(a) N.A. Permission. - Non-agriculture permission will be automatic. As soon as the scheme is notified, lands notified under Special Township area as per Resolution No.37.1.2 will be deemed to have been converted into non-agriculture and no separate permission is required. Non-agriculture assessment, however, will commence from the date of sanction of scheme.
(b) Stamp Duty - The stamp duty rates applicable in Notified Special Township area shall be 50% of prevailing rates of the Mumbai Stamp Act.
(c) Grant of Government Land - Any Government land falling under Special Township area shall be leased out to the developer at the prevailing market rate on usual terms and conditions.
(d) Relaxation from Mumbai Tenancy and Agriculture Land Act - The condition that only the agriculturist will be eligible to buy the agriculture land shall not be applicable in Special Township
area.
(e) Ceiling of agriculture land - There shall be no ceiling limit for holding agriculture land to be purchased by the owner/developer for such Special Township project.
(f) Exemption from Urban Land (Ceiling and Regulation) Act, 1976 - Special Township Projects shall be exempted from the purview of Urban Land (Ceiling and Regulation) Act; 1976.
(g) Scrutiny fee - A Special Township Project shall be partially exempted from payment of scrutiny fee being levied by the Planning Authority for processing the development proposal on certain terms and conditions as may be decided by the Planning Authority.
(h) Floating FSI - There will be floating FSI in the township. Unused FSI of one plot can be used anywhere in the whole township.
(i) Special benefits / concessions in respect of Star Category Hotels, Hospitals and Multiplexes / Property Tax shall be provided.
The Township project has to be an integrated township project. The project should necessarily provide land for following users: -
(a) Residential
(b) Commercial
(c) Educational
(d) Amenity Spaces
(e) Health Facilities
(f) Parks, Gardens and Play Grounds.
(g) Public Utilities.
These Regulations would be applicable to the Corporation area excluding the area under jurisdiction of Maharashtra Industrial Development Corporation, Eco Sensitive area, if any declared by Government and Special planning Authority, if any.
37.1.1 Area Requirement - Any suitable area having access by means of an existing or proposed Development Plan road having a minimum width of 18 mtr can be identified for the purpose of development as “Special Township Project”.
The area notified under the Special Township shall be one, continuous, unbroken and uninterrupted and in any case shall not be less than 40 Ha. (100 acres) at one place.
Explanation – If such minimum 40 Ha. (100 Acre) area proposed to be developed under a Special Township Project is divided by one or more water courses (such as nallas, canal etc.), existing or proposed roads of any width or railways etc., then such area shall be considered to be continuous, unbroken and uninterrupted, subject to the condition that the developer shall construct necessary connecting roads or bridges as per site requirements at his own cost with due permission from concerned authorities.
The area under any Special Township Project shall not include the area under notified forest, water bodies like river, creek, canal, reservoir, Tribal lands, lands falling within the belt of 500 mtrs. from the High Flood Line (HFL) of major lakes, lands in the command area or irrigation projects, land falling within the belt of 200 mtrs. from the historical monuments and places of Archaeological importance, Archaeological monuments, Heritage precincts and places, restricted areas, notified National Parks, Defence areas, Cantonment areas, area under Eco-sensitive Zone, other environmentally sensitive areas, Quarry Zone, notified areas of Special Economic Zone (SEZ) and designated Airport areas.
However, such Special Township, may include private land under Hill-tops and Hill-slopes Zone, Afforestation Zone. Provided that, the area of lands in such Hill-tops and Hill-slopes Zone and Afforestation Zone shall not exceed 40 percent of the gross area of the project and such area shall be included in part shown towards 50% area to be kept permanently open where no development activity shall be permissible under such Town ship Project. The said areas shall be developed for tree plantation as per the norms specified. However, for the purpose of calculation of Floor Space Index (FSI), such areas shall be excluded.
However, such Special Township Project may also include lands under Industrial Zone, and Public/Semi-Public Zone, subject to the condition that minimum 60 percent built-up area from the land under such zone shall be used for the purpose of respective main user of such zone, with remaining 40 percent, for the Residential and allied users.
