Figure No. AF-1: Sprinkler protection of glass for floor open to Atrium
Page No 5
Page No 6
14.1 General
This section, which has been framed in accordance with National Building Code 2016, covers the requirement for fire prevention, life safety in relation to fire and fire protection of buildings. Notwithstanding anything contained anywhere else, this section shall be followed by the fire department and all the authorities required to issue fire and safety permissions. Notwithstanding anything else contained anywhere else in proposed or finalised ‘Dadra and Nagar Haveli and Daman & Diu Fire and Emergency Service Regulation, 2022’ or in any other such law, these bye-laws shall be deemed to be Bye-Law within the meaning of 2(e) of the draft Dadra and Nagar Haveli and Daman & Diu Fire and Emergency Service Regulation, 2022 and the fire department shall follow the provisions of this part of GDR in supersession of anything contained anywhere else in NBC or any other law. In case there is any confusion regarding any provision in this Part the same may be referred to the Planning and Development Authority whose decision in this regard shall be final. A certificate of the fire department to the effect shall be sufficient proof that all requirements of this chapter have been met.
14.2.3Types of Building Construction
The design of any building and the type of materials used in its construction are important factors in making the building resistant to a complete burn-out and in preventing the rapid spread of fire, smoke or fumes, which may otherwise contribute to the loss of lives and property.
The fire resistance of a building or its structural and non-structural elements is expressed in minutes against a specified fire load which is expressed in kcal/m2, and against a certain intensity of fire. The fire-resistance test for structural element shall be done in accordance with accepted standards.
Types of construction according to fire resistance shall be classified into four categories:
a) Type 1 Construction,
b) Type 2 Construction,
c) Type 3 Construction
d) Type 4 Construction.
The minimum fire resistance ratings of structural and non-structural members for various types of construction shall be as given in Table No. 14.3. Non-combustible materials should be used for construction of buildings, and the internal walls of staircase enclosures should be of brick work or reinforced concrete or any other material of construction with minimum of 120 min rating. The walls for the chimney shall be of Type 1 or Type 2 Construction depending on whether the flue gas temperature is above 200°C or less, respectively. Load bearing steel beams and columns of buildings having total covered area of 500 m2and above shall be protected against failure/collapse of structure in case of fire.
It is required that a structural and/or non-structural element/component shall have the requisite fire resistance rating (Refer Table No. 14.3). The fire resistance rating for the structural and non-structural elements shall be based on guidelines as per approved and accepted standards. The fire rating shall be validated and certified with a view to meeting the requirements of Table No. 14.3. In the absence of any validated/certified rating, guidance may be obtained from the information available in Annexure C.
Load bearing steel beams and columns of buildings having total covered area of 5 0 0 ~ m 2 and above shall be protected against failure/collapse of structure in case of fire. This could be achieved by use of appropriate methodology using suitable fire resistance rated materials along with suppression system (Refer Annexure C, Table 25 and Table 26 Timber Floors).
The false ceiling, including all fixtures used for its suspension, shall be of non-combustible material and shall provide adequate fire resistance to the ceiling in order to prevent spread of fire across ceiling.
Page No 28
Table No.14.3: Fire Resistance Ratings of Structural and Non-Structural Elements (minutes)
No.
Structural Element
Fire Resistance Ratings (min) for Type of Construction
Type1
Type2
Type3
Type4
(1)
(2)
(3)
(4)
(5)
(6)
i)
Exterior walls:
a)
Fire less than 3.7 m:
1)
Bearing
240
120
120
60
2)
Non-bearing
120
90
60
60
b)
Fire separation of 3.7 m or more but less than 9 m
1)
Bearing
240
120
120
60
2)
Non-bearing separation
90
60
60
60
c)
Fire separation of 9 m or more:
1)
Bearing
240
120
120
60
2)
Non-bearing
60
60
60
60
ii)
Fire separation assemblies (like fire check doors)
120
120
120
120
iii)
Fire enclosures of exits
120
120
120
120
iv)
Shafts for services, lift hoist way and refuse chutes
120
120
120
120
v)
Vertical separation between adjacent tenant spaces
60
60
60
60
vi)
Dwelling unit separation:
a)
Load bearing
120
120
60
60
b)
Non-load bearing
60
60
30
30
vii)
Interior bearing walls, bearing partitions, columns, beams, girders, trusses (other than roof trusses) and framing:
a)
Supporting more than one floor
240
120
120
120
b)
Supporting one floor only
f) Vertical Opening
Every vertical opening between the floors of a building shall be suitably enclosed or protected, as necessary, to provide the following:
i) Reasonable safety to the occupants while using the means of egress by preventing spread of fire, smoke, or fumes through vertical openings from floor to floor to allow occupants to complete their use of the means of egress. Further it shall be ensured to provide a clear height of 2100 mm in the exit access.
ii) Limitation of damage to the building and its contents.
Figure No. 14.4: Sprinklers around Escalator Opening
5 Electrical Installation
b) Emergency Power for Fire and Life Safety Systems
Emergency power supplying distribution system for critical requirement for functioning of fire and life safety system and equipment shall be planned for efficient and reliable power and control supply to the following systems and equipment where provided:
i) Fire pumps.
ii) Pressurization and smoke venting; including its ancillary systems such as dampers and actuators.
iii) Fireman’s lifts (including all lifts).
iv) Exit signage lighting.
v) Emergency lighting.
vi) Fire alarm system.
vii) Public address (PA) system (relating to emergency voice evacuation and annunciation).
viii) Magnetic doors hold open devices.
ix) Lighting in fire command centre and security room.
Power supply to these systems and equipment shall be from normal and emergency (standby generator) power sources with changeover facility. If power supply, is from HV source and HV generation, the transformer should be planned in standby capacity to ensure continuity of power to such systems. Wherever transformers are installed at higher levels in buildings and backup DG sets are of higher voltage rating, then dual redundant cables shall be taken to all transformers. The generator shall be capable of taking starting current of all the fire and life safety systems and equipment as above.
