An Integrated Solid Waste Treatment Centre (CISWTC) is proposed at Vellalur Dump yard, the Vellalur dump area is spread over 389 acres including the existing Sewage Treatment Plant, compost yard, Dump yard and Biomining plant. The proposed ISWTC aims to streamline and enhance solid waste management. It includes dedicated zones for waste segregation, shredding, green buffers resource recovery unit, Refuse-Derived Fuel (RDF) unit, an expanded compost yard, and a sanitary landfill. The concept design of the Integrated Solid waste treatment is illustrated in the Figure 9.5.
To determine the treatment capacity and the area requirement for different treatment facilities proposed, the composition of solid waste has been analysed based on existing Solid waste Composition for the Corporation and Town Panchayats in Cluster 1. Based on this analysis, suitable treatment facilities have been proposed in ISWTC. The following table presents the estimated solid waste generation and the corresponding proposed treatment facilities within the Integrated Solid Waste Management Complex (ISWMC).

Figure 9.5: Concept design of Coimbatore Integrated Waste Treatment Center
| Content | Quantity | |
| Total Solid Waste Estimated to be generated in 2041 for Cluster 1 (MT/day) | 2032.68 | |
| Capacity of Existing Treatment Facility in Cluster 1 | 1024.61 | |
| Total Future Demand in Cluster 1 - 2041 | 1008.07 | |
| Total Compostable Solid waste (MT) | 696.76 | |
| Total Dry Waste for Refuse to Fuel (MT) | 293.79 | |
| Total Organic and Dry waste | 990.56 | |
| Hazardous waste (MT) | 16.97 | |
| Proposals | ||
| Added Capacity to Existing Treatment facility (by Enhancing the Micro Composting center in Proposal 1) | 19 | |
| Capacity of Bio Gas Plant (MT) | 250 | |
| Capacity of Proposed Compost Yard (MT) | 500 | |
| Capacity of refuse-derived Fuel plant (MT) | 350 | |
| Total Capacity of Proposed Treatment Facility | 1119 | |
| Surplus facility available after treating the total projected solid waste for 2041 | Organic waste treatment | 72.24 |
| Dry waste treatment | 56.21 | |
| Area requirements | ||
| Compost yard (Ha) | 6 | |
| Refuse derived Plant (Ha) | 2.1 | |
| Total area required (Ha) | 8.1 | |
From the above table, it can be seen the total area required for the proposed Solid waste treatment capacity is 8.1 Ha. The area can be effectively accommodated within the existing Vellalur dump yard. As the biogas plant is already allotted, no additional area allocation is considered for it in this proposal. While providing the Integrated Waste treatment plant in the existing Vellalur dump yard, it is essential to allocate a dedicated area for a sanitary landfill, to manage non-treatable waste such as inert materials, silt, and residual rejects. Accordingly, an area of approximately 0.08 hectares is proposed to be reserved for the landfill. The landfill shall be monitored periodically for leachate generation, and appropriate leachate collection and disposal systems shall be incorporated during the design and development
stages to ensure environmental compliance and long-term sustainability. The collected leachate to be treated in the sewerage treatment plant before disposal. The hazardous waste will be transported to the Vellalur Bio Medical
Proposal 2B : Integrated Solid Waste Treatment Centre (ISWTC) – Cluster 2
Cluster 2 Includes Gudalur Municipality and 4 town Panchayat. The total Solid waste estimated to be generated from cluster 2 is about 76.06 Mt, of which about 33.69 MT of solid waste is estimated to be generated from Gudalur Municipality. The existing solid waste treatment facility in Gudalur Municipality is only the Windrow method of compost and hence and MCC of 5 Mt of capacity, an incineration unit of 2 Mt capacity are proposed within Gudalur Municipality. In addition to this, an integrated treatment plant with a Compost yard of 50 MT of capacity and a Resource recovery centre of 20 MT capacity are also proposed, considering the total waste generated from the Municipality and the 4 Town Panchayat of the cluster. The following table provides the details of the integrated solid waste Treatment centre for Cluster 2
| Content | Quantity | |
| Total Solid Waste Estimated to be generated in 2041 for Cluster 2 (MT/day) | 76.06 | |
| Capacity of Existing Treatment Facility in Cluster 1 | 24.70 | |
| Total Future Demand in Cluster 1 - 2041 | 51.36 | |
| Total Compostable Solid Waste (MT) | 34.86 | |
| Total Dry Waste for Resource Recovery (MT) | 16.50 | |
| Proposals | ||
| Capacity of Proposed Compost Yard (MT) | 50 | |
| Capacity of Resource Recovery Unit (MT) | 20 | |
| Total Capacity of Proposed Treatment Facility | 70 | |
| Surplus facility available after treating the total projected solid waste for 2041 | Organic waste treatment | 15.14 |
| Dry waste treatment | 3.50 | |
| Area Required | ||
| Compost yard (Ha) | 0.6 | |
| Resource Recovery Unit (Ha) | 0.5 | |
| Total area required (Ha) | 1.1 | |
The Integrated Solid Waste Treatment Center proposed for Cluster 2, designed to handle approximately 94.70 metric tons (MT) of waste per day. This capacity exceeds the current waste generation demand of around 76.06 MT, providing a buffer to accommodate potential increases in waste production in the future. A land area of 1.1 hectares needs to be identified to set up this integrated solid waste management centre in Cluster 2.
