufficient / Insufficient |
| 5.6.6 | Curing | Satisfactory/ unsatisfactory |
| 5.7 | Reinforcing Steel |
| 5.7.1 | Type of Steel | Plain mild steel HYSD bars |
| 5.7.2 | Source | Authorized Dealer /Market |
| 5.7.3 | Whether IS Marked | Yes/No |
| 5.7.4 | Conditions of bars | Clean / Corrugated |
| 5.7.5 | Fixing of reinforcement as per drawing | Yes / No |
| 5.7.6 | Suitable cover | Yes/No |
| 5.7.7 | Spacing of bars | Regular / Irregular |
| 5.7.8 | Overlaps as per specifications | Yes / No |
| 5.8 | Form Work | Timber/ Play board /Steet |
| 5.8.1 | Type of form work | Yes/No |
| 5.8.2 | Use of mould oil |
| 5.8.3 | Leakage of cement slurry | Observed /Not |
| 5.9 | Source |
| 5.9.1 | Cement |
| 5.9.2 | Sand |
| 5.9.3 | Coarse Agg. |
The lines of drainage of the building, the size, depth and inclination of every drain and the means to be provided for the ventilation of the drains.
v) The position and level of the outfall of the drain, any existing facilities regarding water supply, etc, diameter and gradient of water supply line, drainage lines for the disposal of storm water.
3 Site Plan for Subdivision and Amalgamation:
a) Minimum scale: 1:500 for building units / plots less than 100 hectares and 1:1000 for others.
Page No 148
b) Boundaries of the building unit / plot and of any contiguous plots belonging to the owner, position of the plot in relation to the neighbouring streets and street names and direction of north point relative to the plan of building.
c) Building unit level in relation to the neighbouring street level; all existing buildings standing on, over or under the plot.
d) The position of the building, and of all other buildings (if any) which the applicant intends to erect upon the contiguous land and referred to in (b) in relation to:
i The boundaries of the building unit / plot and in case where the building unit / plot has been partitioned, the boundaries of the portion owned by the applicant and also of the portions owned by others.
ii All streets, buildings (with number of stories and height) and premises adjacent to the building unit / plot and of the contiguous land, if any, referred to in (b), and.
iii If there is no street within a distance of 12 m of the plot, the nearest existing street.
iv Any street passing through the plot/s.
v Building lines and margins of streets
e) Sub‐division of the land or plot or building unit with dimension and area of each of the proposed sub‐divisions and their use according to these rules.
f) The width and length of the proposed streets and internal roads.
g) Dimensions and Areas of Open space to be left as per the Lakshadweep Building bye-Laws
h) Any existing natural or manmade physical features, such as wells, drains, trees, high tension line, etc.
i) The area of the whole plot and the break‐up of covered area on each floor with the calculations for percentage covered as required under theLakshadweep Building bye-Laws
j) Dimensions and areas of common plot, as required under these Bye-Laws, provided in the layout / sub‐division of plot.