37.1.2 Manner of Declaration - Any area identified above and if found suitable can be Notified by Government in Urban Development Department by following procedure under section 44(2) of the Maharashtra Regional and Town Planning Act, 1966 and also in such other manner as may be determined by it for the purpose of development as Special Township Project.
37.1.3 Infrastructure Facilities - The entire Township should be an integrated one with all facilities within the boundaries of declared townships. All the on-site infrastructure, i.e. roads, including development plan roads, approach road, street lights, water supply and drainage system shall be provided and maintained in future by the developer till it is taken over by the Municipal Corporation and the developer shall also carry out development of amenity or proposals, if any designated in the development plan, in accordance with these regulations.
(a) Water supply - The developer shall be required to develop the source for drinking water (excluding the groundwater source) or secure firm commitment from any water supply authority for meeting the daily water requirement of minimum 140 litres per capita per day exclusive of requirement of water for fire-fighting and gardening. The storage capacity of the same shall be at least 1.5 times of the actual required quantity as determined by expected population (Resident and Floating) and other uses. The developer would be required to develop proper internal distribution and maintenance systems and shall specially undertake rain water harvesting, groundwater recharging and waste water recycling projects within the Township.
(b) Drainage and Garbage disposal - The developer shall make suitable and environment friendly arrangements for the disposal and treatment of sewage and solid waste as per requirements of Maharashtra Pollution Control Board. Recycling sewage for gardening shall be undertaken by the developer.
The developer shall develop Eco-friendly garbage disposal system by adopting the recycling and bio-degradation system in consultation with Maharashtra Pollution Control Board.
(c) Power - The developer shall ensure continuous and quality power supply to township area. The developer may draw the power from any existing supply system or may go in for arrangement of captive power generation with the approval from concerned authority. If power is drawn from any existing supply system, the developer shall before commencement of development, procure a firm commitment of power for the entire township from the power supply company.
37.1.4 Environment - The development contemplated in townships shall not cause damage to ecology. In no case it shall involve topographical changes, changes in alignment and cross section of existing water course, if any, in the scheme area or adjacent to scheme area. Environmental clearance shall be obtained from the Ministry of Environment and Forest, Government of India as per directions issued by the MOEF’s notification dated 7th July 2004. The Township shall provide at least 10% of the total area as park/garden/playground as mentioned in Resolution No.37.4 (f) below, with proper landscaping and open uses designated in the Township shall be duly developed by owner/developer. This amenity shall be open to general public without any restriction or discrimination.
The overall planning of the special townships shall be such that the project fairly meets with the specifications spelt out in the prevailing planning standards approved by the Government. Further, the planning of Special Township shall take care of following land uses in particular.
(a) Residential.- The residential area should be well defined in clusters or neighbourhoods or in plotted development with proper road grid. Out of the total floor area proposed to be utilised which is permissible as proportionate to zoning of area under such township, atleast 60% of the floor area generated by utilizing the basic FSI, may be used for purely residential development (hereinafter referred to as Residential Component of the Special Township).The area earmarked for social housing for E.W.S. /L.I.G. shall be governed by Regulation no.37.5.1(i) &37.5.2(i) in such a way that the building permission for the residential components of the special Township shall be given pro-rata in accordance with the development of Social Housing for EWS/LIG.
(b) Commercial - The commercial area shall be properly distributed in hierarchical manner such as convenient shopping, community centre etc.
(c) Educational. - Comprehensive educational system providing education from primary to secondary should be provided as per the requirement. The area allocation should be on projected population base and as far as possible the educational complex should not be concentrated at one place. All such complexes should have adequate area allocation for playground. Minimum area required for educational purpose shall be as per prevailing planning standards.
(d) Amenity Spaces. - The area allocation for amenity space providing for amenities like market, essential shopping area, recreation centres, town hall, library etc. should not be less than 5% of
gross area and should be evenly placed.
(e) Health Facilities. - Adequate area allocation for health facilities for primary health should be provided for. Minimum area required for health facilities shall be as per prevailing planning standards.
