[See rule 6 (8)]
Form-B
Application for Permission for carrying out construction of building or structure, change of use of building
From

(Affix stamp size photo graph of the applicant)
The Executive Authority of Local Body
-
I/We hereby apply for permission for carrying out construction of building or structure, change of use of building as described in the accompanying plans and drawings.
-
I/We have absolute right over the land applied for and have not made any encroachment on any government land.
-
The names of the registered professionals employed by me/us for the development are as under:
a) The plans have been prepared by Registered Architect/Engineer - [name and registration number]
b) The structural report, details and drawings have been prepared and supplied by the Registered Structural Engineer - [name and registration number]
c) The construction of the proposed buildings will be carried under the supervision of the Registered Construction Engineer on Record ……………(name and registration number)
d) For the foundation work of the High rise building, the services of the Registered Geo-technical Engineer ………….. (name and registration number) will be availed.
e) The construction work of a High rise building executed by Registered Construction Engineer on the record will be under the independent quality inspection programme prepared and implemented under the supervision of the independent Registered Quality Auditor on record…………… (name and registration number)
-
I/We have read the Building Rules applicable for the Local body framed under the provisions of the relevant Act and claim to be fully conversant with it.
-
I/We shall fulfill my duties and responsibility in accordance with the provisions of the Building Rules.
Signature of the Owner/Registered Developer
Date:
-
Applicant’s name
-
Postal Address for correspondence Telephone number for communication
-
Applicant’s right over the land to make the proposed development (documentary evidence to be enclosed
-
Development site address
-
Present use of the land and/ or the building [Please give details of each use]
-
Proposed use of the land and/the building, [Please give details of each use]
-
Whether the site applied for forms part of/lie in an approved layout. If yes, please give date of approval and reference no, with a copy of the approved layout plan duly authenticated
-
Existing building - Floor area
-
Proposed building - Floor area - Number of dwelling Units
-
Whether all the documentary evidence, plans details, certificates required to be enclosed with the application as per the Building Rules have been enclosed:
-
In industrial use machineries a) Existing H.P. Proposed H.P.
b) Number of workers- Existing - Proposed
c) Whether detailed report on the raw materials used, process and machineries involved, effluent discharge methods progressed, product manufactured, category of power consumption (i.e. LT/HT), action taken and minimize its negative impact, if any, or the environment, etc. enclosed
Signature of the Owner/Builder