Where parallel HV/LV supply from a separate substation fed from different grid is provided with appropriate transformer for emergency, the provision of generator may be waived in consultation with the Authority.
The power supply to the panel/distribution board of these fire and life safety systems shall be through fireproof enclosures or circuit integrity cables or through alternate route in the adjoining fire compartment to ensure supply of power is reliable to these systems and equipment. It shall be ensured that the cabling from the adjoining fire compartment is protected within the compartment of vulnerability. The location of the panel/ distribution board feeding the fire and life safety system shall be in fire safe zone ensuring supply of power to these systems.
Circuits of such emergency system shall be protected at origin by an automatic circuit breaker with its no-volt coil removed. Master switches controlling essential service circuits shall be clearly labelled. Cables for fire alarm and PA system shall be laid in metal conduits or armoured to provide physical segregation from the power cables.
14.2.4General Requirements of All individual Occupancies
1 General
All buildings shall satisfy certain requirements, which contribute, individually and collectively, to the safety of life from fire, smoke, fumes and panic arising from these or similar causes. There are, however, certain general principles and common requirements, which are applicable to all or most of the occupancies.
2 Exceptions and Deviations
Exceptions and deviations to the general provisions of requirements of individual occupancies are given as applicable to each type of occupancy in Rule No. 14.5. In case of practical difficulty or to avoid unnecessary hardship, without sacrificing reasonable safety, local head, fire services may consider exemptions from the Rules.
Page No 29
3 Occupation of Buildings under Construction
A building or portion of the building may be occupied during construction, repairs, alterations, or additions only if all means of exit and fire protection measures are in place and continuously maintained for the occupied part of the building.
b) A high rise building during construction shall be provided with the following fire protection measures, which shall be maintained in good working condition at all the times:
Dry riser of minimum 100 mm diameter pipe with hydrant outlets on the floors constructed with a fire service inlet to boost the water in the dry riser and maintenance should be in accordance with good practice (Refer Annexure K (12)).
ii) Drums of 2000 litre capacity filled with water with two fire buckets on each floor;
iii) A water storage tank of minimum 20000 litre capacity, which may be used for other construction purposes also.
4 Openings in Fire Resistant Walls and Floors
a) At the time of designing openings in fire resistant walls and floors, particular attention shall be paid to all factors which limit fire spread through these openings and maintain fire rating of the structural members.
b) For Types 1 to 3 constructions, a doorway or opening in a fire-resistant wall on any floor shall be limited to 5.6 sq m in area with a maximum height/width of 2.75 m. Every wall opening shall be protected with fire-resisting doors, having the fire rating of not less than 120 min. The openings in the floors shall be protected by vertical enclosures extending above and below such openings, such enclosures having a fire resistance of not less than 120 min and all openings therein being protected with a fire-resisting assembly as per Rule No.14.2.4 (4(f)).
For escalator openings, the smoke spill shall be avoided by provision of smoke barrier (of 450-600 mm) thereby creating smoke compartment. Further, the protection shall be ensured through installation of sprinklers on all sides of the cut out opening on each floor (Refer Figure No. 14.4).
c) For Type 4 construction, openings in the fire separating walls or floors shall be fitted with 120 min fire-resistance rated assemblies.
d) Service ducts and shafts
Openings in walls or floors which are necessary to be provided to allow passages of all building services like cables, electrical wirings, telephone cables, plumbing pipes, etc, shall be protected by enclosure in the form of ducts/shafts having a fire resistance not less than 120 min. The inspection door for electrical shafts/ducts shall be not less than 120 min. Further, medium and low voltage wiring running in shafts/ducts, shall either be armoured type or run through metal conduits.
The space between the electrical cables/conduits and the walls/slabs shall be filled in by a fire stop material having fire resistance rating of not less than 120 min. This shall exclude requirement of fire stop sealing for low voltage services shaft.
For plumbing shafts in the core of the building6, with shaft door opening inside the building, the shafts shall have inspection doors having fire resistance rating not less than 30 min.
For plumbing shafts doors which open in wet areas or in naturally ventilated areas or on external wall of the building, the shafts may not require doors having any specified fire rating.
6 NOTE : In the case of buildings where it is necessary to lower or lift heavy machinery or goods from one floor to the other, it may be necessary to provide larger openings in the floor. Such openings shall be provided with removable covers which shall have the same strength and fire resistance as the floor.
Page No 30
e) Refuse chutes
Refuse chutes, if any provided in a building, shall have opening at least 1 m above roof level for venting purpose and they shall have an enclosure wall of non-combustible material with fire resistance of not less than 120 min.
They shall not be located within the staircase enclosure or service shafts, or air conditioning shafts. Refuse chutes inspection panel and doors shall be tight fitting with 60 min fire resistance. Sprinkler protection system shall be provided for the refuse chutes. They shall be at least 6 m away from exits.
c) Substation/Transformers
Areas in substation shall not be used as storage/dump areas or for other utility purposes other than those required for the functioning of the substation. The substation area should be adequately ventilated.
An independent, ventilated or air conditioned MV panel room shall be provided on the ground level or first basement. This room shall be provided with access from outside (or
Page No 32
through exit passageway accessible from outside). The MV panel room shall be provided with fire resistant walls and doors of fire resistance of not less than 120 min.
If the licensees agree to provide meters on upper floors, the licensees cables shall be segregated from consumers cables by providing a partition in the shaft. Meter rooms on upper floors shall not open into staircase enclosures and should be ventilated directly to open air outside or in electrical room of 120 min fire resistant walls.
Electrical MV main distribution panel and lift panels shall be provided with CO2/inert gas flooding system for all panel compartments with a cylinder located beside the panel.
i) Oil Filled Substation
A substation or a switch-station with oil filled equipment shall be limited to be installed in utility building or in outdoor location. Such substation/utility building shall be at least 7 m away from the adjoining building(s).
