Objective: To ensure accessibility and usability of the building and its facilities by employees, visitors and clients with disabilities.
Criterion 14: Operation and maintenance protocol for electrical and mechanical equipment.
Objective: Ensure the inclusion of specific clauses in the contract document for the commissioning of all electrical and mechanical systems to be maintained by the owner, supplier, or operator. Provide a core facility/service management group, if applicable, which will be responsible for the operation and maintenance of the building and the electrical and mechanical systems after the commissioning. Owner/ builder/ occupants/ service or facility management group to prepare a fully documented operations and maintenance manual, CD, multimedia or an information brochure listing the best practices/do's and don'ts/maintenance requirements for the building and the electrical and mechanical systems along with the names and addresses of the manufacturers/suppliers of the respective system.
Criterion 15: Innovation points.
One innovation points are available under the rating system for adopting criteria which enhance the green intent of a project, and the applicant can apply for this bonus point.
(b) Procedure of Certification
Each criterion has ) 6((six) number of points assigned to it. It means that a project intending to meet the criterion would qualify for the points. Compliances, as specified in the relevant criterion, have to be submitted before Authority with a detail plan of action. The points related to these criteria are awarded provisionally while certifying and are converted to firm points through monitoring, validation, and documents/photographs to support the award of point. Evaluation shall be done by an expert committee constituted for the purpose by the Authority. Examination of plan of action, Monitoring during the construction stage and post construction period shall be done by an Engineer dedicated for the purpose. Report of such findings shall be submitted before the Expert committee for evaluation, rating and certification. Standards shall conform to relevant BIS code and standards as prescribed. There will be in total 100 point for 15 (fifteen) criterions,6 (six) points each for 14 criterions and 16 9sixteen) points for the innovation points. Different levels of certification (one star to five star) are awarded based on the number of points earned. The minimum points required for certification is 50. Buildings scoring 50 to 60 points, 61 to 70 points, 71 to 80 points, and 81 to 90 points shall get one star, ‘two stars’, ‘three stars’ and ‘four stars’ respectively. A building scoring 91 to 100 points will get the maximum rating viz. five stars.
The building having qualified under the star rating will get Certificate of Star rating. The building qualified under star rating may shall apply before building permit issuing Authority for property tax rebate.
"Appendix-X
Appendix IXGreen Building Certification
Green Building Certification shall evaluate the environmental performance of a building holistically over its entire life cycle, thereby providing a definitive standard of a building that is environmental friendly and to optimize the conservation and utilisation of resources land, water, natural habitat, and energy.
Construction of Green Buildings may be guided by the provisions of part-11 of NBC 2016 and/or ECBC 2017 for commercial buildings and Eco-Niwas Samhita 2018 for residential buildings.
A building shall be rated based on criteria prescribed. Applicant shall apply for eligibility for certification with detail plan of action for fulfillment of each criterion to the authorized agency certifying the star rating. The authorized agency may also follow their own criteria for star rating of these buildings.
(a) Criterions for certification
Criteria 1: Preserve and protect the landscape during construction/compensatory depository forestation.
Objective: Proper timing of construction, preserve top soil and existing vegetation, staging and spill prevention, and erosion and sedimentation control. Replant, onsite, trees in the ratio 1:5 to those removed during construction.
Criteria 2: Reduce hard paving on-site and /or provide shaded hard- paved surfaces. Objective: Minimize storm water run-off from site by reducing hard paving on site.
Criteria 3: Enhance outdoor lighting system efficiency.
Objective: Meet minimum allowable luminous efficacy (as per lamp type) and make progressive use of solar lighting system.
Criteria 4: Reduce landscape water requirement.
Objective: Landscape using native species and reduce lawn areas while enhancing the irrigation efficiency, reduction in water requirement for landscaping purposes managing slope and water retention.
Criterion 5: Reduce building water use.
Objective: Reduce building water use by applying auto-stop fixtures, etc.
Criterion 6: Optimise building design to reduce the conventional energy demand.
