Recommendations of structural Engineer with respect to special requirements needed with respect to structural safety and stability to be taken note of by competent authority feature like incorporation of swimming pool, heavy load on roof, prefabricated structure or any other hazardous features should be included.
Reference No.
Owner's Name: Location:
Developer's Name with
Registration No. :
Submitted on : Received on:
To
................
................
................
Ref: Proposed work of ....(Title of the project)
................at............(Site address) ........for ........(Name of Owner / Developer / Builder), ........(his address and Tel. No.)
................
I hereby inform that the construction of the building in (site address) in............ will commence on ....as per the permission obtained vide Office communication No..........., dated........... under the supervision of ....Architect / Engineer / Construction Engineer on record, Registration No. ....and in accordance with the plans sanctioned.
Signature of Registered Architect/Engineer Developer with date
Signature of Owner / Registered
Name of Owner / Registered Developer in Block Letters
Address of Owner
Dated:................
Tel. No.
Form 3
[See rule 9 (2) (b)]
Progress Certificate
Plinth Stage / In case of basement, casting of basement slab stage Reference No.
Owner's Name:
Developer's Name:
Location:
Submitted on:
Received on:
To
Sir,
(i) We hereby inform you that the work of execution of the building as per approved plan, working drawing, detailed structural drawings and structural specifications prepared by the Registered Structural Engineer on Record, the detailed Architectural drawings and Architectural specifications prepared by the Registered Architect on Record, has reached the Plinth Level casting of basement slab level and is executed under our supervision.
(ii) We declare that revised /amended plan is not necessary at this stage.
(iii) We also undertake to comply with the rule no. 19 regarding the change of owner/Developer / Professionals
Yours faithfully,
Signature of the
Signature of the
Registered Architect/Engineer
Owner/ Registered Developer (with
Registration No,)
Date: ____
Date: ____
Name in block letters: ____
Name in block letters____
(with Registration No.)
Address: ____
Address ____
Signature of the
Registered Construction Engineer on Record
Date: ____
Name in block letters: ____
(with Registration No.)
Address: ____
Signature of Structural Engineer
The construction up to this stage has been executed as per the structural drawing without any deviation with respect to structural component and reinforcement details in complying with provisions of NBC The recommendations made by me to ensure adequate safety of the structure are complied with by the owner to my entire satisfaction.
Signature of the
Registered Construction Engineer on Record
Registration No.)
Date:____
Name in block letters____
Address: ____
Form 4
[See rule 9 (2) (b)] Progress Certificate - Last Storey
Reference No.
Owner's Name:
Location:
Registered Developers Name:
Submitted on:
Received on:
To
____
____
Sir,
We hereby inform you that the work of execution of the building as per approved plan, working drawing, detailed structural drawings and structural specifications prepared by the Registered Structural Engineer on Record, the detailed Architectural drawings and Architectural specifications prepared by the Registered Architect on Record, has reached the ----storey level and is executed under our supervision
We declare that revised / amended plan is not necessary at this stage.
We also undertake to comply with the rule no,19 regarding the change in Owner/Developer/Professionals.
The construction up to this stage has been executed as per the structural drawing without any deviation with respect to structural component and reinforcement details in complying with provisions of NBC. The recommendations made by me to ensure adequate safety of the structure are complied with by the owner to my entire satisfaction.
Signature of the
Registered Construction Engineer on Record
Registration No.)
Date:____
Name in block letters____
Address: ____
Form 5
[See rule 21 (1)]
Completion Report
Reference No.
Owner's Name:
Location:
Submitted on:
Received on:
To
----
----
Sir,
The work of erection/re-erection of building as per approved plan is completed under the Supervision of Registered Construction Engineer on record who has given the completion certificate which is enclosed herewith.
We declare that the work is executed as per the approved plan/permission granted and to our satisfaction. We declare that the construction is to be used for ____ the purpose as per approved plan and it shall not be changed without obtaining written permission.
We hereby declare that the plan as per the building erected has been submitted and approved.
We will transfer the area of parking space provided as per approved plan to the occupants /association before for occupancy certificate.
Any subsequent change from the completion drawings will be our responsibility.
One complete set of structural drawings showing the reinforcement details/structural details/foundation details including reinforcement drawings certified by structural engineer as executed have been submitted to the competent authority. The submitted drawing shall show all features that affect the structural stability including non structural items.
Yours faithfully,
(Developer's Signature)
(Owner's
Signature)
Name of Registered Developer (with Registration No.)/Name of Owner
Date:
Address:
Encl: Completion Report
Form 6
[See rule 20 (1)]
Building Completion Report by Registered Architect or Engineer
Reference No.