Substation equipment (exceeding oil capacity of 2000 litre) in utility building shall have fire rated baffle walls of 240 min rating constructed between such equipment, raised to at least 600 mm above the height of the equipment (including height of oil conservators) and exceeding 300 mm on each side of the equipment.
All transformers where capacity exceeds 10 MVA shall be protected by high velocity water spray systems or nitrogen injection system.
ii) Dry Type Substation
Transformers located inside a building shall be of dry type and all substation/switch room walls, ceiling, floor, opening including doors shall have a fire resistance rating of 120 min. Access to the substation shall be provided from the nearest fire exit/exit staircase for the purpose of electrical isolation.
14.2Fire Prevention
14.2.1 Classification of Buildings based on Occupancy
All buildings/uses, whether existing or hereafter erected shall be classified according to use or the character of occupancy in one of the following groups as indicated in the table below. The table also summarizes the types of examples of buildings:
Page No 15
Table No. 14.1: Classification of Buildings based on Occupancy and Fire Divisions
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
1
A
A-1
Dwelling 1
Detached dwelling unit. Clinic not having indoor treatment facility.
Fire Division 1
12.50
10.00
6.50
30.00
22.50
Firefighting installations in Table No. 14.7
Agriculture 1 (Part)
Farmhouse.
Dwelling 1a
Detached dwelling unit - affordable Housing
Dwelling 2
Semi-detached dwelling unit Row House Tenement Cottage Industry
12.50
10.00
6.50
30.00
22.50
Firefighting installations in Table No. 14.7
Dwelling 2a
Semi Detached dwelling unit - affordable Housing
Agriculture 1 (Part)
Farmhouse
2
A-2
Dwelling 3 (Part)
Old Age Home Orphanage
7.5
15
13
30.00
22.50
Firefighting Installation in Table No. 14.7, vary with Height of the Building.
3
A-3
Dwelling 3 (Part) Dormitory
Hostels Dormitories Dharamshala Homestay Night Shelter
12.50
10.00
6.50
30.00
22.50
Firefighting Installation in Table No. 14.7, vary with Height of the Building.
Polytechnic Industrial Training Institutes (ITI) Vocational Training Centre College University and Ancillary use
8
C-2
Education 3
Research and Development Establishments/ Centre
Fire Division 2
10
10.00
6.50
30.00
30.00
9
D
D-1
Health 1
PHC, Clinic without indoor facility Dispensary Health and Wellness Centre Ayushman Bharat
Fire Division 1
10(Outdoor Patients area)15(Indoor Patients area)
15
13
30.00
22.50
Firefighting Installation in Table No. 14.7, vary with Height of the Building, area of Building Unit and No. of Beds
Health 2
Clinic with indoor facility Indoor Hospital facility up to 20 Bed Surgical Hospital, Nursing Home, Maternity Home, Community Health Centre Veterinary Facilities
Planning and Development Authority
Page No 18
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
Health 3
Multi-specialty hospital- Upto 100 beds Medical College, Research and Development Centre Hospital- more than 100 beds
10
D-2
Health 4
Hospital for infectious diseases Mental Hospital / Asylum
15(see Note2)
15
13
30.00
22.50
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons
Public / Public Office
Custodial and Penal institutions Jails Prison Mental hospitals Houses of Correction Detention Reformatories
11
D-3
Public / Public Office
Offices for public Government / semi government entities for Health Transport Communication Security Ward Office Law Courts, Police Stations / Chowkis Panchayat Circuit House etc.
10
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building
12
E
E-1
Assembly 1
Community Hall Banquet Hall (No permanent seating and no permanent stage)
Fire Division 1
0.65
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons
Assembly 2
Town Hall Convention Centre Exhibition Hall Studio
Page No 19
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
Performing Arts Theatre Gymnasium (without spectator seating) Club (No permanent seating and no permanent stage)
Assembly 4
Party Plot (No permanent seating and no permanent stage)
13
E-2
Assembly 2
Convention Centre Auditorium Planetarium Museum Performing Arts Theatre (with Fixed seatings)
N *1.2 (where N = number of seats) (see Note4)
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons.
Assembly 3
Theatre Cinema Multiplex (with Fixed seatings)
14
E-3
Religious
Temple Shrine Church / Chapel Mosque / Dargah Gurudwara Synagogue Ashram / Upashraya / Math / Sant Niwas Any other Religious Structure. ( No permanent seating and no permanent stage)
Fire Division 1
0.65
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons
Planning and Development Authority
Page No 20
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
15
E-4
Sports and Leisure
Gymnasium Sports complex Swimming pool Playfield Water sports facilities Theme Amusement Park Aquarium Exhibition Mela Shooting Range
Fire Division 1
1.4(see Note3)
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons.
Cremation and Burial
Crematorium
Temporary Use
Fair Circus Exhibition Mela Pandal Concrete batching plant for construction Seasonal Market
16
F
F-1
Transportation
Bus Terminal / station (public / private) Transport Terminal for Passengers
Fire Division 1
30
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons
EP 2
Port Harbour Hover ports for Coast Guards Jetties
17
F-2
Transportation
Transport Terminal for Goods (Truck)
Fire Division 3
30
10
6.5
30(see Note 8)
NA
Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area
Page No 21
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
18
G
G-1
Agriculture 1 (Part)
Green Houses Dairy Development Animal rearing and breeding/gaushala Poultry Farm
Fire Division 2
1.4
10
6.5
45(see Note 8)
NA
Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area
19
G-2
Agriculture 2
Animal Shed Agro-Based Storage
Fire Division 3
30
10
6.5
30(see Note 8)
NA
Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area
Communication Infrastructure - telephone, microwave tower or other means of communication facilities
25
J
J-1*
Utility
Infrastructure for Water Supply - treatment / purification plant, pumping station.
