The proposed housing strategy incorporates specific approaches for development of new housing areas, up-gradation and re-densification through redevelopment of existing housing areas including unauthorized colonies, housing in villages and Special Area. Looking at the possible distribution of housing types, the future requirement of shelter provision will be dominated by small dwelling units. In view of the limited availability of land and increased requirement of housing, plotted residential development shall be discouraged.
It is proposed to adopt a multi-pronged housing strategy for provision of housing stock and for delivery of serviced land, involving the private sector to a significant extent, public agencies and co-operative societies etc. The overall responsibility for
provision of land and facilitation of adequate housing to meet the projected demand lies with the DDA in collaboration with GNCTD and other agencies.
Planning norms, land use zoning, density, FAR, and building controls have been reviewed for housing, both in new areas to be opened up and for redevelopment of existing areas. In the context of housing strategy, it is essential to optimise utilization of land and space with a view to increasing net residential density. These norms and controls should also be reviewed periodically (preferably every five years) by DDA and suitably modified / updated to meet the requirements of the citizens. It has been observed that the practice of prescribing FAR / density norms without distinguishing between housing categories in terms of plinth area, can result in over population or under population on the one hand, and non-optimal design and under-utilisation of the utility network, on the other. The norms should provide options to achieve the density and FAR both in Ground + 3 or 4 storeyed walk-up structures, without lift or in high-rise construction. 1[]
2[As the development of housing in new area or redevelopment of existing housing stock in built up area to be taken by the Public Agencies, Society or private developers the upper limit of density be taken as 200 DUs/ha.(900pph) with flexible Dwelling Unit sizes to achieve optimal utilization of land. The density for Slum & JJ clusters (In-situ up-gradation/ Rehabilitation/ Redevelopment of Slum & JJ Clusters, Resettlement Colonies) and EWS Public Housing Schemes be maximum 900 DUs/ ha.]
The Central Government may relax density and other norms in consultation with DDA for public housing and projects of national importance.
In case of plotted development, the permissible number of dwelling units will be as prescribed for different plot sizes given in the development controls.
In case of Bungalow area (Part zone D) any residential density in group housing pockets shall be prescribed on the basis of detailed scheme.
In case of Civil Lines Bungalow Area, the development controls for group housing shall be as prescribed in the Zonal Development Plan of zone ‘C’.
To make the construction activity more environment friendly, the choice of alternative building materials and techniques have to be reoriented and promoted for construction activity. Building technology parks and mobile expositions for cost effective materials and techniques are to be explored for new housing areas and redevelopment schemes. Standard specifications may also be incorporated in the Government Schedule and may be adopted for public buildings and housing schemes.
1Deleted vide S.O. 1215 (E) dated 13-05-2013
2Added vide S.O. 1215 (E) dated 13-05-2013 and modified vide S.O. 2894 dated 23-09-2013
4.1Housing Need
As per the Census 2001, Delhi has 24.5 lakh Census houses under the category of residence and residence-cum-other uses, in which 25.5 lakh households are residing. This reflects a net housing shortage of about 1.0 lakh houses / dwelling units. The households are accommodated in a variety of housing types including different categories of planned built housing, squatter settlements, unauthorized colonies, traditional areas and villages. The Sub-group on Shelter noted that up to the year 1991, the contribution to housing stock through institutional agencies was only 53% (excluding squatter housing). Therefore, the component of housing through non-institutional sources, viz., unauthorized colonies, squatter / JJ clusters, etc., is quite significant. This trend has continued in the current decade as well and has to be kept in view while determining the plan and strategy for housing.
Based on the projected population of 230 lakh by 2021, the estimated additional housing stock required will be around 24 lakh dwelling units. This includes an estimated housing requirement of 20 lakh dwelling units for additional population and backlog of about 4 lakh units comprising of 1 lakh net shortage and the rest by dilapidated and Kutcha structures requiring replacement.
It has also been assessed that around 40% of housing need can potentially be satisfied through redevelopment / up-gradation of existing areas of Delhi. This may be met in the present urban limits of A to H zones and in the sub cities of Dwarka, Rohini and Narela. This implies that the remaining 60% of the requirement would have to be met through 14.4 lakh new housing units to be provided in new areas. In order to ensure that housing need is accommodated in the urban extension, the Zonal Plans for 2021 should be prepared within 12 months.
Keeping in view the socio-economic composition of the population, it is estimated that around 50-55% of the housing requirement would be for the urban poor and
the economically weaker sections in the form of houses of two rooms or less. Based on past experience it is necessary to distinguish between the urban poor comprising the inhabitants of squatter settlements / pavement dwellers, etc. and other economically weaker sections of the society, conventionally classified in the form of EWS, LIG, etc. The role of the government would have to be both as a provider and facilitator. The category of the urban poor is to be broadly catered in old and new urban areas through up-gradation of old / traditional areas, employers and industrial housing, group housing and also in unauthorised regularised colony infills.
A possible indicative scenario in terms of mode of housing supply in different types of development for the next two decades emerges as under:
Table 4.1Indicative Distribution of Housing Types
Housing Type
Development Agencies
Housing Component (%)
EWS / LIG
Others
Total
Slum & JJ - In-situ Rehabilitation Relocation / Reconstruction & Up-gradation Houses on Independent Plots & Redevelopment Group Housing (Min. 35% of total DUs mandatory 2 room or less) Employer Housing Unauthorised Regularised colonies infill Other Housing areas, Up-gradation of Old areas/ Traditional areas/ Villages
Public, Private, Co-op Society Public, Private Public, Private, Co-op Society Central / State Govt. Co-op Society/ Residents' Association / Private Public, Private, Co-op Society
25414263
-428293
258424156
TOTAL
54
46
100
Chapter 4
4.0 Shelter
The policy regarding “Shelter” is based on the goal of ensuring ‘Shelter for All’ by harnessing the potential of the public, private / corporate and household sectors. It aims to ensure effective housing and shelter options for all citizens, especially for the vulnerable groups and the poor, by creation of adequate housing stock on either rental or ownership basis. It envisages the role of the public agencies as facilitator through policy and strategic interventions.
Housing has a strong spatial relationship with employment, social services and other urban activities. The policy for development of housing could act as major tool for influencing the efficiency and equity of urban areas, besides its direct role in the provision of shelter.
4.2.1New Housing Areas
Even if the assumptions regarding the extent of housing that could be met by redevelopment of the existing areas actually materialize, there would still be a need for the development of housing to the extent of at least 75,000 DUs per annum in different categories. This implies that specific plans would have to be evolved by DDA with the approval of the Competent Authority and action be taken with reference to the following:
(i) Determination of area requirement;
(ii) Identification of the areas for urbanization / housing development;
(iii) Evolving the pattern and norms for new housing development;
(iv) The mode and manner of development, and the roles of the private and public sectors in this process.