Objective: Plan appropriately to reflect climate responsiveness, adopt an adequate comfort range, less air-conditioned areas, day-lighting, avoid over-design of the lighting and air-conditioning systems.
Criterion 7: Reduce volume, weight, and time of construction by adopting an efficient technology (e.g. pre-cast systems, ready-mix concrete, etc.).
Objective: Replace a part of the energy-intensive materials with less energy intensive materials and/or utilize regionally available materials and light weight materials in (internal partitions, paneling /false ceiling/interior wood finishes/ in-built furniture door/window frames, flooring etc.
Criterion 8: Renewable energy utilization.
Objective: Provide solar energy system equivalent to at least 20% of connected load. Energy requirements will be calculated based on realistic assumptions which will be subject to verification during appraisal.
Criterion 9: Water recycle, reuse and rainwater harvesting.
Objective: Provide wastewater treatment on-site for achieving prescribed concentration, rainwater harvesting, reuse of treated waste water and rainwater for meeting the building's water and irrigation demand.
Criterion 10: Waste management.
Objective: Ensure maximum resource recovery and safe disposal of wastes generated during construction and reduce the burden on landfill. Use different coloured bins for collecting different categories of waste from the building. Allocate separate space for the collected waste before transferring it to the recycling/disposal stations. resource recovery systems for biodegradable waste as per the Solid Waste Management and handling Rules, 2000 of the MoEF.
Criterion 11: Ensure water quality.
Objective: Ensure groundwater or the source of water meet the water quality norms as prescribed in the Indian Standards for various applications (Indian Standards for drinking [IS 10500-1991], irrigation applications [IS 11624-1986]. In case the water quality cannot be ensured, provide necessary treatment of raw water for achieving the desired concentration for various applications.
Criterion 12: Acceptable outdoor and indoor noise levels.
Objective: Ensure outdoor noise level conforms to the Central Pollution Control Board Environmental Standards–Noise (ambient standards) and indoor noise level conforms to the National Building Code of India, 2005, Bureau of Indian Standards, Part 8-Building Services; Section 4-Acoustics, sound insulation, and noise control.
Conditions
(i) I agree not to proceed with laying out of land for building purposes until the planning permission is granted by the Authority under relevant provision of building byelaws and Guwahati Building Construction (Regulation) Act 2010.
(ii) I agree not to do any development otherwise than in accordance with the layout plan, specifications which have been approved or in contravention of any provision of the building byelaws, order or other declaration made there under or of any direction or requisition lawfully given or made under the said Act rules or by laws.
(iii) I agree to make any modification which may be required by any notice issued by any order confirmed by the Authority.
(iv) I agree to keep one copy of the approved layout plans at the site at all reasonable times when development is in progress and also agree to see that the plan is available and the site is open at all reasonable times for the inspection of the Authority or any officer authorized by him in that behalf.
(v) I agree to furnish a set of completion plans within fifteen days from the date of completion of the development.
(vi) I agree to hand over all the proposed roads after duly forming them to the satisfaction of the local authority concerned and sites reserved for parks, play grounds, open spaces for public purpose free of cost to the local authority concerned in which the site falls when so directed by the authority.
I ....have signed this application in my capacity as the Owner/Power of Attorney Holder/Lease Holder and declare that the checklist and statement made therein are true to the best of my knowledge and belief.
Signature of the Owner of the Land /Power of attorney holder / Lease holder
I ....have signed this application in my capacity as the Architect/ Registered Technical Person (RTP) of Attorney Holder/Lease Holder and declare that the checklist and statement made therein are true to the best of my knowledge and belief.
Signature of the Architect/ Registered Technical Person (RTP)
FORM-1 (Part-II for Building Permit)
APPLICATION FORM TO ERECT, RE-ERECT OR TO MAKE MATERIAL ALTERNATION IN A BUILDING (Submitted under section Guwahati Building Construction (Regulation) Act 2010))
Executive Officer/ Commissioner/Secretary GP MB/Corporation/Panchayat/
Sir,
I/We hereby give notice that I intend to erect/re-erect or to make alteration in the House No .... of situated at Road area of Ward No.... in Dag No.... Patta No.... of Revenue Village
in accordance with the Assam Unified Building Byelaws 2022, and I forward herewith, the following plans and specifications duly signed by me and
...... (Name in block letters) of the Registered Technical Personal, Registration No.
