14.1 General
This section, which has been framed in accordance with National Building Code 2016, covers the requirement for fire prevention, life safety in relation to fire and fire protection of buildings. Notwithstanding anything contained anywhere else, this section shall be followed by the fire department and all the authorities required to issue fire and safety permissions. Notwithstanding anything else contained anywhere else in proposed or finalised ‘Dadra and Nagar Haveli and Daman & Diu Fire and Emergency Service Regulation, 2022’ or in any other such law, these bye-laws shall be deemed to be Bye-Law within the meaning of 2(e) of the draft Dadra and Nagar Haveli and Daman & Diu Fire and Emergency Service Regulation, 2022 and the fire department shall follow the provisions of this part of GDR in supersession of anything contained anywhere else in NBC or any other law. In case there is any confusion regarding any provision in this Part the same may be referred to the Planning and Development Authority whose decision in this regard shall be final. A certificate of the fire department to the effect shall be sufficient proof that all requirements of this chapter have been met.
14.2Fire Prevention
14.2.1 Classification of Buildings based on Occupancy
All buildings/uses, whether existing or hereafter erected shall be classified according to use or the character of occupancy in one of the following groups as indicated in the table below. The table also summarizes the types of examples of buildings:
Page No 15
Table No. 14.1: Classification of Buildings based on Occupancy and Fire Divisions
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
1
A
A-1
Dwelling 1
Detached dwelling unit. Clinic not having indoor treatment facility.
Fire Division 1
12.50
10.00
6.50
30.00
22.50
Firefighting installations in Table No. 14.7
Agriculture 1 (Part)
Farmhouse.
Dwelling 1a
Detached dwelling unit - affordable Housing
Dwelling 2
Semi-detached dwelling unit Row House Tenement Cottage Industry
12.50
10.00
6.50
30.00
22.50
Firefighting installations in Table No. 14.7
Dwelling 2a
Semi Detached dwelling unit - affordable Housing
Agriculture 1 (Part)
Farmhouse
2
A-2
Dwelling 3 (Part)
Old Age Home Orphanage
7.5
15
13
30.00
22.50
Firefighting Installation in Table No. 14.7, vary with Height of the Building.
3
A-3
Dwelling 3 (Part) Dormitory
Hostels Dormitories Dharamshala Homestay Night Shelter
12.50
10.00
6.50
30.00
22.50
Firefighting Installation in Table No. 14.7, vary with Height of the Building.
Polytechnic Industrial Training Institutes (ITI) Vocational Training Centre College University and Ancillary use
8
C-2
Education 3
Research and Development Establishments/ Centre
Fire Division 2
10
10.00
6.50
30.00
30.00
9
D
D-1
Health 1
PHC, Clinic without indoor facility Dispensary Health and Wellness Centre Ayushman Bharat
Fire Division 1
10(Outdoor Patients area)15(Indoor Patients area)
15
13
30.00
22.50
Firefighting Installation in Table No. 14.7, vary with Height of the Building, area of Building Unit and No. of Beds
Health 2
Clinic with indoor facility Indoor Hospital facility up to 20 Bed Surgical Hospital, Nursing Home, Maternity Home, Community Health Centre Veterinary Facilities
Planning and Development Authority
Page No 18
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
Health 3
Multi-specialty hospital- Upto 100 beds Medical College, Research and Development Centre Hospital- more than 100 beds
10
D-2
Health 4
Hospital for infectious diseases Mental Hospital / Asylum
15(see Note2)
15
13
30.00
22.50
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons
Public / Public Office
Custodial and Penal institutions Jails Prison Mental hospitals Houses of Correction Detention Reformatories
11
D-3
Public / Public Office
Offices for public Government / semi government entities for Health Transport Communication Security Ward Office Law Courts, Police Stations / Chowkis Panchayat Circuit House etc.
10
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building
12
E
E-1
Assembly 1
Community Hall Banquet Hall (No permanent seating and no permanent stage)
Fire Division 1
0.65
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons
Assembly 2
Town Hall Convention Centre Exhibition Hall Studio
Page No 19
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
Performing Arts Theatre Gymnasium (without spectator seating) Club (No permanent seating and no permanent stage)
Assembly 4
Party Plot (No permanent seating and no permanent stage)
13
E-2
Assembly 2
Convention Centre Auditorium Planetarium Museum Performing Arts Theatre (with Fixed seatings)
N *1.2 (where N = number of seats) (see Note4)
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons.