As already indicated, more than 50% of the new housing would be in the form of one and two room units with average plinth area of about 25 sq.m. to 40 sq.m. The average plinth area per house to be achieved in various neighbourhoods will also depend on composition of various income groups to be accommodated in the composite housing schemes.
The policy should indicate that EWS & LIG houses after construction by a private group shall be handed over to the nodal agency/ agencies and these should be allotted to eligible beneficiaries.
The new housing developed through the aforementioned methods should be based on a composite area basis and should cater to the special needs of elderly, handicapped and single occupants. With these aspects and planning norms, the land required to be developed in new housing will be to the tune of around 450-500 ha. per annum.
4.2.2.2Traditional Inner City and Unplanned Areas
The congested areas of the city have a predominant residential component like Shahjehanabad (Walled City), and its Extensions, Karol Bagh (Special Area) and villages. The unauthorised / regularised colonies, which are unplanned areas, have a role to play as a housing stock provider. All these areas should be redeveloped ensuring modern services and amenities for a safe residential environment and in the process, eliminating risk prone structures and activities. The owners can jointly redevelop the areas based on the prescribed guidelines.
A. Special Area and Villages
The Old City areas, Shahjehanabad (Walled City), and its Extensions, Karol Bagh (designated as Special Area) are fast changing their residential character to non-residential use, but still have a residential component. The non-residential uses of varying degrees have developed with time depending on their location, related with accessibility and the established trade.
In the case of traditional inner city areas, it is essential first to distinguish between the heritage segment of the area and the non-heritage segment of the area. Well-designed Special Area Redevelopment Schemes must be prepared for traditional areas giving the development control parameters for the heritage areas keeping in view archaeological norms / architectural character and general parameters for the non-heritage segment of the traditional area. Each Special Area Redevelopment Scheme should entail an enumeration of the monuments and old buildings within the heritage areas, which must be conserved. The 1[concerned municipal body] is the nodal agency who should prepare Special Area Redevelopment Schemes for all traditional areas within a time frame.
The basic objective of Special Area Redevelopment Scheme in traditional areas is to bring about in situ improvements which help in improving architectural character of the area, i.e., design and layout, as well as revitalising trade and commerce in the area.
The villages are also considered at par with these as they also have the same traits. The socio-economic changes in these old
1 Modified vide S.O. 3173(E) dated 12-12-2014
unplanned areas, especially in villages, have been substantial. The redevelopment plans should ensure that the permissibility of mixed use zoning at property or within the premise level is compatible to the predominant residential areas.
B. Unauthorised / Regularised Unauthorised Colonies
Unauthorised colonies in Delhi pose a serious human problem as a huge population is living in these colonies. The issue of existing unauthorized colonies has engaged attention since the mid-seventies when a policy for regularization was formulated. 567 out of 607 listed unauthorized colonies were regularised till October 1993, but many more unauthorized colonies have come up since then. Such colonies are to be identified by the Govt. of NCTD.
The present method of regularization of unauthorized colonies is by the provision of basic infrastructure to improve the environment. However, regularization has not really brought in any tangible improvement. Effectively, the process has only led to de-facto tenure rights on the land and access to services.
In all unauthorised colonies whether on private or public land, regularization should be done as per the government orders issued from time to time. It must be ensured that for improvement of physical and social infrastructure, the minimum necessary / feasible level of services and community facilities are provided.
4.2.2Restructuring and Up-gradation of the Existing Areas
In Delhi, a large number of areas are old and are characterized by poor structural condition of buildings, sub-optimal utilisation of land, congestion, poor urban form, inadequate infrastructure services, lack of community facilities, etc. The housing stock in both planned and unplanned areas can be enhanced through various approaches as given below.
4.2.2.1 Planned Areas
A. Plotted / Group Housing
The flats built by DDA, particularly those, which have become aged, may be redeveloped with permission and subject to the condition that the structural safety of other flats is not impinged. Already developed group housing inclusive of public (DDA and others), co-operative housing may be redeveloped on the basis of prescribed norms and
regulations by formulating co-operative societies or self-managing communities. The funds for redevelopment should be contributed by the residents.
B. Employer Housing
In Delhi after Independence, substantial areas were developed at low density and have potential for densification. These are mainly government and cantonment areas. In order to optimally utilise these prime lands there is need of intensive development. On a conservative estimate the present housing stock can be increased to more than double. Infrastructure enhancement and provision for additional housing can be financed from the funds generated through cross-subsidisation between commercial and residential use for EWS and LIG categories.
C. Bungalow Area
Lutyens’ Bungalow Zone comprises of large size plots and has a very pleasant green environment. The essential character of wide avenues, large plots, extensive landscape and low rise development, has a heritage value which has to be conserved. Mixed use, high intensity development along MRTS corridor and de-densification of trees / reduction of green cover is not permitted at all. The strategy for development in this zone will be as per the approved plans and the LBZ guidelines, as may be issued by the Government of India from time to time.
Civil Lines also has Bungalow Area of which the basic character has to be maintained.
1[D. Low Density Residential Area
The majority of Farm Houses in the urban extension areas are located on lands where ground water has already been severely depleted or close to such depletion. Further, intensification of residential density and heavy additional load on civic infrastructure such as water supply, Drainage, Sewerage, Parking etc. is highly undesirable in such areas from environmental considerations. Therefore, villages containing existing farm houses clusters are notified as “Low Density Residential Area” (list of village at Annexure- 4.0 (I). Low Density Residential Plots are also allowed in the village falling in Green belt (list of villages in Green Belt at Annexure-4.0 (II).]
1Added vide S.O. 1744 (E) dated 18-06-2013
A. UC Regeneration Scheme
(i) UC Regeneration Scheme shall be prepared by a Developer Entity (DE) or constituent land owners or RWAs, coming together as a DE, through a legally enforceable agreement.
(ii) The DE shall get the Layout and Services Plan prepared in consultation with the concerned authority for approval.
(iii) The approval shall comprise of the following two stages: a) DE shall obtain the approval of Layout Plan for UC Regeneration Scheme for entire or part UC
b) Individual approvals/sanctions for building plans as per UBBL provisions.
(iv) Direct access to the site should be from minimum 12m RoW (at least along 10% of the perimeter of the UC Regeneration Scheme or 25 m, whichever is higher).
(v) In case such access is not available, a road of 12m RoW may be provided on at least one side of the proposed layout plan and land required for the said road shall be shared on prorata basis. Such road must be connected to an existing road of minimum 12m RoW.
(vi) Amalgamation and reconstitution of plots shall be permitted for preparing and implementing UC Regeneration Schemes as follows:
a)
Level 1:
2,000sqm - up to 3,000 sq.m.
b)
Level 2:
More than 3,000 - up to5,000 sq.m.
c)
Level 3:
More than 5,000 - up to10,000 sq.m.
d)
Level 4:
More than 10,000 sq.m
(vii) All UC Regeneration Schemes shall provide setbacks as per Para 4.2.2.3 A sub para (xviii). These setbacks shall be utilised for widening or development of roads to fulfill the access conditions for neighbouring UCs/part UCs to come forward with UC Regeneration Schemes.