...... who have prepared the plans,
statements/documents (as applicable).
a) Three copies of site plan and building plan as required by building bye laws, GMC, and drawn by Technical Personal registered in G.M.C.
b) Photostat Copy of land document (Such as land deed, Mutation order or Patta). The photocopy is to be self attested.
c) Structural Certificate (as per building bye laws of 2006) issued by Technical Personal / Group Agency Registered in G.M.C.
d) Service plan for building when it is above 12.00m high.
e) For boundary wall permission; an undertaking through affidavit will be required particularly for road side wall.
f) Key plan of the location.
g) Soil test report (Geo-Technical Report) in case of building above 12.00 m high.
h) Trace Map.
i) Receipt Copy of up-to-date property tax.
The schedule of the land is also given below:
(a) Total plot area
(b) Name of owners of adjoining land
North : ............
South : ............
East : ............
West : ............
(c) Is there any future provision for
(i) Vertical extension
(ii) Horizontal extension
(iii) If yes No. of floors
seen
9825
I request that the construction may be approved and permission accorded to me to Execute the work. I hereby also declare that contents of the above application and the enclosures are true and correct to my/our knowledge. No part of it is false and nothing has been concealed there from.
Signature of the Applicant
:
Name of the Applicant (in block letters)
:
Father/Husband Name
:
Mother Name
:
Postal Address of Applicant
:
Phone No / Mobile No
:
PAN No.
:
FOR OFFICE USE
B.P. fees Received Rs.(Rupees............) onlyRt. No.............. BookNo.............. Date............(Cashier)
The site to be shown to the concern Zonal Engineer within 7 days.
You are to contact to office counter of the building permission branch within 30 (thirty) days from the date of submission for further information.
Signature of the Applicant
Fees to be paid:
Rs....
for construction of RCC / Boundary Wall / AT building for .... use.
Zonal Engineer
To BE Completed by the Owner of the Land / Power of Attorney Holder / Lease Holder
Applicant (in block capital)
Name ...........
Address ...........
Particulars of proposal for which permission or approval is sought
(a) Full address or location of the land to which this application relates and site area
Dag No./PP No. .... ....
Division No./Ward No. ....
Name of Town or village ---- ----
Mouza ....
Land area ....
(b) State whether the applicant owns or controls any adjoining land. If so give its location and extent.
Particulars of present and previous use of land (i) Present use of land (ii) If vacant, the last previous use
Information regarding the proposed use.
(i) State number and type of dwelling units (whether bungalows, houses, flats, etc.) factories Shops, institutions, parks & play fields etc. proposed.
(ii) Extent of land use proposed : (extent in hectares)
(a) Land allotted for residential purpose ............
(b) Land allotted for commercial purpose............
(c) Land allotted for industrial purpose............
(d) Land allotted for institutional purpose............
(e) Land allotted for park and play fields............
(f) Land allotted for roads and pathways............
(g) Land allotted for other uses (to be specified)..........
Does the proposed development involve felling of any trees?
Does the proposed development involve erection of any advertisement board? If yes, indicate its position on plan and type of the Advertisement board to be erected.
Whether the land in question is property belonging to a Wakf or a Hindu Religious Institution and if so whether proper prior approval or authority clearance has been obtained for the proposed development.
Declaration by Architect /fire Consultant
Name & address of the building :____
Type of Principal Occupancy :____
Type of Case : Construction permit/Completion Certificate
Fire Safety directives letter No.: ____
Height of Building (m) :____
Name & registration number of Architect & Fire Consultant: ____
Year of Construction:____
Applicant's letter No._
S1.No.