Fire Division 2
10
10
6.5
45(see Note 8)
NA
Firefighting Installation in Table No 14.7, vary with Height of the Building and Covered area
Industrial 1
All White Category of Industries as defined by CPCB in Classification of Industrial Sector(2016)
Industrial 2
All Green Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP
Industrial 3
All Orange Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP Dumping of Solid Waste Mining and Quarrying Brick Kiln Roof Tiles Tannery Slaughterhouse
Page No 23
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area
Utility
Electric substations
Industrial 1
All White Category of Industries as defined by CPCB in Classification of Industrial Sector(2016)
Industrial 2
All Green Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP
Industrial 3
All Orange Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP Dumping of Solid Waste Mining and Quarrying Brick Kiln Roof Tiles Tannery Slaughterhouse Petroleum Storage Roofing Tiles and Cement Pipes
27
J-3*
Industrial 1
All White Category of Industries as defined by CPCB in Classification of Industrial Sector(2016)
Fire Division 3
10
10
6.5
22.5(see Note 8)
NA
Fire fighting Installation in Table No. 14.7, vary with Covered Area
Industrial 2
All Green Category of Industries as defined by CPCB in
Planning and Development Authority
Page No 24
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
Classification of Industrial Sector (2016), CETP
Industrial 3
All Orange Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP Dumping of Solid Waste Mining and Quarrying Brick Kiln Roof Tiles Tannery Slaughterhouse Petroleum Storage Roofing Tiles and Cement Pipes
Notes: *Detailed uses of Subgroup J-1, J-2 and J-3 will correspond to low hazard, moderate hazard and high hazard respectively as in accordance with Annex B ** Occupant load 1 Gross area shall be the floor area. All factors expressed are in gross area unless marked net. 2 Occupant load in dormitory portions of homes for the aged, orphanages, insane asylums, etc where sleeping accommodation is provided shall be calculated at not less than 7.5 m2 gross floor area / person. 3 These shall include gymnasium, table tennis room, billiard room and other gaming rooms, library, swimming pool and like. 4 In case of assembly occupancy having fixed seats, the occupant load shall be determined by multiplying the number of seats by 1.2. 5 Car parking areas under occupancy other than storage shall also be 30 m2 per person. *** Travel Distance 6 For fully sprinklered building, the travel distance may be increased by 50 percent of the values specified. 7 Ramp shall not be counted as an exit in case of basements below first basement in car parking. 8 Construction of Type 3 or Type 4 is not permitted.
Page No 25
d) Standby Supply
Diesel generator set(s) shall not be installed at any floor other than ground/first basement. If the same are installed indoors, proper ventilation and exhaust shall be planned. The DG set room shall be separated by 120 min fire resistance rated walls and doors.
The oil tank for the DG sets (if not in the base of the DG) shall be provided with a dyked enclosure having a volumetric capacity of at least 10 percent more than the volume of the oil tank. The enclosure shall be filled with sand for a height of 300 mm.
For detailed information regarding fire safety requirements for hazardous petroleum products, reference may be made to the Petroleum Act, 1934 and the Rules, framed thereunder.
e) Lightning Protection of Buildings
Routing of down conductors (insulated or uninsulated) of lightning protection through electrical or other service shafts are not allowed as it can create fire and explosion during lightning (Refer Part VIII Building Services, Section II Electrical and Allied Installations, National Building Code).
6 Escape Lighting and Exit Signage:
Exit access, exits, and exit discharge shall be properly identified, with adequate lighting maintained in the elements of the egress systems so that all occupants shall be able to leave the facility safely.
d) Exit Signage
Where exit access is provided through corridors/paths, the occupants shall be able to easily identify the way to exits. Exit signs shall be provided such that no point in an exit access is more than 30 m from a visible exit directional sign. An exit sign indicating the direction to an exit shall be provided at all changes in direction.
Exits shall be clearly visible and the route to reach the exits shall be clearly marked and signs posted to guide the occupants of the floor concerned. Signs shall be illuminated and
Page No 34
wired to an independent electrical circuit on an alternative source of supply. The sizes and colours of the exit signs shall be in accordance with good practice (Refer Annexure K(7)). The colour of the exit signs shall be green.7
The exit sign with arrow indicating the way to the escape route shall be provided at a suitable height from the floor level on the wall and shall be illuminated by electric light connected to corridor circuits. All exit way marking signs should be so installed that no mechanical damage shall occur to them due to moving of furniture or other heavy equipment. Further, all landings of floor shall have floor indicating boards prominently indicating the number of the floor. Photo luminescent markings shall be pasted at internal hydrant boxes.
7 Air Conditioning, Ventilation and Smoke Control
a) Air conditioning and mechanical ventilation requirements of different rooms or areas in any occupancy shall be in accordance with Part VIII ‘Building Services Section I Lighting and Natural Ventilation and ‘Section III Air conditioning, Heating and Mechanical Ventilation’ National Building Code.
Air conditioning and ventilating systems shall be so installed and maintained as to minimise the danger of spread of fire, smoke or fumes from one floor to other or from outside to any occupied building or structure.
Many high-rise buildings integrate smoke management systems into their conventional HVAC systems. In such installation, it requires special design considerations, including safe and adequate controls, acceptable and documented testing, and regular maintenance systems.
Wherever batteries are provided, the same shall be segregated by 120 min fire rated construction. Ventilation to the room shall be provided as per manufacturer’s instructions.
b) Air Handling Unit
i) From fire safety point of view, Separate air handling units (AHU) for each floor shall be provided so as to avoid the hazards arising from spread of fire and smoke through the air conditioning ducts. The air ducts shall be separate from each AHU to its floor and in no way shall interconnect with the duct of any other floor. Within a floor it would be desirable to have separate air handling unit provided for each compartment.