(viii) UC Regeneration Schemes shall maintain regular shape and boundary to the extent possible.
(ix) In case of UC Regeneration Scheme of part UC, the identified area under Layout Plan should be surrounded by physical features such as roads, drains etc. The proposal should ensure that connectivity, including basic services, are available and network continuity is maintained in the adjoining UC.
(x) Two or more adjoining UCs/ part UCs may be brought under a single UC Regeneration Scheme.
(xi) UC Regeneration Schemes may also include contiguous additional area (not notified as UC) outside the boundary of the UC, if the land owners on both sides agree to plan in an integrated manner. This additional area shall not be more than 25% area of the identified unauthorized colony. The development control norms applicable (i.e. FAR & ground coverage) on this additional area shall be in consonance with its existing land use. Development Control norms of UC Regeneration scheme shall not be applicable on this additional area; however, setbacks for the scheme area as per para (xviii) shall be applicable.
(xii) Public areas such as roads, open spaces, drains, etc. may be included in Levels 3 and 4 schemes for integrated planning. The area under public facilities shall not be considered for computation of permissible FAR and ground coverage. Such areas may be reconfigured as part of the UC Regeneration Scheme provided:
a) The area provided for roads, streets, parks, drains etc. is equal or more than the area under such existing features within the scheme area.
b) Equivalent area of any Government land included in the scheme is retained and NOC is obtained from the concerned land owning agency.
c) Public areas like public parks and roads are handed over to the concerned public agency and kept open to public at all times.
(xiii) The land use of the Regeneration Schemes shall be ‘Residential’.
(xiv) Any requirement for maintaining affordable rental housing units shall be met as per specific policy/regulations adopted for Delhi under the national scheme for the same.
(xv) FAR for a UC Regeneration Scheme shall be calculated as follows:
a) Permissible FAR for each constituent plot shall be as per the table below:
Area of plot (sq.m.)
Permissible FAR*
Up to 175
350
175 up to 250
300
250 up to 750
250
750 up to 1500
225
1500 and above
200
*In case the computed built area for a plot is less than that permitted in a lower category plot, the maximum built area of the lower category shall be permitted.
b) Permissible Scheme level FAR [excluding Amenities FAR as per Para 4.2.2.3 A sub para (xvi)] shall be the sum of FARs of all constituent land parcels as per Para 4.2.2.3 A sub para (xv) a.
c) Up to 15% of this permissible Scheme level FAR may be utilised for creating privately owned local facilities, of which, only 5% can be utilised for commercial use.
(xvi) All Schemes shall be eligible for incentive Amenities FAR (over and above the permissible FAR) for creating additional PSP facilities as follows:
Level of UC Regenerati on Scheme
Available Amenitie s FAR
Regulating conditions for use of Amenities FAR
Level 1
20
Secondary schools and city-level facilities shall not be permitted.
Level 2
30
Level 3
40
All PSP uses permitted. Separate entry/exit and service cores shall be provided for city-level facilities.
Level 4
50
(xvii) Applicable charges:
a) No FAR charges shall apply to scheme level FAR up to 200.Additional FAR over and above 200 (excluding Amenities FAR) shall be charged as per rates prescribed by Government from time to time.
b) Any other applicable infrastructure charges shall be paid to the concerned service providing agencies.
(xviii) The following norms shall be applicable for various levels of UC Regeneration Schemes:
Parameter
Level1
Level2
Level 3
Level 4
Ground coverage
Up to50%
Up to50%
Up to40%
Up to 40%
Minimum setback as per edge condition*
2.0m - on each side with 12m RoW and above 3.0m - on each side with RoW above 7.5m-below 12m 4.5m - on each side with RoW above 3m-below 7.5m 6.0m - on each side with RoW up to 3m or with adjoining existing built-up
Public space**
10%as a single plot
10%as a single plot
10% as open space for public purpose including at least one plot of 500 sq.m.
10% as open space for public purpose including at least one plot of 1,000 sq.m.
Parking
1.0 ECS/100 sq. m. irrespective of use premises
Land for public PSP facilities*** (to be provided as separate plot and handed over to local body)
-
10%
*Setbacks shall be kept hindrance free at all times and be made available for road widening/construction as and when required.
**shall have access from minimum RoW of 9m and shall be transferred to the local body. Local body may utilize such public space for provision of parks, plazas or installation of utilities as per requirement.
***shall be provided as one consolidated land parcel with access from minimum RoW of 9m.Local body may utilize the land for provision of schools or multi-facility centres (including healthcare facilities, community halls, basti vikas kendras, police posts, child-care centres, early learning centres, smallscale non-polluting economic activities, community greenwaste recycling, material recovery centres, informal markets, etc.)
(xix) Minimum necessary level of services and community facilities are to be provided. The norms for social infrastructure based on reduced space standards shall be as follows:
Facility
Facilities built on separate plots
Facilities provided through vertical mixing
Minimum Plot Area (sq.m.)
FAR
Ground Coverag e (%)
Minimu m built up area (sq.m.)
Additional conditions
Primary School
800
120
30
960
Minimum Open space requirement to be met*
Sr. Secondary School
2000
150
35
3000
Minimum Open space requirement
to be met*
Any other local facility
500-1000 in the form of Multi-Facility Centres
120
30
600
Health facilities with a maximum of 50 bedded facility (@60 sq. m./bed)
*In case where no such playground is available due to the location of the school in an area where no suitable open space is available, the school shall make arrangement for a playground in a nearby area where students could be provided the facilities for games and sports
(xx) In Level 4 UC Regeneration Schemes, implementation may be permitted for smaller blocks of minimum 3,000 sq.m. area after approval of the overall scheme.
B. Regularisation of Existing Unauthorized Colonies
(i) UCs/ part UCs that fulfill the minimum conditions set out in Para 4.2.2.3 B sub para (ii) will have the option of getting their existing Layout Plans regularized. Thereafter, individual land owners may proceed for approval of revised building plan sanction for any regularization/ addition / alteration / new construction from the concerned local body subject to all statutory clearances w.r.t. relevant provisions of building bye laws, structural safety, fire safety etc.
(ii) Layout plans of existing UC /part UC may be submitted for regularisation indicating the following:
a) Direct access from minimum 12m RoW.
b) All plots are within30m distance of a 6m RoW road, excluding drains / open drains, for access of firetenders during emergencies, subject to NOC from the fire department.
c) Plots/ community lands that will be maintained as open evacuation spaces and spaces for shared facilities such as material recovery facilities, composting facilities, electric sub-stations, public/stack parking, etc., based on need assessment. It shall be ensured that all plots are within 500m distance of identified evacuation spaces.
d) Accessibility to primary health and education facilities
e) Approved Services improvement plan(s)as per clause (iv) below
(iii) In case of part UC, the identified area under layout plan should be surrounded by physical features such as roads, drains etc. The proposal should ensure that connectivity including basic services are available and network continuity is maintained in the adjoining UC.
