18.1 Applicability
The quality control and inspection shall apply to all non-residential buildings.
(Refer Rule No. 3.2.5)
1 Procedure for Ascertaining whether a Person on Record has failed to Discharge his Responsibility.
A four-member Professional Oversight Committee shall be established by the Union Territory to ascertain whether a Person on Record has failed to discharge his responsibilities.
The Professional Oversight Committee shall comprise of the following four members:
Secretary(Works),UTLA
Superintending Engineer, LPWD, UTLA
Executive Engineer, LPWD, UTLA
Expert Architect / Engineer from the Private Sector
The Professional Oversight Committee shall undertake scrutiny of each case on an individual basis and shall provide at least one opportunity to the Person on Record under scrutiny to be heard. Its proceedings shall be recorded in writing.
The Professional Oversight Committee shall ascertain whether the Professional on Record has failed in discharging his responsibilities and shall determine and administer penalties for the same.
Page No 134
Table No. S2 – 1: Penalties for Person on Record
| Financial | Financial | Financial | Financial penalty<sup>1</sup> and | Delisting for 12 months and | |
|---|---|---|---|---|---|
| Violation of Reg. No.: | penalty<sup>1</sup> | penalty<sup>1</sup> | penalty<sup>1</sup> | delisting for 6 months | registration of complaint with professional body |
| Rule Nos. 4.4: Person on Record undertake construction on | 1<sup>st</sup> offence | 2<sup>nd</sup> offence | 3<sup>rd</sup> offence | 4<sup>th</sup> offence | |
| plot without revalidating a Lapsed Development Permission | (Rs. 10,000) | (Rs.15,000) | (Rs.20,000) | (Rs.25,000) | |
| or when a Development Permission has been cancelled | |||||
| Rule No. 5.4: Negligence of Person on Record leading to | 1<sup>st</sup> offence | ||||
| structural failure of a building | (Rs.50,000) | ||||
| Rule Nos. 4.10.1, 4.12.1 and 4.14.1: Architect on Record | 1<sup>st</sup> offence | 2<sup>nd</sup> offence | 3<sup>rd</sup> offence | 4<sup>th</sup> offence | |
| fails to register the Issue of Direct Development Permission / | (Rs. 10,000) | (Rs.15,000) | (Rs.20,000) | (Rs.25,000) | |
| Revision of Direct Development Permission / Revalidation of | |||||
| Direct Development Permission with the Competent | |||||
| Authority within the stipulated period | |||||
| Rule Nos. 4.10, 4.11, 4.12, 4.13, 4.14, 4.15, 4.16: Person on | 1<sup>st</sup> offence | 2<sup>nd</sup> offence | 3<sup>rd</sup> offence | 4<sup>th</sup> offence | |
| Record submits incomplete or inadequate drawings, | (Rs. 10,000) | (Rs.15,000) | (Rs.20,000) | (Rs.25,000) | |
| document, and specifications along with application to | |||||
| register Issue of Direct Development Permission / Revision | |||||
| of Direct Development Permission / Revalidation of Direct | |||||
| Development Permission to the Competent Authority. | |||||
| Rule Nos. 4.10, 4.11, 4.12, 4.13, : Person on Record | 1<sup>st</sup> offence | 2<sup>nd</sup> offence | |||
| intentionally and fraudulently misrepresents or hides material | (Rs. 15,000) | (Rs.25,000) | |||
| facts from the Commissioner in the application to register | |||||
| issue of or grant of Development Permission / Revised | |||||
| Development Permission / Revalidation of Development | |||||
| Permission | |||||
| Rule No. 5.2: Construction Engineer on Record fail to | 1<sup>st</sup> offence | 2<sup>nd</sup> offence | 3<sup>rd</sup> offence | 4<sup>th</sup> offence | 5<sup>th</sup> offence |
