14.2.1 Classification of Buildings based on Occupancy
All buildings/uses, whether existing or hereafter erected shall be classified according to use or the character of occupancy in one of the following groups as indicated in the table below. The table also summarizes the types of examples of buildings:
Page No 15
Table No. 14.1: Classification of Buildings based on Occupancy and Fire Divisions
| No | Main | Sub | Use Group as per proposed ODP GDR | Detailed Uses As per proposed ODP GDR | Fire Divisions | Occupant Load Factor(sqm/person) As per NBC** | Capacity Factors (Width Per Person in mm) As per NBC | Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC*** | Final Remarks | ||
| Stairways | Level Componen ts and Ramps | Types 1 and 2 | Types 3 and 4 | ||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
| 1 | A | A-1 | Dwelling 1 | Detached dwelling unit. Clinic not having indoor treatment facility. | Fire Division 1 | 12.50 | 10.00 | 6.50 | 30.00 | 22.50 | Firefighting installations in Table No. 14.7 |
| Agriculture 1 (Part) | Farmhouse. | ||||||||||
| Dwelling 1a | Detached dwelling unit - affordable Housing | ||||||||||
| Dwelling 2 | Semi-detached dwelling unit Row House Tenement Cottage Industry | 12.50 | 10.00 | 6.50 | 30.00 | 22.50 | Firefighting installations in Table No. 14.7 | ||||
| Dwelling 2a | Semi Detached dwelling unit - affordable Housing | ||||||||||
| Agriculture 1 (Part) | Farmhouse | ||||||||||
| 2 | A-2 | Dwelling 3 (Part) | Old Age Home Orphanage | 7.5 | 15 | 13 | 30.00 | 22.50 | Firefighting Installation in Table No. 14.7, vary with Height of the Building. | ||
| 3 | A-3 | Dwelling 3 (Part) Dormitory | Hostels Dormitories Dharamshala Homestay Night Shelter | 12.50 | 10.00 | 6.50 | 30.00 | 22.50 | Firefighting Installation in Table No. 14.7, vary with Height of the Building. | ||
| Dwelling 3 (Part) | Flats Apartment (mixed, serviced) | 12.50 | 10.00 | 6.50 | 30.00 | 22.50 | |||||
| Dwelling 3a | Affordable Housing | ||||||||||
| Dwelling 3s | Chawls Labour Housing Sparsh Housing / Affordable Housing Affordable Rental Housing | ||||||||||
Planning and Development Authority
Page No 16
| No | Main | Sub | Use Group as per proposed ODP GDR | Detailed Uses As per proposed ODP GDR | Fire Divisions | Occupant Load Factor(sqm/person) As per NBC** | Capacity Factors (Width Per Person in mm) As per NBC | Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC*** | Final Remarks | ||
| Stairways | Level Componen ts and Ramps | Types 1 and 2 | Types 3 and 4 | ||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
| Complex Low-Cost Housing Complexes | |||||||||||
| 4 | B | B-1 | Hospitality 1 | Camping Tents Eco Hotels (Upto Four Star Category) | Fire Division 1 | 12.50 | 10.00 | 6.50 | 30.00 | 22.50 | Firefighting Installation in Table No 14.7, vary with Height of the Building and Floor Area |
| Hospitality 2 | Resort Cottage Houses Spa and Wellness Centre (Upto Four Star Category) | ||||||||||
| Hospitality 3 | Bed and Breakfast Guest House Lodging and Boarding Hotel Motel Serviced Apartment (Upto Four Star Category) | ||||||||||
| 5 | B-2 | Hospitality 1 | Camping Tents Eco Hotels (Five Star and above Category) | 12.50 | 10.00 | 6.50 | 30.00 | 22.50 | Firefighting Installation in Table No. 14.7, vary with Height of the Building | ||
| Hospitality 2 | Resort Cottage Houses Spa and Wellness Centre (Five Star and above Category) | ||||||||||
| Hospitality 3 | Bed and Breakfast Guest House Lodging and Boarding Hotel Motel Serviced Apartment (Five Star and above Category) | ||||||||||
| 6 | B-3 | Hospitality 3 (Part) | Bed and Breakfast Guest House Lodging and Boarding | 12.50 | 10.00 | 6.50 | 30.00 | 22.50 | Firefighting Installation in Table No. 14.7, vary with the number of rooms | ||
Page No 17
| No | Main | Sub | Use Group as per proposed ODP GDR | Detailed Uses As per proposed ODP GDR | Fire Divisions | Occupant Load Factor(sqm/person) As per NBC** | Capacity Factors (Width Per Person in mm) As per NBC | Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC*** | Final Remarks | ||