Air handling unit shall be provided with effective means for preventing circulation of smoke through the system in the case of a fire in air filters or from other sources drawn into the system and shall have smoke sensitive devices for actuation in accordance with the accepted standard and control.
ii) Shafts or ducts 8, if penetrating multiple floors, shall be of masonry construction with fire damper in connecting ductwork or shall have fire rated ductwork with fire dampers at floor crossing. Alternatively, the duct and equipment may be installed in room having walls, doors and fire damper in duct exiting/entering the room of 120 min fire resistance rating. Such shafts and ducts shall have all passive fire control meeting 120 min fire resistance rating requirement to meet the objective of isolation of the floor from spread of fire to upper and lower floors through shaft/duct work.
iii) The air filters of the air handling units shall be made of non-combustible materials.
iv) The air handling unit room shall not be used for storage of any combustible materials.
7 Note : This provision shall not apply to A-2 and A-4 occupancies less than 15m in height.
8 Zoned and compartmented HVAC systems are encouraged with and approach to avoid common exhaust shafts and fresh air intake shafts which will limit the requirements of such passive measure and fire rated duct work and dampers.
Page No 35
d) Fire or Fire/Smoke Dampers
i) These dampers shall be evaluated to be located in supply air ducts, fresh air and return air ducts/ passages at the following points:
At the fire separation wall,
Where ducts/passages enter the vertical shaft,
• Where the ducts pass through floors, and
At the inlet of supply air duct and the return air duct of each compartment on every floor.
ii) Damper shall be of motorized type/fusible link.
Damper shall be so installed to provide complete integrity of the compartment with all passive fire protection sealing. Damper should be accessible to maintain, test and also replace, if so required. Damper shall be integrated with Fire Alarm Panel and shall be sequenced to operate as per requirement and have interlocking arrangement for fire safety of the building. Manual operation facilities for damper operation shall also be provided.
8 Heating
a) Installation of Chimney and heating apparatus shall be in accordance with the good practice (Refer Annexure K (10)).
b) Boiler Rooms
i) Provisions of boiler and boiler rooms shall conform to The Boilers Act, 1923.
ii) Further, the following additional aspects may be taken into account in the location of boiler room:
• The boilers shall be installed in a fire resisting room of 180 min fire resistance rating.
• Entry to this room shall be provided with a composite door of 120 min fire resistance rating.
The boiler room shall be provided with its dedicated natural or mechanical ventilation system. Mechanical ventilation system for the boiler room would be
Page No 36
accepted with 120 min fire resistance rating ductwork, if it has interface with other mechanical areas. Ventilation system should not be allowed to be routed through electrical room area or through exit corridor/exits.
The oil tank for the boiler shall be provided with a dyked enclosure having a volumetric capacity of at least 10 percent more than the volume of the oil tank. The enclosure shall be filled with sand for a height of 300 mm.
9 Glazing
a) The glazing shall be in accordance with Part VI Structural Design, Section VIII Glass and Glazing. of the National Building Code. The entire glazing assembly shall be rated to that type of construction as given in Table No. 14.3. The use of glass shall not be permitted for enclosures of exits and exit passageway.
This shall be applicable along with other provisions of this Part related to respective uses as specified therein. The use of glass shall not be permitted for enclosures of exits and exit passageway.
b) Glass facade shall be in accordance with the following:
i) For fully sprinklered9 buildings having fire separation of 9 m or more, tempered glass in a non-combustible assembly, with ability to hold the glass in place, shall be provided. It shall be ensured that sprinklers are located within 600 mm of the glass facade providing full coverage to the glass.
ii) All gaps between floor-slabs and facade assembly shall be sealed at all levels by approved fire-resistant sealant material of equal fire rating as that of floor slab to prevent fire and smoke propagation from one floor to another.
iii) Openable panels shall be provided on each floor and shall be spaced not more than 10 m apart measured along the external wall from centre-to-centre of the access openings. Such openings shall be operable at a height between 1.2 m and 1.5 m from the floor and shall be in the form of openable panels (fire access panels) of size not less than 1000 mm X 1000 mm opening outwards.
The wordings, FIRE OPENABLE PANEL OPEN IN CASE OF FIRE, DO NOT OBSTRUCT of at least 25 mm letter height shall be marked on the internal side. Such panels shall be suitably distributed on each floor based on occupant concentration. These shall not be limited to cubicle areas and shall be also located in common areas/corridors to facilitate access by the building occupants and fire personnel for smoke exhaust in times of distress.
10 Surface Interior Finishes
a) The use of combustible surface finishes on walls (including facade of the building) and ceilings affects the safety of the occupants of a building. Such finishes tend to spread the fire and even though the structural elements may be adequately fire resistant, serious danger to life may result. It is, therefore, essential to have adequate precautions to minimise spread of flame on wall, facade of building and ceiling surfaces. The finishing materials used for various surfaces and decor shall be such that it shall not generate toxic smoke/fumes.
b) The susceptibility of various types of wall surfaces to fire is determined in terms of the rate of spread of flame. Based on the rate of spread of flame, surfacing material shall be considered as divided into four classes as follows:
i) Class 1 Surfaces of very low flame spread.
ii) Class 2 Surfaces of low flame spread.
9In case of all other buildings, fire resistance rating of glass facade shall be in accordance with Table No. 14.3.
Page No 37
iii) Class 3 Surfaces of medium flame spread.
iv) Class 4 Surfaces of rapid flame spread.
c) The uses for which surface materials falling into various classes shall be adopted in building construction are given below:
Table No. 14.4: Surface Material details for various uses as per class
Class 1(1)
Class 2(2)
Class 3(3)
May be used in any situation
May be used in any situation, except on walls, facade of the building, staircase, and corridors.
May be used only in living rooms and bedrooms (but not in rooms on the roof) and only as a lining to solid walls and partitions1); not on staircases or corridors or facade of the building.