| display necessary information on the Notice Board at site | (Rs. | (Rs.15,000) | (Rs.20,000) | (Rs.25,000) | (Rs.30,000) |
Page No 135
| Violation of Reg. No.: | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financial penalty<sup>1</sup> and delisting for 6 months | Delisting for 12 months and registration of complaint with professional body |
|---|---|---|---|---|---|
| 10,000) | |||||
| Rule No. 5.3: Construction Engineer on Record fails to maintain necessary drawings and documents at site during Period of Construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) |
| Rule No. 5.4.1: Architect on Record and Construction Engineer on Record stack, store or dispose building material on public space or street without obtaining Permit to Use Abutting Street for Construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) |
| Rule No. 5.4.2: Construction Engineer on Record does not provide barricading or provides inadequate barricading of the plot during period of construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) |
| Rule No. 5.4.3: Construction Engineer on Record causes or fails to prevent damage or inconvenience during construction | 1<sup>st</sup> offence (Rs.10,000) | 2<sup>nd</sup> offence (Rs.15,000) | 3<sup>rd</sup> offence (Rs.20,000) | 4<sup>th</sup> offence (Rs.25,000) | 5<sup>th</sup> offence (Rs.30,000) |
| Rule Nos. 5.5.1: Architect on Record or Construction Engineer on Record fail to notify the Commissioner before commencing construction on the plot within the stipulated period | 1<sup>st</sup> offence (Rs. 15,000) | 2<sup>nd</sup> offence (Rs.20,000) | 3<sup>rd</sup> offence (Rs.25,000) | 4<sup>th</sup> offence (Rs.30,000) | |
| Rule Nos. 5.5.3: Architect on Record and Construction Engineer on Record fail to notify the CompetentAuthorityProgress of Construction, Compliance Certification and obtaining Permission to Proceed with Further Construction within the stipulated period | 1<sup>st</sup> offence (Rs. 15,000) | 2<sup>nd</sup> offence (Rs.20,000) | 3<sup>rd</sup> offence (Rs.25,000) | 4<sup>th</sup> offence (Rs.30,000) | |
Page No 136
Department of Panchayat, Union Territory of Lakshadweep
| Violation of Reg. No.: | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financialpenalty<sup>1</sup> | Financial penalty<sup>1</sup> and delisting for 6 months | Delisting for 12 months and registration of complaint with professional body |
|---|---|---|---|---|---|
| fraudulently misrepresents or hides material facts from the CompetentAuthority in the application to register issue or grant of Development Use Permission or Permission to Change Sanctioned Use of Development | (Rs. 15,000) | (Rs.25,000) | |||
| Rule Nos. 3.3.2: If there is any deviation from building sanction plan the AOR blacklisted for 10 years |
All financial penalties are to be decided by the Professional Oversight Committee to ascertain whether a Person on Record has failed to discharge his responsibilities and to determine penalties for the same.
2 If the penalties imposed in the 1st offence are not complied with by the Person on Record within 1 month of the date of imposing the penalty, the penalty for 2nd offence shall apply and so forth.
3 If the penalties imposed in the 1st offence are not complied with by the Person on Record within 6 months of the date of imposing the penalty, the Person on Record shall be unregistered from the records of the CompetentAuthorityfor 1 year and complaint filed with his professional body.