(iv) Other general conditions for regularisation:
a) The RWA shall apply to the concerned agencies for provision/ improvement of services, including laying/ augmenting water supply lines, laying/ sewerage network, solid waste management, decluttering of overhead electric cables and necessary fire fighting infrastructure
b) Concerned agencies shall prepare and approve the plans for augmenting services and collect charges or fees as may be required.
c) The internal development shall be done by the DE or constituent land owners or RWA.
(v) The plot-level building plan sanctions shall be submitted to the concerned local body once the approval/ sanction of layout plan is granted.
a) Building plan sanctions may be sought for existing buildings or for reconstruction on individual/amalgamated plots or vacant plots, if any.
b) Building plan sanctions shall be given only to those buildings which are in conformity with the UBBL provisions.
c) Sanction of existing building shall only be provided if structural safety audit has been conducted through an authorized structural engineering firm as empaneled by DDA /local bodies/any other Government agency.
d) During the building plan sanction process, building owners shall mandatorily apply for individual metered water supply and power connections (if not already obtained). Septic tank facilities shall be installed or a sewerage connection shall be obtained and it shall be ensured that no sewage is disposed from the building into storm water drains.
(vi) The land use of all approved plots shall be ’Residential’. However, to ensure provision of local level facilities within such UCs, the following shall be permitted:
a) Plots measuring 100 sq.m. or more and with access from minimum 9m RoW road shall be permitted to utilize up to 100% of the residential FAR for providing social infrastructure.
b) Commercial component up to 5% of permissible FAR shall be permitted on plots with access from road having minimum 9m RoW, subject to NOC from fire department.
c) Reconstruction on individual/amalgamated plots shall be permitted for provision of PSP facilities as per applicable norms.]
4.2.3Housing for Urban Poor
The category of urban poor for purpose of the Plan would mainly comprise the inhabitants of squatter settlements and informal service providers. Such services could include domestic help, hawkers and vendors, low paid workers in the industrial, commercial and trade / business sectors, etc. These include both existing population and future migrants. In terms of housing requirements of the city, this continues to be the single biggest challenge and would require a mix of approaches and innovative solutions.
4.2.3.1 Rehabilitation / Relocation of Slum & JJ Clusters
In so far as the existing squatter settlements are concerned, the present three-fold strategy of relocation from areas required for public purpose, in-situ up-gradation at other sites to be selected on the basis of specific parameters and environmental up-gradation to basic minimum standards shall be allowed as an interim measure. Rest of the clusters, till they are covered by either of the first two components of the strategy, should be continued.
During the Plan period 1981-2001, sites and services approach based relocation was employed in which resettlement of squatter slums was done on 18 sqm and 12.5 sqm. plots (transit accommodation)allotted to eligible persons on licence basis. This has led to a number of aberrations and there are several aspects, due to which this approach needs to be progressively abandoned and substituted by an alternate approach. Broadly, speaking this alternate approach should have the following components:
(i) Resettlement, whether in the form of in-situ up-gradation or relocation, should be based mainly on built up accommodation of around 25 sq. m with common areas and
facilities, rather than on the model of horizontal plotted development.
(ii) The concept of land as a resource should be adopted to develop such accommodation with private sector participation and investment, to the extent possible.
(iii) Incentives by way of higher FAR, part commercial use of the land and, if necessary and feasible, Transfer of Development Rights should be provided.
(iv) A cooperative resettlement model with adequate safeguards may be adopted with tenure rights being provided through the institution of Co-operative Societies.
(v) The provision of accommodation should be based on cost with suitable arrangements for funding / financing, keeping in view the aspect of affordability and capacity to pay.
(vi) In cases of relocation, the sites should be identified with a view to develop relatively small clusters in a manner that they can be integrated with the overall planned development of the area, particularly keeping in view the availability of employment avenues in the vicinity. Very large resettlement sites could lead to a phenomenon of planned slums.
(vii) Suitable arrangement for temporary transit accommodation for families to be rehabilitated should be made. This may preferably be near or at the same site and the utilization of these may be synchronised with the phases of implementation of the scheme of in-situ up-gradation.
(viii) Community Based Organisations (CBOs) and Non-Governmental Organisations (NGOs) should be closely involved in the resettlement process.
4.2.3.2 Resettlement Colonies
Most of the resettlement colonies have been provided with essential services, but the immediate need is of individual services i.e. water, sewerage and electricity. To ensure healthy and better environment, the construction of houses needs to be based on approved / standard building plans.
Co-operative societies / private developers / govt. agencies may come forward for redevelopment based on the incentives as applicable for the Squatter Rehabilitation Scheme. Reconstruction of existing plotted development, group housing should be
encouraged as per the Redevelopment Guidelines given in para 4.2.3.4.
4.2.3.3 New Housing for Urban Poor
New housing should be in the form of one or two room units, which would be developed through public and private agencies and through Cooperative societies. As this category constitutes bulk of the housing stock that has to be catered at an affordable price to the lowest income bracket as housing for Economically Weaker Sections (EWS), this is often done by cross-subsidization.
For this purpose, adequate land would be earmarked for EWS housing. The developers of group housing shall ensure that minimum ¹ [15% of proposed FAR to be] constructed for Community-Service Personnel / EWS and lower income category. ² [Employer Housing of Central Government, State Government and other Government Agencies are not required to follow the requirement of FAR or Dwelling Units for Community Service Personnel / EWS and lower income category.] In old built up areas, this may be as redevelopment schemes or industrial housing, etc., whereas, in urban extensions, the acquisition and development cost of this land should be borne by rest of the project. Such reserved lands should be handed over to a designated agency for promoting housing for low income and weaker sections.
The pattern of EWS housing shall be such as to ensure optimal utilization of land in a sustainable manner. For that purpose, multi-storied housing will be the preferred option. Apart from mandatory provision for EWS housing in all group housing projects/ schemes, the primary responsibility for creating adequate stock of housing for urban poor shall be borne by public agencies.
4.2.3.4 Slum & JJ Redevelopment Regulations and Guidelines for Collective Community Rehabilitation / Relocation - In-situ Upgradation / Rehabilitation of Slum & JJ Clusters, Resettlement Colonies, ³[schemes for rehabilitation of project-affected persons# and Unsafe Buildings*#] ⁴[and EWS public housing schemes]
¹ Modified vide S.O. 1215 (E) dated 13-05-2013
² Added vide S.O. 1277(E) dated 19-05-2009
³ Added vide S.O. 2894(E) dated 23-09-2013 and modified vide S.O. 2895(E) dated 23-09-2013
⁴ Added vide S.O. 2895(E) dated 23-09-2013
The ¹[implementing agency / corporate body concerned] should work out schemes for collective community rehabilitation/relocation and explore the possibility of involving private sector/slum cooperatives. In existing resettlement colonies, redevelopment, regular servicing and maintenance, which are overdue, are to be based on the guidelines and incentives as applicable for the Slum& JJ Rehabilitation Scheme ¹[schemes for rehabilitation of project-affected persons# and for Unsafe Buildings*#] ²[and EWS public housing schemes.]
