(For above G+2)
Form for specification of proposed building
(1) The purpose (Residence, Office, Restaurant, Hotel, Dharamshala, School, Hostel, Cinema, Shop, Factory. Others) for which it is intended to be used
(2) Details of Area on respective floor are given below
| Floor | Existing (sq. mt.) | Proposed (sq. mt.) | Total (sq. mt.) | |
|---|---|---|---|---|
| 1 | Basement | |||
| 2 | Ground | |||
| 3 | Mezzanine | |||
| 4 | First floor | |||
| 5 | Second floor | |||
| 6 | Third | |||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| 10 | Service floor (if any) |
(3)
(a) Approximate number of inhabitants proposed to be accommodated ....
(b) The number of Latrine. Urinals, Kitchens. Baths to be provided ....
(c) The source of water to be used in the construction ..... (d) Distance from public sewer (if any) ..... (e) The materials to be used in construction walls/ Columns/ Foundations/ Roof/ Floors
…… Signature of registered Architect/Engineer/ supervisor Name ..... Registration No. ..... Address ....
(4) The period of construction valid up to ____ as per the lease condition/further extension of the time for construction granted by the leaser is valid upto ____ Time construction obtained form the Competent Authority.
(5) Size of dwelling unit is not more than ....
Signature of the owners:
Name (in block letters):
Address of the owner(s):
Dated:
Signature of registered Architect/Engineer/ supervisor Registration no. of the Architect/Engineer/ supervisor: Name (in block letters): Address of the Architect/Engineer/ supervisor: Dated:
FORM-25
Authority letter
I hereby authorise that Mr./Mrs. .... to collect the sanction whose signature is verified below. Specimen signature of .... signature of the owner(s)/Registered architect
Mr./Mrs. Dated received .... Date ....
(Signature of authorized person/owner/Registered Architect)
Dated ...... Remarks, if any ......
FORM-26 Affidavit-cum Undertaking
(For all categories of buildings except residentialR.C.C. above G+2)
(Affidavit of applicant on Rs. 20/- Non-Judicial Stamp paper of specified amount to be attested by Notary Public/Metropolitan Magistrate) Ref: Proposal work of ....
(Dag No. .... Patta No. .... of Revenue Village ....under .... Mouza situated at .... Road, Guwahati for..... (Name of the owner/Developer/Builder)
Address:................
Telephone No. .... Mobile No. ....
I ...... son of ...... has applied for
permission and do hereby solemnly affirm and declare as under:
-
That I or through my authorized representative and Registered Technical Person (RTP) have visited the site and surveyed the site and the site measurements are found to be in conformity with land area at site and land document provided to me by my client. The plot under proposal forms part of the existing Master Plan for Greater Guwahati with respect to its location, proposed land use in conformity with the existing zoning regulation and Building Byelaws.
-
The appointment of Construction Engineer on record, Building Contractor, Plumbing Contractor, Electrical Contractor, HVAC Contractor if required separately shall be met at an appropriate stage before the relevant work commences.
-
That in case I dispense with services of my Registered Technical Person (RTP) and or deviates from the sanctioned design at any stage whatsoever, I will inform the concern authority within 48 (forty eight) hours after it is brought to my notice.
-
That mandatory setbacks will be kept and shall be maintained in accordance with the setbacks marked in the Layout Plan and approved plan.
-
That in case any thing contrary to the above is found or established at any stage, the concern Authority shall be at liberty to take action as per rule.
-
I will submit completion certificate prior to obtaining electric connection.
-
I will construct the building as per approved plan.
-
I will not occupy the building without obtaining the occupancy certificate.
-
I will not change the Registered Technical Person (RTP) during the construction period without prior notice to Authority, and if the change has taken place the new Registered Technical Person (RTP) /applicant has to fulfill all the formalities completed by the earlier Registered Technical Person (RTP).
-
That nothing has been concealed and no misinterpretation has been made while applying for permission.
Deponent
Verification:
I the above named deponent do hereby verify at .... on this .... of .... 201.... that contents of the above affidavit are true and correct to my knowledge. No part of it is false and nothing has been concealed there from.
FORM-27
Detail report on construction of Building as per as built drawing. (To be submitted by Applicant and Registered Technical Person (RTP) jointly for Completion & Occupancy Certificate)
-
Name of Applicant / Builder :
-
Location of Building
-
Name of Road
-
NOC No. & Date :
-
Zone :
6. Floor wise use / Area statement :
| Floors | Approved | Maintained | Deviation | ||||||
| Use | Area before deduction | Area after deduction | Use | Area before deduction | Area after deduction | Use | Area before deduction | Area after deduction | |
| Basement | |||||||||
| Ground | |||||||||
| Mezzanine | |||||||||
| First | |||||||||
| Second | |||||||||
| Third | |||||||||
| Fourth | |||||||||
| Fifth | |||||||||
| Sixth | |||||||||
| Seventh | |||||||||
| Eighth | |||||||||
| Ninth | |||||||||
| Tenth | |||||||||
7. Setback / Margins :
| Direction/ Side | Setbacks | Cantilever | ||||
| Approved | Maintained | Deviation | Approved | Maintained | Deviation | |
| North | ||||||
| South | ||||||
| East | ||||||
Completion CUM Occupancy Certificate
With reference to your notice of completion dated....It is hereby certified that the building as per description below in certified plan at dag No.... Patta no......, Village.... Mouza....
situated at .... whose plans were sanctioned vide No....dt.... has been inspected with reference to building bye-laws and following documents and is certified to be completed & allowed to occupy.
(a)Documents furnished:
(b) Description of Construction Work Block Wise/Building Wise.
-
Block Building No.
-
Detail area statement Work floor wise.
Chairman......
Municipal Board/ Commissioner..
corporation
/President GP
Form No. 29 Form of Rejection or Compliance in Respect of Occupancy Certificate
File No................... Dated:................
Shri/Smti. Subject: Occupancy Certificate in respect of Plot No.... NO no.... dated....
Dear Sir / Madam,
- With reference to your letter dated.
- With reference to your notice of completion dated.
- In continuation of this office letter of even No....dated on the subject noted above, I am to inform you that your case has been examined and occupancy certificate is rejected for the reasons as given below:-
- .....
- .....
- .....
- ....
Chairman........... Municipal Board/ Commissioner........... corporation /President GP
FORM-30
Office of the ..... Building Permit Issuing Authority
NO:........../............
Dated, Guwahati the
To, ................ ................ ................ ................ ................ ................
SUB: APPROVAL UPTO PLINTH LEVEL CONSTRUCTION
REF: Your application dated ....
Sir/Madam With reference to your above application. approval upto plinth level construction of the building permitted vide No ....dated.... at............ is hereby accorded, as per plan/section forwarded
herewith with / without modification and you are required to comply with the conditions mentioned in the Planning Permit/Building permit as applicable,. The particulars of the construction for which permission accorded is given below.
i)Plinth area
ii) Plinth height
iii)Setbacks
iv)......
Chairman......
Municipal Board/ Commissioner.
Corporation
/President GP
Memo No: GPL /...................
Dated, Guwahati the ....
Copy to:
i) Assessment Branch, G.M.C/ULB/GP for information with a copy of approved plan. ii) CEO, GMDA/Chairman other Development Authority.
iii) Site Engineers concerned.
iv) Concerned R. T. P.
Chairman........... Municipal Board/ Commissioner........... corporation /President GP