Page No 137
Schedule No. 3 Technical Audit Report
(Refer Rule No. 3.3)
Table No. S3 – 1: Details of Technical Audit Report
| 1 | Design | Comments | |
| 1.1 | Design / Drawings available? | Y/N | |
| 1.2 | Design Category | ||
| 1.2.1 | Type Design? | Y/N | |
| 1.2.2 | Specific Design | Design to be collected to refer to Design Consultant /H.O. | |
| 1.3 | Drawings prepared / checked by competent Authority? | Y/ N | |
| 1.3 | Design Drawing/ Details | Y/ N | |
| 1.5 | Structural details included | Y/ N | |
| 1.6 | Earthquake/cyclone resistant features Included? | Y/ N | |
| 1.7 | Design verified/vetted by Dept./Govt. approved agency/competent authority? | Y/N | |
| 1.8 | Design changes approved by Dept./Govt. approved agency/competent authority | Y/N | |
| 2 | Foundation | ||
| 2.0 | Foundation used | Existing/ New | |
| 2.1 | If existing foundation used | ||
| 2.1.1 | Depth of foundation below ground | <50 cm @ 50-70/> 70cm | |
| 2.1.2 | Type of masonry | Stone / Bricks / PCC Blocks | |
| 2.1.3 | Thickness of masonry (above ground) | 23cin /35 />35 | |
| 2.1.4 | Mortar used | Cement - Sand | |
| 2.1.5 | Mix of cement mortar | As per NBC Indicate | |
| 2.1.6 | Height up to Plinth | _____m, as per Lakshadweep Building Bye-Laws Y/N | |
| 2.1.7 | If stone masonry | ||
| 2.1.7.1 | Through Stones | Yes / No. If Yes Adequate/Inadequate | |
| 2.1.7.2 | Corner Stones | Yes / No. If Yes Adequate/Inadequate | |
| 2.2 | If a new foundation used | ||
| 2.2.1 | Depth of foundation below ground | <50/50-70/>70 cm | |
| 2.2.2 | Type of masonry blocks | Stone / bricks / PCC | |
| 2.2.3 | Thickness of Masonry above plinth - | 23cm/35/>35cm | |
| 2.2.4 | Mortar used | Cement-sand / lime / mud | |
| 2.2.5 | Mix of cement mortar (1:4)/As Per NBC | Yes/No | |
| 2.2.6 | Height up to plinth | _____m, as per Lakshadweep Building Bye-Laws Y/N | |
| 2.2.7 | If stone masonry | ||
| 2.2.7.1 | Through Stones | Yes / No. If Yes Adequate/Inadequate | |
| 2.2.7.2 | Comer Stones | Yes / No. If Yes Adequate/Inadequate | |
| 2.3 | Vertical reinforcement in foundation | Yes /No | |
| 3 | Walls | ||
| 3.1 | Type of masonry | Stone/ Brick / PCC Blocks | |
| 3.2 | Mortar used | Cement- Sand / Lime/Mud | |
| 3.3 | Mix of cement mortar | 1:4/1:1.6/Leaner | |
| 3.4 | Thickness of wall | >23cm/23cm/23cm | |
| 3.5 | Mixing of mortar | OK /Not OK | |
Page No 138
| 3.6 | Join property filled | OK /Not OK | |
| 3.7 | Wetting of bricks | Good / Medium /Poor | |
| 3.8 | Stonemasonry | ||
| 3.8.1 | Through Stones | Yes/No | |
| 3.8.2 | Corner Stones | Yes / No | |
| 3.9 | Overall workmanship | Good / Medium / Poor | |
| 4 | Roofing | ||
| 4.1 | Type of roof | Flat / Sloping | |
| 4.2 | If sloped | Morbid tiles / AC sheet / G.I. sheet | |
| 4.3 | Purlins | Angle - | |
| Material - Iron/ Timber/ NA | |||
| 4.4 | Truss type | ||
| 4.5 | Anchorage with wall | Adequate / Inadequate /NA | |
| 5 | Materials | Specifications must be conforming to NBC/Relevant IS Codes | |
| 5.1 | Cement | ||
| 5.1.1 | Source | Authorized Dealer / Market OPC/PPC/ PSC | |
| 5.1.2 | Type of cement | Grade (33 / 43 / 53) | |
| 5.1.3 | If OPC | OPC / PPC/ PSC | |
| 5.2 | Sand | ||
| 5.2.1 | Type of sand | Fine / Coarse | |
| 5.2.2 | Presence of deleterious materials | Mild / Moderate / High | |
| 5.3 | Coarse Aggregates | ||
| 5.3.1 | Type coarse Aggregates | Gravel / Crushed Stone | |
| 5.3.2 | Presence of deleterious material | Mild / Moderate / High | |
| 5.4 | P.C.C. Blocks (Applicable for onsite production) | ||
| 5.4.1 | Type of P.C.C. Blocks | Solid blocks / Hollow blocks | |
| 5.4.2 | Ratio of concrete in block | ||
| 5.4.3 | Interlocking feature | Yes / No | |
| 5.4.4 | Coarse aggregates used | Natural / Crushed stone | |
| 5.5 | Bricks Blocks, Stone etc. | ||