The following guidelines with site-specific relaxations may be adopted as required. Regular monitoring of executed schemes and revision of these guidelines at the time of preparation of new schemes is essential. Group housing norms shall be applicable with the following conditions:
(i) ¹ [Minimum plot size 2000 sqm (on a min. ROW of 9m).] ¹ [In case of Public Housing, the Technical Committee of DDA may relax minimum plot size by 10 %.]
ARHCs schemes aimed at creating vibrant, sustainable and inclusive affordable rental housing avenues for urban migrants and urban poor including street vendors, rickshaw pullers, other service providers, industrial workers, migrants labours for market/trade associations, educational/health institutions, hospitality sector, long-term tourists/visitors, students or any other persons of such category.
The Modalities with respect to ARHC shall be as per the Operational Guidelines for the Affordable Rental Housing Complexes as issued by Ministry of Housing and Urban Affairs, Govt. of India. Further, these shall also adhere to the approvals as granted by DDA.]
4.3Night Shelter
²[The provision of night shelters is envisaged to cater to the shelterless, which should be provided as per requirements and should be identified keeping in view major work centres. Special provisions should be made for the homeless, women and children including the differently-abled ³{persons}, orphans and old age persons.] ⁴[Further, to the development of night shelters by GNCTD/DUSIB/⁵{concerned municipal body}/ DDA as per MPD-2021, provisions for night shelter should also be made in existing buildings and in new proposed constructions within the Railway Terminals, Bus Terminals, Wholesale/Retail markets, Freight Complexes, Police Stations, etc. by the agencies concerned such as Railways, Health, Industry, DTC, Police, etc., wherever available, with suitable modifications into night shelters as well as by adopting innovative concepts such as integrated complex with commercial space on the ground floor and night shelters on the first floor.] In addition, multi-purpose use of the existing facility buildings may be allowed for night shelter purpose. Provision should also be made for converting existing buildings, wherever available, with suitable modifications into night shelters.³[Since land is a constraint, the endeavour should be to optimally utilize the land for creating multipurpose facilities in residential and PSP plots.]
On the basis of the 2001 Census of houseless population, at least 25 sites should be earmarked in Delhi for night shelters. In order to make the provision of this facility financially sustainable for the local body, innovative concepts such as integrated complex with commercial space on the ground floor and night shelter on the first floor should be explored. The guidelines and incentive package should be designed
¹ Added vide S.O.3610(E) dated 01-08-2022
² Modified vide S.O. 2894(E) dated 23-09-2013
³ Added vide S.O.2895(E) dated 23-09-2013
⁴ Added vide S.O. 2894(E) dated 23-09-2013
⁵ Modified vide S.O. 3173 (E) dated 12-12-2014
by the concerned local agency in collaboration with the Govt of NCT-Delhi with a view to develop self-sustaining night shelters. One night shelter shall be provided for 1 lakh population. ³ [The actual location and need of night shelter is to be decided by the Local Authorities / GNCTD based on practical demand / assessment. However, in this regard for the geographical distribution of Night Shelters a minimum of at least one Night Shelter per administrative unit such as the Revenue Sub-Division or jurisdiction of Police Station may also be taken as criteria for planning purposes.]
2[4.2.2.3 Development Control Norms for Unauthorised Colonies:
These Development Control Norms shall be applicable to Unauthorized Colonies (UCs) covered under ‘National Capital Territory of Delhi (Recognition of Property Rights of Residents in Unauthorized Colonies)’ Regulations, 2019 notified on 29.10.2019.
The norms have been formulated based on the following:
(i) A large number of residents live in rental accommodation in the UCs, therefore the norms facilitate continued availability of affordable rental housing.
1 Deleted vide S.O. 1014 (E) dated 08-03-2022
2 Added vide S.O. 1014 (E) dated 08-03-2022
(ii) Provision of differentiated norms to facilitate adequate infrastructure and services in these areas and improve the quality of built environment.
(iii) Two alternative to undertake upgradation and improvement of the existing physical and socio-economic conditions in Eligible UCs/part UCs:
a) UC Regeneration Scheme- by incentivizing, amalgamation of plots and ensuring participation of the inhabitants as defined in Para 4.2.2.3A.
b) Regularization of existing colonies - that meet certain minimum planning requirements as defined in Para 4.2.2.3B.
4.4Development Controls for Residential Use Zone
In the residential use zone there are two sub-zones, RD - Residential Area (including villages within Laldora located in any use zone) and RF - Foreign Mission. Permission of use premises in sub-use zone RD shall be as per permissibility given in the respective chapters.
4.4.1 Permission of Use Premises Inthe Sub Use Zone - Foreign Mission (RF)
Use premises in the Foreign Mission sub use zone as part of the approved layout plan.
i. Foreign Mission
iii. Guest House
ii. Housing (for the Mission Employees)
iv. Local Shopping
v. Bank
vi. Recreational Club
vii. Health Centre- Hospital,
¹ [/Tertiary health care centre,]
Dispensary
viii. Integrated Residential School
ix. Cultural and Information Centre x. Police Post and Fire Station
xi. Post and Telegraph office
4.4.2$^{2}$ [a] Sub-division of Residential Zone (RD) Into Use Premises
The sub-division of residential use zone into use premises and subsequent approval of the layout plans shall be governed by the following norms:
The residential area can have both the plotted and group housing. In case of group and cluster court housing the minimum plot size shall be 3000 sqm. (2000 sqm for slum re-housing plot with differential infrastructure norms).
The provision of requisite social infrastructure shall be governed by the norms for residential neighbourhood of 10,000 population. In any
¹ Added vide S.O. 2893 (E) dated 23-09-2013
² Added vide S.O. 2895(E) dated 23-09-2013
residential sub division plan the minimum area reserved for social infrastructure shall be about 7 sqm per person.
2[4.4.2 B Use Premises for Residential Use Zone at Community Level and Above
Following Use Premises are to be provided/ permitted while preparing plans for Residential use zone at Community level and above:
i. Family Welfare Centre/ Pediatric Centre/Geriatric Centre/ Diagnostic Center
ii. Maternity Home
iii. Nursing Home/Polyclinic
iv. Dispensary for pet animals & birds
v. Police Post
vi. Community Recreational Club Socio-Cultural activities (auditorium, music, dance & drama centre/meditation & spiritual centre)
vii. Night Shelter
viii. Multipurpose Community hall (provision for marriages, small public gathering, function, eating joint and library, gym etc.)
ix. Electric sub-station 66 KV
x. Informal Bazaar
xi. Bus terminal
xii. Old age Home
xiii. Care Centre for Physically/Mentally challenged
xiv. Working women- men hostel
xv. Adult Education Centre
xvi. Orphanage/Children's centre
xvii. Sewage Pumping Station
xviii. Waste Water Treatment Facility
xix. Telephone Exchange
xx. Head Post Office & Administration Office
xxi. Municipal Office for water & sewerage
xxii. Parking space for parking of buses, LMVs, IPTs, etc.]