Fire & Life Safety Requirements
NBC/Bye Law Requirement
Proposed/ Provided at site
RemarksMR/NMR
1
Access to Building
Access to Building
Access to Building
Access to Building
Road width
Gate width
Width of internal road
2
Number, Width, Type & Arrangement of Exists
Number, Width, Type & Arrangement of Exists
Number, Width, Type & Arrangement of Exists
Number, Width, Type & Arrangement of Exists
a. Number of staircases
Upper Floors
Basements
b. Width of staircases
Upper Floors
Basements
c. Protection of exits
Fire check door
Pressurization
d. No. of continuous staircases to terrace
e. Width of Corridor
f. Door size
g. Fire Tower
g. Fire Tower
3
Compartmentation
Compartmentation
Compartmentation
Compartmentation
Fire check door
Sealing of electrical shafts
Fire Rating of shaft door
Water Curtain
Fire Curtain
Fire Dampers
4
Smoke Management System
Smoke Management System
Smoke Management System
Smoke Management System
Basements
_a/c per hour
Upper floors
_/c per hour
Atrium
_/c per hour
5
Fire Extinguishers
Fire Extinguishers
Fire Extinguishers
Fire Extinguishers
Total Numbers
ISI marked
Types
ISI marked
IS marking
ISI marked
6
First-Aid Hose Reels
First-Aid Hose Reels
First-Aid Hose Reels
First-Aid Hose Reels
Total numbers on each floor
30 m
Length of hose reel hose
30 m
Nozzle diameter
5 mm
7
Automatic fire detection and alarming system
Automatic fire detection and alarming system
Automatic fire detection and alarming system
Automatic fire detection and alarming system
Type of detectors
Location of Main Panel
Location of Repeater Panel
Alternate source of Power Hooter's Location
8
MOEFA
MOEFA
MOEFA
MOEFA
9
Public Address System
Public Address System
Public Address System
Public Address System
10
Automatic Sprinkler System
Automatic Sprinkler System
Automatic Sprinkler System
Automatic Sprinkler System
Basement
Upper Floor
Sprinkler above false ceiling
11
Internal Hydrants
Size of riser/down-comer
Number of hydrants per floor
Hose Box containing hoses & a nozzle
12
Yard Hydrants
Total Number of hydrants
Hose Box containing hoses & a nozzle
13
Pumping Arrangements
Ground Level
Discharge of main Pump
Head of main Pump
Number of Main pumps
Jockey Pump out put
Jockey Pump head
Standby pump out put
Standby Pump head
Auto starting /manual stopping
Pump House access
Terrace level
Discharge of pump
Head of the pump
Power Supply
Auto starting of pump
14
Captive Water Storage for fire fighting
Captive Water Storage for fire fighting
Captive Water Storage for fire fighting
Captive Water Storage for fire fighting
Underground tank capacity
Draw-off connection
Fire service inlet
Access to tank
Overhead Tank capacity
15
Exit Signage
Exit Signage
Exit Signage
Exit Signage
16
Provision of Lifts
Provision of Lifts
Provision of Lifts
Provision of Lifts
Pressurization of Lifts Shaft
Pressurization of Lift lobby
Communication In lift Car
Fireman's Grounding Switch
Lift Signage
17
Standby power supply
Standby power supply
Standby power supply
Standby power supply
18
Refuge Area
Total Area
Location
19
Fire Control Room • Detector System Panel• Flow Switch Panel• PA System Panel• Batter backup• Building Floor Plans
• Detector System Panel• Flow Switch Panel• PA System Panel• Batter backup• Building Floor Plans
• Detector System Panel• Flow Switch Panel• PA System Panel• Batter backup• Building Floor Plans
• Detector System Panel• Flow Switch Panel• PA System Panel• Batter backup• Building Floor Plans
• Detector System Panel• Flow Switch Panel• PA System Panel• Batter backup• Building Floor Plans
20
Special Fire Protection Systems for Protection of special Risks, if any.