Owner’s Name:
Location:
Registered Developers Name:
Submitted on:
Received on:
To
Sir,
The building/s has/have been constructed according to the sanctioned plan.
The building/s has /have been constructed as per approved plan.
Construction has been done under our supervision / guidance and adheres to the drawings submitted.
Signature of the Owner / Registered Developer (with Registration No.)
Signature of Registered Architect on Record / Registered Engineer on Record
Date
Date
Name in block letter:
Name in block letters:
(with Registration No.)
Address:
Address:
Form 7
[See rule 20 (1)]
Building Completion Report by Registered Construction Engineer
Reference No.
Owner’s Name:
Location:
Registered Developers Name:
Submitted on :
Received on :
To
Sir,
The building/s has/have been constructed according to the sanctioned plan.
The building/s has / have been constructed as per
the detailed structural drawings and structural specifications prepared by the Registered Structural Engineer on Record
- the detailed Architectural drawings and Architectural specifications prepared by the Registered Architect on Record.
- detailed drawings and specifications of all services
All materials used in the construction have been tested as provided in specifications and a record of test reports has been kept.
4.The building was inspected and cleared by the structural engineer with respect to stability features of structure and foundation.
Signature of the Owner / Registered Developer
(with Registration No.)
Signature of Registered
Construction Engineer on
Record
Date
Date
Name in block letter:
Name in block letters:
(with Registration No.)
Address:
Address:
Form 8 [See rule 20 (1)]
Building Completion Report of Registered Structural Engineer
Reference No.
Owner’s Name :
Location :
Developers Name:
Submitted on :
Received on :
To
Sir,
This is to certify that detailed structural drawings of the buildings/s has / have been prepared on the basis of a detailed analysis and a detailed design carried out according to relevant provisions of the latest Indian Standard Codes, National Building Code and as indicated in the structural design basis report.
The construction up to this stage has been executed as per the structural drawing without any deviation with respect to structural component and reinforcement details in complying with provisions of NBC The recommendations made by me to ensure adequate safety of the structure are complied with by the owner to my entire satisfaction.
Signature of the Owner Engineer
Signature of Registered Structural
on Record
Date
Name in block letters:
Date
Name in block letters:
(with Registration No.)
Address:
Address:
Form 9
[See rules 9 (2) (b) and 51 (5)]
Structural Inspection Report (to be submitted at plinth level and last storey)
(This form has to be completed by Registered Structural Engineer after his site inspection and verification regarding compliance of all his recommendations by the owner, which in the opinion of the registered structural engineer are necessary for safety of the structure)
I. Work of ……….. (Title of the project)…….. at ……… [Site address]…………
II. Name of the present owner:
III. Description of the structure:
Class I or Class II (Briefly describe the property in general and the structure in particular) Indicate whether the structure is regular/irregular as per IS1893 of the structure is in Zone-III.
(a) Function
(b) Framed construction
Residence (with or without shops
Apartments (with or without shops
Office Bldg.
Shopping Centre
School, College
Hostel
Auditoria
Factory or any other building (pl. state)
1
2
3
4
5
6
7
8
A. Load bearing masonry wall construction
B. Framed structure
Construction and structural materials
Critical load bearing element
Brick
RCC
Stone
Timber
Steel
Roof Floor
RCC
Timber
RBC
Steel
Jack-arch
IV. Year of construction
Year of subsequent additions or rectifications (Please describe briefly the nature of additions or rectifications).
Date of last inspection report filed: Last filed by whom (This does not apply to the first report).
VI. Soil on which building is founded
X. Recommendations if any
This is to certify that the above is a correct representation of facts as given to me by the owner and as determined by me after Site Inspection to the best of my ability and judgment.
XI. Indicate any hazard the structure faces such as cyclone/land slide/Tsunami/weak soil/flooding
The construction up to this stage has been executed as per the structural drawing without any deviation with respect to structural component and reinforcement details in complying with provisions of NBC The recommendations made by me to ensure adequate safety of the structure are complied with by the owner to my entire satisfaction.
Signature of the Registered Structural Engineer on Record
Date:
Name of the registered structural Engineer:
Registration No.
Address:
Form 10
1Design
COMMENTS
1.1
Design/Drawings available?
Y/N
Design category Type design? Specific design ?
Y/N Design to be collected to refer to Design Consultant/H.O.
Drawings prepared/checked by competent authority?
Y/N
Design Drawings/details Structural detailed included Earthquake/cyclone resistant features included?