Table 4.2Infrastructure Requirement for layout at Residential Neighbourhood level
S.No.
Use Premises
No. of units
Unit Area (ha.)
Total land (ha.)
(a) (b) (c)
Education 1. Primary School 2. Senior Secondary School Shopping 3. Local Convenience shopping 4. Service Market 5. Informal Bazaar Other Community Facilities 6. Milk Booth
11111--
0.20-0.400.60-0.800.400.200.10
0.20-0.400.60-0.800.400.200.10
(a) (b) (c)
Education 1. Primary School 2. Senior Secondary School Shopping 3. Local Convenience shopping 4. Service Market 5. Informal Bazaar Other Community Facilities 6. Milk Booth
11111--
As per standard norms (in LSC)
As per standard norms (in LSC)
(d) (e) (f)
7. Banquet Hall 8. Religious Building 9. Housing Area Play ground 10. Neighbourhood Play area 11. Anganwari Recreational 12. Tot lot @ 0.50sq.m/person 13. Housing Area Park 14. Neighbourhood Park Utilities <sup>1</sup>[15. Area for segregation of waste and parking of utility vehicles.] 16. Underground water tank 17. Local level waste water treatment facility Transportation 18. Three wheeler and Taxi Stand
i. These facilities should preferably be located along internal roads with minimum 12 m ROW, unless specified. The development of the infrastructure should be monitored to assess the achievement in the relevant sectors.
ii. The open space at the neighbourhood level shall be provided @ 4.5 sq.m. per person Minimum size of tot lot at cluster level shall be 125 sq.m.
iii. The location of schools and Anganwaris should be made in the layout plan in cluster form to facilitate sharing of common parking space and playground.
iv. The planning of physical infrastructure shall be governed by the following norms:
a) Underground tank, sewerage-pumping system shall be provided as per requirement.
b) Rainwater harvesting shall be an integral part of the storm water drainage plan at the time of sanction of layout plan for all the plots.
c) The natural drainage pattern is not to be disturbed.
d) Dual pipe system of recycled water is recommended in new areas and redevelopment schemes.
e) Dhalaos including facility of segregation of biodegradable and recyclable solid waste should be provided.
f) Electric sub station shall be provided as per requirement.
1 Modified vide S.O. 2895(E) dated 23-09-2013
g) Pole mounted electric transformers for augmenting electric supply in already developed areas are recommended.
h) Non-conventional sources i.e. solar energy etc is recommended for public areas in all the establishments.
i) Provisions for decentralised sewerage treatment plant and segregated waste disposal shall be made where centralised system is not available. It shall be ensured that no untreated effluent is allowed to exit / spill out of the scheme area.
v. Planning of the residential neighbourhood regarding circulation system, including safety requirements shall be governed by the BIS standards or as per the norms of the concerned agencies.
vi. Suitable landscape plans for the neighbourhood shall be prepared, indicating in reasonable detail, the landscape development of the parks and roadside plantation etc.
vii. These are suggestive norms and lower norms could be adopted in built up areas / Special Areas, etc.
¹ [viii. Local Bodies to ensure removal of existing dhalaos in phases.]
Table 4.3Uses / Use Activities Permitted in Use Premises
Use Premises
Definition
Use/ Use Activities Permitted
* Residential Plot - Plotted Housing
A Premise for one or more than one dwelling unit and may have on it one main building block and one accessory block for garages and service personnel.
Residence, mixed use activity as per the Master Plan provisions/Registered RWA/ Society Office (50 sq.m.)
Residential Plot - Group Housing
A premise of size not less than 3000 sqm (2000 sqm. for slum/JJ rehabilitation 2[and 1670 sqm. i.e., 2000 sq.yds. for Redevelopment Areas / Rehabilitation area / Special Area / Village (Lal Dora / Firni) / Extended Lal Dora)] comprising of residential flats with basic amenities like parking, park, convenience shops, public utility etc.
Residential flat, mixed use activity as per the Master Plan provisions, retail shops of confectionery, grocery & general merchandise, books and stationery, Chemist, Barber, Laundry, Tailor, Vegetable Shop (On ground floor with an area up to 20 sqm. each). Community Room, Society office, Crèche / Day Care Centre, religious, Senior citizen recreation room, swimming pool.
¹ Added vide S.O. 2895(E) dated 23-09-2013
² Added vide S.O. 2894(E) dated 23-09-2013
Residential Flat
Residential accommodation for one family / household as part of group housing.
Residence, mixed use activity as per the Master Plan provisions.
Residential Premises Special Area
A residential premise in Special Area.
As per Special Area Regulations
Slum/rehabilitation
Residential accommodation provided- JJ as part of slum area resettlement/ rehabilitation
As per Slum Area Redevelopment Regulations
Foreign Mission
A Premise for the foreign mission.
Foreign Mission and related facilities / offices 1[]
Hostel
A premise in which residential accommodation in the form of rooms is provided, usually attached to an institution, with or without dining facility.
2[i) Hostel, Old Age Home, ii) Dining Area, Watch and Ward Residence (20 sqm), Service Shops of Barber, Laundry, Soft Drink and Snack Stall to be restricted up to 20% of floor area.]
A premise providing temporary accommodation for short durations.
1[i. Guest Rooms ii. Watch and Ward Residence (20 sqm), Service Shops of Barber, Laundry, Soft Drink and Snack Stall to be restricted up to 20% of floor area.]
Dharamshala or its equivalent
A premise providing temporary accommodation for short duration on no-profit basis.
1[i. Dharamshala, ii. Service Personnel Shops of Barber & Laundry, Soft Drink & Snack Stall to be restricted up to 20% of floor area.]
Rain Basera (Night Shelter)
A premise having the facility for providing the night accommodation to individuals without any charges or with token charges. It may run by local government or voluntary agencies. **
Night Shelter and related facilities.
1[Low Density
Existing farm houses in urban
Low Density Residential/Housing
¹ Deleted vide S.O. 225 (E) dated 02-02-2012
² Modified vide S.O. 2895(E) dated 23-09-2013
Residential Plot
extension regularised as per Policy and new Low Density Residential Plots to be permitted in the green belt and in Low Density Residential Area in the Urban Extension.
Plots, service Personnel Residence, watch and Ward residence, subject to further uses as per Para 4.4.3.G.]
2[Studio Apartment
A premise in which residential accommodation in the form of multipurpose rooms is provided for Individual/Family.
i) Suiteii) Caretaker's Office, Retail Shops, Dining and supporting facilities, as per the requirement to be restricted up to 10% of floor area.]
3[State Bhawan/ State Guest Houses
A Government owned premise for providing the short term/transit accommodation for the guests of State Government and Central Government.