Certified that necessary markings of the aforesaid requirements has been made on the building plans.
Signature of the Fire Consultant
Name
Signature of Architect
Registration No.
Name
Registration No.
FORM-1
(Part-I for Planning Permit)
Application for Planning Permission
For Laying out the Land for Building Purposes
For Office use only Ref :
Date received :
Chairman/The Chief Executive Officer
Development Authority/DD T&CP
Sir,
I hereby apply for Planning Permission for laying out of my land in Dag no.... PP No.... Village.... Mouza.... for building purposes/desire to find out whether under noted development is permissible.
I forward herewith the following particulars in quadruplicate duly signed by the Registered Technical Person and me.
(a) A key map of the site showing adjoining areas of the proposed layout under reference, marking clearly therein the boundaries of the proposed layout in colour, existing roads, structures, landmarks, streams, H.T. or L.T. Power Lines, drains to passing through layout and levels of the site.
(b) A detailed site plan to a scale of not less than 1:200 showing the proposed layout indicating size of plots, width of the proposed roads, open spaces and amenities provided and type of buildings be built, if any, and
(c) The Trace map of the area. required under building byelaws.
(d) Other documents, maps and drawings as required under building byelaws.
I/We the owner/legal representative of the land to which the accompanying application relates request that the layout may be approved and Planning Permission may be accorded.
Date :
Signature of the Owner of the land / Power of attorney holder/Lease Holder
Certificate of Undertaking for Hazard Safety Requirement
To,
......
......
REF : Proposed work of ____
(Title of project)
Dag No. ____ Patta No. ____ of Revenue Village ____ ____
____ under ____ Mouza situated at
Guwahati.
Certified that the building plans submitted for approval will satisfy the safety requirements as stipulated under Building Regulation No. .... and the information given therein is factually correct to the best of our knowledge and understanding.
It is also certified that the structural design including safety from hazards based on soil conditions shall be duly incorporated in the design of the building and these provisions shall be adhered to during the construction.
Signature of Owner with date ____
Name in Block Letters ____
Structural Engineer on Record with date
Address____
Name in Block Letters ____
(1) AD = BD = (1)/(2)AB,AB = AC = (1)/(2)BC
Address____
(1) AD = 2 ( AB + BD ) = 3 ( AC + BD ) + 4 ( AC + BD ) = 3 ( AC + BD ) + 4 ( AC + BD ) - 2 ( AC + BD ) = 3 ( AC + BD ) + 4 ( AC + BD ) - 2 ( AC + BD ) + 3 ( AC + BD ) = 3 ( AC + BD ) + 4 ( AC + BD )
Signature of Developer
Signature of the Architect on
with date ____
Record/ Engineer on Record
with date ____
Name in Block Letters ____ ____
Address____
Name in Block Letters ____
Address____
Form NO. 7
Office of the ..... Building Permit
NO:........../............
Dated, Guwahati the
To,
................
................
................
Contact number:
Email id:
(NB: Full address with contact number and email id. of applicant to be filled up above)
SUB: BUILDING PERMIT
REF: Your application dated ....
Sir/Madam
With reference to your above application for permission to erect/re-erect/add to/alter a / a building at ....( Full address of the project site to be mentioned including location of project with co-ordinates, name of road, By-lane, PIN code and near by landmark)is hereby accorded and you are required to comply with the conditions mentioned overleaf in accordance with plan submitted with / without modification. The particulars of the construction for which permission accorded is given below.
