(a) Every electric lift shall be provided with upper and lower terminal limit switches arranged to stop the car automatically within the top and bottom over-travels from any speed attained in normal operation. Such limit switches are to act independently of the operating device, the ultimate or final limit switches and the buffers.
(b) Terminal stopping limit switches may be fitted to the lift-car, in the liftwell, or in the machine room, and such switches shall be brought into operation by the movement of the lift-car.
(c) The contacts of all terminal limit switches shall be opened positively and mechanically by the movement of the lift-car.
(d) When terminal switches are situated in the machine room, they shall be mounted on and operated by stopping device mechanically connected to and driven by the lift-car without dependence upon friction as a driving means. An automatic safety switch shall be provided which will stop the machine should the tape, chain, rope or other similar device, mechanically connecting the stopping device to the car fail.
Provided that when the floor controlling or selector of an automatically operated lift is driven in accordance with this requirement, the floor stopping contacts for each terminal floor may serve as normal terminal floor stopping devices.
- Ultimate or Final limit Switches .—(a) Electric lifts shall, in all cases, be provided with ultimate or final limit switches arranged to stop the lift-car automatically within the top and bottom clearances independently of the normal operating device and the terminal limit switches but with the buffers operative. The switches and the oil buffer shall be so arranged that the opening of the switch and the engagement of the buffer shall be as nearly simultaneous as is possible. When spring, buffers are employed, the switch shall open before the buffers are engaged.
(b) Ultimate or final limit switches shall act to prevent movement of the liftcar under power in both directions of travel and shall, after operating, remain open until the lift-car has been moved by hand winding to a position ;within the limits of normal travel.
(c) Ultimate or final switches shall be operated by the movement of the liftcar in the lift-well; they shall not be mounted on the lift-car.
(d) Ultimate or final limit switches shall not control the same relay switches on the controller as the terminal limit switches unless two or more separate and independent relay switches on the controller are provided, two of which shall be closed to complete the motor and brake circuit in each direction of travel. When the ultimate or final limit switches control the same relay switch or switches on the controller as the operating device, or the terminal limit switches they shall be connected in the control circuit on opposite sides to the terminal limit switches.
(e) Ultimate limit switches designed to open the main circuit of the motor may control the same switch or switches on the controller as the terminal limit switches but when such ultimate limit switches are
employed on direct current power supplies, they shall be provided with additional contacts to control the brake circuit.
(f) The contacts of all final or ultimate limit switches shall be opened positively and mechanically by the movement of the lift-car. The cam or cams for operating the limit switches shall be of metal.
26.Tests :
(a) A contract load test of each new lift shall be made by the Engineer, who is entrusted with the work of installing the lift, in the presence of the Inspector of Lifts, before such lift is put into service for normal and regular operations. This test shall be made to determine whether the machinery and safety gear will operate satisfactorily within the specified limits with full load in the lift-car.
(b) The brakes, limit switches, buffers, safety gear or gears and speed governor if fitted, shall be made to function during the test, and the electrical wiring and connections shall be tested for earthing insulation resistance and general soundness.
(c) In the case of traction drive lifts, it shall be ascertained by a trial descent with 1.5( one and half ) times the full load whether the friction between the ropes and the sheave is sufficient.
(d) The runway test shall be made with all electrical apparatus operative, except for the over speed contract or cut-out on the governor. For lifts operating directly from alternating current the governor shall be tripped by hand at the maximum speed obtainable.
(e) At each subsequent inspection the safety gear shall be tested with the lift-car stationary and the lift-car shall be lowered to ensure that the safety gear functions correctly.
(f) The insulation of the electrical parts of all operating and similar devices shall be tested to withstand an alternating test-voltage equal to 10 times the working voltage for one minute, with a maximum of 2,000 volts, applied between contacts or similar parts, in the open position and between such contacts and earthed parts.
- Notices .—In case of automatic lifts the following notices shall be placed in conspicuous places in the lift-car and no other notices shall be fixed in the lift-car:—
(i) The lift shall not be used by more than specified persons.
(ii) On entering or leaving the lift-car, close properly the landing gate and the car-gate.
(iii) Do not open the lift-car when the lift-car is moving. The gate should only be opened after the lift-car has stopped opposite a landing gate.
(iv) In case of danger, press the alarm button but leave the lift-car gate closed. Wait inside until the lift-car is brought opposite a landing, and do not attempt to leave the lift-car until the landing gate is opened fully.
(v) Children under 12 years of age shall not use the lift unless accompanied by an adult or lift operator.
Form 'A' [See rule 3(2)]
To
(The officer authorized under section 3 of the Act).
Sir,
I am willing to install a lift or to make additions / alterations to a lift already installed at ( Name of the place) .Therefore, I request you to kindly permit me to install the same . The necessary particulars/ documents as required under section 3 of the Act are as under:—
-
Full name and address of the applicant.