Y/NY/N
Design verified/vetted by Dept./Govt. approved agency/competent authority?
Y/N
Design changes approved by dept./govt. approved agency/competent authority?
Y/N
2
Foundation
2.1
Foundation used
Existing/New
2.2.1 If existing foundation used 2.2.1 Depth of foundation below ground : <50cm/50-70/>70cm 2.2.2 Type of masonry : Stone/Bricks/PCC Blocks 2.2.3 Thickness of masonry (above ground) : 23cm/35/>35 2.2.4 Mortar used : Cement-Sand/Lime/Mud 2.2.5 Mix of cement mortar : 1:4/1:6/Leaner 2.2.6 Height up to Plinth : ________________ cm 2.2.7 If stone masonry 2.2.7.1 Through Stones : Yes/No, if Yes Adequate/Inadequate 2.2.7.2 Corner Stones : Yes/No, if Yes Adequate/Inadequate 2.3 If new foundation used 2.3.1 Depth of foundation below ground : _____ <50/50-70/>70cm 2.3.2 Type of masonry blocks : stone/bricks/PCC 2.3.3 Thickness of Masonry above plinth : 23 cm/35/>35cm 2.3.4 Mortar used : Cement - sand/lime/mud 2.3.5 Mix of cement mortar (1:4) : Yes/No 2.3.6 Height up to Plinth : <60/>60cm 2.3.7 If stone masonry 2.3.7.1 Through Stones : Yes/No, if Yes Adequate/Inadequate 2.3.7.2 Corner Stones : Yes/No, if Yes Adequate/Inadequate 2.4 Verticle reinforcement in foundation : Yes/No
2.2.1 If existing foundation used 2.2.1 Depth of foundation below ground : <50cm/50-70/>70cm 2.2.2 Type of masonry : Stone/Bricks/PCC Blocks 2.2.3 Thickness of masonry (above ground) : 23cm/35/>35 2.2.4 Mortar used : Cement-Sand/Lime/Mud 2.2.5 Mix of cement mortar : 1:4/1:6/Leaner 2.2.6 Height up to Plinth : ________________ cm 2.2.7 If stone masonry 2.2.7.1 Through Stones : Yes/No, if Yes Adequate/Inadequate 2.2.7.2 Corner Stones : Yes/No, if Yes Adequate/Inadequate 2.3 If new foundation used 2.3.1 Depth of foundation below ground : _____ <50/50-70/>70cm 2.3.2 Type of masonry blocks : stone/bricks/PCC 2.3.3 Thickness of Masonry above plinth : 23 cm/35/>35cm 2.3.4 Mortar used : Cement - sand/lime/mud 2.3.5 Mix of cement mortar (1:4) : Yes/No 2.3.6 Height up to Plinth : <60/>60cm 2.3.7 If stone masonry 2.3.7.1 Through Stones : Yes/No, if Yes Adequate/Inadequate 2.3.7.2 Corner Stones : Yes/No, if Yes Adequate/Inadequate 2.4 Verticle reinforcement in foundation : Yes/No
2.2.1 If existing foundation used 2.2.1 Depth of foundation below ground : <50cm/50-70/>70cm 2.2.2 Type of masonry : Stone/Bricks/PCC Blocks 2.2.3 Thickness of masonry (above ground) : 23cm/35/>35 2.2.4 Mortar used : Cement-Sand/Lime/Mud 2.2.5 Mix of cement mortar : 1:4/1:6/Leaner 2.2.6 Height up to Plinth : ________________ cm 2.2.7 If stone masonry 2.2.7.1 Through Stones : Yes/No, if Yes Adequate/Inadequate 2.2.7.2 Corner Stones : Yes/No, if Yes Adequate/Inadequate 2.3 If new foundation used 2.3.1 Depth of foundation below ground : _____ <50/50-70/>70cm 2.3.2 Type of masonry blocks : stone/bricks/PCC 2.3.3 Thickness of Masonry above plinth : 23 cm/35/>35cm 2.3.4 Mortar used : Cement - sand/lime/mud 2.3.5 Mix of cement mortar (1:4) : Yes/No 2.3.6 Height up to Plinth : <60/>60cm 2.3.7 If stone masonry 2.3.7.1 Through Stones : Yes/No, if Yes Adequate/Inadequate 2.3.7.2 Corner Stones : Yes/No, if Yes Adequate/Inadequate 2.4 Verticle reinforcement in foundation : Yes/No