Project Area :
Number of blocks :
Number of Units :
Admissible FLOOR AREA RATIO (FAR) :
Achieved FLOOR AREA RATIO (FAR)
PROPOSEDUSE
ZONE
TYPEOFCONSTRUCTION
MARGINS
NORTH
NO OFFLOORS
PARKING(No.&Area)
BASEMENT
PARKING(No.&Area)
GROUND
PARKING(No.&Area)
OPEN
AREA
BASEMENT
(SETBACKS)
SOUTH
(SETBACKS)
EAST
(SETBACKS)
WEST
CANTILEVER
NORTH
CANTILEVER
SOUTH
CANTILEVER
EAST
CANTILEVER
WEST
DETAILS OF LAND
DAG NO
DETAILS OF LAND
PATTANO
DETAILS OF LAND
WARDNO
Name of Road :Mouza / Vill :
Name of Road :Mouza / Vill :
Name of Road :Mouza / Vill :
OF FLOORS
GROUND
MEZZ.FLOOR
FIRST
SECOND
THIRD
FOURTH
FIFTH
SIXTH
SEVENTH
EIGHT
NINTH
TENTH
Enclo : One copy of approved Plan.
Yours faithfully,
N.B. : Please see back page.
LENGTH OF B/WALL
HEIGHT OF B/WALL
Note: Add additional floor if required.
Chairman......
Municipal Board/ Commissioner.
corporation
/President GP
Memo No: GPL /...................
Copy to:
Dated, Guwahati the ....
(i) Assessment Branch, Guwahati Municipal Corporation/Urban Local Bodies for information with a copy of approved plan.
(ii) Chief Executive Officer, Guwahati Metropolitan Development Authority/Chairman other Development Authorities.
(iii) Registered Technical Person
Chairman......
Municipal Board/ Commissioner.
corporation
/President GP
Form NO. 6
Notice
This Permit shall remain valid up to two years only from the date of issue of the permit.
The Permit is not transferable.
The owner upon commencement of his work under a no-objection certificate shall give Notice to Guwahati Municipal Corporation that he has started his work and Corporation shall cause inspection of the work to be made within 14 days following receipt of notice to verify that the building has been erected in accordance with the sanctioned plans.
Should the Corporation determine at any stage that the layout or the construction is not proceeding according to the sanctioned plan or is in violation of any provision of the Act, it shall serve a notice on the applicant requiring him to stay further execution until correction has been made in accordance with the approved plan.
If the Permit holder fails to comply with the requirements at any stage of construction the corporation is empowered to cancel the building permit issued.
Every person who erects or re-erects any building shall within one month of the completion of the work deliver to the Commissioner at his office a notice in writing of such completion and shall give him all necessary facilities for the inspection of such works as provided in the Building Bye-laws.
Whenever asked by the Commissioner or his subordinates, the Permit holder shall produce the Permit along with the copy of the approved plan for verification.
In the event of reclamation of the plot for construction of building/boundary wall the reclamation level shall not exceed the level of the nearest P.W.D. or Guwahati Municipal Corporation Road. For preparation of hilly land for construction, retaining wall has to be constructed on the excavated earth and spoils should be adequately guarded to prevent erosion.
Conditions:—
“M/S ....” along with the builder will be held responsible for any kind of structural failure of the building.
N.O.C. from Director of FIRE Service is to obtained for the building.
Necessary fire fighting facilities are to be provided in and around the building.
The Road side drain along with the Road is to be constructed at the cost of the builder connecting main outlet of the area.
Before installation of Deep Tube Well, N.O.C. from Central Ground Water Board is to be obtained.
"CHUTES" are to be provided inside the building for garbage disposal.
At least 2 nos. of DUST BIN are to be placed near the plot at the cost of the builder.
Planning of minimum 10 nos. of evergreen trees inside the plot on the date of commencement of construction and be maintained.
Application for Enrolment as Competent Registered Technical Personnel
To,
The Director,
Town and Country Planning
Dispur, Guwahati.
I hereby apply for enrolment of my name as Architects/Engineers/Structural Engineers....1 to do the various works of schemes for Planning Permit/ Building Permit and supervision I do hereby also declare that I shall follow and will abide by all the rules and regulations now in force under provisions of Guwahati Building Construction (Regulation) Act and byelaws framed there under.
My personal bio-data are as follows-
Name :
Qualification :
(Certificate to be enclosed)
Past experience :
Father's Name :
Age :
Present Address :
Permanent Address :
I deposit herewith annual enrolment fees of Rs.... (Rupees....) only in cash as required. I am not associated with any other similar group or Firms in any manner for this purpose.
