- 10.1 Introduction.... 440
- 10.1.1 Tamil Nadu Installed Power Capacity and Generation.... 441
- 10.1.2 Coimbatore District Installed power capacity comparison with Tamil Nadu.... 442
- 10.1.3 Per Capita Energy Consumption.... 444
- 10.2 Administrative Boundary.... 448
- 10.3 Present Power Consumption and Number of Service connections.... 452
- 10.3.1 Residential Service Connections.... 453
- 10.3.2 Heavy Industrial Connection.... 455
- 10.3.3 Light Industrial Connection.... 455
- 10.3.4 Institutional Service Connections.... 458
- 10.4 Power Infrastructure.... 460
- 10.4.1 Power Generation.... 460
- 10.4.2 Substations Installed capacity and its locations.... 461
- 10.4.3 Distribution Transformer Installed capacity and its locations.... 467
- 10.5 Transmission and Distribution Network.... 471
- 10.5.1 Transmission through Extra High-Tension Lines.... 471
- 10.6 Substation wise Energy Capacity and Gap-Circle Level.... 473
- 10.7 Energy Projection - LPA.... 475
- 10.7.1 Energy Demand Projection - Local Body wise.... 475
- 10.7.2 Energy Consumption Projection - Local Body wise.... 481
- 10.7.3 Source of Power Generation Capacity Projection.... 489
- 10.8 Proposal & Policy.... 490
- 10.8.1 Existing Proposals.... 490
- 10.8.2 Proposal for substations - capacity.... 490
- 10.8.3 Solar Power Potential - Roof Top.... 499
- 10.8.4 Land Suitability for Solar Power Plant.... 501
- 10.9 Block Costing for Proposed Substation - Coimbatore LPA.... 504
- 10.9.1 Option 1 - 8 MVA 110/11KV AIS (Air Insulated Substation).... 504
- 10.9.2 Option 2 - 8 MVA 110/11KV GIS (Gas Insulated Substation).... 504
- 10.9.3 Recommended for AIS.... 505
- 10.9.4 Recommended for GIS.... 505
- 10.9.5 Block Costing for Proposed substation - Coimbatore LPA.... 506
xi