-
Name and address of Agent, if any
-
Whether a licence has been previously granted. (Details to be given)
Type of lift proposed to be erected. (A sketch of the lift and erection plans should be attached
-
The rated maximum speed of the lift.
-
The maximum number of passengers in addition to the lift operator which the lift can carry.
-
The total weight of the lift cage carrying the maximum load.
-
The weight of the counterweight.
-
The number, description, weight and size of the supporting cables.
-
The depth of the pit from lowest part of the lift cage when at the lowest floor.
-
Details of the construction of the overhead arrangements with the weight and sizes of the beams.
Place: (Date)
(Signature of the applicant.)
Form 'B'
[See rule 4(1) ]
(Notice intimating the completion of the work of erection of a lift and application for a licence to work the lift).
To
The ( officer authorized by Chief Engineer ( Electrical), under section 4(1) of the Act).
Sir,
With reference to your letter No. dated by which permission has been granted in my/ our favour to erect a lift at the above mentioned premises, I/We state that the work of erection of the lift was completed on
I/We now request that a licence for working the lift may be granted. The work of erection of the lift has been carried out in accordance with Himachal Pradesh Lifts Rules, 2008.
A fee of Rs.750/- has been paid into the Govt. Treasury and a copy of the challan for the said amount is enclosed or the requisite fee has been paid at the office of the Chief Engineer ( Electrical) or Superintending Engineer (Electrical), Himachal Pradesh, Public Works Department, Shimla (H.P.), as the case may be, in cash or by money order or through a bank draft or crossed cheque payable at a local scheduled bank in favour of Chief Engineer (Electrical) or Superintending Engineer ( Electrical), Himachal Pradesh, Public Works Department, Shimla (H.P.), as the case may be.
Yours faithfully,
Place:
( Date.)
( Signature of the owner of the premises.)
H.P. State Administration.
Licence for working a lift
is / are hereby authorized to work the lift installed in the premises owned by and situated at subject to the conditions mentioned in the Himachal Pradesh Lifts Rules, 2008.
Place:
(Date)
Himachal Pradesh Public Works Department, Shimla ( H.P.) / the person authorized by him Under section 4(3) of the Act.
Chief Engineer (Elect.) ,
Form 'D'
[See rule 6]
(Application for issuing of licence under section 5 of the Himachal Pradesh Lifts Act,2007 for working a lift installed prior to the coming into force of the Act)
To
The [officer authorized by Chief Engineer ( Electrical),
Himachal Pradesh Public Works Department
Shimla ( H.P.) under section 4(1) of the Act].
Sir,
It is submitted that I/we are running the lift installed at (Name of the place) since .Now, I/We request you to kindly issue necessary licence as required under section 5 (1) of the Act for running/working of the said lift.
A fee of Rs. 750/- has been paid into the Govt. treasury and a copy of the Challan for the said amount is enclosed or the requisite fee has been paid at the office of the Chief Engineer ( Electrical) or Superintending Engineer (Electrical), Himachal Pradesh Public Works Department, Shimla (H.P),as the case may be, in cash or by money order or through a bank draft or crossed cheque payable at a local scheduled bank in favour of Chief Engineer (Electrical) or Superintending Engineer (Electrical), Himachal Pradesh Public Works Department, Shimla (H.P.), as the case may be.The necessary particulars/ documents as required under the Act are as under:—
-
Full name and address of the applicant.
-
Name and address of agent, if any.
-
Type of lift erected. ( A sketch of the lift should be attached.)
-
Rated maximum speed of the lift.
-
Maker’s or designers rated capacity in weight.
-
Maximum number of passengers in addition to the lift operator which the lift can carry.
-
Total weight of the lift cage carrying maximum load
-
Weight of the counterweight.
-
Number, description, weight and size of the supporting cables.
-
Depth of the pit from the lowest part, of the lift, cage when at the lowest floor.
-
Details of the construction of the overhead arrangement with the weight and sizes of the beams.
-
Full details as to in what respects the lift does not comply with the requirements laid down in the SCHEDULE appended to the Himachal Pradesh .State Lifts Rules 2008.
Place:
(Date)
(Signature of the applicant)
Form 'E'
[See rule 8]
To
The Inspector of Lifts and District Magistrate.
Subject:- Notice of accidents.
Sir,
As per provisions of section 9 of the Himachal Pradesh Lifts Act 2007, I/We hereby inform you that an accident has occurred in the operation of the lift at the premises owned by me/us , the details of which are given below:-
I/We have discontinued the working of the lift, pending permission to resume working.
Place:
(Date).
Yours faithfully,
Copy to:
-
The Executive Engineer, Electrical Division, HP PWD.,
-
The Sr. Superintendent of Police, District H.P.
-
The District Magistrate, District HP.
jktdh; eqnz.kky;] fg0 iz0] f'keyk&4103&ih0 MCY;0w Mh0@2009&&4&3&2009&&200-