Signature:
Dated:
FORM-5 Application for Enrolment as Competent Registered Technical Personnel (Group or Agency)
To,
The Director,
Town and Country Planning
Dispur, Guwahati.
We hereby apply for enrolment of our Group/Agency in the name and style as mentioned below, as competent technical personnel to do the various works of schemes for Building Permit and supervision under provisions of the Guwahati Building Construction (Regulation Act 2010) and byelaws framed thereunder.
We do hereby also declare that we shall follow and will abide by all the rules and regulations now in force and that may be framed from time to time under the provision of the Act. Name of the group and persons associated with personal bio-data are as follows-
Name of the Group or Agency: -
Present & Permanent Address: -
Name of persons associated: - with his/ her personal capacity and rank and personal bio-data (Certificates enclosed)
(A)
(B)
(C)
(D)
We deposit herewith the annual enrolment fees of Rs.... (Rupees....) only in cash as required.
Signature of head of the group or agency.
N.B. Any person associated with any group or agency will not be eligible for enrollment as an individual.
FORM-2 Office of the ................... Development Authority/guwahati Metropolitan Development Authority. /DD T&CP
With reference to the above application for layout of land and development to erect/re-erect/add to/alter a/a building at ...., Planning Permits hereby accorded under section ...... read with section .... of Assam Building Construction Regualtion ( Amendment )Act,2022 in accordance with plan submitted with / without modification. The particulars of the construction for which permission accorded is given below. Modification in Building Plan if required shall be done within the permissible limit given below.
Sl. No.
Parameter
Permissible
Proposed
Approved
Remarks
1
PLOT AREA
2
DAG NO.
3
PATT A NO.
4
WARD NO.
5
Name of the Road
6
Vill / Mouza
7
USE
FLOOR AREA RATIO (FAR)
8
TYPE OF CONSTRUCTION
9
FRONT SETBACK( )
10
REAR SETBACK( )
11
SIDE SETBACK( )
12
SIDE SETBACK( )
LENGTH OF B/WALL
HEIGHT OF B/WALL
Yours faithfully,
Chairman.........
Development Authority/
Chief Executive Officer, GMDA
/President GP /Deputy
Director/Assistant Director
Memo No:................
Copy to: i) ....
Dated, Guwahati the ....
ii)....
iii)....
iv)....
Chairman......
Development Authority/
Chief Executive Officer, GMDA
/President GP /Deputy
Director/Assistant Director
FORM-3
Certificate of Undertaking of Architect on Record/ Engineer on Record
To
................
................
................
Ref : Proposal work of ____
(Title of the project)
Dag No. ____ Patta No. ____ of Revenue Village ____
____ under ____ Mouza situated at ____ ____ ____
Guwahati.
For____
(Name of Owner /Developer/Builder)
Address:____
Tel.No.:____
I am a member of Council of Architects/Institution of Engineers (India) and I am possessing current registration to act as registered Architect/Engineer.
I hereby certify that I am appointed as the Architect on Record / Engineer on Record to prepare the plans, sections and details as required under the provisions of the Act / Development control Regulations for the above mentioned project and that I have
prepared and signed the same and that the execution of the project shall be carried out under my direction, and supervision of a Construction Engineer on Record, as per the approved drawings. I am fully conversant with the provisions of the Regulations, which are in force, and about my duties and responsibilities under the
same and I undertake to fulfill them in all respects, except under the circumstances of natural calamities.
I also undertake to provide my guidance for the adequate measure to be taken by the owners for installation of plumbing, drainage, sanitation and water supply. The appointment of a Construction Engineer on Record, building contractor, plumbing contractor and electrical contractor shall be made at the appropriate stage by the owner before the relevant work commences.
Signature : ____
Reg. No. ____ Date: ____
Name : ____
Address : ____
Tel. No.: ____
\"form NO. 7A Certificate of Undertaking by Empanelled Registered Technical Personnels under \"mukhya Mantrir Sohoj Griha Nirman Achoni\":
To
......
