Name & address of the building :____
-
Type of Principal Occupancy :____
-
Type of Case : Construction permit/Completion Certificate
-
Fire Safety directives letter No.: ____
-
Height of Building (m) :____
-
Name & registration number of Architect & Fire Consultant: ____
-
Year of Construction:____
-
Applicant's letter No._
| S1.No. | Fire & Life Safety Requirements | NBC/Bye Law Requirement | Proposed/ Provided at site | RemarksMR/NMR |
| 1 | Access to Building | Access to Building | Access to Building | Access to Building |
| Road width | ||||
| Gate width | ||||
| Width of internal road | ||||
| 2 | Number, Width, Type & Arrangement of Exists | Number, Width, Type & Arrangement of Exists | Number, Width, Type & Arrangement of Exists | Number, Width, Type & Arrangement of Exists |
| a. Number of staircases | ||||
| Upper Floors | ||||
| Basements | ||||
| b. Width of staircases | ||||
| Upper Floors | ||||
| Basements | ||||
| c. Protection of exits | ||||
| Fire check door | ||||
| Pressurization | ||||
| d. No. of continuous staircases to terrace | ||||
| e. Width of Corridor | ||||
| f. Door size | ||||
| g. Fire Tower | ||||
| g. Fire Tower | ||||
| 3 | Compartmentation | Compartmentation | Compartmentation | Compartmentation |
| Fire check door | ||||
| Sealing of electrical shafts | ||||
| Fire Rating of shaft door | ||||
| Water Curtain | ||||
| Fire Curtain | ||||
| Fire Dampers | ||||
| 4 | Smoke Management System | Smoke Management System | Smoke Management System | Smoke Management System |
| Basements | _a/c per hour | |||
| Upper floors | _/c per hour | |||
| Atrium | _/c per hour | |||
| 5 | Fire Extinguishers | Fire Extinguishers | Fire Extinguishers | Fire Extinguishers |
| Total Numbers | ISI marked | |||
| Types | ISI marked | |||
| IS marking | ISI marked | |||
| 6 | First-Aid Hose Reels | First-Aid Hose Reels | First-Aid Hose Reels | First-Aid Hose Reels |
| Total numbers on each floor | 30 m | |||
| Length of hose reel hose | 30 m | |||
| Nozzle diameter | 5 mm | |||
| 7 | Automatic fire detection and alarming system | Automatic fire detection and alarming system | Automatic fire detection and alarming system | Automatic fire detection and alarming system |
| Type of detectors | ||||
| Location of Main Panel | ||||
| Location of Repeater Panel | ||||
| Alternate source of Power Hooter's Location | ||||
| 8 | MOEFA | MOEFA | MOEFA | MOEFA |
| 9 | Public Address System | Public Address System | Public Address System | Public Address System |
| 10 | Automatic Sprinkler System | Automatic Sprinkler System | Automatic Sprinkler System | Automatic Sprinkler System |
| Basement | ||||
| Upper Floor | ||||
| Sprinkler above false ceiling | ||||
| 11 | Internal Hydrants | |||
| Size of riser/down-comer | ||||
| Number of hydrants per floor | ||||
| Hose Box containing hoses & a nozzle | ||||
| 12 | Yard Hydrants | |||
| Total Number of hydrants | ||||
| Hose Box containing hoses & a nozzle | ||||
| 13 | Pumping Arrangements | |||
| Ground Level | ||||
| Discharge of main Pump | ||||
| Head of main Pump | ||||
| Number of Main pumps | ||||
| Jockey Pump out put | ||||
| Jockey Pump head | ||||
| Standby pump out put | ||||
| Standby Pump head | ||||
| Auto starting /manual stopping | ||||
| Pump House access | ||||
| Terrace level | ||||
| Discharge of pump | ||||
| Head of the pump | ||||
| Power Supply | ||||
| Auto starting of pump | ||||
| 14 | Captive Water Storage for fire fighting | Captive Water Storage for fire fighting | Captive Water Storage for fire fighting | Captive Water Storage for fire fighting |
| Underground tank capacity | ||||
| Draw-off connection | ||||
| Fire service inlet | ||||
| Access to tank | ||||
| Overhead Tank capacity | ||||
| 15 | Exit Signage | Exit Signage | Exit Signage | Exit Signage |
| 16 | Provision of Lifts | Provision of Lifts | Provision of Lifts | Provision of Lifts |
| Pressurization of Lifts Shaft | ||||
| Pressurization of Lift lobby | ||||
| Communication In lift Car | ||||
| Fireman's Grounding Switch | ||||
| Lift Signage | ||||
| 17 | Standby power supply | Standby power supply | Standby power supply | Standby power supply |
| 18 | Refuge Area | |||
| Total Area | ||||
| Location | ||||
| 19 | Fire Control Room • Detector System Panel• Flow Switch Panel• PA System Panel• Batter backup• Building Floor Plans | |||
| • Detector System Panel• Flow Switch Panel• PA System Panel• Batter backup• Building Floor Plans | ||||
| • Detector System Panel• Flow Switch Panel• PA System Panel• Batter backup• Building Floor Plans | ||||
| • Detector System Panel• Flow Switch Panel• PA System Panel• Batter backup• Building Floor Plans | ||||
| • Detector System Panel• Flow Switch Panel• PA System Panel• Batter backup• Building Floor Plans | ||||
| 20 | Special Fire Protection Systems for Protection of special Risks, if any. |
Certified that necessary markings of the aforesaid requirements has been made on the building plans.
Signature of the Fire Consultant
Name
Signature of Architect
Registration No.
Name
Registration No.
FORM-1
(Part-I for Planning Permit) Application for Planning Permission For Laying out the Land for Building Purposes
For Office use only Ref :
Date received :
Chairman/The Chief Executive Officer
Development Authority/DD T&CP
Sir,
I hereby apply for Planning Permission for laying out of my land in Dag no.... PP No.... Village.... Mouza.... for building purposes/desire to find out whether under noted development is permissible.
I forward herewith the following particulars in quadruplicate duly signed by the Registered Technical Person and me.
(a) A key map of the site showing adjoining areas of the proposed layout under reference, marking clearly therein the boundaries of the proposed layout in colour, existing roads, structures, landmarks, streams, H.T. or L.T. Power Lines, drains to passing through layout and levels of the site.
(b) A detailed site plan to a scale of not less than 1:200 showing the proposed layout indicating size of plots, width of the proposed roads, open spaces and amenities provided and type of buildings be built, if any, and
(c) The Trace map of the area. required under building byelaws.
(d) Other documents, maps and drawings as required under building byelaws.
I/We the owner/legal representative of the land to which the accompanying application relates request that the layout may be approved and Planning Permission may be accorded.
Date :
Signature of the Owner of the land / Power of attorney holder/Lease Holder