1) Panelling (lining) shall be permitted in a limited area. It shall not be permitted in a vestibule.
d) Materials of Class 4 which include untreated wood fibreboards may be used with due fireretardant treatment as ceiling lining, provided the ceiling is at least, 2.4 m from the top surface of the floor below, and the wall surfaces conform to requirements of class. Class 4 materials shall not be used in kitchens, corridors and staircases. Some materials contain bitumen and, in addition to risk from spread of fire, emit dense smoke on burning; such materials shall be excluded from use under these conditions and shall also not be used for construction of ceiling where the plenum is used for return air in air-conditioned buildings.
e) When frames, walls, partitions or floors are lined with combustible materials, the surfaces on both sides of the materials shall conform to the appropriate class, because there is considerable danger from fire starting and rapidly spreading within the concealed cavity unknown to the occupants whose escape may be hampered thereby. For detailed information on materials and details of construction with their fire resistance rating, reference may be made to good practice (Refer Annexure K (12)).
11 Fire Command Centre (FCC)
a) Fire command centre shall be on the entrance floor of the building having direct access. The control room shall have the main fire alarm panel with communication system (suitable public address system) to aid floors and facilities for receiving the message from different floors.
b) Fire command centre shall be constructed with 120 min rating walls with a fire door and shall be provided with emergency lighting. Interior finishes shall not use any flammable materials. All controls and monitoring of fire alarm systems, pressurization systems, smoke management systems shall happen from this room. Monitoring of integrated building management systems, CCTVs or any other critical parameters in building may also be from the same room.
c) Details of all floor plans along with the details of firefighting equipment and installations (2 sets laminated and bound) shall be maintained in fire command centre.
d) The fire staff in charge of the fire command centre shall be responsible for the maintenance of the various services and firefighting equipment and installations in coordination with security, electrical and civil staff of the building.
Page No 38
14.3Life Safety
14.3.1 General
Every building shall be so designed, constructed, equipped, maintained and operated as to provide adequate means of egress to avoid undue danger to the life and safety of the occupants from fire, smoke, fumes or panic during the time period necessary for escape.
For high occupancy areas, it may be required to have annunciation, announcements and voice guided/aided system to direct the occupants towards safe egress routes, areas of comparative safety or exits, and to avoid situation of panic during distress.
Every main occupancy may have certain occupancies which may be incidental to the main occupancy. The exit requirements pertaining to such incidental occupancies from the floor of the occupancy to the level of exit discharge shall be calculated to meet the requirement of the actual occupancy of such type, to ensure adequate means of egress of the occupants.
Refer Part III Development Control Rules and General Building Requirements, National Building Code for accessibility for elderly and persons with disabilities, for various requirements for enabling a smooth and safe egress.
a) General Requirements
For requirements regarding electrical installations from the point of view of fire safety, reference may be made with the provisions of Part VIII Building Services, Section II Electrical and Allied Installations, National Building Code and Annexure K(6), to the satisfaction of the Competent Authority.
In general, it is desirable that wiring and cable must have flame retardant property. Medium and low voltage wiring running in shafts, and within false ceiling shall run in metal conduit. Any 230 V wiring for lighting or other services, above false ceiling, shall have 660 V grade insulation.
The electric distribution cables/wiring shall be laid in a separate shaft. The shaft shall be sealed at every floor with fire stop materials having the same fire resistance as that of the floor. High, medium and low voltage wiring running in shaft and in false ceiling shall run in separate shaft/conduits.
Page No 31
Water mains, gas pipes, telephone lines, intercom lines or any other service line shall not be laid in the duct for electrical cables; use of bus ducts/solid rising mains instead of cables is preferred.
All metallic items like steel structural members, etc, shall be bonded properly to the earthing system.
c) Duct Work
i) Air ducts serving main floor areas, corridors, etc, shall not pass through the exits/exit passageway/ exit enclosure. Exits and lift lobbies, etc, shall not be used as return air passage.
ii) As far as possible, metallic ducts shall be used even for the return air instead of space above the false ceiling.
iii) Wherever the ducts pass through fire walls or floors, the opening around the ducts shall be sealed with materials having fire resistance rating of the compartment. Such duct shall also be provided with fire dampers at all fire walls and floors unless such ducts are required to perform for fire safety operation; and in such case fire damper may be avoided at fire wall and floor while integrity of the duct shall be maintained with 120 min fire resistance rating to allow the emergency operations for fire safety requirements.
iv) The ducting within compartment would require minimum fire resistance rating of 30 min. Such ducting material in substantial gauge shall be in accordance. If such duct crosses adjacent compartment/floor and not having fire dampers in such compartment/floor, it will require fire resistance duct work rating of 120 min. The requirements of support of the duct shall meet its functional time requirement as above.
v) The materials used for insulating the duct system (inside or outside) shall be of non-combustible type. Any such insulating material shall not be wrapped or secured by any material of combustible nature.
vi) Inspection panels shall be provided in the ductwork to facilitate the cleaning accumulated dust in ducts and to obtain access for maintenance of fire dampers.
14.3.3Occupant Load
For determining the exits required, the number of persons within any floor area or the occupant load shall be based on the actual number of occupants declared, but in no case less than that specified in Table No. 14.1. The occupant load of a mezzanine floor discharging to a floor below shall be added to that floor occupancy and the capacity of the exits shall be designed for the total occupancy load thus established.
The occupant load of each story considered individually shall be required to be used in computing the number of means of egress at each story, provided that the required number of means of egress is not decreased in the direction of egress travel.
Page No 41
The assembly occupancies and call centres shall be required to display, limiting occupant load details positioned in a conspicuous place near the entrance of each of such respective occupancy to avoid possible overcrowding and overloading. The display shall preferably be engraved on a metal plate of not less than 300 mm × 200 mm, with letters of height and width not less than 50 mm, with detail of occupancy, area and occupancy load.
