5.0 Procedure During Construction
5.1 Inspection of Construction
5.1.1 Inspection of Construction at Any Time
All buildings / development for which development permission is required, are subject to inspection by the Competent Authority and the Competent Authority reserves the right to inspect such buildings at any time during the period of Construction without giving prior notice of its intention to do so.
2 Owner of the building unit and/or any person undertaking construction shall permit authorized officers of the Competent Authority to enter the buildingunit and inspect the building for the purpose of enforcing these Bye-Laws.
3 No inspection of a residential premise shall be done after sunset and before sunrise without sufficient cause and without giving a reasonable opportunity of being heard.
5.1.2 Inspection where Direct Development Permission is Issued
All building / developments for which Direct Development Permission has been issued shall be subject to random inspection by the Competent Authority during construction.
2 It shall be the responsibility of the Architect on Record / Engineer on Record for the development to report commencement, progress at various stages, and completion of construction to the Competent Authority as specified in Rule No. 5.5.
5.1.3 Inspection where Development Permission is Granted
1 All buildings for which development permission has been granted shall be subjected to periodic inspection by the Competent Authority during construction.
2 It shall be the responsibility of the Owner, the Architect on Record or Engineer on Record, for the building to report commencement, progress at various stages, and completion of construction to the Competent Authority as specified in Rule No. 5.5.
5.2 Information to be Prominently Displayed on Site
1 It shall be the responsibility of the Owner to erect a notice board on the buildingunit displaying key information pertaining to the building/development within 15 working days from the grant or issue of development permission.
2 Specifications for notice board and the information to be displayed are specified in Schedule No. 6A.
3 The notice board should be prominently visible, easily readable and should be located next to the primary access to the building unit. More than one notice board may be erected.
4 The notice board/s should be maintained for the entire period of construction / development up to issue or grant of occupancy certificate.
5 Failure to comply with this Bye-Laws may result in cancellation of the development permission. Penalties leviable on the person on Record for not displaying the necessary information are stipulated in ScheduleNo. 2.
5.3 Documents and Drawings to be Maintained on Site
It shall be the responsibility of the Owner for the building to keep all the documents and drawings listed in ScheduleNo.6B on the site, at all times after issuing notice of commencement of construction to the Competent Authority up to the issue or grant of occupancy certificate.
2 These documents should be made available to any authorised officer of the Competent Authority inspecting the site for the purpose of enforcing these Bye-Laws.
Page No 54
3 Failure to comply with this Bye-Lawsmay result in cancellation of the development permission. Penalties leviable on the person on Record for not displaying the necessary information are stipulated in ScheduleNo. 2.
5.4 Reducing Inconvenience and Ensuring Safety during Construction
5.4.1 Stacking, Storing and Disposal of Building Material
1 The stacking of building materials, sand debris on public roads, shall be prohibited.
It shall be the responsibility of the Owner / Developer to ensure that no building material, building equipment or building debris is stacked, stored, left or disposed off, outside the buildingunit for which development permission has been granted, on any public street or space.
3 Permission may be obtained in special circumstances to stack building materials, sand, debris on public roads from the Competent Authority on payment of Deposits and Charges indicated in Schedule No. 4A.
5.4.2 Barricading the Building Unit / Plot during Construction
1 It shall be the responsibility of the Architect on Record or Engineer on Record to ensure that the plot on which construction is being undertaken is adequately barricaded and safety measures are in place and there is no public inconvenience caused and or safety is compromised.
2 Failure to comply with this Rule may result in cancellation of a development permission.
5.4.3 No Damage or Undue Inconvenience during Construction
It shall be the responsibility of the Owner or Developer to undertake all necessary measures to ensure that no
1 No damage is caused to adjoining properties due to construction.
2 No undue inconvenience is caused to the public, due to factors such as noise, dust, smell, or vibrations.
3 No traffic is not disrupted due to construction.
4 Failure to comply with this Rule may result in cancellation of a development permission.
5.4.4 Liability for Ensuring during Construction
The Owner or Developer shall be responsible for ensuring that all necessary measures for safety for all are taken on site. Grant of Development Permission, grant of Building Use Permission for part of a building or issuing of any instructions to ensure public safety or reduce inconvenience, does not render the Competent Authority liable for any injury, damage or loss whatsoever that may be caused to anyone in or around the area during the Period of Construction.
5.5 Progress of Construction and Inspection
5.5.1 Notice for Commencement of Construction
The owner and the AOR shall intimate the Competent Authority (Authority-I & Authority-II) about the commencement of construction after obtaining construction permission within 15 days of such commencement in the format prescribed in Form No.19.
2 The construction shall commence only after the Competent Authority registers the issue of Direct Development Permission by the AOR / EOR.
3 Failure to notify the Competent Authority aftercommencing construction may result in cancellationof the development permission.
5.5.2 Development Permission may Lapse if Construction Not Commenced on Time
Development permission can be extended for one year at a time, provided that there has been no change in the Rules of the construction is in conformity with new Rules. The extended period shall in no case exceed three years.In the aggregate, a development permission cannot remain valid fora
Page No 55
period of more than sixyears. After that an application for a new development permission shall be made.
5.5.3 Competent Authority to be Notified of Progress of Construction
The Owner or Developer and the Architect on Record or Engineer on Record shall be responsible for notifying the Competent Authority (Authority-I) of progress of construction having been completed up to the stages stipulated in Schedule No. 6C. Notice of Progress of Construction shall be made in the format prescribed in FormNo.20. and approved by the Persons on Record.
The Notice of Progress of Construction shall not be necessary in the following cases:
1 Alteration in building not involving the structural part of the building.
2 Extension of existing residential building on the ground floor up to maximum area of 40 sqm.
On receipt of the Notice of Progress of Construction from the owner or developer, it shall be the duty of the Competent Authority (Authority-I), if necessary, to check any deviation from the sanctioned plan and convey decision within 7 days to the owner or developer accordingly for compliance.
5.6 Inspections
The Authority II assisted by Authority III & Authority IV shall carryout the inspection of construction based on the ‘risk’ posed by the developmentand shall submit report to Authority-I. Any development carried out by the owner, or the developer attracts risk during the design and construction. Risk is definedas the likelihood of non- compliance with building regulations and the potential extent of harm to current and future users of building and the environment associated with non-compliance.
2 The different Risk Consequence Classes (CC), along with description of the principles, use groups, design supervision levels (SL) And inspection requirements are indicated in Schedule No.7
3 For the purpose of inspecting the construction at different stages, the Competent Authority may hire the services of the architects / engineers who are registered with the competent Authority (Authority III). Schedule No. 7 indicates the experience requirements for such professional to conductinspections based on the RiskConsequence Classes of buildings / development.
4 For this the Competent Authority shall, for the subsequent financialyear, latest by 15 March every year invite the applications of architects andengineers who would be willing to work as inspection architect / engineer. On receipt of theapplications, Competent Authority shall make a panel of approved engineer / architect. The Competent Authority shall make a contract agreement with all the engineers / architectincluded in the panel. The agreement shall include the scope of work, the reporting systems, and the protocols (including penalty Clauses, mode of payments and reporting systems bothonline and in hard copies) for smooth functioning of inspections.
5 The CompetentAuthority shall decide the fees for each site visit and the site report.
Page No 56