3.1 General
To comply with the Code, buildings shall
a) have an Energy Performance Index Ratio (EPI Ratio) as defined in §3.1.2 that is less than or equal to 1 and,
b) meet all mandatory requirements mentioned under §4.2, §5.2 , §6.2, and §7.2.
3.1.1 Energy Performance Index
The Energy Performance Index (EPI) of a building is its annual energy consumption in kilowatthours per square meter of the building. While calculating the EPI of a building, the area of unconditioned basements shall not be included. EPI can be determined by:
To comply with the Code, EPI shall be calculated based on one of the following:
a) Prescriptive Method including Building Envelope Trade-off Method (see §3.2.2)
b) Whole Building Performance Method (see §3.2.3)
3.1.2 Determining EPI Ratio
The EPI Ratio of a building is the ratio of the EPI of the Proposed Building to the EPI of the Standard Building:
where,
Proposed Building is consistent with the actual design of the building, and complies with all the mandatory requirements of ECBC.
Standard Building is a standardized building that has the same building floor area, gross wall area and gross roof area as the Proposed Building, complies with the mandatory requirements §4.2,
§5.2, §6.2, and §7.2, and minimally complies with prescriptive requirements of §4.3, §5.3 and §6.3 for ECBC Buildings.
The EPI of the Proposed Building shall be established through any one of the following two methods described in §3.2 –
a) Prescriptive Method (see §3.2.2)
b) Whole Building Performance Method (see §3.2.3)
3.1.2.1 EPI Ratio through Prescriptive Method
ECBC Buildings that demonstrate compliance through Prescriptive Method (§3.2.2) shall be deemed to have an EPI equal to the Standard Building EPI, and therefore an EPI Ratio of 1. ECBC+ Buildings and SuperECBC Buildings that demonstrate compliance through Prescriptive Method shall be deemed to have an EPI Ratio equal to the EPI Ratios listed in §9.5 under the applicable building type and climate zone.
3.2 Compliance Approaches
Buildings that fall within the scope of the Code as mentioned in §2, shall comply with the Code by meeting all the mandatory requirements (see §3.2.1) and any of the compliance paths mentioned in §3.2.2, §3.2.2.1, or §3.2.3.
3.2.1 Mandatory Requirements
Buildings shall comply with all mandatory requirements mentioned under §4.2, §5.2 , §6.2, and §7.2, irrespective of the compliance path.
3.2.2 Prescriptive Method
A building complies with the Code using the Prescriptive Method if it meets the prescribed minimum (or maximum) values for envelope components (§4.3), comfort systems and controls (§5.3, §5.4, §5.5), and lighting and controls (§6.3), in addition to meeting all the mandatory requirements.
3.2.2.1 Building Envelope Trade-off Method
Building Envelope Trade-off Method may be used in place of the prescriptive criteria of §4.3.1, §4.3.2 and §4.3.3. A building complies with the Code using the Building Envelope Trade-off Method if the Envelope Performance Factor (EPF) of the Proposed Building is less than or equal to the EPF of the Standard Building, calculated as per §4.3.5, in addition to meeting the prescriptive requirements for comfort systems and controls (§5.3, §5.4), and lighting and controls (§6.3), and all the mandatory requirements (§4.2, §5.2, §6.2 and §7.2).
3.2.3 Whole Building Performance Method
A building complies with the Code using the Whole Building Performance (WBP) Method when the estimated annual energy use of the Proposed Design is less than that of the Standard Design, even though it may not comply with the specific provisions of the prescriptive requirements in §4 trough §7. The mandatory requirements of §4 through §7 (§4.2, §5.2, §6.2, and §7.2) shall be met when using the WBP Method.
3.3 Compliance Requirements
3.3.1 New Building Compliance
3.3.1.1 Full building Compliance
New buildings with completed fit-outs shall comply with either the provisions of §4 through §7 of this Code or the Whole Building Performance Method of §9.
3.3.1.2 Core and Shell building Compliance
New core and shell building shall demonstrate compliance with ECBC requirements for the following base building systems in the common areas:
a) Building envelope
b) Thermal comfort systems and controls (only those installed by developer/ owner)
c) Lighting systems and controls (only those installed by developer/ owner)
d) Electrical systems (installed by developer/ owner)
e) Renewable energy systems
Additionally, the tenant lease agreement shall have a legal undertaking clause to ensure interior fit-outs made by tenant shall be Code compliant. The legal undertaking shall mandate the relevant energy efficiency compliance requirements for all interior fit-outs within the tenant leased area, including, but not limited to, §5.2.1, §5.2.2.2, §5.2.2.3, §5.2.3, §6, and §7.2.4.
3.3.2 Additions to Existing Buildings
Where the new connected load demand of the addition plus the existing building exceeds 100 kW or 120 kVA, the additions shall comply with the provisions of §4 through §7. Compliance may be demonstrated in either of the following ways:
a) The addition shall comply with the applicable requirements, or
b) The addition, together with the entire existing building, shall comply with the requirements of this Code that shall apply to the entire building, as if it were a new building.
Exceptions to §3.3.2: When space conditioning is provided by existing systems and equipment, the existing systems and equipment need not comply with this code. However, any new equipment installed must comply with specific requirements applicable to that equipment.
3.3.3 Alterations to Existing Buildings
Where the connected load or contract demand of the existing building exceeds 100 kW or 120 kVA respectively, part of a building and its systems that are being altered shall meet the provisions of §4 through §7.
Exception to §3.3.3: When the entire building complies with all of the provisions of §4 through §7, as if it were a new building.
3.4 Approved Analytical Tools
A building following the whole building performance approach shall show compliance through a whole building energy simulation software that has been approved by BEE. Compliance to the daylight requirements of §4.2.3, if calculated through software tools, shall be shown through a daylighting software approved by BEE. The list of BEE approved software for whole building energy simulation and daylighting analysis is given in Appendix E.
3.5 Administrative Requirements
Administrative requirements, including but not limited to, permit requirements, enforcement, interpretations, claims of exemption, approved calculation methods, and rights of appeal are specified by the authority having jurisdiction.
3.6 Compliance Documents
3.6.1 Compliance Documents
Construction drawings and specifications shall show all pertinent data and features of the building, equipment, and systems in sufficient detail to permit the authority having jurisdiction to verify that the building complies with the requirements of this code. Details shall include, but are not limited to:
a) Building Envelope: opaque construction materials and their thermal properties including thermal conductivity, specific heat, density along with thickness; fenestration U-factors, solar heat gain coefficients (SHGC), visible light transmittance (VLT) and building envelope sealing documentation; overhangs and side fins, building envelope sealing details;
b) Heating, Ventilation, and Air Conditioning: system and equipment types, sizes, efficiencies, and controls; economizers; variable speed drives; piping insulation; duct sealing, insulation and location; solar water heating system; requirement for balance report;
c) Lighting: lighting schedule showing type, number, and wattage of lamps and ballasts; automatic lighting shutoff, occupancy sensors, and other lighting controls; lamp efficacy for exterior lamps;
d) Electrical Power: electric schedule showing transformer losses, motor efficiencies, and power factor correction devices; electric check metering and monitoring system.
e) Renewable energy systems: system peak generation capacity, technical specifications, solar zone area
3.6.2 Supplemental Information
The authority having jurisdiction may require supplemental information necessary to verify compliance with this code, such as calculations, worksheets, compliance forms, manufacturer’s literature, or other data.