(f) Parks, Gardens and Play grounds. – The Special Township Project in Residential Zone shall also provide at least 10 percent of the gross area of the Project as parks/gardens/ playgrounds which shall be developed by the Developer as such and kept open to the general public. This shall be exclusive of the statutory open spaces to be kept in smaller layouts and shall be distributed in all residential clusters.
(g) Public Utilities. - Appropriate area allocation should be provided for (a) power receiving station/ substation, (b) water supply system, (c) sewerage and garbage disposal system, police station (e) public parking, (f) cemetery/cremation ground, (g) bus station, fire brigade station and other public utilities as per requirements.
(h) Transport and Communication. - The entire area of township shall be well knitted with proper road pattern, taking into consideration the linkages with existing roads within the township and outside area as well. All such roads shall be developed by the developer as per standard and road widths shall be as given below.
Classified Road - as prescribed.
Main road/Ring road - 18 to 24 meters wide.
Internal road - as per the DCPR, subject to minimum road width 9 mt.
(i) Service Industries. - In the Special Township area, lands required for commercial uses, industrial uses, permissible in residential user, may also be earmarked. However, the predominated land use would be residential use.
(j) Economic Activities : In order to make the Special Townships self-sustainable and ensure their development as new self-contained micro-centres of urban growth, the Special Township shall ideally be centred around one or more key economic activities like Trade/commerce, Education, Health Care, Non-polluting/ Service Industries, Entertainment, Tourism, etc. Special Townships shall compulsorily provide minimum 20 % built up area for such economic activities and development of residential Component of the Special Township shall be permissible pro-rata, in accordance with the development of the economic activity.
i) Educational activity and Health care activity mentioned above shall not include Primary/Secondary Schools and Primary/Secondary health care facilities respectively.
ii) The total built up area for Commercial Activity under Resolution no.37.4(b) and the total commercial built up area under Resolution no.37.4(d) shall be counted towards the built up area for the aforesaid Economic Activity.
Notes. - (I) All the amenities referred to above shall be inclusive of designated amenities and Amenity space required as per DCPR.
(II) Development Plan roads in the township area shall be developed and maintained by developer, and the same shall be always open for general public without any restrictions there upon.
(III) Minimum parking shall be provided as per these regulations, provided that for hotel, restaurant, college, school, educational institute, educational classes, hospitals, polyclinics and diagnostic centres, offices, Mangal Karyalaya, town hall, clubs, etc. onsite parking shall be provided. For buildings having mixed users, in addition to the regular parking area as mentioned above a space of 3.0 mt. wide strip along the road on front/side shall be provided for visitors
parking.
Development Control and Promotion Regulations for Nashik City as well as provisions of MoEF notification, issued from time to time shall be applicable to the Special Township Projects except those expressly provided in these Special Regulations.
37.5.1 Special Township project in Residential Zone, Industrial Zone, Public-semipublic Zone:
(i)The admissible FSI in respect of a special Township project in the Residential Zone, Industrial Zone, Public semi-public Zone within the development plan area shall be as given in Table No.33below;
| Table No.33 | |||||
| Sr. No. | Area of Township (In Ha.) | Basic FSI on gross plot area | Additional Social Housing FSI (@ 20% of the basic ) for EWS/LIG (compulsory) | Additional FSI Against Payment of Premium (Optional) | Maximum Total Permissible FSI on Gross plot area |
| 1 | 40-100 | 1.0 | 0.20 | 0.10 | 1.30 |
| 2 | Above 100 to200 | 1.0 | 0.20 | 0.20 | 1.40 |
| 3 | Above 200 | 1.0 | 0.20 | 0.30 | 1.50 |
ii) Subject to the limits imposed by the overall FSI admissible under these Regulations to the Special Township Project, there shall be no limit on the Total built up area / FSI utilization for the development of any individual plot in the STP. Maximum Height of any building shall be as per these regulation
However, the height of a building may be increased further, subject to provision of firefighting arrangements, with prior approval of the Director of Fire Services, Government of Maharashtra.
iii) The Planning & Design of Social Housing Component for EWS/LIG shall not be amenable to combining one or more flats to make larger flats.