| 5.5.1 | Strength (field assessment) | Low / Medium / High | |
| 5.5.2 | Dimensional accuracy | Yes / No | |
Page No 139
| 5.9.4 | Bricks | ||
| 5.9.5 | PCC Blocks | ||
| 6 | Seismic Resistance Features for Masonry Structures | ||
| 6.1 | Provision of seismic band provided Adequate | Yes/No | |
| 6.1.1 | Plinth level | Yes/No | |
| 6.1.2 | Stilt level | Yes/No | |
| 6.1.3 | Lintel level | Yes/No | |
| 6.1.4 | Roof level (if applicable) | Yes/No | |
| 6.2 | If sloped roof, whether seismic bands are providedat | Yes/No | |
| 6.2.1 | Gable wall top | Yes/No | |
| 6.2.2 | Eaves level | Yes/No | |
| 6.3 | Provision of vertical street in masonry at | Yes/No | |
| 6.3.1 | Each corner | Yes/No | |
| 6.3.2 | Each T-junction | Yes/No | |
| 6.3.3 | Each door joint | Yes/No | |
| 6.3.4 | Around each window | Yes/No | |
| 6.4 | Openings | Yes/No | |
| 6.4.1 | Total width of openings (*-42% for double storey) | <50%/50*-60%/>60% | |
| 6.4.2 | Clearance from corner | Ok/ Not Ok | |
| 6.4.3 | Pier width between two opening | Ok/ Not Ok | |
| 7 | Workmanship | Specifications must be conforming to NBC/Relevant IS Codes | |
Name of AOR
Registration No.:
Name of EOR:
Address:
Registration No.:
Tel. No.:
Address:
Signature:
Tel No.:
Date:
Signature:
Date:
Name of SEOR
Registration No.:
Address:
Tel. No.:
Signature:
Date:
Page No 140
(Refer Rule No. 4.10.2, 4.11.2, 4.12.2, 4.13.2, 4.14.2, 4.15.2, 5.3, 5.4.1, 6.6.2)
A person applying for a Development Permission / Revised Development Permission / Revalidation of Permission shall have to pay the following Fees and Charges along with the application to the Competent Authority at the following rates:
The fees shall be paid for both – Direct Development Permission and Development Permission. The scrutiny fees shall be levied at the time of making an application for Development Permission.
Table No. S4A – 1: Scrutiny Fees for Building
| Rate per sq m of Built-Up Area | ||
|---|---|---|
| No | Type of Use | (Subject to minimum fees of Rs. 1000/-) |
| 1 | Residential | Rs. 5.00 |
| 2 | Commercial | Rs. 8.00 |
| 3 | Residential Cum Commercial | Rs. 6.00 |
| 4 | Industrial | Rs. 7.00 |
| 5 | Public Offices, Utilities | Rs. 4.00 |
| 6 | Others | Rs. 5.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
• In case of a revised development permission, these shall be paid again.
In case of revalidation of lapsed / suspended development permission, these shall not be paid again, only a revalidation fee will be paid which will be 25% of the Scrutiny Fee already paid.
• In case of cancellation of development permission, these shall be forfeited.
A One-time payment shall be made for approval of subdivision / amalgamation / layout of land. It shall be valid for a period of 5 years.
Table No. S4A – 2: Fees for Subdivision /Amalgamation / Layout of Building Unit / Plot
| No | Type of land Use | Rate per sq m of land (Subject to minimum fees of Rs. 1000/-) | |
| Amalgamation | Subdivision / Layout of Building Unit / Plot | ||
| 1 | Residential | Rs. 3.00 | Rs. 6.00 |
| 2 | Commercial | Rs. 4.00 | Rs. 8.00 |
| 3 | Residential Cum Commercial | Rs. 3.50 | Rs. 7.00 |
| 4 | Industrial | Rs. 5.00 | Rs. 10.00 |
| 5 | Public Offices, Utilities | Rs. 3.00 | Rs. 6.00 |
| 6 | Others | Rs. 4.00 | Rs. 8.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
In case of a revised development permission, these shall be paid again.
Page No 141
In case of revalidation of lapsed / suspended development permission, these shall not be paid again, only a revalidation fee will be paid which will be 25% of the Scrutiny Fee already paid.
In case of cancellation of development permission, it shall be forfeited.
The owner / developer / occupants and registered appointed Persons on Record shall have to certify the inspection and safety report as per Schedule No.3.
