We (Owner / Builder / Structural Engineer / Architect / Geo-Tech Expert) certify that the structural plans of the building meet the structural safety requirements for all situations including natural disasters, as applicable, as stipulated under Part 6 Structural Design of the National Building Code of India and other relevant Codes; T he design has been done after detailed soil test and we are satisfied as to the adequacy of soil test carried out and the information given therein is factually correct to the best of our knowledge and understanding.
T he site is fit for the proposed construction, it has been tested vide soil test report. No......................... dt..................... done by ..............
We (Owner / Builder / Structural Engineer / Architect / Site Engineer) certify that the development, erection, re-erection or making alteration in the building shall be carried out under our supervision and we certify that all the materials (type and grade) and the workmanship of the work shall be generally in accordance with the general and detailed specifications, as per NBC standards and to meet out the structural design of the proposed building.
We (Owner / Builder / Structural Engineer / Architect / Site Engineer) undertake not to continue construction without any supervis ion by the our Site Engineer and submit the report to the local body.
I (Landowner / Builder ) certify to engage the above mentioned Engineers for the active period of building execution and I hereby assure to give Revised Certificate in case of any change of Engineer, I shall ensure no work is taken up in this period till required Engineers are engaged by me.
In case construction work is entrusted by a Builders Agreement to a 3rd Party, I (Land Owner or Power of Attorney Holder or Builder or Promoter)shall undertake to include these conditions as part of the agreement.
Applicable incase of existing building within the site
I (Structural Engineer / Architect / Site Engineer) hereby certify that the development, erection, re-erection or for making alteration in the building has been carried out under our supervision and we certify that all the materials (type and grade) and the workmanship of the work was in accordance with the general and detailed specifications, as per NBC standards and met out the structural design of the constructed building. The construction was made under the supervision of Site Engineer and submitted the report to the local body periodically.
I (Owner / Builder / Structural Engineer / Architect) hereby certify that the building, has been designed by me and the Structural Design was made by Thiru to the approved plans sanctioned in the Planning Permission No. dated and the Building Permit No… dated… The Building has been constructed and completed under my guidance and supervision as per the structural design furnished by the Structural Engineer engaged by us. I also assure and undertake that, I have signed in the plan and in “as on site” plan and the same is structurally safe and fit for occupancy based on my personal assessment and certification of the Structural Engineer engaged by us.
This deed of undertaking is executed by us on the……… …….day of……… ……….20………….with the full knowledge of the contents of this document.
| Consultant | Name and Address | Registration No. | E-Mail ID & Mobile No. | Signature |
|---|---|---|---|---|
| Owner of the land / Power of Attorney Holder / Lease Holder | ||||
| Architect / L.S. | ||||
| Structural Engineer | ||||
| Geo-Tech Expert | ||||
| Site Supervision Engineer |
DEPONENT
Witnesses:
Duly attested by the
SEAL
Notary Public
Planning Permission Application is processed based on the compliance to land use provisions in the respective development plan in force and the Tamil Nadu Combined Development and Building Rules;
Compliance to the Provisions of other relevant Act and Rules with respect to construction is the responsibility of the applicant or owner and the competent authority is not responsible for any lapse;
Planning Permission for buildings is issued in accordance with the provisions of the Town and Country Planning Act, 1971. and the rules made there under.
Issuance of Planning Permission by competent authority under the statutory provisions does not confirm any ownership or title over the property, in favour of the applicant. Before issuing Planning Permission for any development, competent authority in this regard, checks only the aspect of applicant’s right over the site under reference to make the development thereon based on the copies of the documents (such as Sale Deed, Patta, Lease Deed, Gift Deed etc., and GPA) furnished by the applicant along with his /her application to prove the same. Thus, competent authority primarily considers only the aspect whether the applicant prima facie has a right to carry out development on the site under reference.
Any person who acquires interest in the property shall ensure independently about the ownership and the applicant’s right before acquiring the same. Further, if any individual claim right (or) title over the property he / she / they shall have to prove it before the appropriate or competent Court to decide on the ownership or get the matter settled in the Court of Law and competent authority is not the statuary authority to decide on this matter.