iv) (a)The Landowner/Developer shall construct the stock of the EWS/LIG tenements in the same Special Township Project and the Planning Authority, shall ensure that the Occupation Certificate for the rest of the development under the Special Township Project is not issued till the Occupation Certificate is issued for the EWS/LIG tenements under the said Special Township Project.
b)The completion of EWS/LIG tenements under the Special Township Project, along with necessary particulars including a copy of the Occupation Certificate granted by the Planning Authority in respect thereof, shall be immediately intimated by the Landowner/Developer to MHADA. Upon such intimation MHADA, within a period of 6 months from the date of receipt of such intimation, shall either purchase such EWS/LIG tenements or allot such tenements to the allottees selected by MHADA through a system of lottery, drawn after such EWS/LIG tenements have been granted Occupation Certificate and thereafter, the Landowner / Developer shall dispose of such tenements to MHADA or such allottees, as the case may be, at the construction rates in the Annual Statement of Rates (ASR), prepared by the Inspector General of Registration, applicable to
the land under the project, on the date of grant of Occupation Certificate to such EWS/LIG tenements.
c) The Landowner / Developer may also be permitted to utilise ¼ of the total 20% FSI earmarked for the EWS/LIG to construct EWS/LIG tenements in the form of service quarters in the same Special Township Project but in a separate block which shall have to be sold as service quarters only to the purchasers of the free sale flats constructed under the Residential Component of the Special Township Project.
v) The optional Additional FSI as per Regulation no.37.5.1(i) to be granted against premium, shall be granted against premium, shall be sold at the 50% of the land rate as prescribed in ASR, by the respective Authorities notified by the Government. No premium shall be charged for the grant of FSI for social housing for EWS/LIG.
vi) The amount of premium collected by the respective authorities shall be deposited in a separate account and should be exclusively used for creating off-site infrastructure and implementation of development plan.
i) Development of Special Township Project in Agricultural/ No Development Zone, Green contained in the development Plan shall be permissible subject to conditions that 50% of the gross area of the project shall be kept open while the project of Special Township shall be executed on the remaining 50% land with basic FSI of 0.5 worked out on the entire gross area of the project. Further, while developing such project, it shall be obligatory on the part of the developer to provide and develop all the infrastructure facilities including sites required for public purposes as per the prescribed planning norms. As regards 50% of land, which is required to be kept open, the same shall be made free from encumbrances and no development except town level open amenities shall be permissible thereon.
Provided that over and above the built up area corresponding to the basic FSI of 0.50, the developer shall have to be compulsorily provide built up area for the EWS and the LIG equal to 20 % of the basic FSI (i.e. 0.10 FSI on gross plot area) which shall not be counted towards the total FSI of the project.
37.5.3 In every Special Township proposal the structural designer of developer has to submit declaration with project report to Planning Authority about the construction of building as below.-
‘I have confirmed that the proposed construction in the scheme are as per norms as specified by Indian Standards Institute, for the resistance of earthquake, fire safety and natural calamities’.
(i) Upper and lower ground floor type construction shall not be allowed.
(ii) The following shall not be included in covered area for built up area and F.S.I. calculations:-
(a) Area covered by the staircase rooms for stair flights of width 0.75 m. & above, in case of row housing & pent houses and duplexes, 1 mt. in case of residential building, 1.2 mt. & above in case of commercial (mercantile) buildings, 2.00 mt. & above in the case of public & semi-public building, subject to payment of premium in consultation with Director, Town Planning, Maharashtra State, Pune.
(b) Area covered by lift room for a building with height upto 16 mt.
(c) Stilt floor space (exclusively for parking space) constructed under building of maximum cleared height 2.4 mt. and which shall be open atleast from two sides.
(d) Balcony or balconies as per these regulations
(e) In special Township schemes under Residential Zone and No Development Zone trees at the rate of minimum 150 trees per ha. and 400 trees per ha., respectively shall be planted and
maintained by the developer.
(f) Once the proposal for Special Township is submitted to the Government under Regulation no.37.7.a, no change of zone proposal in such Township area shall be considered by Government.