3 Walling 3.1 Type of masonry : Stone/Brick/PCC Blocks 3.2 Mortar used : Cement - Sand/Lime/Mud 3.3 Mix of cement mortar : 1:4/1:6/Leaner 3.4 Thickness of wall : >23cm/23cm/23cm 3.5 Mixing of mortar : OK/Not OK 3.6 Joint Property filled : OK/NOT OK 3.7 Wetting of bricks : Good/ Medium/ Poor
3 Walling 3.1 Type of masonry : Stone/Brick/PCC Blocks 3.2 Mortar used : Cement - Sand/Lime/Mud 3.3 Mix of cement mortar : 1:4/1:6/Leaner 3.4 Thickness of wall : >23cm/23cm/23cm 3.5 Mixing of mortar : OK/Not OK 3.6 Joint Property filled : OK/NOT OK 3.7 Wetting of bricks : Good/ Medium/ Poor
3 Walling 3.1 Type of masonry : Stone/Brick/PCC Blocks 3.2 Mortar used : Cement - Sand/Lime/Mud 3.3 Mix of cement mortar : 1:4/1:6/Leaner 3.4 Thickness of wall : >23cm/23cm/23cm 3.5 Mixing of mortar : OK/Not OK 3.6 Joint Property filled : OK/NOT OK 3.7 Wetting of bricks : Good/ Medium/ Poor
3.8 If stone masonry 3.8.1 Through Stones : Yes/No 3.8.2 Corner Stones : Yes/No 3.9 Overall workmanship : Good / Medium / Poor
3.8 If stone masonry 3.8.1 Through Stones : Yes/No 3.8.2 Corner Stones : Yes/No 3.9 Overall workmanship : Good / Medium / Poor
3.8 If stone masonry 3.8.1 Through Stones : Yes/No 3.8.2 Corner Stones : Yes/No 3.9 Overall workmanship : Good / Medium / Poor
4 Roofing 4.1 Type of roof : Flat/Sloping 4.2 If sloped : Morbid tiles/ A.C. sheet/ G.I. sheet 4.3 Purlins : Angle-Iron / Timber / NA 4.4 Truss type ____________ 4.5 Anchorage with wall : Adequate/ Inadequate/ NA 5 Materials 5.1 Cement 5.1.1 Source Authorised Dealer/Market
4 Roofing 4.1 Type of roof : Flat/Sloping 4.2 If sloped : Morbid tiles/ A.C. sheet/ G.I. sheet 4.3 Purlins : Angle-Iron / Timber / NA 4.4 Truss type ____________ 4.5 Anchorage with wall : Adequate/ Inadequate/ NA 5 Materials 5.1 Cement 5.1.1 Source Authorised Dealer/Market
4 Roofing 4.1 Type of roof : Flat/Sloping 4.2 If sloped : Morbid tiles/ A.C. sheet/ G.I. sheet 4.3 Purlins : Angle-Iron / Timber / NA 4.4 Truss type ____________ 4.5 Anchorage with wall : Adequate/ Inadequate/ NA 5 Materials 5.1 Cement 5.1.1 Source Authorised Dealer/Market
5.1.2 Type of cement : OPC/PPC/PSC 5.1.3 If OPC : Grade (33/ 43/ 53) 5.2 Sand 5.2.1 Type of sand : River sand / Stone dust 5.2.2 Presence of deleterious materials : Mild / Moderate/ High 5.3 Coarse Aggregates 5.3.1 Type coarse Aggregates : Gravel/ Crushed Stone 5.3.2 Presence of deleterious material : Mild/ Moderate / High P.C.C. Blocks (Applicable for onsite production)
5.1.2 Type of cement : OPC/PPC/PSC 5.1.3 If OPC : Grade (33/ 43/ 53) 5.2 Sand 5.2.1 Type of sand : River sand / Stone dust 5.2.2 Presence of deleterious materials : Mild / Moderate/ High 5.3 Coarse Aggregates 5.3.1 Type coarse Aggregates : Gravel/ Crushed Stone 5.3.2 Presence of deleterious material : Mild/ Moderate / High P.C.C. Blocks (Applicable for onsite production)
5.1.2 Type of cement : OPC/PPC/PSC 5.1.3 If OPC : Grade (33/ 43/ 53) 5.2 Sand 5.2.1 Type of sand : River sand / Stone dust 5.2.2 Presence of deleterious materials : Mild / Moderate/ High 5.3 Coarse Aggregates 5.3.1 Type coarse Aggregates : Gravel/ Crushed Stone 5.3.2 Presence of deleterious material : Mild/ Moderate / High P.C.C. Blocks (Applicable for onsite production)