The Administrator, UT of Lakshadweep shall have full powers to amend all or any provision of these Building Bye - laws.
Page No 130
Schedule
Page No 131
Minimum Qualification, Experience and Document Requirements for being considered for Registering with the Competent Authority as Persons on Record
(Refer Rule No. 3.2.1, 3.2.2, 3.2.3)
The procedure for registering persons with the Competent Authority is given in Rule No. 3.2.1. The registration shall be renewed annually. The following are the minimum qualifications and experience requirements for all persons to be considered for registering with the Competent Authority as Persons on Record, in order to determine their competence to fulfil their responsibilities as specified in Rule No. 3.2.2.
A Qualification and Experience:
Minimum qualifications and experience requirements for architects, for being considered for registration with the Competent Authority, as Architects on Record shall be as follows:
(a) Bachelor’s Degree in Architecture / Diploma in Architecture Equivalent to B. Arch and Architect must hold a valid registration with the Council of Architecture, India, issued as per the provisions of the Architects Act, 1972 and
(b) Architect must have a minimum of two years of experience in practice of architecture.
B Scope Work and Competence:
(a) Preparation & planning of all types of layouts; submission of drawings; submission of certificate of supervision, progress reports and submission of certificate of completion for all types of buildings in accordance with the provisions of these building Rules.
(b) Supervision & execution of construction work as per specifications & drawings prepared by authorised registered structural designer & engineer.
A Qualification and Experience:
Minimum qualifications and experience requirements for engineers, for being considered for registration with the Competent Authority, as Engineers on Record shall be as follows:
1 Development Charges for Infrastructure:
• The Development Charges for infrastructure shall be paidboth – Direct Development Permission andfor Development Permission.
The development charges for infrastructure shall be levied at the time of making an application for Development Permission.
Table No. S4A – 4: Development Charges for Buildings
| No | Type of land Use | Rate per sq m of Built up (Subject to minimum fees of Rs. 1000/-) |
|---|---|---|
| 1 | Residential | Rs. 50.00 |
| 2 | Commercial | Rs. 80.00 |
| 3 | Residential Cum Commercial | Rs. 80.00 |
| 4 | Industrial | Rs. 100.00 |
| 5 | Public Offices, Utilities | Rs. 20.00 |
| 6 | Others | Rs. 80.00 |
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
• In case of a revision of development permission, the differential shall be paid.
• In case of revalidation of lapsed / suspended development permission, these shall not be paid again.
In case of cancellation of development permission, it shall be forfeited.
Stacking Charges shall be levied during grant of commencement certificate and charges will be taken per week.
Table No. S4A – 5: Charges for Stacking Building Material on Public Roads
| No | Type of land Use | Rate per sq m of Building Unit (Subject to minimum fees of Rs. 1000/-) |
|---|---|---|
| 1 | Residential | Rs. 4.00 |
| 2 | Commercial | Rs. 8.00 |
| 3 | Residential Cum Commercial | Rs. 6.00 |
| 4 | Industrial | Rs. 10.00 |
| 5 | Public Offices, Utilities | Exempted |
| 6 | Others | Rs. 4.00 |
| Rule No. 6.5.1 and 6.6.1: Person on Record submits incomplete or inadequate drawings, document, and specifications to the CompetentAuthority along with application to register Issue or grant of Development Use Permission or Permission to Change Sanctioned Use of Development |
| 1<sup>st</sup> offence (Rs. 10,000) |
| 2<sup>nd</sup> offence (Rs.15,000) |
| 3<sup>rd</sup> offence (Rs.20,000) |
| 4<sup>th</sup> offence (Rs.25,000) |
| Rule Nos. 6.5 and 6.6: Person on Record intentionally and | 1<sup>st</sup> offence | 2<sup>nd</sup> offence |
| 5.6 |
| Concrete |
| 5.6.1 | Mix of concrete | (1:1 1/2:3)/ (1:2:4)/ Design Mix |
| 5.6.2 | Batching | Weight batching/ Volume batching |
| 5.6.3 | Compaction | Vibrators / Thappies and rods |