37.7.a Locational Clearance. - The proposal for development of Special Township, alongwith details of ownership of land or Development rights of lands in the proposed scheme, site plan, part plan of sanction development plan along with No Objection Certificate of Irrigation Department of State Government shall be submitted to the Government in Urban Development Department along with a copy to Director of Town Planning Maharashtra State Pune, for grant of locational clearance. Upon receipt of such proposal, depending upon the merits of the case, locational clearance may be granted by the Government u/s 44(2) of Maharashtra Regional &Town Planning Act, 1966 in consultation with the Director of Town Planning, within a period of 90 days from the date of receipt of the proposal and after completion of the prescribed procedure specified in Regulation no. 37.1.2 above and compliance of any such document as may be required by the State Government and subject to the condition that the developer shall obtain environmental clearance from appropriate authority. This locational clearance will be valid for one year from the date of issue and if within such period the letter of intent and final approval is not taken or not applied for, such clearance/approval will stand lapsed unless it is renewed by Government for sufficient reasons. Application for renewal has to be made to Government before expiry of one year. In that case these Special Regulations shall not be applicable to the area under such scheme.
37.7.b Letter of intent. - Upon receipt of locational clearance from the Government, the developer shall submit the proposal in respect of Special Township Project to the Municipal Commissioner, alongwith the environmental clearance as mentioned in Regulation no. 37.1.4 for issue of letter of intent. The proposal shall contain documents regarding ownership rights/ development rights, in respect of 100 percent of the area under the project and other particulars as decided and directed by Municipal Commissioner., details of qualified technical staff and consultant in technical and law field. Letter of intent shall be issued within a period of 45 days from the date of receipt of the completed full & final proposal. The letter of intent shall be valid for six months unless renewed.
(a) Development of basic infrastructure & amenity shall be completed by the developer to the satisfaction of the Municipal Commissioner as per phases of scheme. Development of the scheme shall be completed within 10 years from the date of final sanction to the layout plan of scheme.
(b) No building in the scheme is permitted to be occupied in any manner unless occupancy certificate is issued by Municipal Commissioner.
(c) Final completion certificate for the scheme is to be issued by Municipal Commissioner in consultation with Maharashtra Pollution Control Board, Forest Department as far as tree plantation is concerned and Fire Officer of Municipal Corporation.
(d) Application for occupation certificate or final completion certificate shall be submitted along with a declaration and undertaking by the developer and his structural consultant, Architect, Town Planner as follows: -
(i) We confirm that all buildings constructed in the scheme area are as per norms as specified by Indian Standard Institute for the resistance of earthquake, fire safety and natural calamities.
(ii) Work is done as per sanctioned plan.
(iii) Built up area and FSI consumed in scheme is as per sanctioned plan
(iv) No balcony is enclosed.
(e) If it is found that extra built up area/FSI is consumed in the scheme at any time, it shall be demolished by developer at his own cost as directed by Municipal Commissioner.
If any question or dispute arises with regard to interpretation of any of these regulations, the matter shall be referred to the State Government. The Government after considering the matter and, if necessary, after giving hearing to the parties, shall give a decision on the interpretation of the provisions of the Regulations. The decision of Government on the interpretation of these Regulations shall be final and binding on all concerned.
This regulation will apply to those buildings, artifacts, structures, areas and precincts of historic and/or architectural and /or cultural significance (hereinafter as ‘Listed Buildings/Heritage Buildings and listed precincts/Heritage precincts’’) and those natural features of environmental significance including scared graves, hills, hillocks, water bodies(and the areas adjoining the same) etc.
It would be obligatory on the part of the developer firstly to provide for basic infrastructure and as such no permission for sale of plot/ flat shall be allowed unless the basic infrastructure as per Regulation no.37.1.3 is completed by the developer to the satisfaction of the Municipal Commissioner. In case the development is proposed in Phases & sale permission is expected after completion of Phase wise basic infrastructure, such permission may be granted by the Municipal Commissioner. Before granting such sale permission, Developer has to submit undertaking about the basic infrastructure to be provided & completed phase wise by Developer. The plots earmarked for amenities, facilities, and utilities shall be also simultaneously developed phase-wise along with residential/allied development.