Guest Room, Conference Halls, and related facilities, Government Offices/ Souvenir shops/ Restaurant, ATM and upto 15% of maximum FAR can be utilized for staff residential accommodation]
4[Affordable Rental Housing Complexes (ARHCs)
Affordable Rental Housing Complexes is a listed project with a mix of at least 40 Dwelling Units (DUs) and Dormitories along with basic civic infrastructure facilities such as water, sanitation, sewerage/ septage, road, electricity along with necessary social/commercial Infrastructure for urban migrant/poor of EWS/LIG categories.In an ARHC -a. all the residents in the ARHC shall occupy the house on the basis of License rights provided by the Owner of the Housing Complex to them,
Residential Flat, Convenience Shops, Community Room, Society Office, Anganwari, Milk Booth.]
¹ Modified vide S.O. 1199(E) dated 10-05-2013
² Added vide S.O. 2895(E) dated 23-09-2013
³ Added vide S.O. 1208(E) dated 23-03-2016
⁴ Added vide S.O.3610(E) dated 01-08-2022
b. The Tenure of such Licenses shall not be less than three months and not more than three years, and c. The License deed should not be renewable beyond the maximum tenure of 3 years. Further, in an ARHC, it shall be the obligation of the owner of the Housing complex that - a. He does not charge any premium towards grant of license to any resident b. No Resident is allowed to continue residing in the house / complex beyond the maximum tenure of license by re-executing a license.
* Pre 1962 plotted double storied flats shall be treated as Residential Plots.
* Bed and Breakfast accommodation may be a permissible activity in residential plot/ flat, if registered under the Scheme notified by Ministry of Tourism, GoI/ GNCTD from time to time.
1[** As land is a constraint, the endeavour should be to optimally utilize the land for creating multipurpose facilities in residential and PSP plots.
Night shelter should also be made in existing buildings and in new proposed constructions within the Railway Terminals, Bus Terminals, Wholesale/Retail markets, Freight Complexes, Police Stations etc. by the agencies concerned such as Railways, Health, Industry, DTC, Police, etc., wherever available, with suitable modifications into night shelters as well as by adopting innovative concepts such as integrated complex with commercial space on the ground floor and night shelter on the first floor.]
Terms and Conditions:
i. The additional number of dwelling units would be subject to payment of levy for the augmentation of civic infrastructure.
1 Added vide S.O. 2690(E) dated 11-08-2016
2 Modified vide S.O. 2983(E) dated 26-11-2014
ii. The total coverage and FAR permissible in any plot in a category, shall not be less than that permissible and available to the largest plot in the next lower category.
iii. 1[Height: Maximum height of the building shall be 15m in plots without stilt parking and 17.5m in plots with stilt parking. Such residential building shall not be considered as high rise building. For purpose of fire and life safety requirements, clearance of Fire Department will be obtained by the individual plot owner.]
iv. Subdivision of plots is not permitted. However, if there are more than one buildings in one residential plot, the sum of the built up area and ground coverage of all such buildings, shall not exceed the built up area and ground coverage permissible in that plot.
v. The mezzanine floor, and service floor, if constructed, shall be counted in the FAR.
vi. Basement: Basement shall not be counted towards FAR if used for purposes permissible under Building byelaws namely household storage and parking. Basement area shall not extend beyond the coverage on the ground floor as per permissible and sanctioned built up area, but may extend to the area below the internal courtyard and shaft. Basement if used in terms of Chapter 15.0. Mixed Use regulations shall count towards FAR and shall be liable to payment of appropriate charges, if it exceeds the permissible FAR.
vii. Stilts: If the building is constructed with stilt area of non-habitable height (less than 2.4m), used for parking, such stilt area shall not be included in FAR but would be counted towards the height of the building.
viii. Parking: Parking space shall be provided for within the residential plot as follows:
a) 2 Equivalent Car Space (ECS) in plots of size 250-300 sq.m.
b) 1 ECS for every 100 sq.m. built up area, in plots exceeding 300 sq.m., provided that, if the permissible coverage and FAR is not achieved with the above-mentioned parking norms in a plot, the parking norms of the preceding category shall be allowed.
ix. Density: For the purpose of density calculations, the dwelling unit shall be considered to accommodate 4.5 persons and the servant quarter to accommodate 2.25 persons.
1 Modified vide S.O. 2894(E) dated 23-09-2013
x. The minimum setbacks shall be as given in the following table:
(ii) Maximum ¹ [900 DUs/ha] on residential component of the land.
(iii) The scheme should be designed in a composite manner with an overall maximum FAR of 400 on the residential component of the land ¹[(including facilities i.e., Facility for the level as indicated in Table.3.3 of Chapter 3 based on the population accommodated under the project/scheme)]
³ [The maximum FAR of 300 on the remunerative component of the land shall be applicable irrespective of the landuse.
Any use/ mix of uses shall be permitted as proposed by the developer entity within the overall FAR of 300, in the remunerative component as per MPD provisions.
In case the developer entity proposes mix of uses, the parking and other development control norms will be applicable on pro-rata basis, on the FAR utilized for the particular use.]
(iv) Mixed land use / commercial component ⁴ [(including all commercial activities as permitted under Table 5.1 of Chapter 5)] up to 10% of permissible FAR in the residential component of the land. ¹ [In addition ⁴ {to the above}, 10% of the permissible FAR ⁴ {may} be permitted for home based economic activities (i.e., Group-A Household Industries as given in Annexure I of Chapter 7) to the beneficiaries of the
¹ Modified vide S.O. 2894(E) dated 23-09-2013
² Added vide S.O. 2895 (E) dated 23-09-2013
³ Modified vide S.O. 4674(E) dated 23-12-2020
⁴ Added vide S.O. 475 (E) dated 28-01-2019
project/ scheme.] 1[All the commercial activities shall be permissible irrespective of the land use subject to all statutory clearances and shall in no case compromise with the basic community needs and infrastructure facilities required to be provided as per MPD-2021.]
(v) Specific situations may require clubbing of scattered squatters with JJ sites in the neighbourhood to work out an overall comprehensive scheme.
(vi) The minimum residential component of the land area for rehabilitation of squatters has to be 60% and maximum area for remunerative use has to be 40%.
(vii) Area of dwelling unit for ²[EWS or rehabilitation shall be minimum 25 sqm and max. 40 sq. mt. and room sizes as per IS: 8888.]
(viii) 3[Common parking is to be provided for residential component at 0.5 ECS per 100 sqm of floor area which can be relaxed wherever required. Parking for remunerative purposes shall be as applicable for the relevant land use.]
(ix) No restriction on ground coverage (except set backs)
(x) Schemes shall be approved by concerned local body.
(xi) Schemes / designs should be compatible for ⁴ [differently-abled persons].
(xii) Norms for Social Infrastructure shall be as per 5[4.2.2.3 A. sub para (xix).]
(xiii) Norms for Physical Infrastructure shall be as per note (iv) of Table 4.2.