The capacity of any open mezzanine/balcony shall be added to the capacity of the floor below for the purpose of determining exit capacity.
b) Arrangement of Exits
i) Exits shall be so located that the travel distance on the floor shall not exceed the distance (Refer Table No. 14.1).
ii) Travel distance shall be measured from the most remote point within a storey or a mezzanine floor along the natural and un-obstructed path of horizontal or vertical egress travel to the door to an exit.
iii) The dead-end corridor length in exit access shall not exceed 6 m for educational, institutional and assembly occupancies. For other occupancies, the same shall be 15 m. (Refer Figure No. 14.7).
iv) Exits shall be placed as remote from each other as possible and shall be arranged to provide direct access in separate directions from any point in the area served.
14.3.4Egress Components
Egress components to be considered are the number of exits to which access is provided, capacity of exit access, travel distance to an exit, the obviousness of the direction to an exit, and any hindrance including due to security issues involved.
1 Exit Access
a) A common path of travel is desirable in exit access which leads to two independent directions to separate exits.
b) Capacity of exit access: The width of corridors, aisles or ramps required for exit access shall be sufficient to ensure a smooth flow of occupants to the exit. Where a corridor is the only way of access to an exit, the corridor width shall not be less than the calculated exit width.
c) Objects like tables, chairs or any other temporary/permanent structures in exit access corridors shall be avoided as this may result in congestion and impeding smooth flow of personnel during emergencies.
d) In order to ensure that each element of the means of egress can be effectively utilized, they shall all be properly lit and marked. Lighting shall be provided with emergency power back-up in case of power failures. Also, exit signs of adequate size, marking, location, and lighting shall be provided so that all those unfamiliar with the location of the exits may safely find their way.
e) Exit access to fireman’s lift and refuge area on the floor shall be step free and clearly sign posted with the international symbol of accessibility.
f) Exit access shall not pass through storage rooms, closets or spaces used for similar purpose.
g) The calculation of capacity of exit access shall be in accordance with Rule No. 14.3.2(4).
Page No 42
Figure No. 14.7: Dead End Corridor
2 Exits
a) Number of Exits
The minimum required number of exits in a building shall be determined based on occupant load (Refer Table No. 14.1) and width required per person (Refer No. Table 14.1) as appropriate to the type of exit for respective occupancies, subject to complying with maximum travel distance requirement (Refer Table No. 14.1).
a) Lighting
The exit, exit access and exit discharge systems shall be illuminated continuously. The floors of the means of egress shall be illuminated at all points, including angles and intersections, in corridors and passageways, stairwells, landings of stairwells and exit.
Page No 33
ii) Emergency lighting shall be powered from a source independent of that supplying the normal lighting.
iii) Escape lighting shall be capable of,
• indicating clearly and unambiguously the escape routes.
providing adequate illumination along such routes to allow safe movement of persons towards and through the exits; and
ensuring that fire alarm call points and firefighting equipment provided along the escape routes can be readily located.
iv) The horizontal luminance at floor level on the centreline of an escape route shall not be less than 10 lumen/m2. In addition, for escape routes up to 2 m wide, 50 percent of the route width shall be lit to a minimum of 5 lumen/m2. In auditoriums, theatres, concert halls and such other places of assembly, the illumination of floor exit/access may be reduced during period of performances to values not less than 2 lux.
v) Required illumination shall be arranged such that the failure of any single lighting unit, such as the burning out of one luminaire, will not leave any area in darkness and does not impede the functioning of the system further.
vi) The emergency lighting shall be provided to be put on within 5s of the failure of the normal lighting supply. Also, emergency lighting shall be able to maintain the required illumination level for a period of not less than 90 min in the event of failure of the normal lighting even for smaller premises.
vii) Battery pack emergency lighting, because of its limited duration and reliability, shall not be allowed to be used in lieu of a diesel engine driven emergency power supply.
viii) Escape lighting luminaires should be sited to cover the following locations:
Near each intersection of corridors,
At exits and at each exit door,
Near each change of direction in the escape route,
Near each staircase so that each flight of stairs receives direct light,
Near any other change of floor level,
Outside each final exit and close to it,
Near each fire alarm call point,
Near firefighting equipment, and
To illuminate exit and safety signs as required by the enforcing authority.
ix) The luminaires shall be mounted as low as possible, but at least 2 m above the floor level.
c) Capacities of means of egress.
i) Exit capacity is the number of people that can pass through a stairway, and level components (door and corridor) and ramps. The total capacity of all the respective means of egress serving a floor shall be sufficient to allow egress of the entire population of the floor.
ii) The unit of exit width, used to measure the capacity of any exit, shall be 500 mm. A clear width of 250 mm shall be counted as an additional half unit. Clear widths less than 250 mm shall not be counted for exit width.
iii) Width per person for stairways, and level components and ramps shall be determined using the capacity factors in accordance with Table No. 14.1. For example, if an exit doorway measures 1000 mm in clear width, it would be defined as providing exit capacity for 1000/6.5 occupants, that is, 153 persons (say 150 persons) and number of such exit doorways can then be calculated depending on the occupant load.
iv) When calculating stairways, level components and ramps and other exit means, the capacity of the entire system shall have to be based upon the minimum capacity available from any part of the system. The corridor, if so provided shall also to be planned with consideration of exit access adequacy for the number of occupants. Further, consider the situation of doors opening to an exit stairway. If the stairway provides an exit capacity of 150 persons, and the doors leading into the stairway
Page No 43
provide an exit capacity of 153 persons, the overall exit system would be considered to provide the minimum exit capacity of only 150 persons afforded by the stairway. The exit planning will be limited by the most restrictive exit calculation under the means of egress.
v) In the procedures for determining required egress capacity, the number of required means of egress is based on a floor-by-floor consideration, rather than the accumulation of the occupant loads of all the floors. However, the number of means of egress cannot decrease as an occupant proceeds along the egress path.
d) Types of exit access and exits
Various types of exit access and exits are doorways, corridors and passageways, horizontal exits, internal staircases, exit passageways, external staircases, and ramps. Requirements for each are as detailed below:
i) Doorways
Every exit doorway shall open into an enclosed stairway or a horizontal exit of a corridor or passageway providing continuous and protected means of egress (Refer Figure No. 14.8).
