Rain Water Harvesting in a building site includes storage or recharging the ground water by rainwater falling on the terrace or any paved or unpaved surface within the building site.
- The following systems may be adopted for harvesting the rainwater drawn from terrace and the paved surface.
i) Open well of a minimum 1m dia. and 6m in depth into which rain water may be channeled and allowed to filter for removing silt and floating material. The well shall be provided with ventilating covers. The water from the open well may be used for non-potable domestic purposes such as washing, flushing and for watering the garden etc.
ii) Rain Water Harvesting for recharge of groundwater may be done through a bore-well around which a pit of 1m width may be excavated upto a depth of at least 3m and refilled with stone aggregate and sand. The filtered rain water may be channeled to the refilled pit for recharging the bore-well.
iii) An impressive surface/underground storage tank of required capacity may be constructed in the setback or other open spaces and the rain water may be channeled to the storage tank. The storage tank shall always be provided with ventilating covers and shall have draw-off taps suitably placed so that rain water may be drawn off for domestic, washing, gardening and such
other purposes. The storage tank shall be provided with an overflow.
iv) The surplus rain water after storage may be recharged in to ground through percolation pits or trenches or combination of pits and trenches. Depending on the geo-morphological and topographical conditions, the pits may be of the size of 1.20 m width X 1.20 m length X 2 m to 2.50 m depth. The trenches can be of 0.60 m width X 2 to 6 m length X 1.50 to 2 m depth. Terrace water shall be channeled to pits or trenches. Such pits or trenches shall be back filled with filter media comprising the following materials :-
a) 40 mm stone aggregate as bottom layer upto 50% of the depth.
b) 20 mm stone aggregate as lower middle layer upto 20% of the depth.
c) Coarse sand as upper middle layer upto 20% of the depth.
d) A thin layer of fine sand as top layer.
e) Top 10% of the pits/trenches will be empty and a splash is to be provided in this portion in such a way that roof top water falls on the splash pad.
f) Brick masonry wall is to be constructed on the exposed surface of pits/trenches and the cement mortar plastered. The depth of wall below ground shall be such that the wall prevents lose soil entering into pits/ trenches. The projection of the wall above ground shall at least be 15 cm.
g) Perforated concrete slabs shall be provided on the pits/trenches.
h) If the marginal distances surrounding the building is not paved, the top layer up to a sufficient depth shall be removed and refilled with coarse sand to allow percolation of rain water into ground
-
The terrace shall be connected to the open well/bore-well/storage tank/ recharge pit/trench by means of HDPE / PVC pipes through filter media. A valve system shall be provided to enable the first washing from roof or terrace catchment, as they would contain undesirable dirt. The mouth of all pipes and opening shall be covered with mosquito (insect) proof wire net. For the efficient discharge of rain water, there shall be at least two rain water pipes of 100 mm dia. for a roof area of 100 sq.m.
-
Rain Water Harvesting structures shall be sited as not to endanger the stability of building or earthwork. The structure shall be designed such that no dampness is caused in any part of the walls or foundation of the building or those of an adjacent building.
-
The water so collected/recharged shall as far as possible be used for non-drinking and non-cooking purpose. Provided that when the rain water in exceptional circumstances will be utilised for drinking and/or cooking purpose, it shall be ensured that proper filter arrangement and the separate outlet for bypassing the first rain water has been provided.
It will be ensured that for such use, proper disinfectants and the water purification arrangements have been made.
34.0 Grey Water Reuse
The grey water (bathroom and kitchen) reuse or recycling regulations are meant to reduce the requirement of potable treated water taking into consideration the increase in demand of water day by day and also to help sustainable development.
34.1 Application
These regulations shall be applicable to all new development of housing, commercial and industrial premises, which fall in the one of the following category.
i) Housing complex having aggregate built-up area more than 10000 sq.m.or more.
ii) Three star or higher category hotels.
iii) Commercial establishment, hostels, having built-up area 10000 sq.m. or more.
Provided that these provision shall not be applicable to those constructions for which commencement certificate have been already been granted prior to sanction of these regulations.
34.2 Separation of grey water
The grey water shall be separated from wastes from toilets, by means of separate down take discharge system. The grey water shall be recycled by providing recycling plant and shall be reused for non-potable purposes after storing the same in the distinctly separate tank by means of purple coloured down take pipes. The water quality shall to conform to standards of non-potable water. The recycle water shall be tested once in a six months and the result shall be made available to Municipal Commissioner or his authorised officer, whenever demanded.
34.3 Separate plumbing for grey water and provision of recycling
Every developer shall provide in new construction, separate down take plumbing for grey water, water plant for recycling, storage and reuse fitting before the selling of tenement / building.
34.4 Reuse of grey water strictly for non-potable, non-contact use
The reuse of grey water shall be strictly for non-potable use by means of providing a distinctly separate reuse system coloured in purple. The non-contact uses shall be restricted to toilet flushing, drip irrigation of trees/shrubs, sub-surface irrigation of lawns and recharge of ground water.
34.5 No cross connection of potable and non-potable water
There shall not be cross connection of fittings of potable and non-potable water at any point. The recycle water system shall be maintained at a lower operating pressure than that of lower potable water system. Precautions should be taken at the makeup connection to prevent contamination.
34.6 Recycle water measurement
The recycled water shall be measured by means of flow meter / water meter before storing the same in separate water tank. The flow meter / water meter shall be read monthly by the occupier and shall make available the results whenever demanded.