Ref : Proposed Ground/ Ground +1/ Ground +2 residential building of
(Name of Owner)
Address:____
Tel.No.:____
Dag No. ____ Patta No. ____ of Revenue Village
____ ____ under ____ Mouza situated at
Guwahati/other areas.
I do hereby certify that I am appointed as the Registered Technical Person (RTP) to prepare the plans, sections and details as required under the provisions of the Act / Development control Regulations for the above mentioned project and that I have prepared and signed the same and that the execution of the project shall be carried out under my direction and supervision.
I am fully conversant with the provisions of the Regulations, which are in force, and about my duties and responsibilities under the same and I undertake to fulfil them in all respects, except under the circumstances of natural calamities.
I also hereby certify that:
(a) I have examined the land documents as provided to me by the applicant and verified the site.
(b) I have examined the provisions of the Master Plan for Guwahati Metropolitan Area/ other areas and the building byelaw in force and accordingly I have prepared this plan.
In case there is an existing building in the plot or the proposal is for extension of existing residential building the following need to be certified:
(a) I have examined the existing Ground/ Ground +____ residential building and found that the building was constructed with NOC/ without NOC.
(b) I have examined the existing building and found (Tick whichever is applicable)
i. No deviations.
ii. Deviations found which are compoundable in nature.
iii. The existing building is as per the provisions of the Building Byelaw in force and can be regularized.
Penalty calculated at Rs._ which shall be deposited at Guwahati Metropolitan Development Authority / Guwahati Municipal Corporation/ other Development Authorities/Urban Local Bodies/Gaon Panchayats authorities before issue of Planning Permit/ Building Permit.
Form NO. 9 Certificate of Undertaking of the Construction Engineer on Record
To............
Ref : Proposed work of ____
Dag No. ____ Patta No. ____ of Revenue Village ____
____ under ____ Mouza situated at ____ ____
Guwahati.
Tele. No....
I possess a current registration to act as Registered Construction Engineer.
I hereby certify that I am appointed as a Construction Engineer on Record on the above mentioned project and that all the works under my charge shall be executed in accordance with the drawings and specifications prepared for this project.
I am fully conversant with the provisions of the Regulations which are in force and about the duties and responsibilities under the same and I undertake to fulfill them in all respect.
* I undertake not to supervise more than ten works at a given time as provided in Development Control Regulations.
* I undertake not to supervise work simultaneously at one point of time on any other sites during my supervision of the execution of this work.
Signature:....
Registration No......Date......
Name....
Address....
Tele.No....
Form NO. 10
The owner through the licensed architect, engineer, as the case may be Registered Technical Person (RTP) who has supervised the construction, shall give notice to the Authority regarding completion of work and obtain “Occupancy Certificate” before occupying the building.
For building above seven storeyed, Party shall submit detail structural design for proof checking by Structural Design Review Panel (SDRP) at least one month prior to commencement of construction.
FORM-4
Signature : ____
Reg. No. ____ Date: ____
Name : ____
Address : ____
Tel. No.: ____”
Form NO. 8 Certificate of Undertaking of Structural Engineer on Record (SER)
To
................
................
................
Ref : Proposed work of ____
Dag No. ____ Patta No. ____ of Revenue Village ____
I am a Registered Structural Engineer (RSE). This is to certify that I have been appointed as the Structural Engineer on record to prepare the Structural design basis report, detailed structural design and detailed structural drawings for above mentioned project. I am fully conversant of my duties and responsibilities under the Regulations and assure that I shall fulfill them in all respects.
I have prepared and signed a Structural Design Basis Report (SDBR).
I undertake to carry out a detailed structural design and prepare detailed structural drawings of the proposed building as per the latest Indian Standard Specifications, and as indicated in the Structural design basis report.
I undertake to supply the owner and the supervisor the detailed structural drawings. If my services are terminated, I undertake to intimate the Authority in writing.