6 [Note:
* Unsafe buildings are to be determined by the statutory competent authority.
# In case of Schemes for Rehabilitation of Project-affected Persons & Unsafe Buildings, this will only be applicable for those schemes wherein these guidelines are adopted. Disposal and eligibility for allotment of the built flats/plots for Schemes for Rehabilitation of Project-affected Persons & Unsafe Buildings shall be governed by the separate policy already formulated or yet to be framed by the Housing & Lands Departments of DDA.]
³ [Slum & JJ Clusters on plots smaller than 2000 sqm be relocated instead of taking up in-situ rehabilitation as per the above-cited guidelines.]
¹ Added vide S.O. 475 (E) dated 28-01-2019
² Modified vide S.O. 2894(E) dated 23-09-2013
³ Added vide S.O. 2895 (E) dated 23-09-2013
⁴ Modified vide S.O. 3173 (E) dated 12-12-2014
⁵ Modified vide S.O. 1014 (E) dated 08-03-2022
⁶ Added vide S.O.2894(E) dated 23-09-2013
S. No.
Plot size (in sq.m.)
Minimum Setbacks (in metre)
Front
Rear
Side(1)
Side(2)
1
Below 100
0
0
0
0
2
Above 100 and upto 250
3
0
0
0
3
Above 250 and upto 500
3
3
3
0
4
Above 500 and upto 2000
6
3
3
3
5
Above 2000 and upto 10000
9
6
6
6
6
Above 10000
15
9
9
9
a) In case the permissible coverage is not achieved with the above-mentioned setbacks in a plot, the setbacks of the preceding category may be allowed.
b) In the case of construction in the future, a minimum 2m x 2m open courtyard shall be provided for in residential plots of area of 50 sqm. to 100 sqm.
xi. Number of servant quarters shall be provided as per approved layout plan and shall be constructed within the stipulated height. However, if the garage block space is merged with the main building, no separate servant quarter block or servant quarter, as part of main building shall be allowed. However, provision for a servant’s room as part of the dwelling unit within the permissible coverage FAR shall be allowed.
xii. Each servant quarter shall comprise of one habitable room of area not less than 11 sqm. floor area, exclusive of cooking verandah, bathroom and lavatory. The maximum size of servant quarter shall be 25 sqm. If larger in size, the servant’s quarter shall be counted in density as a full dwelling unit.
xiii. Plot owners / allottees seeking extra coverage, additional floor or part thereof, over and above Gazette Notification dated 23.07.98, as per above mentioned norms shall be charged betterment levy (or additional FAR charges) at the rates notified with the approval the Government from time to time. This is in addition to the levy payable on the additional FAR allowed vide notification dated 23.07.98 and over the FAR allowed vide notification dated 15.05.95.
xiv. Plot owners / allottees seeking regularization of construction in terms of the additional coverage allowed under this notification, shall have to pay a penalty and compounding charges notified
with the approval of the Government, over and above the betterment levy referred to in para (xiii) above.
xv. Plot owners / allottees seeking regularization of additional height in terms of this notification, will have to pay penalty and special compounding charges notified with the approval of the Government, in addition to betterment levy referred to in para (xiv).
xvi. The amount so collected be deposited in an escrow account by the local body concerned for incurring expenditure for developing parking sites, augmentation of amenities / infrastructure and environmental improvement programmes and a quarterly statement of the income and expenditure of the account shall be rendered by the local bodies to the Government.
xvii. 1[Enroachment on public land shall not be regularized and shall be removed before the local body grants sanction for regularization of additional construction or height except the following:-
a) Projections / chajjas / covered chajjas built up portion which existed before 7.2.2007 upto 1m above 3m height from the ground level shall be regularized for plot size upto 175 sqm on roads below 24m ROW in pre-1962 colonies (except for A & B category), in unplanned areas (including special area, village abadi and unauthorized regularized colonies) and resettlement colonies. The owners /occupiers shall have to obtain structural safety certificate and fire clearance within a reasonable period of time as notified by the Government. Such projections / built up portion thereon shall be counted in FAR and in case of excess FAR over and above permissible FAR, such FAR in excess shall be regularized subject to payment of appropriate charges as approved by the Government.
b) The local body concerned shall carry out a survey within a period of two months from the date of notification of all such projections eligible to be regularized and put such list in public domain for objections from the occupiers / owners and any person of the public against inclusion / exclusion of such projection in the list and the list thereafter will be finalized within a period of one month after considering such objections received in writing.]
1Substituted vide S.O. 2034(E) dated 12-08-2008
xviii. Every applicant seeking sanction or regularization of additional FAR and/ or height shall submit a certificate of structural safety obtained from a structural engineer. Where such certificate is not submitted or the Building is otherwise found to be structurally unsafe, formal notice shall be given to the owner by the local body concerned, to rectify the structural weakness within a reasonable stipulated period, falling which the building shall be declared unsafe by the local body concerned and shall be demolished by owner or the local body.
xix. Standard Plans: There are a number of standard building plans designed and approved by the Authority. Such plans shall continue to operate whenever applicable. Such plans shall be modified as per the applicable development controls.
xx. 1[Amalgamation of the two plots upto 64 sq.m maximum will be permitted with following conditions:
- Local Body will simultaneously modify the Layout Plan.
- The maximum Ground Coverage, setbacks, parking, Dwelling Units etc. shall be for the amalgamated plot size.
- The maximum FAR permissible shall not be less than the permissible in case of two individual plots.]
4.4.3Control for Building/ Buildings Within Residential Premises
A. Residential Plot - Plotted Housing
Maximum ground coverage, FAR, number of dwelling units for different size of residential plots shall be as per the following table:
1 Added vide S.O. 2894(E) dated 23-09-2013
Area of Plot (sq. m)
Max. Ground Coverage %
FAR
No. of DUs
<sup>1</sup>[1
Upto 50
90*
350
3]
2
Above 50 to 100
90*
350
4
3
Above 100 to 250
75**
300**
4
4
Above 250 to 750
75
225
6
5
<sup>2</sup>[Above 750 to 1000
50
200
9
6
Above 1000 to 1500
50
200
9
7
Above 1500 to 2250
50
200
12
8
Above 2250 to 3000
50
200
15
9
Above 3000 to 3750
50
200
18
10
Above 3750
50
200
21]
The local body concerned shall be competent to disregard variation of upto 2% in plot size, arising from conversion of area from sq. yard to sq.m. and to grant the norms applicable to the lower category of plot size in accordance to para (ii) below.
*100% ground coverage shall be eligible for regularization of construction, already existing as on 22.09.06 on payment of charges as notified.
Minimum size of the residential plot shall be 32 sqm. However, in case of Government sponsored economically weaker section schemes, size could be reduced further.
**100% ground coverage and 350 FAR shall be eligible for regularization of construction already existing as on 22.09.06 on payment of charges as per the notification, in respect plot size between 100 to 175sqm.
Permissible FAR and Dwelling Units shall not be less than MPD-2001 norms.