| 5.6.4 | Workability | Low / Medium / High |
| 5.6.5 | Availability of water | Sufficient / Insufficient |
| 5.6.6 | Curing | Satisfactory/ unsatisfactory |
| 5.7 | Reinforcing Steel |
| 5.7.1 | Type of Steel | Plain mild steel HYSD bars |
| 5.7.2 | Source | Authorized Dealer /Market |
| 5.7.3 | Whether IS Marked | Yes/No |
| 5.7.4 | Conditions of bars | Clean / Corrugated |
| 5.7.5 | Fixing of reinforcement as per drawing | Yes / No |
| 5.7.6 | Suitable cover | Yes/No |
| 5.7.7 | Spacing of bars | Regular / Irregular |
| 5.7.8 | Overlaps as per specifications | Yes / No |
| 5.8 | Form Work | Timber/ Play board /Steet |
| 5.8.1 | Type of form work | Yes/No |
| 5.8.2 | Use of mould oil |
| 5.8.3 | Leakage of cement slurry | Observed /Not |
| 5.9 | Source |
| 5.9.1 | Cement |
| 5.9.2 | Sand |
| 5.9.3 | Coarse Agg. |
(a) Master’s Degree in Civil Engineering, a bachelor’s degree in Civil Engineering or Building construction or its equivalent qualification recognized by the All-India Board of Technical Education, or, a Diploma in Civil Engineering or Diploma in Building Construction recognized by State Board of Technical Examination of any State of India or Associate Membership (Civil Engineering) of the Institute of Engineers, India (AMIE), and
(b) Engineer having bachelor’s degree, or its equivalent qualification must have minimum of two years of experience and Diploma holder/or AMIE must have minimum of five years of experience in professional work.
Schedule No. 2
(a) Preparation & planning of all types of layouts except special structures / special buildings as per these Rules; submission of drawings and submission of certificate of supervision & completion for all types of buildings. A person having qualification of a Diploma in Civil Engineering shall be permitted to undertake low rise buildings only.
(b) Supervision & execution of construction work as per specifications & drawings prepared by authorized registered structural designer.
(c) He / she can prepare & submit structural details & calculations for buildings of load bearing structures.
Page No 132
Minimum qualifications and experience requirements for structural engineers, for being considered for registration with the Competent Authority as Structural Engineer on Record shall be as follows:
Table No. S1 – 1: SEOR Qualifications and Experience
| Grade | Scope of Work | Qualification | Minimum Years of Experience* |
| SEOR 1 | 1 Building with height above 25m 2 Total proposed built-up area for a building unit is more than10000sqm 3 Mercantile - 2, 3; Educational -1, 2, 3; Assembly; Health - 2, 3, 4; Hospitality, Utility; Public Office; Special Buildings | Category 1 | 10 |
| Category 2 | 3 | ||
| SEOR 2 | 1 Building with height above 15 m /17.5 m (with Stilt) and up to 25m 2 Total proposed built-up area for a building unit is more than 2000 sqm and up to 10000 sqm | Category 1 | 5 |
| Category 2 | 2 | ||
| SEOR 3 | 1 Building with height up to 15m /17.5 m (with Stilt). 2 Total proposed built-up area for building unit up to 2000sqm | Category 1 | 2 |
| Category 2 | ----- | ||
| Notes: 1 *Minimum years of experience of preparing structural design, detailed drawings, and specifications after attaining the degree/Diploma. 2 Category 1: B.E/ B. Tech Civil or equivalent degree recognized by the AICTE. 3 Category 2: M.E/ M. Tech Civil, or a Ph. D in Structural Engineering. 4 Person holding Higher grade license can also work for Lower Grade Work 5 Maximum Height of building shall be permissible as prescribed under prevailing Integrated Island Management Plan (IIMP) for Lakshadweep Islands. | |||
Page No 133
(*others: includes Health, Education, etc. and other than the above-mentioned type of land use)
Page No 142
A person applying for permission to carry out any development shall have to pay tree plantation deposit (Rs. 500 / tree required to be planted) along with his application to the Competent Authority. This deposit shall be refundable after the period of five years with the condition that trees planted on the site shall be grown up and maintained properly, otherwise the deposit shall be forfeited.