Assembly 3
Theatre Cinema Multiplex (with Fixed seatings)
14
E-3
Religious
Temple Shrine Church / Chapel Mosque / Dargah Gurudwara Synagogue Ashram / Upashraya / Math / Sant Niwas Any other Religious Structure. ( No permanent seating and no permanent stage)
Fire Division 1
0.65
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons
Planning and Development Authority
Page No 20
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
15
E-4
Sports and Leisure
Gymnasium Sports complex Swimming pool Playfield Water sports facilities Theme Amusement Park Aquarium Exhibition Mela Shooting Range
Fire Division 1
1.4(see Note3)
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons.
Cremation and Burial
Crematorium
Temporary Use
Fair Circus Exhibition Mela Pandal Concrete batching plant for construction Seasonal Market
16
F
F-1
Transportation
Bus Terminal / station (public / private) Transport Terminal for Passengers
Fire Division 1
30
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons
EP 2
Port Harbour Hover ports for Coast Guards Jetties
17
F-2
Transportation
Transport Terminal for Goods (Truck)
Fire Division 3
30
10
6.5
30(see Note 8)
NA
Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area
Page No 21
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
18
G
G-1
Agriculture 1 (Part)
Green Houses Dairy Development Animal rearing and breeding/gaushala Poultry Farm
Fire Division 2
1.4
10
6.5
45(see Note 8)
NA
Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area
19
G-2
Agriculture 2
Animal Shed Agro-Based Storage
Fire Division 3
30
10
6.5
30(see Note 8)
NA
Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area
Communication Infrastructure - telephone, microwave tower or other means of communication facilities
25
J
J-1*
Utility
Infrastructure for Water Supply - treatment / purification plant, pumping station.
Fire Division 2
10
10
6.5
45(see Note 8)
NA
Firefighting Installation in Table No 14.7, vary with Height of the Building and Covered area
Industrial 1
All White Category of Industries as defined by CPCB in Classification of Industrial Sector(2016)
Industrial 2
All Green Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP
Industrial 3
All Orange Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP Dumping of Solid Waste Mining and Quarrying Brick Kiln Roof Tiles Tannery Slaughterhouse
Page No 23
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area
Utility
Electric substations
Industrial 1
All White Category of Industries as defined by CPCB in Classification of Industrial Sector(2016)
Industrial 2
All Green Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP
Industrial 3
All Orange Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP Dumping of Solid Waste Mining and Quarrying Brick Kiln Roof Tiles Tannery Slaughterhouse Petroleum Storage Roofing Tiles and Cement Pipes
27
J-3*
Industrial 1
All White Category of Industries as defined by CPCB in Classification of Industrial Sector(2016)
Fire Division 3
10
10
6.5
22.5(see Note 8)
NA
Fire fighting Installation in Table No. 14.7, vary with Covered Area
Industrial 2
All Green Category of Industries as defined by CPCB in
Planning and Development Authority
Page No 24
No
Main
Sub
Use Group as per proposed ODP GDR
Detailed Uses As per proposed ODP GDR
Fire Divisions
Occupant Load Factor(sqm/person) As per NBC**
Capacity Factors (Width Per Person in mm) As per NBC
Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC***
Final Remarks
Stairways
Level Componen ts and Ramps
Types 1 and 2
Types 3 and 4
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
Classification of Industrial Sector (2016), CETP
Industrial 3
All Orange Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP Dumping of Solid Waste Mining and Quarrying Brick Kiln Roof Tiles Tannery Slaughterhouse Petroleum Storage Roofing Tiles and Cement Pipes
Notes: *Detailed uses of Subgroup J-1, J-2 and J-3 will correspond to low hazard, moderate hazard and high hazard respectively as in accordance with Annex B ** Occupant load 1 Gross area shall be the floor area. All factors expressed are in gross area unless marked net. 2 Occupant load in dormitory portions of homes for the aged, orphanages, insane asylums, etc where sleeping accommodation is provided shall be calculated at not less than 7.5 m2 gross floor area / person. 3 These shall include gymnasium, table tennis room, billiard room and other gaming rooms, library, swimming pool and like. 4 In case of assembly occupancy having fixed seats, the occupant load shall be determined by multiplying the number of seats by 1.2. 5 Car parking areas under occupancy other than storage shall also be 30 m2 per person. *** Travel Distance 6 For fully sprinklered building, the travel distance may be increased by 50 percent of the values specified. 7 Ramp shall not be counted as an exit in case of basements below first basement in car parking. 8 Construction of Type 3 or Type 4 is not permitted.
Page No 25
23
H-4
Mercantile 2
Vegetable Fish Market Agriculture Horticulture Produce
Fire Division 1
3
10
6.5
30.00
30.00
Firefighting Installation in Table No. 14.7, vary with Height of the Building and Area
Mercantile 3
Wholesale Market and ancillary uses Timber mart / Lathi Bazaar