No exit doorway shall be less than 1000 mm in width except assembly buildings, where door width shall be not less than 2000 mm (Refer Figure No. 14.9). Doorways shall be not less than 2000 mm in height.
Exit doorways shall be operable from the side which they serve, without the use of a key.
Mirrors shall not be placed on exit doors and in exits to avoid confusion regarding the direction of exit.
Revolving doors can be accepted as a component in a means of egress where the following requirements are fully complied with:
Doors shall be capable of collapsing to a book fold position with parallel egress paths, of width not less than 1000 mm.
Doors shall not be located within 3 m of the foot or top of stairs or escalators. A dispersal area shall be provided between the stairs or escalators and the doors.
Each revolving door shall be provided with a hinged door in the same wall within 3 m thereof, with same exiting capacity.
Each revolving door shall be considered as capable of exiting only 50 persons.
All fire rated doors and assembly shall be provided with certificate and labels prominently indicating the manufacturer’s identification, door details covering door type, serial/batch number, month and year of manufacture, fire resistance rating, etc. The doors and assembly shall be certified with all prescribed hardware such as hinges, locks, panic bars, door closer, and door viewers.
Access controlled doors: Access controlled doors and electromagnetic doors shall fall under this category. These shall meet the following requirements:
Doors shall have fire rating as per the requirements at the location of installation.
Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors in the direction of egress, and the doors shall remain unlocked until the automatic sprinkler system or firealarm system has been manually reset.
Loss of power to the part of the access control system that locks the doors shall automatically unlock the doors in the direction of egress.
A manual release device shall be provided in the readily accessible vicinity of the egress door with a signage PUSH TO EXIT and when the same is operated, it shall result in direct interruption of power to the lock, independent of the access control system electronics.
Page No 44
Turnstiles: Turnstiles or similar devices that restrict travel to one direction or are used to collect fares or admission charges shall not be placed so as to obstruct any required means of egress unless door openings of required width are available within 3m thereof. Turnstiles or such similar devices shall also be disengaged through automatic or manual intervention to allow egress in the direction of exit.
180
90
60
60
c)
Supporting a roof only
180
90
60
60
viii)
Walls supporting structural members
180
90
60
60
ix)
Floor construction
120
90
60
60
x)
Roof construction:
a)
5 m or less in height to lowest member
120
90
60
60
b)
More than 5 m but less than 6.7 m in height to lowest member
60
60
60
60
c)
6.7 m or more in height to lowest member
0
0
0
0
NOTES: 1 The above fire resistance rating shall be required to achieve the respective type of construction unless otherwise specified in the respective clauses for different applications/use. 2 In case of lift bank, the partition wall, if any, need not be of fire rating specified in this table.
23
H-4
Mercantile 2
Vegetable Fish Market Agriculture Horticulture Produce
Fire Division 1
3
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and Area
Mercantile 3
Wholesale Market and ancillary uses Timber mart / Lathi Bazaar
x) Signs are required at all exits, emergency exits and escape routes, which should comply with the graphic requirements of the relevant Indian Standards.
b) Exit passageway (at ground) and staircase lighting shall also be connected to alternative supply. The alternative source of supply may be provided by battery continuously trickle charged from the electric mains.
c) Suitable arrangements shall be made by installing double throw switches to ensure that the lighting installed in the staircase and the corridor does not get connected to two sources of supply simultaneously. Double throw switch shall be installed in the service room for terminating the stand-by supply.
The emergency lighting system shall be well maintained by periodical inspections and tests so as to ensure their perfect serviceability at all times.
Doors in folding partition shall not be treated as approved means of egress.
ii) Corridors and passageways of means of egress.
Corridors and passageways shall be of width not less than the calculated aggregate width of exit doorways leading from them in the direction of travel to the exit (Refer Table No. 14.1).
In the case of buildings where there is a central corridor, which is part of exit access, the doors of rooms (except for rooms having assembly occupancy) shall open inwards to permit smooth flow of traffic in the corridor.
Figure No. 14.8: Unacceptable Arrangement for Enclosing a Stair Serving as a Required Exit
iii) Staircases
General
The requirements of number of staircases shall supplement the requirement of different occupancies in accordance with Rule No. 14.5.
All buildings, as mentioned in accordance with Rule No. 14.1.1, shall have a minimum of two staircases. The actual number of staircases shall comply with the requirement of Rule No. 14.3.4(2). All exit staircases shall discharge, at the level of exit discharge, to the exit discharge, either,
directly, or
− through an exit passageway, or
− through a large lobby.
At least 50 percent of the staircases shall discharge directly and/or through an exit passageway.
The minimum width of tread without nosing shall be 250 mm for staircase of residential buildings. This shall be minimum 300 mm for assembly, hotels, educational, institutional, business and other buildings. The treads shall be constructed and maintained in a manner to prevent slipping. The maximum height of riser shall be 190 mm for staircase of residential buildings (A-1) and 150 mm for other buildings. The number of risers shall be limited to 12 per flight. The staircases may be internal staircases or external staircases.
Page No 45
Table No. 14.4A: Staircase Details
No
Use
Staircase
Minimum Flight Width (m)
Minimum Tread (mm)
Maximum Riser (mm)
(1)
(2)
(3)
(4)
(5)
1
Residential(A-2) Note- For row housing with 2 storeys, the minimum width shall be 0.75
1
3001
1502
2
Residential (A-1, A-3, and A-4)
1.25
3
Residential hotel (A-5 and A-6)
1.50
4
Assembly Note- The width of stairs may be accepted to be 1.50m in case of assembly occupancy having less than 150 persons
2.00
5
Educational
1.50
6
Institutional
2.00
7
All other occupancies
1.50
*Note:
1 For one or two family dwelling, it may be reduced to not less than 250mm
2 For one or two family dwelling, it may be increased to not more than 190mm. The number of risers shall be limited to 12 per flight