| Stairways | Level Componen ts and Ramps | Types 1 and 2 | Types 3 and 4 | ||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
| Motel Serviced Apartment (Non-Starred Category) | |||||||||||
| 7 | C | C-1 | Education 1 | Anganwadi Day Care Pre School Pre-Primary School | Fire Division 1 | 4 | 10.00 | 6.50 | 30.00 | 22.50 | Firefighting Installation in Table No. 14.7, vary with Height of the Building |
| Education 2 | Primary Schools Secondary Schools Higher Secondary Schools | ||||||||||
| Education 3 | Polytechnic Industrial Training Institutes (ITI) Vocational Training Centre College University and Ancillary use | ||||||||||
| 8 | C-2 | Education 3 | Research and Development Establishments/ Centre | Fire Division 2 | 10 | 10.00 | 6.50 | 30.00 | 30.00 | ||
| 9 | D | D-1 | Health 1 | PHC, Clinic without indoor facility Dispensary Health and Wellness Centre Ayushman Bharat | Fire Division 1 | 10(Outdoor Patients area)15(Indoor Patients area) | 15 | 13 | 30.00 | 22.50 | Firefighting Installation in Table No. 14.7, vary with Height of the Building, area of Building Unit and No. of Beds |
| Health 2 | Clinic with indoor facility Indoor Hospital facility up to 20 Bed Surgical Hospital, Nursing Home, Maternity Home, Community Health Centre Veterinary Facilities | ||||||||||
Planning and Development Authority
Page No 18
| No | Main | Sub | Use Group as per proposed ODP GDR | Detailed Uses As per proposed ODP GDR | Fire Divisions | Occupant Load Factor(sqm/person) As per NBC** | Capacity Factors (Width Per Person in mm) As per NBC | Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC*** | Final Remarks | ||
| Stairways | Level Componen ts and Ramps | Types 1 and 2 | Types 3 and 4 | ||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
| Health 3 | Multi-specialty hospital- Upto 100 beds Medical College, Research and Development Centre Hospital- more than 100 beds | ||||||||||
| 10 | D-2 | Health 4 | Hospital for infectious diseases Mental Hospital / Asylum | 15(see Note2) | 15 | 13 | 30.00 | 22.50 | Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons | ||
| Public / Public Office | Custodial and Penal institutions Jails Prison Mental hospitals Houses of Correction Detention Reformatories | ||||||||||
| 11 | D-3 | Public / Public Office | Offices for public Government / semi government entities for Health Transport Communication Security Ward Office Law Courts, Police Stations / Chowkis Panchayat Circuit House etc. | 10 | 10 | 6.5 | 30.00 | 30.00 | Firefighting Installation in Table No. 14.7, vary with Height of the Building | ||
| 12 | E | E-1 | Assembly 1 | Community Hall Banquet Hall (No permanent seating and no permanent stage) | Fire Division 1 | 0.65 | 10 | 6.5 | 30.00 | 30.00 | Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons |
| Assembly 2 | Town Hall Convention Centre Exhibition Hall Studio | ||||||||||
Page No 19
| No | Main | Sub | Use Group as per proposed ODP GDR | Detailed Uses As per proposed ODP GDR | Fire Divisions | Occupant Load Factor(sqm/person) As per NBC** | Capacity Factors (Width Per Person in mm) As per NBC | Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC*** | Final Remarks | ||
| Stairways | Level Componen ts and Ramps | Types 1 and 2 | Types 3 and 4 | ||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
| Performing Arts Theatre Gymnasium (without spectator seating) Club (No permanent seating and no permanent stage) | |||||||||||
| Assembly 4 | Party Plot (No permanent seating and no permanent stage) | ||||||||||
| 13 | E-2 | Assembly 2 | Convention Centre Auditorium Planetarium Museum Performing Arts Theatre (with Fixed seatings) | N *1.2 (where N = number of seats) (see Note4) | 10 | 6.5 | 30.00 | 30.00 | Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons. | ||
| Assembly 3 | Theatre Cinema Multiplex (with Fixed seatings) | ||||||||||
| 14 | E-3 | Religious | Temple Shrine Church / Chapel Mosque / Dargah Gurudwara Synagogue Ashram / Upashraya / Math / Sant Niwas Any other Religious Structure. ( No permanent seating and no permanent stage) | Fire Division 1 | 0.65 | 10 | 6.5 | 30.00 | 30.00 | Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons | |
Planning and Development Authority
Page No 20
| No | Main | Sub | Use Group as per proposed ODP GDR | Detailed Uses As per proposed ODP GDR | Fire Divisions | Occupant Load Factor(sqm/person) As per NBC** | Capacity Factors (Width Per Person in mm) As per NBC | Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC*** | Final Remarks | ||
| Stairways | Level Componen ts and Ramps | Types 1 and 2 | Types 3 and 4 | ||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
| 15 | E-4 | Sports and Leisure | Gymnasium Sports complex Swimming pool Playfield Water sports facilities Theme Amusement Park Aquarium Exhibition Mela Shooting Range | Fire Division 1 | 1.4(see Note3) | 10 | 6.5 | 30.00 | 30.00 | Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons. | |
| Cremation and Burial | Crematorium | ||||||||||
| Temporary Use | Fair Circus Exhibition Mela Pandal Concrete batching plant for construction Seasonal Market | ||||||||||
| 16 | F | F-1 | Transportation | Bus Terminal / station (public / private) Transport Terminal for Passengers | Fire Division 1 | 30 | 10 | 6.5 | 30.00 | 30.00 | Firefighting Installation in Table No. 14.7, vary with Height of the Building and number of persons |
| EP 2 | Port Harbour Hover ports for Coast Guards Jetties | ||||||||||
| 17 | F-2 | Transportation | Transport Terminal for Goods (Truck) | Fire Division 3 | 30 | 10 | 6.5 | 30(see Note 8) | NA | Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area | |
Page No 21
| No | Main | Sub | Use Group as per proposed ODP GDR | Detailed Uses As per proposed ODP GDR | Fire Divisions | Occupant Load Factor(sqm/person) As per NBC** | Capacity Factors (Width Per Person in mm) As per NBC | Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC*** | Final Remarks | ||
| Stairways | Level Componen ts and Ramps | Types 1 and 2 | Types 3 and 4 | ||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
| 18 | G | G-1 | Agriculture 1 (Part) | Green Houses Dairy Development Animal rearing and breeding/gaushala Poultry Farm | Fire Division 2 | 1.4 | 10 | 6.5 | 45(see Note 8) | NA | Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area |
| 19 | G-2 | Agriculture 2 | Animal Shed Agro-Based Storage | Fire Division 3 | 30 | 10 | 6.5 | 30(see Note 8) | NA | Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area | |
| Storage | Warehouse Godown Cold storage Steel stockyard Ice Factory | ||||||||||
| 20 | H | H-1 | Mercantile 1 | Office | Fire Division 1 | 10 | 10 | 6.5 | 30.00 | 30.00 | Firefighting Installation in Table No. 14.7, vary with Height of the Building and Area |
| Mercantile 2 | Business Offices Corporate Offices | ||||||||||
| 21 | H-2 | Mercantile 2 | Shopping mall Shopping complex Cineplex | 1.8 | 10 | 6.5 | 30.00 | 30.00 | Firefighting Installation in Table No. 14.7, vary with Height of the Building and Area | ||
| 22 | H-3 | Mercantile 1 | Retail shop Shopping Centre Office Restaurant Café | 6 | 10 | 6.5 | 30.00 | 30.00 | Firefighting Installation in Table No. 14.7, vary with Height of the Building and Area | ||
Planning and Development Authority
Page No 22
| No | Main | Sub | Use Group as per proposed ODP GDR | Detailed Uses As per proposed ODP GDR | Fire Divisions | Occupant Load Factor(sqm/person) As per NBC** | Capacity Factors (Width Per Person in mm) As per NBC | Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC*** | Final Remarks | ||
| Stairways | Level Componen ts and Ramps | Types 1 and 2 | Types 3 and 4 | ||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
| 24 | I | I | Mercantile 2 | Laboratory Research establishments | Fire Division 2 | 10 | 10 | 6.5 | 30.00 | 30.00 | Firefighting Installation in Table No. 14.7, vary with Height of the Building |
| Assembly 2 | Library | ||||||||||
| Service Establishment 2 | Call Centres Service-related shops Information Technology (IT) Biotechnology (BT) Nano Technology (NT) | ||||||||||
| Utility | Communication Infrastructure - telephone, microwave tower or other means of communication facilities | ||||||||||