5.4.1 Type of P.C.C. Blocks : Solid blocks/Hollow blocks 5.4.2 Ratio of concrete in blocks : ______________________ 5.4.3 Interlocking feature : Yes/No 5.4.4 Course aggregates used : Natural/ Crushed stone 5.5 Bricks Blocks, Stone etc. 5.5.1 Strength (field assessment) : Low/Medium/High 5.5.2 Dimensional accuracy : Yes/No
5.4.1 Type of P.C.C. Blocks : Solid blocks/Hollow blocks 5.4.2 Ratio of concrete in blocks : ______________________ 5.4.3 Interlocking feature : Yes/No 5.4.4 Course aggregates used : Natural/ Crushed stone 5.5 Bricks Blocks, Stone etc. 5.5.1 Strength (field assessment) : Low/Medium/High 5.5.2 Dimensional accuracy : Yes/No
5.4.1 Type of P.C.C. Blocks : Solid blocks/Hollow blocks 5.4.2 Ratio of concrete in blocks : ______________________ 5.4.3 Interlocking feature : Yes/No 5.4.4 Course aggregates used : Natural/ Crushed stone 5.5 Bricks Blocks, Stone etc. 5.5.1 Strength (field assessment) : Low/Medium/High 5.5.2 Dimensional accuracy : Yes/No
5.6.3 Compaction : Vibrators/Thappies and rods 5.6.4 Workability : Low / Medium / High 5.6.5 Availability of water : Sufficient / Insufficient 5.6.6 Curing : Satisfactory/Unsatisfactory. 5.7 Reinforcing Steel 5.7.1 Type of Steel : Plain mild steel/HYSD bars 5.7.2 Source : Authorised Dealer/Market 5.7.3 Whether IS marked : Yes/No 5.7.4 Conditions of bars : Clean/Corroded 5.7.5 Fixing of reinforcement as per drawing : Yes/No 5.7.6 Suitable cover : Yes/No 5.7.7 Spacing of bars : Regular/Irregular 5.7.8 Overlaps as per specifications : Yes/ No 5.8 Form Work 5.8.1 Type of Form Work : Timber / Ply board Steel 5.8.2 Use of mould oil : Yes/No 5.8.3 Leakage of cement slurry : Observed/ Not observed 5.9 Source 5.9.1 Cement
5.6.3 Compaction : Vibrators/Thappies and rods 5.6.4 Workability : Low / Medium / High 5.6.5 Availability of water : Sufficient / Insufficient 5.6.6 Curing : Satisfactory/Unsatisfactory. 5.7 Reinforcing Steel 5.7.1 Type of Steel : Plain mild steel/HYSD bars 5.7.2 Source : Authorised Dealer/Market 5.7.3 Whether IS marked : Yes/No 5.7.4 Conditions of bars : Clean/Corroded 5.7.5 Fixing of reinforcement as per drawing : Yes/No 5.7.6 Suitable cover : Yes/No 5.7.7 Spacing of bars : Regular/Irregular 5.7.8 Overlaps as per specifications : Yes/ No 5.8 Form Work 5.8.1 Type of Form Work : Timber / Ply board Steel 5.8.2 Use of mould oil : Yes/No 5.8.3 Leakage of cement slurry : Observed/ Not observed 5.9 Source 5.9.1 Cement
5.6.3 Compaction : Vibrators/Thappies and rods 5.6.4 Workability : Low / Medium / High 5.6.5 Availability of water : Sufficient / Insufficient 5.6.6 Curing : Satisfactory/Unsatisfactory. 5.7 Reinforcing Steel 5.7.1 Type of Steel : Plain mild steel/HYSD bars 5.7.2 Source : Authorised Dealer/Market 5.7.3 Whether IS marked : Yes/No 5.7.4 Conditions of bars : Clean/Corroded 5.7.5 Fixing of reinforcement as per drawing : Yes/No 5.7.6 Suitable cover : Yes/No 5.7.7 Spacing of bars : Regular/Irregular 5.7.8 Overlaps as per specifications : Yes/ No 5.8 Form Work 5.8.1 Type of Form Work : Timber / Ply board Steel 5.8.2 Use of mould oil : Yes/No 5.8.3 Leakage of cement slurry : Observed/ Not observed 5.9 Source 5.9.1 Cement
5.9.2
Sand
5.9.3
Coarse Agg.
5.9.4
Bricks
5.9.5
PCC Blocks
6
Seismic Resistance Features
6.1
Masonry Structures
6.1.1
Provision of bands at 6.1.1.1 Plinth level 6.1.1.2 Sill level 6.1.1.3 Lintel level 6.1.1.4 Roof level (if applicable)