Proposal 2C : Combined Solid Waste Treatment Centre– Cluster 3
Cluster 3 consists of Karumathampatti Municipality and Mooppiripalayam Town Panchayat in the northeastern side of Coimbatore LPA. The total solid waste estimated to be generated in 2041 is about 39 MT, and a combined solid waste treatment centre is proposed for the Municipality and the Town panchayat. The following table provides the salient features of the proposed treatment facility in Cluster 3
| Content | Quantity | |
| Total Solid Waste Estimated to be generated in 2041 for Cluster 3 (MT/day) | 38.99 | |
| Capacity of Existing Treatment Facility in Cluster 1 | 21.10 | |
| Total Future Demand in Cluster 1 - 2041 | 17.89 | |
| Total Compostable Solid Waste (MT) | 11.76 | |
| Total Dry Waste for Resource Recovery (MT) | 6.13 | |
| Proposals | ||
| Capacity of Proposed Compost Yard (MT) | 20 | |
| Capacity of Resource Recovery Unit (MT) | 10 | |
| Total Capacity of Proposed Treatment Facility | 30 | |
| Surplus facility available after treating the total projected solid waste for 2041 | Organic waste treatment | 8.24 |
| Dry waste treatment | 3.87 | |
| Area Required | ||
| Compost yard (Ha) | 0.24 | |
| Resource Recovery Unit (Ha) | 0.25 | |
| Total area required (Ha) | 0.49 | |
The proposed combined solid waste treatment facility can more efficient compared to setting up individual treatment units, as it optimizes land usage, reduces design and construction costs, and minimizes labour requirements.
Proposal 2D : Combined Solid Waste Treatment Centre– Cluster 4
Cluster 4 includes Madukkarai Municiaplaity, Ettimadai and Thirumalaiyampalayam Town panchayat in the southern region of Coimbatore LPA. The region lies in close proximity to Reserve Forest and hence efficient solid waste collection and disposal is one of the prime focus of the cluster. The following are the details of the combined solid water treatment facility for cluster 4.
| Content | Quantity | |
| Total Solid Waste Estimated to be generated in 2041 for Cluster 4 (MT/day) | 30.97 | |
| Capacity of Existing Treatment Facility in Cluster 4 | 16.50 | |
| Total future Demand in Cluster 4 - 2041 | 14.47 | |
| Total Compostable Solid Waste (MT) | 9.40 | |
| Total Dry Waste for Resource Recovery (MT) | 5.07 | |
| Proposals | ||
| Capacity of Proposed Compost Yard (MT) | 10 | |
| Capacity of Resource Recovery Unit (MT) | 10 | |
| Total Capacity of Proposed Treatment Facility | 20 | |
| Surplus facility available after treating the total projected solid waste for 2041 | Organic waste treatment | 0.60 |
| Dry waste treatment | 4.94 | |
| Area Required | ||
| Compost yard (Ha) | 0.12 | |
| Resource Recovery Unit (Ha) | 0.25 | |
| Total area required (Ha) | 0.37 | |