| 25 | J | J-1* | Utility | Infrastructure for Water Supply - treatment / purification plant, pumping station. | Fire Division 2 | 10 | 10 | 6.5 | 45(see Note 8) | NA | Firefighting Installation in Table No 14.7, vary with Height of the Building and Covered area |
| Industrial 1 | All White Category of Industries as defined by CPCB in Classification of Industrial Sector(2016) | ||||||||||
| Industrial 2 | All Green Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP | ||||||||||
| Industrial 3 | All Orange Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP Dumping of Solid Waste Mining and Quarrying Brick Kiln Roof Tiles Tannery Slaughterhouse | ||||||||||
Page No 23
| No | Main | Sub | Use Group as per proposed ODP GDR | Detailed Uses As per proposed ODP GDR | Fire Divisions | Occupant Load Factor(sqm/person) As per NBC** | Capacity Factors (Width Per Person in mm) As per NBC | Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC*** | Final Remarks | ||
| Stairways | Level Componen ts and Ramps | Types 1 and 2 | Types 3 and 4 | ||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
| Petroleum Storage Roofing Tiles and Cement Pipes | |||||||||||
| 26 | J-2* | Service Establishment 1 | Wood Workshop Service Garage Flour mills Laundry / dry cleaning establishment | Fire Division 2 | 10 | 10 | 6.5 | 45(see Note 8) | NA | Firefighting Installation in Table No. 14.7, vary with Height of the Building and Covered area | |
| Utility | Electric substations | ||||||||||
| Industrial 1 | All White Category of Industries as defined by CPCB in Classification of Industrial Sector(2016) | ||||||||||
| Industrial 2 | All Green Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP | ||||||||||
| Industrial 3 | All Orange Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP Dumping of Solid Waste Mining and Quarrying Brick Kiln Roof Tiles Tannery Slaughterhouse Petroleum Storage Roofing Tiles and Cement Pipes | ||||||||||
| 27 | J-3* | Industrial 1 | All White Category of Industries as defined by CPCB in Classification of Industrial Sector(2016) | Fire Division 3 | 10 | 10 | 6.5 | 22.5(see Note 8) | NA | Fire fighting Installation in Table No. 14.7, vary with Covered Area | |
| Industrial 2 | All Green Category of Industries as defined by CPCB in | ||||||||||
Planning and Development Authority
Page No 24
| No | Main | Sub | Use Group as per proposed ODP GDR | Detailed Uses As per proposed ODP GDR | Fire Divisions | Occupant Load Factor(sqm/person) As per NBC** | Capacity Factors (Width Per Person in mm) As per NBC | Maximum Travel Distance (Based on Occupancy and Construction Type in m) As per NBC*** | Final Remarks | ||
| Stairways | Level Componen ts and Ramps | Types 1 and 2 | Types 3 and 4 | ||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | (11) | (12) |
| Classification of Industrial Sector (2016), CETP | |||||||||||
| Industrial 3 | All Orange Category of Industries as defined by CPCB in Classification of Industrial Sector (2016), CETP Dumping of Solid Waste Mining and Quarrying Brick Kiln Roof Tiles Tannery Slaughterhouse Petroleum Storage Roofing Tiles and Cement Pipes | ||||||||||
| Notes: *Detailed uses of Subgroup J-1, J-2 and J-3 will correspond to low hazard, moderate hazard and high hazard respectively as in accordance with Annex B ** Occupant load 1 Gross area shall be the floor area. All factors expressed are in gross area unless marked net. 2 Occupant load in dormitory portions of homes for the aged, orphanages, insane asylums, etc where sleeping accommodation is provided shall be calculated at not less than 7.5 m2 gross floor area / person. 3 These shall include gymnasium, table tennis room, billiard room and other gaming rooms, library, swimming pool and like. 4 In case of assembly occupancy having fixed seats, the occupant load shall be determined by multiplying the number of seats by 1.2. 5 Car parking areas under occupancy other than storage shall also be 30 m2 per person. *** Travel Distance 6 For fully sprinklered building, the travel distance may be increased by 50 percent of the values specified. 7 Ramp shall not be counted as an exit in case of basements below first basement in car parking. 8 Construction of Type 3 or Type 4 is not permitted. | |||||||||||
Page No 25