The Authority issuing Completion & Occupancy certificate before doing so shall ensure that following are complied with for consideration of safety against natural hazard:—
(i) Certificate of lift Inspector has been procured & submitted by the owner regarding satisfactory erection of lift;
(ii) The certificate of competent authority and/or fire department for completion and/or fire requirements as provided in these byelaws has been procured and submitted by the owner.
(iii) If any project consists of more than one detached or semi detached building / buildings in a building unit and any building / buildings thereof is completed as per provisions of these bye-laws (such as parking, common areas, internal roads, height of the building, infrastructure facilities, lift and fire safety measures), the competent authority may issue completion certificate for such one detached or semi detached building / buildings in a building unit.
(iv) The completion &occupancy certificate shall not be issued unless the information is supplied by the owner and the Architect on Record/ Engineer on Record concerned in the schedule as prescribed by the competent authority from time to time.
(V) The Completion & Occupancy Certificate shall be issued within a period of 21 days from the date of receipt of the completion certificate, provided it is constructed as per approved plan & NOC.
119. MAINTENANCE OF BUILDINGS.—
In case of building older than fifty years, it shall be the duty of the owner of a building, to get his building inspected by a Registered Structural Engineer (RSE) within a year from the date of coming into force of these bye-laws. The Structural Inspection Report shall be produced by the owner to the appropriate authority. If any action for ensuring the structural safety and stability of the building is to be taken, as recommended by SER, it shall be completed within three years:
Provided that if the Structural Inspection Report does not ensure the structural safety of the building by resorting to retrofitting or taking any other measure to maintain structural safety and makes a recommendation for demolition of the building, in that case, the Authority shall evacuate the occupier of the building immediately and serve notice upon the owner/occupier to demolish the building/structure within a period of three months from the date of receipt of the notice, failing which the Authority shall cause the building/structure demolished and shall realize the cost of such demolition from the owner/occupier, as the case may be. Any adverse report given by the SER, must be supported with reasons backed by detailed calculations.
120. PROTECTIVE MEASURES IN NATURAL HAZARDPRONE AREAS.—
In natural hazard prone areas identified under the landuse Zoning Regulations, structures, buildings and installations which cannot be avoided, protective measures for such construction/ development should be properly safeguarded based on the suggestion given by structural Engineer or competent Authority. Such Natural Hazard prone Areas will be notified and updated by the authority based on Hazard Studies viz. Microzonation, Landslide Hazard zonation, Flood zonation carried out by competent authority and agencies from time to time.
The Assam Unified Building Bye Laws 2022 will be guided by the principles laid down in the Disaster Risk Reduction Roadmap particularly the principles of 'Do No Harm', 'Resilient Development' 'Integrated allhazard approach' and 'Equity and Inclusion'. The bye laws will be inclusive of the DoHUA action plan included in the DRR Roadmap. It would specifically encourage safety audit of existing urban built-in infrastructure, GIS/GPS mapping of existing infrastructure including vulnerabilities and exposure, mapping and essential integration of assembly points and open spaces in design of new infrastructure, green construction practices, pollution reduction measures, waste treatment (solid and liquid) and management including proper sewerage, faecal sludge management, flood risk management in achanging rainfall scenario including renovation and futuristic drainage systems and designs, protocols for retrofitting, disaster management planning and SoP in design, systems of monitoring compliance tobye-laws, grievance redressal and community feedback mechanisms etc. The Bye Laws will promotemulti-hazard resilience in a changing climate at all levels including in design, execution, monitoring and measures to ensure compliance. An integrated compliance dashboard for measuring compliance of thebye-laws with a special tab on disaster resilience would be developed in alignment with '10 essential formaking cities resilient' framework (https://mcr2030.undrr.org/sites/default/files/inline-
files/10%20Essentials%20%28from%20LG%20handbook%29_1.pdf). DoHUA will ensure compliancedash-board is linked to the DRR Roadmap Technology Platform as and when it is developed.